SlideShare una empresa de Scribd logo
1 de 19
STUDY ON ELECTRICITY
DISTRIBUTION, SUBSTATION
OPERATION AND MAINTENANCE OF
DESCO
Presented by:
Md. Nasibul Haque
ID#2012100500008
Md. Ashikur Rahman
ID#2012100500005
Md. Rashidul Islam
ID#2012100500016
Supervised by:
Murad Kabir Nipun
Senior Lecturer & Coordinator
Department of Electrical &
Electronic Engineering (EEE)
Southeast University
 Introduction
 DESCO Overview
 Structure of Bangladesh Power sector
 Supply chain management
 Single line Diagram Generation to consumer
 General equipment of substation
 Operation & maintenance of Substation
 Line maintenance
 Metering system
Electricity is a vital element of any country. Without
proper electricity No country cannot achieve Economic
prosperity. Only 62% of Bangladeshi population has
access to electricity. To increase the GDP growth rate
available and reasonably priced electricity is
prerequisite.
 The main reason for the current power crisis in our
country are-
◦ The lack of generation capacity
◦ Poor operational and performance
◦ The power sector has been with distribution system.
 Customer satisfaction provides their
dependable power service.
 Concern about future requirement of energy.
 Reduce system loss to a reasonable level.
 Run it commercially to a variable way.
 Installing new line, sub-station etc. in the
newly developed area and existing area to
fulfill the ever rising demand of electricity.
 Power Transformer
 Switchgear/Circuit Breaker
 CT and PT
 Auxiliary Transformer
 Control Relay Panel
 Bus bar
 Isolator
 Lightening Arrester
 Remote Terminal Unit For DAS
 AC & DC Distribution Panels
At the Substation maintenance period the first step is cut off
greed connection from the maintenance Transformer and
ground it. 2nd step consumer feeder change one Transformer
line to another, Then breaker line cut off from the Bus Bar.
 Operation & Maintenance of Transformer
 Test oil sample of transformer main tank & tap changer tank
 Operation of Tap changer
 Operation of cooling control system
 Operation & Maintenance of Breakers
 Check SF6 gas pressure
 Check for oil leaks
 Operation & Maintenance of Insulator
 Clean and lubricate auxiliary switch contacts
 Operation & Maintenance of Lightening Arrester
 Deformation of corona or stress rings
 Operation & Maintenance of Bus Bar
 Checking of insulation resistance
 2kw-8kw Single phase LT
 8kw-49kw 3phase connection
 <50kw HT connection
And Solar power Supply must required to get new
connection for HT.
DESCO take a project to prepaid Metering system which
like as mobile sim . After research a cash card
installed to the meter then connection Automatic run.
When balance is over it give a signal to research it .
 Purbachol new town project : 500mw by the
year 2020.
 Uttara 3rd phase residential area-230mw by
the year2020
 In future DESCO can extend their area at
Gazipur.
 Day by day increasing the demand of power because of
industrial and life style is developing. So to cover up the
demand establishing the new power plant i.e. Ruppur
Nuclear Power plant. So new distribution company may be
established or present distribution company may be
extended their service. I wish to include myself this type
generation or distribution sector .By managing its
operation in efficient and effective manner providing better
consumer service, desco has become the role model for all
the electricity service providers of Bangladesh.
 I praise the almighty for providing us the opportunity and granting
me the capability to complete Industrial training successfully.
 I would like to express my deepest sense of Gratitude to my
supervisor Murad Kabir Nipun , M.Sc. Engineer, Senior Lecturer &
Coordinator Department of Electrical & Electronic Engineering
(EEE) Southeast University .
 I would like to thanks DESCO Family who are given their valuable
time, sharing knowledge, guidance, suggestions me.
Electrical and Electronics Engineering (EEE Internship presentation

Más contenido relacionado

La actualidad más candente

Transformer manufacturing and Internship Report
Transformer manufacturing and Internship ReportTransformer manufacturing and Internship Report
Transformer manufacturing and Internship ReportImtiaz Kasuri
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION Ravi Phadtare
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
132 k v-substation-training-for-students
132 k v-substation-training-for-students132 k v-substation-training-for-students
132 k v-substation-training-for-studentsSanjay Kumar Sharma
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationshivashankar307
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad ADARSH KUMAR
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunsurendra rawat
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
final year project report
final year project reportfinal year project report
final year project reportAnuj Kumar
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report19saurabh89
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presentionRazu Khan
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 

