Changeover time
Definition: The time
elapsed between when the
last good piece of product
A comes off and the first
good piece of product B
starts.
INTRODUCTION- HISTORY
History : Land costs in Japan were very high, therefore it was not feasible
to store large inventories of vehicles.
Quick
Change Overs
“A rapid and efficient way of converting a process
from running the current product
to running the next product “
Developed by Shigeo Shingo
( in the late 1950’s and early
1960’s) chief engineer of Toyota.
Reduces the waste of inventory by creating shorter production runs
that better align with customer demand
QUICK CHANGEOVER IN LEAN
CONTINUOUS
IMPROVEMENT
Pull/Kanban Cellular/flow
POUS
TPM
Quality at Source
Standardized Work
Quick Changeover
Batch Reduction Teams
5S systems Plant LayoutVisual Controls
VALUE
STREAM
MAPPING
SINGLE MINUTE
EXCHANGE OF
DIE(SMED)
SMED: Concept that says all
setups should and can take
less than 10 minutes.
Traditional
SMED
SMED- REAL WORLD EXAMPLE
3000-ton Sheet metal stamping press:
Traditional
Time: 4 Hours
SMED
Time: 3 Minutes
Improvement: 98.7%, or a factor of 80
SMED- REAL WORLD EXAMPLE
400-ton LIM molding press with 16-cavity tool:
Traditional
Time: 3 Hours
SMED
Time: 5 Minutes 20 seconds
Increase in effective capacity equal to 15,544
additional parts
HOW TO REDUCE SET-UP COST?
By reducing
setup time
By reducing
wastages
By reducing
various costs
Present
desired
settings
Use quick
fasteners
Use locator
pins
Prevent
misalignm
ents
Eliminate
tools
Make
movements
easier
REDUCING SET-UP TIME
6 TRADITIONAL SETUP STEPS
Preparation
Ensures that all the tools are working properly and are in the right
location.
Extraction
The removal of the tooling, raw material, and support equipment
after the production lot is completed.
Mounting
The placement of the new tool, support equipment, and raw material
before the next production lot.
Establishing
Control
Setting all the process control settings prior to the production run.
First Run
Capability
This includes the necessary adjustments required after the first trial
pieces are produced.
Setup
Improvement
The time after processing during which the tooling, machinery is
cleaned, identified, and tested for functionality prior to storage.
THE SMED PROCESS
End with 5S.
Standardize changeover tasks.
Stay with the machine at all times.
Set and attach ( no fine tuning)
Work from specific positions & standards ( no adjusting).
Utilize Quick Connectors (No bolts needed).
Transfer Internal Time to External Time
Begin With 5S
Eight Rules for Quick Changeover:
Reduce
inventory
Reduce batch
sizes
Reduce
changeover
time
Reduce impact
on equipment
utilization
Improve
quality after
changeover
Improve
repeatability
Improve
throughput
Improve
flexibility
THE SMED PROCESS- GOALS
Observe
and Record
Separate
internal
and
external
activities
Convert
internal
activities to
external
activities
Streamline
all
activities
Document
internal
and
external
procedures
THE SMED PROCESS
STAGES OF
SMED
OBSERVE AND RECORD
We Should always:
Notify the party to be observed
ahead of time.
Explain why we are conducting
an observation
Explain the possible benefits
for them and the company
Review the observation with
the individual
1
❑ Identify internal and external
elements,
❑ waste/lost time,
❑ variances from the standard process
SEPARATE INTERNALAND
EXTERNALACTIVITIES 2
Internal elements
• Operations that must be
performed while the
machine/process is stopped
External elements
• Operations that can be
performed while the
machine/process is running
CONVERT INTERNALS TO
EXTERNALS ACTIVITIES
3
Eliminate Adjustment
CONVERT INTERNALS TO
EXTERNALS ACTIVITIES
3
Eliminate search-and-find work
Arrange tools & materials beforehand
Complete prep work before starting changeover
Standardize settings
Make visual marks vs. trial and error adjustments
Eliminate trial runs
Postpone “put away” work
STREAMLINE ALL
ACTIVITIES
4
STREAMLINE ALL
ACTIVITIES
4
STREAMLINE
INTERNAL PROCESS
•Create Parallel steps
– completed at the
same time
•Reduce complexity
and eliminate waste
STREAMLINE
EXTERNAL PROCESS
•Adopt functional
standards-Visual
factory locations for
tools, Color coding
,Standard set ups
Checklists
Document new process
•Create new work sheets that include
all the steps of the new process
•Get all needed approvals
•Train all workers
•Post the standardized work sheets
(STW)
DOCUMENT INTERNAL &
EXTERNAL PROCEDURES
5
Create new process
• Document who will do what and when
• Practice quick changeover (QCO) before doing it
Test new process
• Run pilot of new process
• Document steps of new process
• Time steps of new process
• Document improvement opportunities
• Videotape and look for additional opportunities
WHEN SHOULD
YOU AUTOMATE?
Criterion 1
• The operation has already
been dramatically simplified
Criterion 2
• Begin with semi automation to
achieve 80% benefit at 20%
cost
Criterion 3
• The automation is cost-
effective
SMED IN DAILY LIFE
Planted , Grown &
harvested Food
Fast Food , instant food,
frozen food.
Self Pick Up Delivery Services
Tie shoes Slip on shoes
In person registration Online registration
SHINGO PRIZE
The Shingo Prize
for Excellence in
Manufacturing
was established in
1988 in honor of
Shigeo Shingo.
The Prize
promotes world-
class
manufacturing
and recognizes
companies that
achieve superior
customer
satisfaction and
business results.
The philosophy of the
Shingo Prize is that
worldclass business
performance may be
achieved through focused
improvements in core
manufacturing and
business processes.
Thank You
If any questions ,feel free to ask us.

