Lynas Corporation
Building a New Business and Creating
an Organisation that meets its vision
HR Leaders Summit
8 May 2013
Introduction
3
• Imagine in that environment attempting to attract, on board and train
employees at a rate of 1 per day for 2.5 years
• Keeping 360 employees engaged and focussed on building a new
industry in an environment where
• You drive to work every day and the car in front of you has a sticker
telling people that your employer should not be here
• That your employer is simply using your country to dump radioactive
waste
• Where you go to restaurants and are refused service based on what
your uniform carrying your employers name
Company overview
4
Mount Weld Concentration Plant
Lynas Advanced Materials Plant
CLD Rare Earth Deposit
Mt Weld Project and
Concentration Plant
LAMP, Malaysia
Primarily involved in the exploration, development, mining and processing of Rare Earth minerals
ASX-listed, market capitalisation of A$1.2bn as of February 27, 2013
Owns and operates:
Mt. Weld – the highest grade known Rare Earths deposit in the world – located 35km south of Laverton
in W.A.
Mt. Weld Concentration Plant – commissioned in 2011 and located 1.5km from site
Lynas Advanced Materials Plant (“LAMP”) facility – located in the Gebeng Industrial Estate (“GIE”) near
the Port of Kuantan in Malaysia
Phase 1 production capacity of 11,000 tonnes per annum (“tpa”) REO and Phase 2 production capacity of
22,000tpa REO
Location of key assets
Building a fully integrated source of Rare Earths from mine to customers
Lynas‟ vision is to be the leader in Rare Earths for a sustainable future
5
Production process overview
Vertically integrated operations from mining at Mt. Weld to oxide production at the LAMP
Rare Earths
Solution
Mt. Weld Mine & Concentration Plant
6
Overview of Australian assets
Mt Weld Project and
Concentration Plant
Location of the Mt. Weld Project & Concentration Plant
Mt. Weld Mine
The highest grade known deposit of Rare Earths in the
world
Consists of the Central Lanthanide Deposit (“CLD”)
and Duncan Deposit
Located 35km south of Laverton in W.A.
Simple, conventional open-pit mining operation
Stockpiled ore is sufficient to sustain Phase 1 steady
state production for 6 years
773kt mined at 15.4% REO (116kt contained REO)
Mt. Weld Concentration Plant
Commissioned in May 2011
Located 1.5km from Mt. Weld mine
Phase 1 capacity: 33,000tpa REO concentrate
Expected capacity including Phase 2: 66,000tpa REO
concentrate
Proven REO flotation technology
~15kt of dry bagged concentrate ready for shipment to
Malaysia
7
CLD is the world‟s highest grade known Rare Earths orebody
Recent drilling on the western side of the CLD has increased confidence levels in the
resource with a large portion of the resources in the measured and indicated categories
Above a REO cut-off of 2.5%, the CLD has a resource of 14.9mt at an average grade of
9.8% REO for a total of 1,460,000 tonnes of REO
CLD resource
category
Ore (mmt) REO (%)¹
Measured 6.9 12.2
Indicated 7.0 8.1
Inferred 1.1 4.6
Total 14.9 9.8
9.8%
6.4%
4.9%
2.6%
2.0%
1.4% 1.1%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
CLD
(Lynas)
Mountain Pass
(Molycorp)
Duncan
(Lynas)
Nolans
(Arafura)
Hoidas Lake
(Great Western)
Thor Lake
(Avalon)
Kvanefjeld
(Greenland)
Source: Company filings
Note: Figures may not sum due to rounding
1 REO (%) includes all the lanthanide elements plus yttrium
Central Lanthanide Deposit
Rare Earth Grade – Mt. Weld vs. some other projects
REO grade (%)
Lynas cut-off grade – 2.5%
8
The LAMP facility is strategically located in Malaysia
Stable operating environment and a
sovereign credit rating of A3
Gebeng is a hub into Asia with exceptional
infrastructure
Located in close proximity to Kuantan deep-
water port with bulk material, liquid and
container berths
Key reagent products located nearby due to
large chemical industry on the east coast of
Malaysia
Established supplier / manufacturer network
within the Gebeng Industrial Estate
High quality and well-maintained
infrastructure and utilities
Access to skilled and competitive labour force
Tax free period granted by the Malaysian
Industrial Development Association under
“strategic pioneer status”
Malaysia operations – Lynas Advanced
Materials Plant
Kangar
PERLIS
LANGKAWI
Alor Setar
KEDAH
George Town
PENANG
Ipoh
PERAK
KELANTAN
Kota Baharu
TERENGGANU
Kuala Terengganu
PAHANG
Kuantan
Johor Baharu
JOHOR
[Melaka]
NEGERI
SEMBILAN
Seremban
SELANGOR
Cameron Highlands
Kuala Lumpur
T H A I L A N D
M A L A Y S I A
S I N G A P O R E
GEBENG
SOUTH SEA CHINA
Tioman
MELAKA
9
Future milestones
LAMP continues to ramp up toward Phase 1 nominal
capacity (expected Q2 2013)
Commissioning of Phase 2 expected in Q2 2013
Ramp-up of Phase 2 in Q3 2013 in line with customer
demand
First feed to kiln achieved in November 2012
First arrival of Rare Earths concentrate from Mount Weld in
November 2012
Initial first feed of concentrate into LAMP rotary kilns in
November 2012
Successful commissioning of LAMP cracking and leaching
units in January 2013
Initial Rare Earths products produced in February 2013
Lynas Advanced Materials Plant – operational
update
10
REO demand growth outlook
Sector
CAGR
2012-2018 Rare Earths used
NiMH Batteries 3.3% La, Nd
Magnets 10.1% NdPr, Dy
Autocatalysts 6.0% Ce
FCCs 8.0% La
Metallurgy &
FerroSilicon
3.4% CeLa
Phosphors -1.2%
Eu, Tb, Y, Ce,
La
Polishing 4.8% CeLa
UV Cut 3.0% Ce
Optical Glass 5.0% La, Gd
Other 3.0%
La, Ce, Nd, Pr,
Sm, Gd, Y
Total demand 5.8%
2015E Expected Global Rare Earths
demand by application
Demand drivers – Rare Earth uses
NiMH Batteries
10%
Magnets
27%
Autocatalysts
7%
FCCs
16%
Metallurgy &
FerroSilicon
13%
Phosphors
7%
Polishing
11%
UV Cut
2%
Optical Glass
3%
Other
4%
Sep „12 Nov„12 Q1„13 Q2 „13
11
Indicative timeline to first sales and operating cash flow
First
shipment to
LAMP from
Mt. Weld
First feed to
kiln
Finished
goods
Customer
qualification
Commercial
shipments
and first
sales
First cash
from sales
Next steps
Current operational focus is LAMP ramp-up towards Phase 1 nominal
capacity
Sales & Marketing focus is on completion of customer qualification process
and commencement of commercial shipments
Commissioning of Phase 2 expected in Q2 2013
TOL issued
External View
Strong cash flows expected in the near term
Nov „12
12
GFC
Community
Outrage
International
and Local
Reviews
IAEA etc
Political
Uncertainty
Sovereign
Risk Issues
