Introduction
1. Intersection at grades
2. Grade separated intersections
3. Traffic island
4. Terminal facilities
Intersections
• Intersection is the location on a roadway
where two or more approaches from different
directions are meeting.
1. Intersection at Grade
2. Grade separated Intersection
INTERSECTION AT GRADE
• Unchannelized Intersection
• Channelized Intersection
• Rotary Intersection
Classification of Intersection at Grade
A) According to Shape:-
Three legged intersection (T, Y and skewed)
Four legged intersection (Right angled, skewed, offset)
Rotary intersection
B) According to Geometric design features:-
Unchannalized intersection
Channelized intersection
C) According to traffic control:-
Uncontrolled intersection
Controlled Intersection
Signalized intersection
D) According to levels of crossing:-
At grade intersections
Grade separated intersections
Requirements of intersection at
Grade
• At the intersection the area of conflict should be
as small as possible.
• For the vehicles, adequate visibility should be
available.
• The relative speed and angle of approach of
vehicles should be small.
• Sudden change of path should be avoided.
• Proper signs should be provided.
• Proper lighting should be provided for better
visibility at night.
Unchannelized Intersections
• The intersection area is paved and there is
absolutely no restriction to vehicle to use any
part of intersection area.
• Lowest class of intersection
• Easy to design but most complex in traffic
operations resulting in maximum conflict area
and more no of accidents.
Channelized Intersections
• Channelized Intersections is achieved by
introducing islands into the intersectional
area, thus reducing total conflict area
available.
• These are help to channelize turning traffic, to
control their speed and to decrease conflict
area.
Advantages of Channelized
Intersections
• By channelization, vehicles confined to definite
path.
• Conflict areas can be decreased.
• Angle of merging streams can be forced to be flat
angles so as to cause minimum disruption.
• Speed of vehicle can be controlled.
• Refuse islands can be provided for pedestrians.
• Points of conflicts can be separated.
• Signs & traffic devices can be installed.
TRAFFIC ISLANDS
• Traffic islands are raised areas constructed
within the roadway to establish physical
channels through which the vehicular traffic
may be guided.
FUNCTIONS OF TRAFFIC ISLANDS
• Functions of Traffic Islands:-
• To segregate the pedestrians and vehicles.
• To separate traffic into specified paths.
• To reduce conflict areas.
• To increase safety
• To divert traffic from obstacles.
ADVANTAGES OF TRAFFIC
ISLANDS
• It provides smooth and controlled traffic flow.
• It reduces the accident and increase safety
• It gives uniform speed of traffic.
• No need of police control.
DISADVANTAGES OF TRAFFIC
ISLANDS
• It consumes useful traffic area.
• It increases travel distance.
• Width of traffic lane decreases.
TYPES OF TRAFFIC ISLANDS
1. Divisional islands
2. Channelizing islands
3. Pedestrian loading islands
4. Rotary islands
Conflicts at an Intersection
 Crossing conflicts
 Merging conflicts
 Diverging conflicts
VISIBILITY AT INTERSECTIONS
 At intersection where the intersecting roads are of
more or less equal importance & there is no
established priority, visibility should be provided .
 SSD is given by,
 SSD = lag distance + breaking distance
SSD values for different speeds
DESIGN SPEED (km.ph) SAFE SSD (m)
20 20
25 25
30 30
40 45
50 60
60 80
65 90
80 120
100 180
 It is customary to control traffic on the minor road by
STOP or GIVEWAYsign or road markings.
 Such intersection are known as Priority Intersection.
 Priority to the right is a right-of-way system, in which the
driver of a vehicle is required to give way to vehicles
approaching from the right at intersections.
WIDTH OF CARRIAGEWAY
 Width needs to be increased in curves, keeping in mind
mechanical widening and psychological widening.
 Extra Widening = Mechanical Widening +
Psychological Widening
 We = nl ²/2R + V/9.5(R)½
MEDIAN OPENINGS
 At Intersections, where nearly all the traffic travels on the
divided highway and volume is below capacity, the