La actualidad más candente (20)

Transformer manufacturing and Internship Report
Transformer manufacturing and Internship ReportTransformer manufacturing and Internship Report
Transformer manufacturing and Internship Report
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
substation internship report
substation internship report substation internship report
substation internship report
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
132 k v-substation-training-for-students
132 k v-substation-training-for-students132 k v-substation-training-for-students
132 k v-substation-training-for-students
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
final year project report
final year project reportfinal year project report
final year project report
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 

Destacado

Introductory Presentation on the AAiT S.ECE Department
Introductory Presentation on the AAiT S.ECE Department Introductory Presentation on the AAiT S.ECE Department
Introductory Presentation on the AAiT S.ECE Department ProjectENhANCE
 
Electrical and Electronics Engineering (EEE) Research Methodology Presentation
Electrical and Electronics Engineering (EEE) Research Methodology PresentationElectrical and Electronics Engineering (EEE) Research Methodology Presentation
Electrical and Electronics Engineering (EEE) Research Methodology PresentationEngr. Md. Ashikur Rahman Ashik
 
Power distribution, operation and maintenance of comilla palli bidyut samity 1
Power distribution, operation and maintenance of comilla palli bidyut samity 1Power distribution, operation and maintenance of comilla palli bidyut samity 1
Power distribution, operation and maintenance of comilla palli bidyut samity 1Kawsar Ahmed
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
A brief introduction to Electrical engineering
A brief introduction to Electrical engineeringA brief introduction to Electrical engineering
A brief introduction to Electrical engineeringSamundra Gurung
 
Electrical Engineering Presentation
Electrical Engineering PresentationElectrical Engineering Presentation
Electrical Engineering Presentationjoe2002
 
Up gradation of TTTC-Dhaka course-curriculum
Up gradation of TTTC-Dhaka course-curriculumUp gradation of TTTC-Dhaka course-curriculum
Up gradation of TTTC-Dhaka course-curriculumJahangir Alam
 
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5,
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5, MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5,
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5, Yu Hao Huang
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...DEGIMA SA
 
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...IAEME Publication
 
Department Day Presentation, Electrical Engineering Department
Department Day Presentation, Electrical Engineering DepartmentDepartment Day Presentation, Electrical Engineering Department
Department Day Presentation, Electrical Engineering DepartmentSaptarshi
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...Harsh Shah
 

Destacado (20)

Thermoelectricity
ThermoelectricityThermoelectricity
Thermoelectricity
 
Introductory Presentation on the AAiT S.ECE Department
Introductory Presentation on the AAiT S.ECE Department Introductory Presentation on the AAiT S.ECE Department
Introductory Presentation on the AAiT S.ECE Department
 
Electrical and Electronics Engineering (EEE) Research Methodology Presentation
Electrical and Electronics Engineering (EEE) Research Methodology PresentationElectrical and Electronics Engineering (EEE) Research Methodology Presentation
Electrical and Electronics Engineering (EEE) Research Methodology Presentation
 
Power distribution, operation and maintenance of comilla palli bidyut samity 1
Power distribution, operation and maintenance of comilla palli bidyut samity 1Power distribution, operation and maintenance of comilla palli bidyut samity 1
Power distribution, operation and maintenance of comilla palli bidyut samity 1
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
A brief introduction to Electrical engineering
A brief introduction to Electrical engineeringA brief introduction to Electrical engineering
A brief introduction to Electrical engineering
 
Electrical Engineering Presentation
Electrical Engineering PresentationElectrical Engineering Presentation
Electrical Engineering Presentation
 
Electrical Engineering
Electrical EngineeringElectrical Engineering
Electrical Engineering
 
SAIDUL-EEE(CV)
SAIDUL-EEE(CV)SAIDUL-EEE(CV)
SAIDUL-EEE(CV)
 
Up gradation of TTTC-Dhaka course-curriculum
Up gradation of TTTC-Dhaka course-curriculumUp gradation of TTTC-Dhaka course-curriculum
Up gradation of TTTC-Dhaka course-curriculum
 
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5,
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5, MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5,
MTS More than Stories, 2011 Asian Smart Living Summer School, Team 5,
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...
OSCILLATORY FLOW OF MHD POLAR FLUID WITH HEAT AND MASS TRANSFER PAST A VERTIC...
 