Rare Earth
Price Erosion
Malaysian
GE13
New
Company
Challenges Along The Way – An External
Environment that creates Employee Anxiety
The Challenge
A People and Culture Perspective.
13
• To create and build an organisation that is capable of surviving but also thriving in
a changing external environment
• Recruit, On-board, Train new employees
• 2009 40 employees; 2013 – 490 employees
• Able to deal with uncertainty and continue to grow willing to take on wicked
problems
• Changing Production Parameters, Cost Structures
• Sovereign Risk Issues
• Social License to Operate
• Focus employee efforts on building a company while at the same time getting
ready to Operate a new 800M plant in Malaysia
The Challenge - People and Culture Perspective.
14
Biggest Challenge for a start up company
• Align Organisational and Employee Goals in a way that contains
employee anxiety” so that employees can focus on goal achievement
• Development of the Organisational Software
• Values,
• Organisational Structure,
• Role Accountabilities and Responsibilities,
• Feedback Mechanisms, Thinking Tools etc
• Organisational Software allows the Organisational Hardware –
Plant, Equipment, Financial Systems to Operate
Psychological Frame
Human Behaviour – Seeking New Experiences and Reducing Exposure
to Unpleasant Experiences”
15
• Gray believed that personality traits and behaviour could not be explained by
classical behavioural conditioning alone.
• Gray proposed a “Biopsychological Theory of Personality”
• Emphasized the relationship between personality and sensitivity to
reinforcement systems of Reward and Punishment
• System 1 - Willingness to try something new – New Goal Orientation
• Approach Motivation; Impulsivity, Willingness to try something new)
, and
• System 2 - Work to avoid unpleasant outcomes
• Motivation (drive to avoid pain, anxiety, punishment, unpleasant
outcomes )
Gray's model of personality is based on two hypothesized brain systems
Gray, J.A. (1981). A critique of Eysenck's theory of personality, In H.J. Eysenck (Ed.) A model for personality (pp 246–276)
Gray, J.A. (1982). The neuropsychology of anxiety: An enquiry into the functions of the septo-hippocampal system
A Biopsychological Frame
“Behavioural Activation System”
16
Behavioural Activation System (BAS)
• The BAS includes brain regions involved in regulating arousal: cerebral
cortex, thalamus, and stratum.
• The system is responsive to conditioned and unconditioned reward cues.
• BAS regulates approach behaviours and is referred to as the Reward System.
Individual BAS Sensitivity
• In general, individuals with a more active BAS tend to be more fun seeking, like
novelty, change , are more disposed to goal seeking, will respond to seeking
novel or new experiences
A Biopsychological Frame
“Behavioral Inhibition System”
17
Behavioral Inhibition System (BIS)
• The BI also includes brain regions involved in regulating arousal: the brain
stem, and neocortical projections to the frontal lobe.
• BIS is responsive to punishment, novelty, uncertainty, and non-rewarding stimuli.
• BIS regulates avoidance behaviours and is often referred to as the Punishment
System.
Individual BIS Sensitivity
• Individuals with more active BIS may be vulnerable to negative
emotions, including frustration, anxiety, fear, and sadness
• See the risk in things, try to avoid pain or lower anxiety by mitigating risk
• Anxiety lowered for Individuals with High BIS sensitivity by
• working within prescribed systems and when given work that allows avoidance of
something unpleasant – e.g avoid uncertainty in outcomes
Psychological Frame – Mapping to People and
Culture Systems and Organisational Culture
18
• In an environment that is facing rapid
discontinuous change, where social
licence to operate and other issues
create uncertainty in the workplace
• How do we develop and build an
organisation and its People and
Culture Processes and Systems in a
way that enables employees to
remain engaged in the business.
• How do we deal with BIS and BAS
sensitivity in a way that allows
ongoing Employee Engagement
“The Lynas Way”
“A System to Contain Employee Anxiety”
Viewing HR System Elements with this Frame in
Mind – The Lynas Way
19
Viewing HR System Elements with this Frame in
Mind – The Lynas Way
20
BIS Sensitivity - Put decision making at an
efficient level (consistent with control and risk
management) ; Match human capability to
role/task complexity
BAS Sensitivity – Time Span of Discretions –
Pushing Accountability and Empowerment within
Time Span of Discretion.
BIS Sensitivity – Provides a Frame when the normal
gaps in Policy, Procedure and System miss but
where people need something to connect to
BAS - Sensitivity
Codifying Breakthrough Thinking and Risk Taking
Provide space for people to try something new
BAS - Sensitivity
Encouraging “Entrepreneurial” and “breakthrough
Thinking Approaches” – Higher Levels of Thinking;
Spiral Dynamics; Deep Change
BIS Sensitivity
Emotional Safety Creation through Values Based
Discussions and EQ toolsets
BIS Sensitivity – Clear
Context, Purpose, Quality, Quantity Resources and
Timing for Task Work Assignments
-21-
Dimension 1 - The Way We Organise
The Challenge of Leadership
“The difficulty is that we have put ourselves to work in organizations so badly put
together as to mitigate against our working together effectively.
We have too many layers, undefined cross-functional working relationships, false
concepts of leadership, unclear leadership accountability and authority, chaotic
compensation systems, phony performance systems, unfair incentive
systems, false notions of capability and its growth, poor career development
processes and on and on. It is these systems that have to be mended. The art is
to mend them in such a way as to elicit the behaviours we want in the process.”
Source: Elliot Jaques, Requisite Organisation, Cason Hall 1996
Employees come to new organizations from these experiences,
effective and creative leadership and behavior in organizations, requires changing
the systems and not by trying to change the people.
Principles of Lynas Way – The Way We Organise
-22-
• Role clarity- Accountabilities and Responsibilities Clear
• Levels of work (Stratums) – Individuals working within their
time span of discretion are naturally expected to have lower
anxiety
• Task Assigning Role Responsibility (TARR’s) and Task
Initiating Role Responsibility – (TIRR’s) – It is clear who can
give me work
-23-
Role Clarity
• Clearly Defined Position Descriptions based on application of RACI Mapping
across the organisation
• Enables people to perform and deliver the required results and behaviour
• Ensures people understand how their role and personal performance
contributes to the achievement of business strategy
• Specifies real accountabilities able to be measured with clarity
• Clarifies interdependencies within and between teams and people – who does
what!
• Provides a framework that focuses on accountabilities, authorities and
capabilities required to deliver expected outcomes
-24-
Stratums - Human Nature and Capability
 Organizational hierarchy is a natural human phenomenon and forms
according to a relatively predetermined formula, based upon human
capability
 Capability is defined as the extent to which an individual can handle the
complexity of any task
 A key measure of capability is how far an individual is able think/project
into the future
▬ i.e. Each of us have a different starting point, however, the longer
time horizon a person has, the more complex roles they are typically
capable of undertaking
.
Appropriate Structure Contains Anxiety
Allowing Structure to Follow Strategy (Removing ambiguity) and
allowing individuals discretion to complete work in a way that fits
their planning horizon
-25-
Levels of Work (Stratums)
Levels of work define the relative complexity of the tasks that make up the
work requirements of particular roles in the organisation.
Each level of work:
- Requires a different way of thinking
- Must provide information laterally
- Sets overall Context and Purpose for the Level below
- Allocates tasks to the Level below (direct reports)
-26-
Levels of Work (Stratum)
6 10 - 20 Years Value Delivery
5 5 - 10 Years Strategic Direction
4 2 - 5 Years Strategic Delivery
3 1 - 2 Years Operational Direction
2 3 - 12 Months Operational Delivery
1 0 - 3 Months Operational Execution
-27-
How Flat Should a Structure be?
Role Compression and Effective Organisation
Stated Organisation
Structure
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
What really
happens
I
F
G
H
J
A
B
C
D
E
Should be
After Elliott Jacques “Requisite Organisation”; Cason-Hall 1989
-28-
PROJECT
ENGINEER
TEAM LEADER
SPECIALIST
• Safety
• Industrial Relations
OTHER TEAM
LEADER
Role Relationships
Task Assigning and Task Initiating
TARR
- only your team leader
can assign you tasks
(blue box )
TIRR
• if previously
agreed, the people
in green boxes can
initiate certain tasks
with you
TEAM MEMBER
Inevitably people perform tasks that are not given to them by their immediate leader.
This can cause concern and confusion with respect to who can ask who to do what - In these
situations the employee needs to be given clarity on what type of work can be assigned to
them and by whom.
-29-
Dimension 2 - The Lynas Way
Work Allocation - CPQQRT
Whenever work is allocated to employees (assigned or initiated) the following information
should be provided:
CONTEXT
Context gives clarity around why the task exists, by describing the events/activities/changes
that have lead to it at this point in time.
PURPOSE
Purpose is the objective of what needs to be achieved in relation to the task being assigned
and should flow directly from the context.
QUANTITY
Quantity is defined as the numeric value attached to any task and represents the amount of
what ever has to be achieved.
QUALITY
Quality is defined as the standard that has to be met and can be either objective or
subjective
RESOURCES
Resources are defined as the materials, information, people, money, accountabilities and
authorities allocated to the individual to effectively complete the task.
TIME
Time is the deadline or time available for completion of the task.
Dimension 2 - The Lynas Way
Work Allocation - CPQQRT
30
BIS Sensitivity
• Context ,Purpose, Quality, Quantity, Resources and Timing (CPQQRT)
• Reduces Anxiety for BIS ensures that all information and resources for
task completion are described on task initiation.
Dimension 3 - Lynas Way – Values and
Behaviours
31
Values provide a framework that
• provide a sense of certainty in times of rapid discontinuous change
• provide a reference for when the systems, process and procedures that
are either immature-under developed or not in place – a typical start up
.
Care RelationshipRespect Integrity Courage
The Lynas Way – Values and Behaviours
32
BIS Sensitivity
• Provides a Frame to fills gaps in Policy, Procedure and System and where people need
something to connect with.
BAS - Sensitivity
• Explicitly States Organisational Acceptance for Breakthrough Thinking and Risk Taking
• Encourage organisational time and space for people to try something new
Dimension 4 – The Lynas Way People and
Relationships
33
• Toolsets beyond the Mechanistic
• Cultural Memes, Spiral Dynamics
• Developing the Corporate Heart as well as Minds
in Corporate Conversations and when problem
solving
• Formalised Training in 21st Century leadership
Topics, modelled in project teams and change
efforts
• Thinking beyond socialised norms to challenge
the role that corporations play in “Shared Value”
• Application of “breakthrough thinking” techniques
to creating shared value
• Visioning – “Remember the Future” – pre
meditative states to allow access to subconcious
problem solving and goal setting
• Shared Value Conversations at the heart of
corporate
Dimension 4 – The Lynas Way People and
Relationships
34
BAS - Sensitivity
• Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” –
Higher Levels of Thinking; Spiral Dynamics; Deep Change
• Feeds Novelty Seeking, Encouraging Attainment of Goals not yet
realisable
BIS Sensitivity
• Emotional Safety Creation through Values Based Discussions and EQ
toolsets
• Heart as well as Mind Applied to Problem Solving and People Decisions
mitigating anxiety potential negative outcomes.
Impact of the Lynas Way on Retention.
35
Lynas Labour Turn Over Rates are Respective Industry
Benchmarks (2011-Q1 2013)
23.50
18.9
12.2
14.2
0
5
10
15
20
25
Labour Turn
Over WA
Labour Turn
Over MY
Benchmark
Lynas
http://www.amma.org.au/assets/Policy/Papers/20130227AMMA%20Research%20Paper%20-%20Labour%20Turnover.pdf
Hayes Industry Data – Gebeng Industrial Park – Pahang, Malaysia.
The Lynas Way – An Integrated HR Framework
for a “Developing Company Culture”
36

