The Crossover Conveyance is a continuation of the Branch Sound and Motion study and begins with justification of Assets and Intellectual Properties in order to derive Convergence Metrics and an Intelligent Pathway to Remote design and delivery. See Also Portal Prosperity, an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems. In V2 we learn to thread the system and in v3 the relationship to Site Management in the portal delivery mechanic. We also explain what Religion is for as well as the Citadel of Zion.
Pre Engineered Building Manufacturers Hyderabad.pptx
Crossover Conveyance V3 Continuous Site Management
1. Crossover
Conveyance
THE KEY TO REMOTE CONSTRUCTION
MDIA
Contents
V1 Glass Path
V2 Threading the Needle
V3 Continuous Site Management
y = -56.90221x + 14,557,227,025,214.90000
R² = 0.06092
2. 2/7/2022
Brij Consulting, LLC, Jean Marshall
2
Hypothetical composition pointing
Glass Forms and Mix with Appliance
Components toward a remote portal site
Secant Driven
Process Formulation
Streaming
Warehouse
Secant
Projection
Remote Site
Map
Instance
Assimilation
Bridge
Correlation
Candle
Case Build
Position
Remote Build Schema
Working with a Concept Machine
2
Incumbent Load
3. Remoting a Conveyance Product
• The Entire Remote Conveyance of
Branching and Case Appliance Extension
is the subject of future papers
• IF we were to build a bridge remotely
every part of this process would be
necessary to simulate and produce the
entire bridge between its fenestrated
origins
2/7/2022 Brij Consulting, LLC, Jean Marshall
3
1455+
All kinds of
distance bearing
dilemmas are
contained in
remote building
Number Theory vs. Dimensional Theory
Production vs. Branching vs. Conveyance
From Branch: Sound and Image Construction
P
UV
Mix
Production
Watch
4. Branch Mobility and Conveyance
2/7/2022
Brij Consulting, LLC, Jean Marshall
4
1455+
P
Union Vectors = UV
Time and Motion is clock time
Generating beginning production
UV
P
G
W
Shown in Portal Prosperity
UVremdr.
Pre-Production Setup
Assets are justified to builds according to Product Load Equations
29.5-29.25= .025+.003 =.028 x 100 Theta = 2.8 Pre-Production
337.47 – 332.9 = 4.43 incremental ROI not achieved yet
As a brief look at conveyance
and branch mobility we extend
our production (P) to the gate
(G) and the wall (W) by
branching in other appliances
without additional case builds
by subscribing. No products
have been produced yet.
A
L
LLeveraged Outcomes =29.5
L
5. Streamline
Justification
The Streamline Justification is produced from
Portal Prosperity Analysis and enables
Justification of the Increase in Assets
2/7/2022
Brij Consulting, LLC, Jean Marshall
5
Based on Portal Prosperity Analysis
Gain Justification in Plan
Norm of 33.2 G+28.5 Load= 61.7 yield
Unit Price/Production Price = Yield
Pre-Production
A
The whole
technique for
branching will
cause us to
change the way
we report
Calculation not shown
6. Statistical-Graphical Relations
2/7/2022
Brij Consulting, LLC, Jean Marshall
6
P
Regression
Product
y = -56.90221x + 14,557,227,025,214.90000
R² = 0.06092
Wall Production
Regression
Product
Streamline Rate
Pre-Conversion
Post Rate
+.00002
Incumbent Load
Rate
2/2/22
-4.4 + 2.8 = -1.6 ROI
Relational Proof
7. Difference to equation due to branching
The refinement needed to branch is not available
through a graphing method, so a new approach is
required for conveyance mechanics; see next
2/7/2022
Brij Consulting, LLC, Jean Marshall
7
Difference
to the
equation
shown on
graph to
figures is
branch
Branch Related
Crossover Method Replaced
-4.4 + 2.8 = -1.6 ROI
8. How Does Convergence work?
• Convergence is so named because all things converge upon the same
delivery/work site at once
• It is necessary to unpack the requirement in a potentially useful order
and to arrange instances in order to accommodate the build
• A redounding order of converging conditions causes a build method
to emerge that suits the problems of the order itself
2/7/2022
Brij Consulting, LLC, Jean Marshall
8
x
Convergence:
1. Unpack
Requirements
2. Map build
3. Arrange
Instances
4. Develop
Method
5. Simulate and
Bridge
Convergence Methods
Appliance Branching
Staging
• Appliances
• Instances
Pre-Production Setup
Build Methods
Portal Application
9. What Appliances Do we Need?
• Prior to mobilizing the conveyance, we need to branch in the appliance
requirements for the job
• Conveyances can act like a platform for all types of equipment, and they can
open from a product media mode to dimensional process level and be deployed
to the work site
• Staging the job in pre-production includes requesting appliance delivery
2/7/2022
Brij Consulting, LLC, Jean Marshall
9 Pre-Production Setup
Glass Machines operate more
like software and opens
virtually to build according
to the Warehouse Convention
Established
List to follow in future paper
10. Instances
Supply for
Variable Rate
Demand
• Multiple assemblies are
managed simultaneously (1)
• Coinciding build requirements
are managed separately and
married (4,5)
• The Before and After scenarios
are studied in simulation and
configured together (2,3)
•
Brij Consulting, LLC, Jean Marshall 2/7/2022 10
Flash Metric shows Stage level of Completion
From Portal Prosperity
11. Glass Path
Define
Requirements
Set Production Goals
Appliance
Requirements
Instance
Arrangements
Convergence Timeline
2/7/2022
Brij Consulting, LLC, Jean Marshall
11
Storyboard
Media
Warehouse
Convey
Sample
Portal Req.
Workforce
Partners
Slide 17
12. Shown next…
2/7/2022
Brij Consulting, LLC, Jean Marshall
12 Contents
V1 Glass Path… concept delivered
V2 Threading the Needle… next
V3 Continuous Site Management…next next
Blocks
The Advancing
Footprint carries the
case load to the site
The mu sic of the
process is an Oration
The candle flickers in
abbreviated story
mode
Noel [1805–15; < French: Christmas < Latin nātālis]
In your days, have you commanded the morning
or assigned the dawn its place,
13that it might spread to the ends of the earth
and shake the wicked out of it?
14The earth takes shape like clay under a seal;
its hills stand out like the folds of a garment.
15Light is withheld from the wicked,
and their upraised arm is broken. Job 38
Religion has imposed Faith as a
substitute for the Science we did not
know, and even the science we do
The Citadel of Zion
The Tapestry of Light imposes
formidable works
Builds
13. V2 Threading the Needle
Brij Consulting, LLC, Jean Marshall 2/7/2022
13
• There are a number of appliances and
theories of building which we have
not given much attention to, and
necessary to the outcome of the portal
development.
• The Ark and the Lamb are related in
the Morning Star as the Light can be
threaded and seeded with various
propensities. This method uses Glass
Mix and Form differently than we
have considered but necessary to the
dialogue, and specifically threading
of instances.
Mix
Production
Watch
14. Thread Pattern and Tree Test Similar
Brij Consulting, LLC, Jean Marshall 2/7/2022
14
• Within the digital plait work we
sponsored a tree test which
organized patterns for testing
material response.
• Within this ark threading
model, the tree test is related to
the product tree itself
sponsoring glass response to
test, simulation and production
Produced in digital: Functional Glass along with Goodness of Fit Test
15. Candle Requirements (Builds)
• The New Build
Method is a further
refinement of the
methods which
preceded this.
• Its ability to change an
outcome based on
Light Secant Sound
and Motion projection
is greatly enhanced.
2/7/2022
Brij Consulting, LLC, Jean Marshall
15
Portal Application Appliance Branching Convergence Methods Build Methods
Number Encryptions Order Lumen
NEO Lumen = Candle Requirements
NEO-
Lumen
Number (Documents)
Encryptions (Paths)
Order (Orations)
Lumen (Methods)
16. The Light that changes the Times
2/7/2022
Brij Consulting, LLC, Jean Marshall
16
17. The Science that
Changes the Light
Brij Consulting, LLC, Jean Marshall
17
• The Science of the Morning Star is
dedicated to finding the perfect
engineering of Light and Crystal to
serve in the Ark of Our Father, who
made Heaven and Earth.
• The New Heaven and Earth, the New
Creation is lifted from the Biblical Page
and becomes the Kingdom that will
come
• All three types of confection are related:
Glass (Light and Crystal), Soul and
Sacrament in the New Creation
2/7/2022
Confection
The Sea of Glass and the
New Creation = Lamb
18. Green Solution
• A Green Energy Solution is present in the Light specified
Plait of Glass used cogently to sponsor green energy cells
for gaining acceleration of conveyances such as glass cars
and other conveyances which may operate either in a flat
or a dimensional mode to perform tasks, carriage or
prosper engineering requirements for Lift, Insertion, Force
or Torque, otherwise known as LIFT.
• The Advancing Footprint of the Conveyance is based on a
Green Solution for LIFE and sustainable carriage.
2/7/2022
Brij Consulting, LLC, Jean Marshall
18
19. V3 Site Maintenance
• The maintenance of the portal site arrangement until completion of the work
• The continuous upgrade and maintenance of the site afterwards
2/7/2022
Brij Consulting, LLC, Jean Marshall
19
Configured
I. pipes
II. frame
III. pillar
IV. bars and gates
y = -56.9022x + 14,557,227,025,214.9000
R² = 0.0609
20. Relational or Relative Address?
• Can we set E = mc^2 and derive a good answer? Actually, not without relational
facts derived from a set order point.
• If E = 11092.30, m = 8.49, then c must be? 29.903
2/7/2022
Brij Consulting, LLC, Jean Marshall
20
Our Lady of Notre Dame says you
can not rewrite the laws of the
universe by arbitrary points of
reference and deferring credible
scientific discovery for a pseudo and
unproven commodity.
Is that what we are doing? Technically we
would be if God were not leading us to
comprehend the Mystical Dialogue
behind His Science and His desire to give
people more effective works
Testing
is Key
I. Pipe
21. II. FRAME
Fifth Sunday in Ordinary Time
Lectionary: 75
Reading I
Is 6:1-2a, 3-8
In the year King Uzziah died,
I saw the Lord seated on a high and lofty throne,
with the train of his garment filling the temple.
Seraphim were stationed above.
They cried one to the other,
“Holy, holy, holy is the LORD of hosts!
All the earth is filled with his glory!”
At the sound of that cry, the frame of the door shook
and the house was filled with smoke.
2/7/2022
Brij Consulting, LLC, Jean Marshall
21
Sunday, Feb. 6th
T&M + Scale Thread Value
New Frame
Incremental Cost
The New Frame has 10 Branching
Appliances leased from vendor
partners; The Frame is leased from the
Glass System itself, GGIA sponsored.
=
Deducted 1000 u’s in
configuring investment change
1
22. III. Pillar
2/7/2022
Brij Consulting, LLC, Jean Marshall
22
y = 545,336,653,935.87400x + 2,441,921,916,321.34000
R² = 0.02275
y = 603,905,979,074.50200x + 2,605,960,500,004.93000
R² = 0.02334
-2000000000000000.00%
0.00%
2000000000000000.00%
4000000000000000.00%
6000000000000000.00%
8000000000000000.00%
10000000000000000.00%
0 5 10 15 20 25
Convergence and Streamline correspondence
Pre-Production Theoretical Remote (P(n^) Theoretical P-1 Inhouse
Theoretical P (n )Inhouse P(m) Interim Re-Model
Streamline Convergence Linear (Streamline)
Linear (Convergence)
Since we simulated these various
builds, we can learn to branch in
appliances (future paper.)
23. IV. Bars and Gates
• Using various graphical
arrangements for columns and
beams and both hindering and
creating trajectory is a nuance of
the ark build theory.
• By branching the various
scenarios, it is possible then to
create the MOMENT associated
with the process theory.
• Stopping and starting, locking and
unlocking, many different aspects
are contained in bars and gates.
2/7/2022
Brij Consulting, LLC, Jean Marshall
23
Convergence and Streamline
correspondence
Theoretical Remote (P(n^) Theoretical P-1 Inhouse
Theoretical P (n )Inhouse P(m) Interim
Re-Model Streamline
Convergence Linear (Convergence)
24. Apportioning the Convergence
• By determining the intercept of
the Convergent Production, we
were able to determine the
production price and the number
of appliances branched in. Since
Magi & Marcus do not own these
appliances, they owe a share price
back to the partnering vendors.
• The IP related to the service of the
branches they will configure and
own, FMV/1000
2/7/2022
Brij Consulting, LLC, Jean Marshall
24 #Appliances
2
2
Interim Price Change
705/687 = 1.03 + 4.06 = 5.09
2
IP
C T
#=10
25. New Walk
Brij Consulting, LLC, Jean Marshall
25
• The New Walk is added to the pre-
conditioned walk of the simulated
productions and is streamlined and
converged supplying a perfect branch
correlation.
2/7/2022
49
509
247
1
2
3
7WS-C
Interim Price Change + Transition
705/687 = 1.03 + 4.06 = 5.09 = Interior Margin
2
IP
C T
26. Key Conversion
2/7/2022
Brij Consulting, LLC, Jean Marshall
26
No duplicates
3
1
Interim Price Change + Transition
705/687 = 1.03 + 4.06 = 5.09 = Interior Margin
2
T
T
IP
C
T
27. What happens next?
• Once the build is completely assembled with its appliances and streaming
service, it is worked by its various remote partners (process stakeholders) with
an eye to instances and moments which can converge on time to the project.
• This ballet is choreographed to Mu Sic that takes time and talent to learn.
• The Glass that forms in the Portal Site build concept overall has a pattern to its
maintenance and its upgrade. This and all other topics lend time and attention
to future papers, simulation arrangements and workshops.
2/7/2022
Brij Consulting, LLC, Jean Marshall
27 Coming
up…
28. How is it Encrypted?
• Encryption Keys and Step-thru of
calculations can be accomplished
through a fingerprint designed for
the specific process by changing the
foot and looking for a specific
interior metric along the curve that
fits the pattern. Keys must not be
duplicated in a process warehouse.
There may be certain exceptions to
this, however.
2/7/2022
Brij Consulting, LLC, Jean Marshall
28
y = 0.01001x2 - 579,513,237,010.81800x +
2,690,703,128,754.96000
R² = 0.37679
0.00E+00
5.00E+11
1.00E+12
1.50E+12
2.00E+12
2.50E+12
3.00E+12
0 1 2 3 4 5
7WW Walk
P(n)
P1
remote P(n)^
Pre production
Re-Model
Interim P(m)
Poly. (remote P(n)^)
This is the beginning of the task of writing Mu Sic
Note: We used the Read Method
to Manually Step-thru Process
And made keys for temporary use
Our Permanent keys were gathered from
process statements as is blue arrow for 7WWrite (Slide 21)
If necessary, a random
key method can be
used to cover the key
relational process. In
glass because of the
layers and menu
arrangement, it’s not
normally necessary
From Portal Prosperity
No duplicates
47
507
245
29. BRIJ CONSULTING, LLC, JEAN MARSHALL 29
Extending the Branch
105.71-100= 5.7
-105.71+150=45.2
4
3
2
1
2
4
50.9 = Interior Margin
2 4
+1000 = Mega Margin
2/7/2022
+10509
The beginning of
live instances is
mobile
conveyance and
remote
branching
As shown in Branch:
Sound and Image Construction
30. 2/7/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL
30
IP Growth
IP Growth is related
to the capability of the
glass machine itself
31. Remote 2/7/2022
Brij Consulting, LLC, Jean Marshall
https://www.slideshare.net/Marshallja/presentations
See next slides for list of the preceding Ark and Digital Plait content
1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property
reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature, threading the
advancing fingerprint with a glass path and integral site management, moving into
SIMULATIONS in Real Time
New Schema
This Paper Click to Open Click to Open Click to Open
Ark Mode
Look for this NEXT>>>
32. Ark Model Brij Consulting, LLC, Jean Marshall
V3 and V4
holds all
contents
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media
to write and produce in Ark Science and Dimensional Systems, Introduction of the
Story “Eru finds a Golden Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and
Remix specifications, beginning crosswalk and encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of
Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark
encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility
for building and research in remote Ark Science. Start of Tooling and Secant Design
for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write
Process
8. Bridging the Instance: Now operating multiple instances must bridge the operations,
learn about deciduous models and deliberate the outcome of operations for the 2022
Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products
themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land
Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of
seamless integration of methods and modes of operation. See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus
and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch capability of new
applications, appliances and mode[ls] of operations
https://www.slideshare.net/Marshallja/presentations
See next slide for list of the preceding Digital Plait content
Remote
Access
Streamlined
Rates
33. Brij Consulting, LLC, Jean Marshall
33
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants
and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion
characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional
Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional
systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic product
ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a
Digital Portal Production System using appliances gained through Plait Object and Gate
driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of
product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated
by sound it creates a means by sound to cascade light for safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck
(Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new
(Dialogue paper)
^Mu Sic, see The Corner of Mu Sic
To Change
Digital Plait Papers with Content
Description (Reverse Order)
34. What is Required
2/7/2022
Brij Consulting, LLC, Jean Marshall 34
• Architectural Plans, Digital Glass Model
• The Glass Modeling System, Ark Mode
• 3- Dimensional Media Model
• Storyboards to describe…
• Process Plan
• Integral Materials
• Organization of Instances of
Building (Preludes)
• Secant Construction and Engineering
• Building Organization for Ark Mode
Methods, Tools and Utilities
The Design of the
whole process will
be an extended
period of listening
about this subject.
But we will spend
our time in our next
paper organizing
Secant Processes
Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org)