Más contenido relacionado

La actualidad más candente

History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
Sumon Kumar Kundu
 

La actualidad más candente (20)

LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
SMED Final
SMED FinalSMED Final
SMED Final
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
smed
smedsmed
smed
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
 
3mu
3mu3mu
3mu
 

Similar a Single Minute Exchange of Dies

Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
MohammedLahssaini1
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
Blankdevil
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
Prasanna3804
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
FASI93
 

Similar a Single Minute Exchange of Dies (20)

SMED - 6.pptx.pptx
SMED - 6.pptx.pptxSMED - 6.pptx.pptx
SMED - 6.pptx.pptx
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
StdWork_sample
StdWork_sampleStdWork_sample
StdWork_sample
 
Std Work Sample
Std Work SampleStd Work Sample
Std Work Sample
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
layout planning
layout planninglayout planning
layout planning
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter Five
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERS
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptx
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Just In Time
Just In TimeJust In Time
Just In Time
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 

Más de Md. Nazmul Hasan Dipu (6)

Presentation on Solar Energy in Bangladesh.
Presentation on Solar Energy in Bangladesh.Presentation on Solar Energy in Bangladesh.
Presentation on Solar Energy in Bangladesh.
 
Presentation on Locating and Locator.
Presentation on Locating and Locator.Presentation on Locating and Locator.
Presentation on Locating and Locator.
 
G Code M code
G Code M codeG Code M code
G Code M code
 
Controller
ControllerController
Controller
 
Electron Beam Machining
Electron Beam MachiningElectron Beam Machining
Electron Beam Machining
 
Presentation on Economic Change in Bangladesh in Last Decade.
Presentation on Economic Change in Bangladesh in Last Decade.Presentation on Economic Change in Bangladesh in Last Decade.
Presentation on Economic Change in Bangladesh in Last Decade.
 

Último

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Último (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 

Single Minute Exchange of Dies

  • 1.
  • 2. SINGLE MINUTE EXCHANGE OF DIES (SMED) WELCOME TO THE PRESENTATION OF
  • 4. INTRODUCTION Changeover time Definition: The time elapsed between when the last good piece of product A comes off and the first good piece of product B starts.
  • 5. INTRODUCTION- HISTORY History : Land costs in Japan were very high, therefore it was not feasible to store large inventories of vehicles. Quick Change Overs “A rapid and efficient way of converting a process from running the current product to running the next product “ Developed by Shigeo Shingo ( in the late 1950’s and early 1960’s) chief engineer of Toyota. Reduces the waste of inventory by creating shorter production runs that better align with customer demand
  • 6. QUICK CHANGEOVER IN LEAN CONTINUOUS IMPROVEMENT Pull/Kanban Cellular/flow POUS TPM Quality at Source Standardized Work Quick Changeover Batch Reduction Teams 5S systems Plant LayoutVisual Controls VALUE STREAM MAPPING
  • 7. SINGLE MINUTE EXCHANGE OF DIE(SMED) SMED: Concept that says all setups should and can take less than 10 minutes. Traditional SMED
  • 8. SMED- REAL WORLD EXAMPLE 3000-ton Sheet metal stamping press: Traditional Time: 4 Hours SMED Time: 3 Minutes Improvement: 98.7%, or a factor of 80
  • 9. SMED- REAL WORLD EXAMPLE 400-ton LIM molding press with 16-cavity tool: Traditional Time: 3 Hours SMED Time: 5 Minutes 20 seconds Increase in effective capacity equal to 15,544 additional parts
  • 10. HOW TO REDUCE SET-UP COST? By reducing setup time By reducing wastages By reducing various costs
  • 12. 6 TRADITIONAL SETUP STEPS Preparation Ensures that all the tools are working properly and are in the right location. Extraction The removal of the tooling, raw material, and support equipment after the production lot is completed. Mounting The placement of the new tool, support equipment, and raw material before the next production lot. Establishing Control Setting all the process control settings prior to the production run. First Run Capability This includes the necessary adjustments required after the first trial pieces are produced. Setup Improvement The time after processing during which the tooling, machinery is cleaned, identified, and tested for functionality prior to storage.
  • 13. THE SMED PROCESS End with 5S. Standardize changeover tasks. Stay with the machine at all times. Set and attach ( no fine tuning) Work from specific positions & standards ( no adjusting). Utilize Quick Connectors (No bolts needed). Transfer Internal Time to External Time Begin With 5S Eight Rules for Quick Changeover:
  • 14. Reduce inventory Reduce batch sizes Reduce changeover time Reduce impact on equipment utilization Improve quality after changeover Improve repeatability Improve throughput Improve flexibility THE SMED PROCESS- GOALS
  • 17. OBSERVE AND RECORD We Should always: Notify the party to be observed ahead of time. Explain why we are conducting an observation Explain the possible benefits for them and the company Review the observation with the individual 1 ❑ Identify internal and external elements, ❑ waste/lost time, ❑ variances from the standard process
  • 18. SEPARATE INTERNALAND EXTERNALACTIVITIES 2 Internal elements • Operations that must be performed while the machine/process is stopped External elements • Operations that can be performed while the machine/process is running
  • 19. CONVERT INTERNALS TO EXTERNALS ACTIVITIES 3 Eliminate Adjustment
  • 20. CONVERT INTERNALS TO EXTERNALS ACTIVITIES 3 Eliminate search-and-find work Arrange tools & materials beforehand Complete prep work before starting changeover Standardize settings Make visual marks vs. trial and error adjustments Eliminate trial runs Postpone “put away” work
  • 22. STREAMLINE ALL ACTIVITIES 4 STREAMLINE INTERNAL PROCESS •Create Parallel steps – completed at the same time •Reduce complexity and eliminate waste STREAMLINE EXTERNAL PROCESS •Adopt functional standards-Visual factory locations for tools, Color coding ,Standard set ups Checklists
  • 23. Document new process •Create new work sheets that include all the steps of the new process •Get all needed approvals •Train all workers •Post the standardized work sheets (STW) DOCUMENT INTERNAL & EXTERNAL PROCEDURES 5 Create new process • Document who will do what and when • Practice quick changeover (QCO) before doing it Test new process • Run pilot of new process • Document steps of new process • Time steps of new process • Document improvement opportunities • Videotape and look for additional opportunities
  • 24. WHEN SHOULD YOU AUTOMATE? Criterion 1 • The operation has already been dramatically simplified Criterion 2 • Begin with semi automation to achieve 80% benefit at 20% cost Criterion 3 • The automation is cost- effective
  • 25. SMED IN DAILY LIFE Planted , Grown & harvested Food Fast Food , instant food, frozen food. Self Pick Up Delivery Services Tie shoes Slip on shoes In person registration Online registration
  • 26. SHINGO PRIZE The Shingo Prize for Excellence in Manufacturing was established in 1988 in honor of Shigeo Shingo. The Prize promotes world- class manufacturing and recognizes companies that achieve superior customer satisfaction and business results. The philosophy of the Shingo Prize is that worldclass business performance may be achieved through focused improvements in core manufacturing and business processes.
  • 27. Thank You If any questions ,feel free to ask us.