Más contenido relacionado

La actualidad más candente

Megalithic period
Megalithic periodMegalithic period
Megalithic periodShiji VS
 
Engineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHUEngineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHUSabin Acharya
 
Bhakti movement in india
Bhakti movement in indiaBhakti movement in india
Bhakti movement in indiaDiksha Sharma
 
Tribal revolts and movements led by deposed rulers and zamindars
Tribal revolts and  movements led by deposed rulers and zamindarsTribal revolts and  movements led by deposed rulers and zamindars
Tribal revolts and movements led by deposed rulers and zamindarsSrinivasa Rao
 
Economic Progress in the Gupta Period
Economic Progress in the Gupta Period Economic Progress in the Gupta Period
Economic Progress in the Gupta Period Virag Sontakke
 
Dr. Ram Manohar Lohia Seminar paper
Dr. Ram Manohar Lohia Seminar paperDr. Ram Manohar Lohia Seminar paper
Dr. Ram Manohar Lohia Seminar paperHimanshu Chandra
 
ECONOMIC GEOLOGY.pptx
ECONOMIC GEOLOGY.pptxECONOMIC GEOLOGY.pptx
ECONOMIC GEOLOGY.pptxKavya Mol K S
 

La actualidad más candente (10)

Megalithic period
Megalithic periodMegalithic period
Megalithic period
 
Engineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHUEngineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHU
 
Bhakti movement in india
Bhakti movement in indiaBhakti movement in india
Bhakti movement in india
 
Tribal revolts and movements led by deposed rulers and zamindars
Tribal revolts and  movements led by deposed rulers and zamindarsTribal revolts and  movements led by deposed rulers and zamindars
Tribal revolts and movements led by deposed rulers and zamindars
 
Indo-Greek Coins (Eucratidies & Menander)
Indo-Greek Coins (Eucratidies & Menander)Indo-Greek Coins (Eucratidies & Menander)
Indo-Greek Coins (Eucratidies & Menander)
 
Economic Progress in the Gupta Period
Economic Progress in the Gupta Period Economic Progress in the Gupta Period
Economic Progress in the Gupta Period
 
Ashoka and his dhamma
Ashoka and his dhammaAshoka and his dhamma
Ashoka and his dhamma
 
Dr. Ram Manohar Lohia Seminar paper
Dr. Ram Manohar Lohia Seminar paperDr. Ram Manohar Lohia Seminar paper
Dr. Ram Manohar Lohia Seminar paper
 
ECONOMIC GEOLOGY.pptx
ECONOMIC GEOLOGY.pptxECONOMIC GEOLOGY.pptx
ECONOMIC GEOLOGY.pptx
 
1. history schools
1. history schools1. history schools
1. history schools
 

Similar a Lynas Corporation - Building a new business and creating an organisation that meets its vision

Organisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedOrganisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedAmbadi S - HR Professional
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Company Spotlight
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01ImageRes
 
Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Roneet Kumar
 
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Anver Dole
 
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)sreeni ak
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaPankaj Shukla
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
Presentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxPresentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxRajkishoreSahoo26
 
training and development project IIPM
training and development project IIPM training and development project IIPM
training and development project IIPM Susmitha Chowdary
 
Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Roneet Kumar
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma
 
Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Chris Helweg
 
Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Thomas john
 

Similar a Lynas Corporation - Building a new business and creating an organisation that meets its vision (20)

THAMIL-RESUME
THAMIL-RESUMETHAMIL-RESUME
THAMIL-RESUME
 
Organisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths LimitedOrganisation Study - Indian Rare Earths Limited
Organisation Study - Indian Rare Earths Limited
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01
 
Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...Project Report on Workers' Participation in Management at Central Coalfields ...
Project Report on Workers' Participation in Management at Central Coalfields ...
 