Manish ranjan
Manish ranjanManish ranjan
Manish ranjan
 
Zobii22
Zobii22Zobii22
Zobii22
 
Department Day Presentation, Electrical Engineering Department
Department Day Presentation, Electrical Engineering DepartmentDepartment Day Presentation, Electrical Engineering Department
Department Day Presentation, Electrical Engineering Department
 
ME 485
ME 485ME 485
ME 485
 
SiddheshCorrosion
SiddheshCorrosionSiddheshCorrosion
SiddheshCorrosion
 
Chicoco Radio
Chicoco RadioChicoco Radio
Chicoco Radio
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...
 

Similar a Electrical and Electronics Engineering (EEE Internship presentation

220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docxAkshit Jain
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report9951081577
 
Wireless Charged Inverter
Wireless Charged InverterWireless Charged Inverter
Wireless Charged InverterIRJET Journal
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATIONPower System Operation
 
SIMULATION OF SMART MICROGRID
SIMULATION OF SMART MICROGRIDSIMULATION OF SMART MICROGRID
SIMULATION OF SMART MICROGRIDIRJET Journal
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
IRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET Journal
 
IRJET- Multi-Level Inverter for Solar On-Grid System Design
IRJET- Multi-Level Inverter for Solar On-Grid System DesignIRJET- Multi-Level Inverter for Solar On-Grid System Design
IRJET- Multi-Level Inverter for Solar On-Grid System DesignIRJET Journal
 
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...rameshwar meena
 
Power Quality Improvement with Multilevel Inverter Based IPQC for Microgrid
Power Quality Improvement with Multilevel Inverter Based IPQC for MicrogridPower Quality Improvement with Multilevel Inverter Based IPQC for Microgrid
Power Quality Improvement with Multilevel Inverter Based IPQC for MicrogridIJMTST Journal
 
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTOR
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTORSWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTOR
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTORSafdar Ali
 
Design, simulation and hardware implementation of
Design, simulation and hardware implementation ofDesign, simulation and hardware implementation of
Design, simulation and hardware implementation ofeSAT Publishing House
 
400 kV GSS RRVPNL , Surpura jodhpur
400 kV GSS RRVPNL , Surpura jodhpur400 kV GSS RRVPNL , Surpura jodhpur
400 kV GSS RRVPNL , Surpura jodhpurMANISH BISHNOI
 

Similar a Electrical and Electronics Engineering (EEE Internship presentation (20)

220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
220 kv Sub- Station By Akshit Jain Majhola Moradabad .docx
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
 
A bidirectional resonant converter based on wide input range and high efficie...
A bidirectional resonant converter based on wide input range and high efficie...A bidirectional resonant converter based on wide input range and high efficie...
A bidirectional resonant converter based on wide input range and high efficie...
 
Wireless Charged Inverter
Wireless Charged InverterWireless Charged Inverter
Wireless Charged Inverter
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
SIMULATION OF SMART MICROGRID
SIMULATION OF SMART MICROGRIDSIMULATION OF SMART MICROGRID
SIMULATION OF SMART MICROGRID
 
Report
ReportReport
Report
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
IRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – Microgrid
 
Cv
CvCv
Cv
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
IRJET- Multi-Level Inverter for Solar On-Grid System Design
IRJET- Multi-Level Inverter for Solar On-Grid System DesignIRJET- Multi-Level Inverter for Solar On-Grid System Design
IRJET- Multi-Level Inverter for Solar On-Grid System Design
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
 
Power Quality Improvement with Multilevel Inverter Based IPQC for Microgrid
Power Quality Improvement with Multilevel Inverter Based IPQC for MicrogridPower Quality Improvement with Multilevel Inverter Based IPQC for Microgrid
Power Quality Improvement with Multilevel Inverter Based IPQC for Microgrid
 
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTOR
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTORSWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTOR
SWITCHGEAR AND PROTECTION, STARTING OF 3 PHASE INDUCTION MOTOR
 
Design, simulation and hardware implementation of
Design, simulation and hardware implementation ofDesign, simulation and hardware implementation of
Design, simulation and hardware implementation of
 
400 kV GSS RRVPNL , Surpura jodhpur
400 kV GSS RRVPNL , Surpura jodhpur400 kV GSS RRVPNL , Surpura jodhpur
400 kV GSS RRVPNL , Surpura jodhpur
 

Último

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Último (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Electrical and Electronics Engineering (EEE Internship presentation

  • 1.
  • 2.
  • 3.
  • 4. STUDY ON ELECTRICITY DISTRIBUTION, SUBSTATION OPERATION AND MAINTENANCE OF DESCO Presented by: Md. Nasibul Haque ID#2012100500008 Md. Ashikur Rahman ID#2012100500005 Md. Rashidul Islam ID#2012100500016 Supervised by: Murad Kabir Nipun Senior Lecturer & Coordinator Department of Electrical & Electronic Engineering (EEE) Southeast University
  • 5.  Introduction  DESCO Overview  Structure of Bangladesh Power sector  Supply chain management  Single line Diagram Generation to consumer  General equipment of substation  Operation & maintenance of Substation  Line maintenance  Metering system
  • 6. Electricity is a vital element of any country. Without proper electricity No country cannot achieve Economic prosperity. Only 62% of Bangladeshi population has access to electricity. To increase the GDP growth rate available and reasonably priced electricity is prerequisite.  The main reason for the current power crisis in our country are- ◦ The lack of generation capacity ◦ Poor operational and performance ◦ The power sector has been with distribution system.
  • 7.  Customer satisfaction provides their dependable power service.  Concern about future requirement of energy.  Reduce system loss to a reasonable level.  Run it commercially to a variable way.  Installing new line, sub-station etc. in the newly developed area and existing area to fulfill the ever rising demand of electricity.
  • 8.
  • 9.
  • 10.
  • 11.  Power Transformer  Switchgear/Circuit Breaker  CT and PT  Auxiliary Transformer  Control Relay Panel  Bus bar  Isolator  Lightening Arrester  Remote Terminal Unit For DAS  AC & DC Distribution Panels
  • 12.
  • 13. At the Substation maintenance period the first step is cut off greed connection from the maintenance Transformer and ground it. 2nd step consumer feeder change one Transformer line to another, Then breaker line cut off from the Bus Bar.  Operation & Maintenance of Transformer  Test oil sample of transformer main tank & tap changer tank  Operation of Tap changer  Operation of cooling control system  Operation & Maintenance of Breakers  Check SF6 gas pressure  Check for oil leaks  Operation & Maintenance of Insulator  Clean and lubricate auxiliary switch contacts  Operation & Maintenance of Lightening Arrester  Deformation of corona or stress rings  Operation & Maintenance of Bus Bar  Checking of insulation resistance
  • 14.  2kw-8kw Single phase LT  8kw-49kw 3phase connection  <50kw HT connection And Solar power Supply must required to get new connection for HT. DESCO take a project to prepaid Metering system which like as mobile sim . After research a cash card installed to the meter then connection Automatic run. When balance is over it give a signal to research it .
  • 15.
  • 16.  Purbachol new town project : 500mw by the year 2020.  Uttara 3rd phase residential area-230mw by the year2020  In future DESCO can extend their area at Gazipur.
  • 17.  Day by day increasing the demand of power because of industrial and life style is developing. So to cover up the demand establishing the new power plant i.e. Ruppur Nuclear Power plant. So new distribution company may be established or present distribution company may be extended their service. I wish to include myself this type generation or distribution sector .By managing its operation in efficient and effective manner providing better consumer service, desco has become the role model for all the electricity service providers of Bangladesh.
  • 18.  I praise the almighty for providing us the opportunity and granting me the capability to complete Industrial training successfully.  I would like to express my deepest sense of Gratitude to my supervisor Murad Kabir Nipun , M.Sc. Engineer, Senior Lecturer & Coordinator Department of Electrical & Electronic Engineering (EEE) Southeast University .  I would like to thanks DESCO Family who are given their valuable time, sharing knowledge, guidance, suggestions me.