occasional vehicles may use the median opening either to
come to the through road from the cross road or reverse.
 A bullet nosed median opening designed for the minimum
turning path will meet the requirements.
 A bullet nosed median end is preferable.
 The length of opening depends on the width of median.
Median opening with bullet nosed end
T-INTERSECTION
 It is normally provided for very light traffic and for minor
and local roads.
 For locations where speeds are high and turning
movements are large, it is hazardous.
T-INTERSECTION
Y-INTERSECTION
 Mostly design features are similar to that of T-
Intersections, except where the intersection angle is very
acute.
Y-INTERSECTION
CROSS ROADS
 In case of cross roads, two roads crosses approximately at
right angles.
 Uncontrolled cross roads are very dangerous due to high
accident rate.
CROSS ROADS
STAGGERED INTERSECTION
 The safety at the cross roads can be significantly enhanced
by converting it into a staggered intersection.
 A minimum distance of 35 m is necessary between the
staggered roads.
 A right/left staggered is preferred to left/right stagger
where there are no separate right turning lanes.
STAGGERED INTERSECTION
STAGGERED INTERSECTION
ROTARY INTERSECTION
 A ROTARY INTERSECTION is an enlarged road
intersection where all converging vehicles are forced to
move round a large central island in one direction before
they can weave out of traffic flow into their respective
directions radiating from the central island.
 The main object of providing a rotary are to eliminate the
necessity of stopping even for crossing streams of vehicles
and to reduce area of conflict.
Advantages of rotary intersection
• It ensure one way traffic movement
• Frequent starting and stopping are avoided
• Vehicles move at uniform speed
• It reduces crossing conflicts from 16 to4
• No need of traffic police or signal
• Maintenance is negligible
• Easy movement of right turn traffic
Disadvantages of rotary intersection
• It require large area
• It does not provide any provision for
pedestrian
• Difficult to separate slow traffic movement
• It require may warning and direction sign for
safety
ROTARY DESIGN ELEMENTS
Design Speed
Shape of central island
Radius of entry
Radius at exit
Radius of central island
Weaving length
Width of carriage way at entry and exit
Width of rotary carriageway
Entry and exit angles
Camber and super elevation
Capacity
GRADE SEPARATED INTERSECTIONS
 In a grade separated intersection, the intersecting roadways
are placed at different elevations to allow uninterrupted
traffic movement.
 The grade separated intersections are classified as
OVERPASS and UNDERPASS.
 When the major highway is taken over the road of lesser
importance, it is called as OVERPASS.
 If the major highway is taken by depressing it below the
ground level to cross another road of less importance by
means of under bridge, it is known as UNDERPASS.
TRUMPET INTERSECTIONS
DIAMOND INTERCHANGE
PARTIAL CLOVER LEAF
CLOVER LEAF INTERCHANGE
ADVANTAGES OF GRADE
SEPARATION
It avoids necessity of stopping.
Avoids accidents at intersection.
There is increased safety or turning traffic.
There is overall increase in comfort and convenience to the
motorists and saving in travel time.
It is very useful for expressways.
DISADVANTAGES OF GRADE
SEPARATION
It is very costly.
Where there is limited right of way like built up or urban area
or where topography is not favourable, construction of grade
separation is costly, difficult and undesirable.
TYPES OF GRADE SEPARATED INTERSECTION
 Grade separated intersections without interchange.
 Grade separated intersections with interchange.
 Depending upon no of legs the intersection serves, they are classified
as-
 A) Three-legged Interchange
 T-Intersection
 Y-Intersection
 Partial rotary interchange
B) Four legged interchange
 Diamond Interchange
 Clover leaf interchange
 Rotary Interchange
 Directional Interchange
C) Multi-legged interchange
 Rotary interchange
ROTARY INTERCHANGE
DIRECTIONAL INTERCHANGE
TERMINAL FACILITIES
 Along the highway the terminal facilities required are:-
Bus stops
Bus bays
Drive ways
Footways
• Thank You

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Road marking
Road markingRoad marking
Road marking
 
road markings
road markingsroad markings
road markings
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highways
 
Intersection designs
Intersection designs Intersection designs
Intersection designs
 
Intersection,types
Intersection,typesIntersection,types
Intersection,types
 
Intersections
IntersectionsIntersections
Intersections
 
Types of parking studies
Types of parking studiesTypes of parking studies
Types of parking studies
 
Sight distance
Sight distanceSight distance
Sight distance
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Design of rotary
Design of rotaryDesign of rotary
Design of rotary
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra c
 
Type of traffic signals Ppt
Type of traffic signals PptType of traffic signals Ppt
Type of traffic signals Ppt
 
Hill road
Hill roadHill road
Hill road
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric design
 
Geometric design
Geometric designGeometric design
Geometric design
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
 

Similar a ch. 5 traffic Island.pptx

Lect 28-traffic intersections
Lect 28-traffic intersectionsLect 28-traffic intersections
Lect 28-traffic intersectionsHamidullahFarhang
 
Road Junctions - Transportation Planning
Road Junctions - Transportation PlanningRoad Junctions - Transportation Planning
Road Junctions - Transportation PlanningAkshataParbate1
 
5. TRAFFIC GEOMETRICS (TE) 2170613 GTU
5. TRAFFIC GEOMETRICS (TE) 2170613 GTU5. TRAFFIC GEOMETRICS (TE) 2170613 GTU
5. TRAFFIC GEOMETRICS (TE) 2170613 GTUVATSAL PATEL
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainagenslinkprecinctprojec
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric designNikunj Hindocha
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoSJ Ohi
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptGate20241
 
Roads and its design factors pdf
Roads and its design factors pdfRoads and its design factors pdf
Roads and its design factors pdfSaqib Imran
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2Rron de Guzman
 
Road junction design, parking and signal design
Road junction design, parking and signal designRoad junction design, parking and signal design
Road junction design, parking and signal designAkshay Galav
 
Crossectional Elements of Road.pdf
Crossectional Elements of Road.pdfCrossectional Elements of Road.pdf
Crossectional Elements of Road.pdfTouqeer1
 
Medians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsMedians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsRAMPRASAD KUMAWAT
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineeringCivil Zone
 
67-PPT on Road Safety road Safety .pptx
67-PPT on Road Safety road Safety  .pptx67-PPT on Road Safety road Safety  .pptx
67-PPT on Road Safety road Safety .pptxPranchiJijo
 

Similar a ch. 5 traffic Island.pptx (20)

Lect 28-traffic intersections
Lect 28-traffic intersectionsLect 28-traffic intersections
Lect 28-traffic intersections
 
Road Junctions - Transportation Planning
Road Junctions - Transportation PlanningRoad Junctions - Transportation Planning
Road Junctions - Transportation Planning
 
5. TRAFFIC GEOMETRICS (TE) 2170613 GTU
5. TRAFFIC GEOMETRICS (TE) 2170613 GTU5. TRAFFIC GEOMETRICS (TE) 2170613 GTU
5. TRAFFIC GEOMETRICS (TE) 2170613 GTU
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainage
 
Unit 2
Unit 2Unit 2
Unit 2
 
INTERSECTIONS
INTERSECTIONSINTERSECTIONS
INTERSECTIONS
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Lec04 elements -road_and_drainange
Lec04 elements -road_and_drainangeLec04 elements -road_and_drainange
Lec04 elements -road_and_drainange
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
 
Chapter 3 junction design
Chapter 3 junction designChapter 3 junction design
Chapter 3 junction design
 
Unit_II ARP.pptx
Unit_II ARP.pptxUnit_II ARP.pptx
Unit_II ARP.pptx
 
Roads and its design factors pdf
Roads and its design factors pdfRoads and its design factors pdf
Roads and its design factors pdf
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2
 
Road junction design, parking and signal design
Road junction design, parking and signal designRoad junction design, parking and signal design
Road junction design, parking and signal design
 
Crossectional Elements of Road.pdf
Crossectional Elements of Road.pdfCrossectional Elements of Road.pdf
Crossectional Elements of Road.pdf
 
Medians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsMedians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road margins
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineering
 
67-PPT on Road Safety road Safety .pptx
67-PPT on Road Safety road Safety  .pptx67-PPT on Road Safety road Safety  .pptx
67-PPT on Road Safety road Safety .pptx
 

Último

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 

Último (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

ch. 5 traffic Island.pptx

  • 1. Prof. Mehul M Chavda Design Geometric Design intersection & Traffic Island
  • 2. Introduction 1. Intersection at grades 2. Grade separated intersections 3. Traffic island 4. Terminal facilities
  • 3. Intersections • Intersection is the location on a roadway where two or more approaches from different directions are meeting. 1. Intersection at Grade 2. Grade separated Intersection
  • 4.
  • 5. INTERSECTION AT GRADE • Unchannelized Intersection • Channelized Intersection • Rotary Intersection
  • 6. Classification of Intersection at Grade A) According to Shape:- Three legged intersection (T, Y and skewed) Four legged intersection (Right angled, skewed, offset) Rotary intersection B) According to Geometric design features:- Unchannalized intersection Channelized intersection C) According to traffic control:- Uncontrolled intersection Controlled Intersection Signalized intersection D) According to levels of crossing:- At grade intersections Grade separated intersections
  • 7. Requirements of intersection at Grade • At the intersection the area of conflict should be as small as possible. • For the vehicles, adequate visibility should be available. • The relative speed and angle of approach of vehicles should be small. • Sudden change of path should be avoided. • Proper signs should be provided. • Proper lighting should be provided for better visibility at night.
  • 8.
  • 9. Unchannelized Intersections • The intersection area is paved and there is absolutely no restriction to vehicle to use any part of intersection area. • Lowest class of intersection • Easy to design but most complex in traffic operations resulting in maximum conflict area and more no of accidents.
  • 10.
  • 11. Channelized Intersections • Channelized Intersections is achieved by introducing islands into the intersectional area, thus reducing total conflict area available. • These are help to channelize turning traffic, to control their speed and to decrease conflict area.
  • 12.
  • 13. Advantages of Channelized Intersections • By channelization, vehicles confined to definite path. • Conflict areas can be decreased. • Angle of merging streams can be forced to be flat angles so as to cause minimum disruption. • Speed of vehicle can be controlled. • Refuse islands can be provided for pedestrians. • Points of conflicts can be separated. • Signs & traffic devices can be installed.
  • 14. TRAFFIC ISLANDS • Traffic islands are raised areas constructed within the roadway to establish physical channels through which the vehicular traffic may be guided.
  • 15. FUNCTIONS OF TRAFFIC ISLANDS • Functions of Traffic Islands:- • To segregate the pedestrians and vehicles. • To separate traffic into specified paths. • To reduce conflict areas. • To increase safety • To divert traffic from obstacles.
  • 16. ADVANTAGES OF TRAFFIC ISLANDS • It provides smooth and controlled traffic flow. • It reduces the accident and increase safety • It gives uniform speed of traffic. • No need of police control.
  • 17. DISADVANTAGES OF TRAFFIC ISLANDS • It consumes useful traffic area. • It increases travel distance. • Width of traffic lane decreases.
  • 18. TYPES OF TRAFFIC ISLANDS 1. Divisional islands 2. Channelizing islands 3. Pedestrian loading islands 4. Rotary islands
  • 19.
  • 20.
  • 21. Conflicts at an Intersection  Crossing conflicts  Merging conflicts  Diverging conflicts
  • 22.
  • 23. VISIBILITY AT INTERSECTIONS  At intersection where the intersecting roads are of more or less equal importance & there is no established priority, visibility should be provided .  SSD is given by,  SSD = lag distance + breaking distance
  • 24. SSD values for different speeds DESIGN SPEED (km.ph) SAFE SSD (m) 20 20 25 25 30 30 40 45 50 60 60 80 65 90 80 120 100 180
  • 25.  It is customary to control traffic on the minor road by STOP or GIVEWAYsign or road markings.  Such intersection are known as Priority Intersection.  Priority to the right is a right-of-way system, in which the driver of a vehicle is required to give way to vehicles approaching from the right at intersections.
  • 26. WIDTH OF CARRIAGEWAY  Width needs to be increased in curves, keeping in mind mechanical widening and psychological widening.  Extra Widening = Mechanical Widening + Psychological Widening  We = nl ²/2R + V/9.5(R)½
  • 27. MEDIAN OPENINGS  At Intersections, where nearly all the traffic travels on the divided highway and volume is below capacity, the occasional vehicles may use the median opening either to come to the through road from the cross road or reverse.  A bullet nosed median opening designed for the minimum turning path will meet the requirements.  A bullet nosed median end is preferable.  The length of opening depends on the width of median.
  • 28. Median opening with bullet nosed end
  • 29. T-INTERSECTION  It is normally provided for very light traffic and for minor and local roads.  For locations where speeds are high and turning movements are large, it is hazardous.
  • 31. Y-INTERSECTION  Mostly design features are similar to that of T- Intersections, except where the intersection angle is very acute.
  • 33. CROSS ROADS  In case of cross roads, two roads crosses approximately at right angles.  Uncontrolled cross roads are very dangerous due to high accident rate.
  • 35. STAGGERED INTERSECTION  The safety at the cross roads can be significantly enhanced by converting it into a staggered intersection.  A minimum distance of 35 m is necessary between the staggered roads.  A right/left staggered is preferred to left/right stagger where there are no separate right turning lanes.
  • 38. ROTARY INTERSECTION  A ROTARY INTERSECTION is an enlarged road intersection where all converging vehicles are forced to move round a large central island in one direction before they can weave out of traffic flow into their respective directions radiating from the central island.  The main object of providing a rotary are to eliminate the necessity of stopping even for crossing streams of vehicles and to reduce area of conflict.
  • 39.
  • 40.
  • 41. Advantages of rotary intersection • It ensure one way traffic movement • Frequent starting and stopping are avoided • Vehicles move at uniform speed • It reduces crossing conflicts from 16 to4 • No need of traffic police or signal • Maintenance is negligible • Easy movement of right turn traffic
  • 42. Disadvantages of rotary intersection • It require large area • It does not provide any provision for pedestrian • Difficult to separate slow traffic movement • It require may warning and direction sign for safety
  • 43. ROTARY DESIGN ELEMENTS Design Speed Shape of central island Radius of entry Radius at exit Radius of central island Weaving length Width of carriage way at entry and exit Width of rotary carriageway Entry and exit angles Camber and super elevation Capacity
  • 44. GRADE SEPARATED INTERSECTIONS  In a grade separated intersection, the intersecting roadways are placed at different elevations to allow uninterrupted traffic movement.  The grade separated intersections are classified as OVERPASS and UNDERPASS.  When the major highway is taken over the road of lesser importance, it is called as OVERPASS.  If the major highway is taken by depressing it below the ground level to cross another road of less importance by means of under bridge, it is known as UNDERPASS.
  • 45.
  • 50. ADVANTAGES OF GRADE SEPARATION It avoids necessity of stopping. Avoids accidents at intersection. There is increased safety or turning traffic. There is overall increase in comfort and convenience to the motorists and saving in travel time. It is very useful for expressways.
  • 51. DISADVANTAGES OF GRADE SEPARATION It is very costly. Where there is limited right of way like built up or urban area or where topography is not favourable, construction of grade separation is costly, difficult and undesirable.
  • 52. TYPES OF GRADE SEPARATED INTERSECTION  Grade separated intersections without interchange.  Grade separated intersections with interchange.  Depending upon no of legs the intersection serves, they are classified as-  A) Three-legged Interchange  T-Intersection  Y-Intersection  Partial rotary interchange B) Four legged interchange  Diamond Interchange  Clover leaf interchange  Rotary Interchange  Directional Interchange C) Multi-legged interchange  Rotary interchange