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
Plastics & Rubber Institute of Sri Lanka President (2012/'13) Anver Dole's pr...
 
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
ORGANISATIONAL STUDY @IRE KOLLAM(KERALA UNIVERSITY)
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj Shukla
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Presentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptxPresentation mkt project of mba agk.pptx
Presentation mkt project of mba agk.pptx
 
training and development project IIPM
training and development project IIPM training and development project IIPM
training and development project IIPM
 
Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...Presentation on Workers' Participation in Management at Central Coalfields Li...
Presentation on Workers' Participation in Management at Central Coalfields Li...
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
ADITYA KAUSHIK Resume
ADITYA KAUSHIK ResumeADITYA KAUSHIK Resume
ADITYA KAUSHIK Resume
 
Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)
 
Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...Silvercorp’s management has successfully grown the company into one of the lo...
Silvercorp’s management has successfully grown the company into one of the lo...
 
Maudore mar13presentation
Maudore mar13presentationMaudore mar13presentation
Maudore mar13presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Silver Corp. Presentation
IMPACT Silver Corp. PresentationIMPACT Silver Corp. Presentation
IMPACT Silver Corp. Presentation
 
Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.Kerala electricals & and allied engineering co. ltd.
Kerala electricals & and allied engineering co. ltd.
 

Más de Media Corp International

Large-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumLarge-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumMedia Corp International
 
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyResourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyMedia Corp International
 
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyTalent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyMedia Corp International
 
Sunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationSunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationMedia Corp International
 
Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Media Corp International
 
Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Media Corp International
 
David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013Media Corp International
 
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Media Corp International
 
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Media Corp International
 
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Media Corp International
 
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMalcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMedia Corp International
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitMedia Corp International
 
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitYamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitMedia Corp International
 

Más de Media Corp International (14)

Gender Diversity and Caltex's story
Gender Diversity and Caltex's storyGender Diversity and Caltex's story
Gender Diversity and Caltex's story
 
Large-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro AluminiumLarge-scale organisation change by Trevor Hall, Hydro Aluminium
Large-scale organisation change by Trevor Hall, Hydro Aluminium
 
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin EnergyResourcing in a competitive global market by Keith Wilkinson, Origin Energy
Resourcing in a competitive global market by Keith Wilkinson, Origin Energy
 
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR StrategyTalent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
Talent mangement, leadership strategy; Chris Wood explains Santos' HR Strategy
 
Sunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentationSunsuper's 5 key questions to ask your super fund presentation
Sunsuper's 5 key questions to ask your super fund presentation
 
Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013Jason Allison, GIO presents at OHS Leaders Summit 2013
Jason Allison, GIO presents at OHS Leaders Summit 2013
 
Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013Michael Charman, GIO presents at the OHS Leaders Summit 2013
Michael Charman, GIO presents at the OHS Leaders Summit 2013
 
David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013David Bond, Thiess, presents at the OHS Leaders Summit 2013
David Bond, Thiess, presents at the OHS Leaders Summit 2013
 
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
Richard Coleman, Asciano, presents at the OHS Leaders Summit 2013
 
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
Martin Smith, Tenix, presents at the OHS Leaders Summit 2013
 
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
Paul Cutrone, Sparke Helmore, presents at the OHS Leaders Summit 2013
 
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders SummitMalcolm Deery, Programmed Group, presents at the OHS Leaders Summit
Malcolm Deery, Programmed Group, presents at the OHS Leaders Summit
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
 
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders SummitYamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
Yamini Naidu, One Thousand and One, presents at the OHS Leaders Summit
 

Último

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Último (20)

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Lynas Corporation - Building a new business and creating an organisation that meets its vision

  • 1.
  • 2. Lynas Corporation Building a New Business and Creating an Organisation that meets its vision HR Leaders Summit 8 May 2013
  • 3. Introduction 3 • Imagine in that environment attempting to attract, on board and train employees at a rate of 1 per day for 2.5 years • Keeping 360 employees engaged and focussed on building a new industry in an environment where • You drive to work every day and the car in front of you has a sticker telling people that your employer should not be here • That your employer is simply using your country to dump radioactive waste • Where you go to restaurants and are refused service based on what your uniform carrying your employers name
  • 4. Company overview 4 Mount Weld Concentration Plant Lynas Advanced Materials Plant CLD Rare Earth Deposit Mt Weld Project and Concentration Plant LAMP, Malaysia Primarily involved in the exploration, development, mining and processing of Rare Earth minerals ASX-listed, market capitalisation of A$1.2bn as of February 27, 2013 Owns and operates: Mt. Weld – the highest grade known Rare Earths deposit in the world – located 35km south of Laverton in W.A. Mt. Weld Concentration Plant – commissioned in 2011 and located 1.5km from site Lynas Advanced Materials Plant (“LAMP”) facility – located in the Gebeng Industrial Estate (“GIE”) near the Port of Kuantan in Malaysia Phase 1 production capacity of 11,000 tonnes per annum (“tpa”) REO and Phase 2 production capacity of 22,000tpa REO Location of key assets Building a fully integrated source of Rare Earths from mine to customers Lynas‟ vision is to be the leader in Rare Earths for a sustainable future
  • 5. 5 Production process overview Vertically integrated operations from mining at Mt. Weld to oxide production at the LAMP Rare Earths Solution
  • 6. Mt. Weld Mine & Concentration Plant 6 Overview of Australian assets Mt Weld Project and Concentration Plant Location of the Mt. Weld Project & Concentration Plant Mt. Weld Mine The highest grade known deposit of Rare Earths in the world Consists of the Central Lanthanide Deposit (“CLD”) and Duncan Deposit Located 35km south of Laverton in W.A. Simple, conventional open-pit mining operation Stockpiled ore is sufficient to sustain Phase 1 steady state production for 6 years 773kt mined at 15.4% REO (116kt contained REO) Mt. Weld Concentration Plant Commissioned in May 2011 Located 1.5km from Mt. Weld mine Phase 1 capacity: 33,000tpa REO concentrate Expected capacity including Phase 2: 66,000tpa REO concentrate Proven REO flotation technology ~15kt of dry bagged concentrate ready for shipment to Malaysia
  • 7. 7 CLD is the world‟s highest grade known Rare Earths orebody Recent drilling on the western side of the CLD has increased confidence levels in the resource with a large portion of the resources in the measured and indicated categories Above a REO cut-off of 2.5%, the CLD has a resource of 14.9mt at an average grade of 9.8% REO for a total of 1,460,000 tonnes of REO CLD resource category Ore (mmt) REO (%)¹ Measured 6.9 12.2 Indicated 7.0 8.1 Inferred 1.1 4.6 Total 14.9 9.8 9.8% 6.4% 4.9% 2.6% 2.0% 1.4% 1.1% 0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 12.0% CLD (Lynas) Mountain Pass (Molycorp) Duncan (Lynas) Nolans (Arafura) Hoidas Lake (Great Western) Thor Lake (Avalon) Kvanefjeld (Greenland) Source: Company filings Note: Figures may not sum due to rounding 1 REO (%) includes all the lanthanide elements plus yttrium Central Lanthanide Deposit Rare Earth Grade – Mt. Weld vs. some other projects REO grade (%) Lynas cut-off grade – 2.5%
  • 8. 8 The LAMP facility is strategically located in Malaysia Stable operating environment and a sovereign credit rating of A3 Gebeng is a hub into Asia with exceptional infrastructure Located in close proximity to Kuantan deep- water port with bulk material, liquid and container berths Key reagent products located nearby due to large chemical industry on the east coast of Malaysia Established supplier / manufacturer network within the Gebeng Industrial Estate High quality and well-maintained infrastructure and utilities Access to skilled and competitive labour force Tax free period granted by the Malaysian Industrial Development Association under “strategic pioneer status” Malaysia operations – Lynas Advanced Materials Plant Kangar PERLIS LANGKAWI Alor Setar KEDAH George Town PENANG Ipoh PERAK KELANTAN Kota Baharu TERENGGANU Kuala Terengganu PAHANG Kuantan Johor Baharu JOHOR [Melaka] NEGERI SEMBILAN Seremban SELANGOR Cameron Highlands Kuala Lumpur T H A I L A N D M A L A Y S I A S I N G A P O R E GEBENG SOUTH SEA CHINA Tioman MELAKA
  • 9. 9 Future milestones LAMP continues to ramp up toward Phase 1 nominal capacity (expected Q2 2013) Commissioning of Phase 2 expected in Q2 2013 Ramp-up of Phase 2 in Q3 2013 in line with customer demand First feed to kiln achieved in November 2012 First arrival of Rare Earths concentrate from Mount Weld in November 2012 Initial first feed of concentrate into LAMP rotary kilns in November 2012 Successful commissioning of LAMP cracking and leaching units in January 2013 Initial Rare Earths products produced in February 2013 Lynas Advanced Materials Plant – operational update
  • 10. 10 REO demand growth outlook Sector CAGR 2012-2018 Rare Earths used NiMH Batteries 3.3% La, Nd Magnets 10.1% NdPr, Dy Autocatalysts 6.0% Ce FCCs 8.0% La Metallurgy & FerroSilicon 3.4% CeLa Phosphors -1.2% Eu, Tb, Y, Ce, La Polishing 4.8% CeLa UV Cut 3.0% Ce Optical Glass 5.0% La, Gd Other 3.0% La, Ce, Nd, Pr, Sm, Gd, Y Total demand 5.8% 2015E Expected Global Rare Earths demand by application Demand drivers – Rare Earth uses NiMH Batteries 10% Magnets 27% Autocatalysts 7% FCCs 16% Metallurgy & FerroSilicon 13% Phosphors 7% Polishing 11% UV Cut 2% Optical Glass 3% Other 4%
  • 11. Sep „12 Nov„12 Q1„13 Q2 „13 11 Indicative timeline to first sales and operating cash flow First shipment to LAMP from Mt. Weld First feed to kiln Finished goods Customer qualification Commercial shipments and first sales First cash from sales Next steps Current operational focus is LAMP ramp-up towards Phase 1 nominal capacity Sales & Marketing focus is on completion of customer qualification process and commencement of commercial shipments Commissioning of Phase 2 expected in Q2 2013 TOL issued External View Strong cash flows expected in the near term Nov „12
  • 12. 12 GFC Community Outrage International and Local Reviews IAEA etc Political Uncertainty Sovereign Risk Issues Rare Earth Price Erosion Malaysian GE13 New Company Challenges Along The Way – An External Environment that creates Employee Anxiety
  • 13. The Challenge A People and Culture Perspective. 13 • To create and build an organisation that is capable of surviving but also thriving in a changing external environment • Recruit, On-board, Train new employees • 2009 40 employees; 2013 – 490 employees • Able to deal with uncertainty and continue to grow willing to take on wicked problems • Changing Production Parameters, Cost Structures • Sovereign Risk Issues • Social License to Operate • Focus employee efforts on building a company while at the same time getting ready to Operate a new 800M plant in Malaysia
  • 14. The Challenge - People and Culture Perspective. 14 Biggest Challenge for a start up company • Align Organisational and Employee Goals in a way that contains employee anxiety” so that employees can focus on goal achievement • Development of the Organisational Software • Values, • Organisational Structure, • Role Accountabilities and Responsibilities, • Feedback Mechanisms, Thinking Tools etc • Organisational Software allows the Organisational Hardware – Plant, Equipment, Financial Systems to Operate
  • 15. Psychological Frame Human Behaviour – Seeking New Experiences and Reducing Exposure to Unpleasant Experiences” 15 • Gray believed that personality traits and behaviour could not be explained by classical behavioural conditioning alone. • Gray proposed a “Biopsychological Theory of Personality” • Emphasized the relationship between personality and sensitivity to reinforcement systems of Reward and Punishment • System 1 - Willingness to try something new – New Goal Orientation • Approach Motivation; Impulsivity, Willingness to try something new) , and • System 2 - Work to avoid unpleasant outcomes • Motivation (drive to avoid pain, anxiety, punishment, unpleasant outcomes ) Gray's model of personality is based on two hypothesized brain systems Gray, J.A. (1981). A critique of Eysenck's theory of personality, In H.J. Eysenck (Ed.) A model for personality (pp 246–276) Gray, J.A. (1982). The neuropsychology of anxiety: An enquiry into the functions of the septo-hippocampal system
  • 16. A Biopsychological Frame “Behavioural Activation System” 16 Behavioural Activation System (BAS) • The BAS includes brain regions involved in regulating arousal: cerebral cortex, thalamus, and stratum. • The system is responsive to conditioned and unconditioned reward cues. • BAS regulates approach behaviours and is referred to as the Reward System. Individual BAS Sensitivity • In general, individuals with a more active BAS tend to be more fun seeking, like novelty, change , are more disposed to goal seeking, will respond to seeking novel or new experiences
  • 17. A Biopsychological Frame “Behavioral Inhibition System” 17 Behavioral Inhibition System (BIS) • The BI also includes brain regions involved in regulating arousal: the brain stem, and neocortical projections to the frontal lobe. • BIS is responsive to punishment, novelty, uncertainty, and non-rewarding stimuli. • BIS regulates avoidance behaviours and is often referred to as the Punishment System. Individual BIS Sensitivity • Individuals with more active BIS may be vulnerable to negative emotions, including frustration, anxiety, fear, and sadness • See the risk in things, try to avoid pain or lower anxiety by mitigating risk • Anxiety lowered for Individuals with High BIS sensitivity by • working within prescribed systems and when given work that allows avoidance of something unpleasant – e.g avoid uncertainty in outcomes
  • 18. Psychological Frame – Mapping to People and Culture Systems and Organisational Culture 18 • In an environment that is facing rapid discontinuous change, where social licence to operate and other issues create uncertainty in the workplace • How do we develop and build an organisation and its People and Culture Processes and Systems in a way that enables employees to remain engaged in the business. • How do we deal with BIS and BAS sensitivity in a way that allows ongoing Employee Engagement “The Lynas Way” “A System to Contain Employee Anxiety”
  • 19. Viewing HR System Elements with this Frame in Mind – The Lynas Way 19
  • 20. Viewing HR System Elements with this Frame in Mind – The Lynas Way 20 BIS Sensitivity - Put decision making at an efficient level (consistent with control and risk management) ; Match human capability to role/task complexity BAS Sensitivity – Time Span of Discretions – Pushing Accountability and Empowerment within Time Span of Discretion. BIS Sensitivity – Provides a Frame when the normal gaps in Policy, Procedure and System miss but where people need something to connect to BAS - Sensitivity Codifying Breakthrough Thinking and Risk Taking Provide space for people to try something new BAS - Sensitivity Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” – Higher Levels of Thinking; Spiral Dynamics; Deep Change BIS Sensitivity Emotional Safety Creation through Values Based Discussions and EQ toolsets BIS Sensitivity – Clear Context, Purpose, Quality, Quantity Resources and Timing for Task Work Assignments
  • 21. -21- Dimension 1 - The Way We Organise The Challenge of Leadership “The difficulty is that we have put ourselves to work in organizations so badly put together as to mitigate against our working together effectively. We have too many layers, undefined cross-functional working relationships, false concepts of leadership, unclear leadership accountability and authority, chaotic compensation systems, phony performance systems, unfair incentive systems, false notions of capability and its growth, poor career development processes and on and on. It is these systems that have to be mended. The art is to mend them in such a way as to elicit the behaviours we want in the process.” Source: Elliot Jaques, Requisite Organisation, Cason Hall 1996 Employees come to new organizations from these experiences, effective and creative leadership and behavior in organizations, requires changing the systems and not by trying to change the people.
  • 22. Principles of Lynas Way – The Way We Organise -22- • Role clarity- Accountabilities and Responsibilities Clear • Levels of work (Stratums) – Individuals working within their time span of discretion are naturally expected to have lower anxiety • Task Assigning Role Responsibility (TARR’s) and Task Initiating Role Responsibility – (TIRR’s) – It is clear who can give me work
  • 23. -23- Role Clarity • Clearly Defined Position Descriptions based on application of RACI Mapping across the organisation • Enables people to perform and deliver the required results and behaviour • Ensures people understand how their role and personal performance contributes to the achievement of business strategy • Specifies real accountabilities able to be measured with clarity • Clarifies interdependencies within and between teams and people – who does what! • Provides a framework that focuses on accountabilities, authorities and capabilities required to deliver expected outcomes
  • 24. -24- Stratums - Human Nature and Capability  Organizational hierarchy is a natural human phenomenon and forms according to a relatively predetermined formula, based upon human capability  Capability is defined as the extent to which an individual can handle the complexity of any task  A key measure of capability is how far an individual is able think/project into the future ▬ i.e. Each of us have a different starting point, however, the longer time horizon a person has, the more complex roles they are typically capable of undertaking . Appropriate Structure Contains Anxiety Allowing Structure to Follow Strategy (Removing ambiguity) and allowing individuals discretion to complete work in a way that fits their planning horizon
  • 25. -25- Levels of Work (Stratums) Levels of work define the relative complexity of the tasks that make up the work requirements of particular roles in the organisation. Each level of work: - Requires a different way of thinking - Must provide information laterally - Sets overall Context and Purpose for the Level below - Allocates tasks to the Level below (direct reports)
  • 26. -26- Levels of Work (Stratum) 6 10 - 20 Years Value Delivery 5 5 - 10 Years Strategic Direction 4 2 - 5 Years Strategic Delivery 3 1 - 2 Years Operational Direction 2 3 - 12 Months Operational Delivery 1 0 - 3 Months Operational Execution
  • 27. -27- How Flat Should a Structure be? Role Compression and Effective Organisation Stated Organisation Structure A B C D E F G H I J A B C D E F G H I J What really happens I F G H J A B C D E Should be After Elliott Jacques “Requisite Organisation”; Cason-Hall 1989
  • 28. -28- PROJECT ENGINEER TEAM LEADER SPECIALIST • Safety • Industrial Relations OTHER TEAM LEADER Role Relationships Task Assigning and Task Initiating TARR - only your team leader can assign you tasks (blue box ) TIRR • if previously agreed, the people in green boxes can initiate certain tasks with you TEAM MEMBER Inevitably people perform tasks that are not given to them by their immediate leader. This can cause concern and confusion with respect to who can ask who to do what - In these situations the employee needs to be given clarity on what type of work can be assigned to them and by whom.
  • 29. -29- Dimension 2 - The Lynas Way Work Allocation - CPQQRT Whenever work is allocated to employees (assigned or initiated) the following information should be provided: CONTEXT Context gives clarity around why the task exists, by describing the events/activities/changes that have lead to it at this point in time. PURPOSE Purpose is the objective of what needs to be achieved in relation to the task being assigned and should flow directly from the context. QUANTITY Quantity is defined as the numeric value attached to any task and represents the amount of what ever has to be achieved. QUALITY Quality is defined as the standard that has to be met and can be either objective or subjective RESOURCES Resources are defined as the materials, information, people, money, accountabilities and authorities allocated to the individual to effectively complete the task. TIME Time is the deadline or time available for completion of the task.
  • 30. Dimension 2 - The Lynas Way Work Allocation - CPQQRT 30 BIS Sensitivity • Context ,Purpose, Quality, Quantity, Resources and Timing (CPQQRT) • Reduces Anxiety for BIS ensures that all information and resources for task completion are described on task initiation.
  • 31. Dimension 3 - Lynas Way – Values and Behaviours 31 Values provide a framework that • provide a sense of certainty in times of rapid discontinuous change • provide a reference for when the systems, process and procedures that are either immature-under developed or not in place – a typical start up . Care RelationshipRespect Integrity Courage
  • 32. The Lynas Way – Values and Behaviours 32 BIS Sensitivity • Provides a Frame to fills gaps in Policy, Procedure and System and where people need something to connect with. BAS - Sensitivity • Explicitly States Organisational Acceptance for Breakthrough Thinking and Risk Taking • Encourage organisational time and space for people to try something new
  • 33. Dimension 4 – The Lynas Way People and Relationships 33 • Toolsets beyond the Mechanistic • Cultural Memes, Spiral Dynamics • Developing the Corporate Heart as well as Minds in Corporate Conversations and when problem solving • Formalised Training in 21st Century leadership Topics, modelled in project teams and change efforts • Thinking beyond socialised norms to challenge the role that corporations play in “Shared Value” • Application of “breakthrough thinking” techniques to creating shared value • Visioning – “Remember the Future” – pre meditative states to allow access to subconcious problem solving and goal setting • Shared Value Conversations at the heart of corporate
  • 34. Dimension 4 – The Lynas Way People and Relationships 34 BAS - Sensitivity • Encouraging “Entrepreneurial” and “breakthrough Thinking Approaches” – Higher Levels of Thinking; Spiral Dynamics; Deep Change • Feeds Novelty Seeking, Encouraging Attainment of Goals not yet realisable BIS Sensitivity • Emotional Safety Creation through Values Based Discussions and EQ toolsets • Heart as well as Mind Applied to Problem Solving and People Decisions mitigating anxiety potential negative outcomes.
  • 35. Impact of the Lynas Way on Retention. 35 Lynas Labour Turn Over Rates are Respective Industry Benchmarks (2011-Q1 2013) 23.50 18.9 12.2 14.2 0 5 10 15 20 25 Labour Turn Over WA Labour Turn Over MY Benchmark Lynas http://www.amma.org.au/assets/Policy/Papers/20130227AMMA%20Research%20Paper%20-%20Labour%20Turnover.pdf Hayes Industry Data – Gebeng Industrial Park – Pahang, Malaysia.
  • 36. The Lynas Way – An Integrated HR Framework for a “Developing Company Culture” 36