This document outlines plans for a new science center made of glass that will study materials. It discusses defining the product as cement for the foundation, requiring changes due to ground movement. It describes defining the method by identifying parts and drawings that will change. It discusses creating a story around the change order for cement being the first applied technology. It also covers plans for remote tooling and synthesis of materials.
MAHA Global and IPR: Do Actions Speak Louder Than Words?
The Glass House V1 Building with Synthesis
1. The Glass
House
ARK MODE BUILDING
MDIA
Contents
V1 Building with Synthesis
V2 Matrix Trees Expansion
V3 The Economics of Glass in Ark Mode
V1 Building with Synthesis: When
Glass must carry the load,
insertion, force, torque or equity
requirement of populations, new
building methods are required.
2. Secant Wheel Construction
Product
Media
• Product
Modeling and
Interactive 3D
Media
Product
Confection
• Light
Fabrication
Product
Synthesis
• Heavy
Construction
The Nations shall assemble before Him
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 2
3. Outline of the Project
I. Define the Product
II. Define the Method
III. Create the Story
IV. Define the Technology
V. Sponsor the Mix and Remix
VI. Obtain Certifications
VII. Deliver the Project
Note that the final building will have LIFE
Certification on it for Equity Appraisal
Next Year
Define
the Load
y = -0.05336x + 2,599,363,695.91464
R² = 0.12306
Finger print w/ z path
98.5% c.f.
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 3
4. 1. Define
the Product
(Change
Order)
(The change order C-01 for new cement for the foundation is the portion of the product we
want to outline here since the project itself is multifaceted and worked on by many
people.)
Wall Expansion Joints: change notes
Wall expansion joints should be designed to accommodate the anticipated structural
movement. Consult with a structural engineer regarding possible movement. For
treatment of leaks providing amplified external drainage media similar to that
required on the exterior wall is highly effective. Special emphasis is placed on
evacuating the water at the wall base to avoid water build-up in the back fill or
drainage system.
1. The Consultant for the foundational treatment of the building recommended a
cement and anchor system due to the ground movement in the area and the
additional concern of flash flooding
2. Within the glass system we expect to find varying products due to conditions that
are prebuilt for this purpose, by other groups. Since the Nature of Glass is to plait,
we have a good reason to expect that the product demonstrated should be
adequate to do the job, and that it was produced with the same type of oversight on
it.
3. Changes in tooling and drawings were discussed in our paper: Builds and
Simulations
4. We need to decide on the process for synthesizing the building materials.
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 4
5. Specifications
D/N MM-ENG-M24-1
Because this is plait glass, bolt
insertion is like replication, and
works with remote drill head into
applied plait simultaneously across
length of it
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 5
6. II. Define the Method
A science center for materials research is planned and the engineering
firm of Magi & Marcus is responsible for developing the Plan. The story
develops with the decisions regarding the foundation and the changes
required for cement and anchoring impact the project. The drilling and
anchoring for higher density cement has impacted the tooling and the
anchoring system for the foundation.
We need to identify the parts, drawings and secants that will change and
supply substitutions, within our storyboard. But the method for the
cement synthesis is a major to do list, within our process, primarily due to
the extra formations needed in the rear of the building where the lab is
located. The Science Center is to be dedicated to the study of materials,
in terms of gradation and low impact analysis.
To Be equipped for
Remote Building
Research
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 6
7. Material
Plait
By devising the Plait, it also allows
for the prototyping process to
synthesize & Test the product
P/N MM-CEM-864130-1
Confection occurs
upon Replication
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL
7
8. III. Create the Story
Change Order is First Applied Tech
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 8
Due to the nature of glass itself, the
wall is plait to the column as a more
substantially configured union
Secants subject
to development
9. IV. Technology: Remote Tooling
The theory for the remote tooling
consists of pointing glass to a
specific area and configuring it to
run lengths on materials by
assembling secants to a specific
fingerprint assignment.
The glass concept allows the 1W
Digital Secant to confect the
product upon replication and to
maintain the glass model with
drawings. Ark Media eventually
will become remote building.
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 9
10. IV: Technology:
Synthesis
Synthesis is using a secant driven process to derive material properties
for a complex or heavy-duty material requirement. After it is Synthesized
it can be plait down into a media format and replicated. Because of the
dimensional construction of Ark Mode processes in Plait Glass the z-
strength of the glass can benefit the build out rapidly. Once it is well
understood the Ark Media model will provide for write capability to build
remotely. Small local operations with tooling are permissible. All
Materials must be tested and simulated for the job requirement.
The first instances of Synthesis will be done by the prototyping engineers
and then turned back over to the industry. After engineers are trained for
this process, it can be less of a centralized operation but still requiring
LIFT certification and finally the project must be LIFE certified. Some
aspects of this were discussed in our last paper: Builds and Simulations.
MM-CEM- 864130-1
1023.15yd³= 27625.05ft³
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 10
Technically there won’t be any
loss of the product, because
whatever is not consumed will be
used in testing
11. Remote Building
Plan
Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in
remote Ark Science. The remainder plait at the Gate
pays off their initial building outlay on the theory
that the demand for this type of building will be
greater than the original Scorecard Advantage,
accomplished in 1 z-period of the build, a gain on
the current manifold by an added level of burden.
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 11
12. The 1Wheel Fabrications and the
7Wheel Ark Mode Architectural
Build are Combined for Fair
Market Value All Builds
9/14/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 12
There is a loss of
carriage burden
due to non-
completion of
the work cycle
Pre-Production
13. V2 Matrix Expansion
The building of machines and equipment in Ark Mode requires a focus on the matrix configuration
of the build technique.
Also, with this expansion comes economic changes that impact the way business is configured
and operated. (Discussed in V3.)
9/14/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 13
Coming next…
Machines plus tooling
Technological change
Multiple Industries
Economic Impact Real Change
Redistribution of
Resource and
Opportunity (Wealth)
3D Television and Modeling, Light
Fabrication, Heavy Construction
8 Wheels plus nominal threading
4000 3.5 10
^ x = 40 T
14. What is Required
Architectural Plans, Digital Glass Model
The Glass Modeling System, Ark Mode
3- Dimensional Media Model
Storyboards to describe…
Process Plan
Integral Materials
Organization of Instances of
Building (Preludes)
Secant Construction and Engineering
Building Organization for Ark Mode
Methods, Tools and Utilities
The Design of the
whole process will
be an extended
period of listening
about this subject.
But we will spend
our time in our
next paper
organizing Secant
Processes
Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org)
14
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL
15. Our papers
15
This paper is THE GLASS HOUSE
V3 and V4
holds all
contents
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for
Media to write and produce in Ark Science and Dimensional Systems, Introduction
of the Story “Eru finds a Golden Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and
Remix specifications, beginning crosswalk and encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of
Secants to Build tooling
https://www.slideshare.net/Marshallja/presentations
See next slide for list of the preceding Digital
Plait content
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL
16. 16
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants
and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion
characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional
Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional
systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic product
ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a
Digital Portal Production System using appliances gained through Plait Object and Gate
driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of
product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated
by sound it creates a means by sound to cascade light for safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck
(Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new
(Dialogue paper)
^Mu Sic, requires update
To Change
Digital Plait Papers with Content Description
(Reverse Order)
9/13/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL