SlideShare una empresa de Scribd logo
1 de 8
Date of Birth:
Addrerss:
Mob:
Email:
Linkedln:
19th
of May 1977
Doha , Qatar
+974 (66527010)
mickhalil@yahoo.com
https://WWW.linkedin.com/profile/view?
id=364241016
Michael Khalil Zaki
Personal Attributes
Professional Architect with Proven track record on Projects & Planning – Excellent analytical skills-
Ability to work under pressure – Comprehensive understanding & experience of purchasing strategies
– Regularly achieving cost saving targets –Ability to manage multiple priorities – Results orientated –
Attention to detail – Handling critical issues – Problem solving.
Education
Sept. 2008: International – Associate Value Specialist – AVS – 2008.
June 2000: BSc in Architectural Engineering, Ain Shams University, EGYPT.
Employment Summary
005/2015 – Present
07/2008 – 04/2015
Construction Manager
Senior Project Engineer
(Acting Construction Manager)
Projacs International Co /
Qatar Olympic Committee
Projacs International Co /
Qatar Olympic Committee
01/2007- 07/2008 Finishing Construction
Manager
Ahmadiah Contracting Co. /
360 Kuwait Project
11/2005- 12/2006 Section Manager Depa Hotels and Interiors Co. /
Holiday Inn Hotel, City Stars
03/2005- 11/2005 Senior site engineer Samsung Samcrete JV Co. /
American University new campus
05/2004- 03/2005 Site Manager Alico Egypt, Aluminum construction Co. /
Smart Village
01/2003- 04/2004 Site Engineer CCC Orascom JV Co. /
City Stars Mall
02/2001- 12/2002 Site Engineer Besix Orascom JV Co. /
Royal Meridien Hotel
07/2000- 02/2001 Technical office Engineer Samcrete Egypt Co. /
International Cairo Airport development
Page 1 / 8 Printed on 20.05.15
Project
Employment History
Job Title: Construction Manager
Employer: Projacs International Co.
Client: Qatar Olympic Committee (QOC)
Industry: Sports / Events
Period: Jul. 2008 – up to present
References: Mr. Abdulhakeem Abdulla projects Director
Reporting to: Director of PSD
Key Responsibilities
• Planned control and managed all aspects of various Maintenance Projects including
procurement strategies for equipment and services.
• Chaired regular Project Meetings with End Users and other Directorates within Qatar Olympic
Committee .
• Order Placement Timing, Supply / Demand Alignment, Material Replenishment and Supplier
Performance.
• Develop, process and implement procurement and requisition policies and procedures for
Sports and Event related equipment.
• Devlop Designs and Drawings in relation to the Project.
• Locate vendors of materials, equipment or supplies.
• Review, evaluate, and approve specifications and requirements for issuing and awarding
quotations and proposals including but not limited to tender preparation and monitoring.
• Preparing high quality Tender Documentation.
• Oversee the Tendering and / or procurement process for Equipment and Services.
• Direct the Technical and Commercial Evaluation of Bids.
• Recommendations, Reviews, Modifications and Additions to the existing contracted
and service agreement policies, procedures and systems.
• Control the Award, Execution and Close Out of the Agreement.
• Monitor transaction compliance (milestones, deliverables, invoicing etc).
• Resolve vendor or contractor grievances, and claims against suppliers.
• Develop operational programs for Installation, Dismantle and Storage of supplied
equipment.
• Develop proposals for legacy and / or disposal of surplus materials.
• Constantly monitor and report on progress of the project to all stakeholders.
• Responsible of all projects at PSD department, service and preparation section as followed:
1- Supply, Installation and Maintenance for all sport flooring (Vinyl, Tartan, Acrylic &
Rubber).
2- Supply, Installation and Maintenance for all sport equipment.
3- Supply, Installation and Maintenance for all Gym equipment.
4- Supply, Installation and Maintenance for all light weight construction.
5- Supply, Installation and Maintenance for all FF&E requirements.
Key Achievements
• Delivering Significant Cost Savings for the Committee.
• Developing QOC specification in terms of (Sport equipment, sport flooring, gym equipment,
electrical equipment, signage and Furniture).
Page 2 / 8 Printed on 20.05.15
Job Title: Finishing Construction Manager
Employer: Ahmadiah Contracting Co.
Client: 360 Kuwait Mall Project
Industry: Retail Shooping
Period: Jan. 2007 - Jul. 2008
References: Mr. Elie Hany (Projects Director)
Reporting to: Project Manager
Key Responsibilities
Responsible for all day to day activities for finishing contractors on site ensuring that project is
delivered to the Client to the required quality standards and within agreed timescales.
Major areas taking care of as followed:
• Responsible of all Finishing works at 360 Kuwait Mall including all trades but not limited
to ( Huge façade structure and stone cladding, block work, plaster work, painting work,
granite cladding and flooring, handrails, bulkheads, false ceiling …. etc).
1. Project Delivery
• Co-ordination between all finishing trades and electromechanical trades.
• Achieve agreed Environmental targets.
• Supervise Procurement schedules completion in line with project requirements.
• Deliver the project within agreed programme timescales.
2. Health & Safety
• Control Safery of Works and create a accident free working environemnt.
3. Quality
• Zero defects from Finishing contractors at handover.
• Achieve agreed Timelines.
• Secure Compliance of all finishing trades.
4. Administration
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Section Manager
Employer: Depa Hotels and Interiors Co.
Client: Holiday Inn Hotel, City Stars
Industry: Hotels
Period: Nov. 2005 - Dec. 2006
References: Mr. Walid Negm (Projects Manager)
Reporting to: Project Manager
Page 3 / 8 Printed on 20.05.15
Key Responsibilities
Responsible for all day to day activities for finishing contractors on site ensuring that project is
delivered to the Client to the required quality standards and within agreed timescales.
Major areas taking care of as followed:
• Responsible of all Finishing works at half of the guest area of the project, leading a team
composed of six junior engineers.
• Responsible of some Structural elements at the project.
• Responsible of Checking of all shopdrawings concerning the guest area.
• Responsible of preparing some of the project methods of statement.
• Responsible of Following up some of the Materials approval.
• Responsible of the hotel swimming pool area.
• Responsible of the sub contractors payments.
1. Project Delivery
• Co-ordination between all finishing trades and electromechanical trades.
• Achieve agreed Environmental targets.
• Supervise Procurement schedules completion in line with project requirements.
• Deliver the project within agreed programme timescales.
2. Health & Safety
• Control Safery of Works and create a accident free working environemnt.
3. Quality
• Zero defects from Finishing contractors at handover.
• Achieve agreed Timelines.
• Secure Compliance of all finishing trades.
4. Administration
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Senior Site Engineer
Employer: Samsung Samcrete JV Co.
Client: American University new campus
Industry: Public buildings
Period: March 2005 - Nov. 2005
References: Mr. Nabil Shafiek (Projects Manager)
Reporting to: Construction Manager
Key Responsibilities
Responsible for all day to day activities for civil and finishing trades on site ensuring that project
is delivered to the Client to the required quality standards and within agreed timescales.
Page 4 / 8 Printed on 20.05.15
Major areas taking care of as followed:
• Responsible of all civil works at the administration building for the new campus.
• Responsible of Checking of some shopdrawings.
• Coordination of multi-discipline finishing activities such as: marble & granite,block work,
ceramic tiling, installation of expansion joint assembly, installation of door hardware &
ironmongery, plastering, rendering, painting, millwork , steel structure, screed, suspended
ceiling & gypsum partitions .
• Responsible of the sub contractors payments.
Job Title: Site Manager
Employer: Alico Egypy, Aluminum construction Co.
Client: Smart Village
Industry: Public buildings
Period: May 2004 - March 2005
References: Mr. Essam Swilam (Projects Manager)
Reporting to: Projects Manager
Key Responsibilities
Totaly Responsible for two projects @ Egypt Smart Village
• First for the Residintial building of the ministry of comunication
-All outer and inner Curtain Walls.
-All Flashing of Curtain Walls.
-Clading for Columns.
-Main Space frame Glass Clading.
-Sky lights .
-Aluminium Loovers.
-Aluminium Doors and Windows.
-Aluminium Gutter system.
• Second For Pavilion Builbing
-Main Spider Façade.
-Inner Curtain Wall.
-Aluminium Doors and Windows.
-Handrails.
-External Loovers.
Key Responsibilities
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Site Engineer
Employer: CCC, Orascom JV Co.
Page 5 / 8 Printed on 20.05.15
Client: City Stars Mall
Industry: Retail Shooping
Period: Jan. 2003 - April 2004
References: Mr. Hazzem Kayyali (Project Manager)
Reporting to: Project Manager
Key Responsibilities
• Direct & close monitoring of multi-discipline finishing activities such as: marble & granite
cladding, bricks & ceramic tiling, installation of expansion joint assembly, installation of
door hardware & ironmongery, plastering, rendering, painting, millwork.
• Supervising several major subcontractors for the following activities: Marble & Granite,
Aluminum, Millwork, Steel & Wood doors, Mirrors and E/M works.
• Dealing with Marble & Granite Supplies, which involved preparation of material orders,
follow up the deliveries, monitor the fabrication progress via factory visits and ensuring
that the quality of the finished product is complying with the project specification.
• Follow up attendance to punch list items in some parts of the project.
• Reviewing the as built drawings related to the areas / activities under my supervision
Job Title: Site Engineer
Employer: Besix, Orascom JV Co.
Client: Le Royal Meridien
Industry: Hotels
Period: Feb. 2001 – Dec. 2002
References: Mr. Alfred Rayniers (Project Manager)
Reporting to: Project Manager
Key Responsibilities
Site FF&E Engineer:
• FF&E Engineer department (Fitting, Furnishing and Equipment) responsible for
coordination of Furniture Vendors (Wooden Furniture, Light Fixture, Artwork, and
Signage) and SOE (Glass Ware, Cutlery, Silver Ware, Linen, etc.)
• In charge of follow-up the installation of the above mentioned items.
• Inspecting furniture at factories and reporting to the Client.
• Following up the quantities delivered.
• Supervising the finishing in rooms and public areas till final handing over.
• Quantity control and comparing the deliveries with contract BOQ and purchase orders.
• Dealing with Contract Terms & Conditions.
• Monitoring and certifying SOE (Small Operating Equipment) handing over to the
Operator.
• Dealing with Contract Terms & Conditions of Marble Subcontractor & Responsible of its
Quality Controle and Installation.
• Dealing with All The Change Variation Orders Concerning The above mentioned subjects.
• Issuing and follow-up of weekly delivery schedules for vendors.
Page 6 / 8 Printed on 20.05.15
• Follow-up of desnagging of FF&E works.
Technical office Engineer:
• Preparing electrical as built drawings.
• Preparingmechanical as built drawings.
• Preparing laundry as built drawings.
• Preparing kitchen as built drawings.
Site Engineer :
• Following up the punch list.
• Following up all the finishing at the guarenty period.
Job Title: Technical Office Engineer
Employer: Samcrete Egypt Co.
Client: Cairo International Airport Developement
Industry: Developement
Period: July 2000 – Feb. 2001
References: Mr. Tareq Fahim (Project Manager)
Reporting to: Technical Office Manager
Key Responsibilities
• Responsible for shop-drawing preparation of:
1- Service Buildings.
2- Gates.
3- Parking Areas.
4- Roods and General Layouts.
Language Skills
 Arabic: Native Speaker
 English: Excellent
 French: Good
Computer Skills
 WINDOWS / OFFICE: ALL VERSIONS
 ARCHTIECT: AUTOCAD
Courses
 PMP introduction course (Certified hours from PMI)
Page 7 / 8 Printed on 20.05.15
Page 8 / 8 Printed on 20.05.15

Más contenido relacionado

La actualidad más candente

Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016Maged Ahmed Ali
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
Sami resume new
Sami resume newSami resume new
Sami resume newsamiuae
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15Amro Ali Ali
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Islam Elshoura
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Jimmy Crooks
 

La actualidad más candente (18)

Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016
 
C V
C VC V
C V
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 

Destacado

Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)?Atef Tayeb
 
Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014ahmed khalifa
 
السيرة الذاتية سامي الراجح انجليزي
السيرة الذاتية سامي الراجح انجليزيالسيرة الذاتية سامي الراجح انجليزي
السيرة الذاتية سامي الراجح انجليزيSAMI ALRAJEH
 
MY UPDATED CV WITH COVER LETTER - Copy
MY UPDATED CV WITH COVER LETTER - CopyMY UPDATED CV WITH COVER LETTER - Copy
MY UPDATED CV WITH COVER LETTER - CopyTahir khan
 
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...Shyamal Biswas
 
Areej Hussieni Fadel
Areej Hussieni FadelAreej Hussieni Fadel
Areej Hussieni FadelAreej Fadel
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cvsaryhasabadly
 

Destacado (15)

Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)
 
Ahmed CV new Aug 2014
Ahmed CV new Aug 2014Ahmed CV new Aug 2014
Ahmed CV new Aug 2014
 
Mohammed Al Naggar Resume
Mohammed Al Naggar ResumeMohammed Al Naggar Resume
Mohammed Al Naggar Resume
 
Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014
 
HITHAM CV
HITHAM CVHITHAM CV
HITHAM CV
 
shahid#2
shahid#2shahid#2
shahid#2
 
السيرة الذاتية سامي الراجح انجليزي
السيرة الذاتية سامي الراجح انجليزيالسيرة الذاتية سامي الراجح انجليزي
السيرة الذاتية سامي الراجح انجليزي
 
MY UPDATED CV WITH COVER LETTER - Copy
MY UPDATED CV WITH COVER LETTER - CopyMY UPDATED CV WITH COVER LETTER - Copy
MY UPDATED CV WITH COVER LETTER - Copy
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
CV of Mohd Al-Naeem (Arch)
CV of Mohd Al-Naeem (Arch)CV of Mohd Al-Naeem (Arch)
CV of Mohd Al-Naeem (Arch)
 
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
 
Areej Hussieni Fadel
Areej Hussieni FadelAreej Hussieni Fadel
Areej Hussieni Fadel
 
Projacs 2014 Company Profile
Projacs 2014 Company ProfileProjacs 2014 Company Profile
Projacs 2014 Company Profile
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
CV - Mohammed El Sayed
CV - Mohammed El SayedCV - Mohammed El Sayed
CV - Mohammed El Sayed
 

Similar a ZAKI Michael_CV 042014

Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)ahmed sirajuddin
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)ahmed sirajuddin
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016Derek Swift
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect wael hassan
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain ProjectKhalid Hussain
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabilMohamed Omer
 

Similar a ZAKI Michael_CV 042014 (20)

Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Civil engineer1(2
Civil engineer1(2Civil engineer1(2
Civil engineer1(2
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
Senior Architect
Senior ArchitectSenior Architect
Senior Architect
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Amir QC
Amir QCAmir QC
Amir QC
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
ezzat al hamed
ezzat al hamedezzat al hamed
ezzat al hamed
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Shady Alakhal
Shady AlakhalShady Alakhal
Shady Alakhal
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
CV_JomarDuyao
CV_JomarDuyaoCV_JomarDuyao
CV_JomarDuyao
 
arch saeed CV
arch  saeed CV arch  saeed CV
arch saeed CV
 

ZAKI Michael_CV 042014

  • 1. Date of Birth: Addrerss: Mob: Email: Linkedln: 19th of May 1977 Doha , Qatar +974 (66527010) mickhalil@yahoo.com https://WWW.linkedin.com/profile/view? id=364241016 Michael Khalil Zaki Personal Attributes Professional Architect with Proven track record on Projects & Planning – Excellent analytical skills- Ability to work under pressure – Comprehensive understanding & experience of purchasing strategies – Regularly achieving cost saving targets –Ability to manage multiple priorities – Results orientated – Attention to detail – Handling critical issues – Problem solving. Education Sept. 2008: International – Associate Value Specialist – AVS – 2008. June 2000: BSc in Architectural Engineering, Ain Shams University, EGYPT. Employment Summary 005/2015 – Present 07/2008 – 04/2015 Construction Manager Senior Project Engineer (Acting Construction Manager) Projacs International Co / Qatar Olympic Committee Projacs International Co / Qatar Olympic Committee 01/2007- 07/2008 Finishing Construction Manager Ahmadiah Contracting Co. / 360 Kuwait Project 11/2005- 12/2006 Section Manager Depa Hotels and Interiors Co. / Holiday Inn Hotel, City Stars 03/2005- 11/2005 Senior site engineer Samsung Samcrete JV Co. / American University new campus 05/2004- 03/2005 Site Manager Alico Egypt, Aluminum construction Co. / Smart Village 01/2003- 04/2004 Site Engineer CCC Orascom JV Co. / City Stars Mall 02/2001- 12/2002 Site Engineer Besix Orascom JV Co. / Royal Meridien Hotel 07/2000- 02/2001 Technical office Engineer Samcrete Egypt Co. / International Cairo Airport development Page 1 / 8 Printed on 20.05.15
  • 2. Project Employment History Job Title: Construction Manager Employer: Projacs International Co. Client: Qatar Olympic Committee (QOC) Industry: Sports / Events Period: Jul. 2008 – up to present References: Mr. Abdulhakeem Abdulla projects Director Reporting to: Director of PSD Key Responsibilities • Planned control and managed all aspects of various Maintenance Projects including procurement strategies for equipment and services. • Chaired regular Project Meetings with End Users and other Directorates within Qatar Olympic Committee . • Order Placement Timing, Supply / Demand Alignment, Material Replenishment and Supplier Performance. • Develop, process and implement procurement and requisition policies and procedures for Sports and Event related equipment. • Devlop Designs and Drawings in relation to the Project. • Locate vendors of materials, equipment or supplies. • Review, evaluate, and approve specifications and requirements for issuing and awarding quotations and proposals including but not limited to tender preparation and monitoring. • Preparing high quality Tender Documentation. • Oversee the Tendering and / or procurement process for Equipment and Services. • Direct the Technical and Commercial Evaluation of Bids. • Recommendations, Reviews, Modifications and Additions to the existing contracted and service agreement policies, procedures and systems. • Control the Award, Execution and Close Out of the Agreement. • Monitor transaction compliance (milestones, deliverables, invoicing etc). • Resolve vendor or contractor grievances, and claims against suppliers. • Develop operational programs for Installation, Dismantle and Storage of supplied equipment. • Develop proposals for legacy and / or disposal of surplus materials. • Constantly monitor and report on progress of the project to all stakeholders. • Responsible of all projects at PSD department, service and preparation section as followed: 1- Supply, Installation and Maintenance for all sport flooring (Vinyl, Tartan, Acrylic & Rubber). 2- Supply, Installation and Maintenance for all sport equipment. 3- Supply, Installation and Maintenance for all Gym equipment. 4- Supply, Installation and Maintenance for all light weight construction. 5- Supply, Installation and Maintenance for all FF&E requirements. Key Achievements • Delivering Significant Cost Savings for the Committee. • Developing QOC specification in terms of (Sport equipment, sport flooring, gym equipment, electrical equipment, signage and Furniture). Page 2 / 8 Printed on 20.05.15
  • 3. Job Title: Finishing Construction Manager Employer: Ahmadiah Contracting Co. Client: 360 Kuwait Mall Project Industry: Retail Shooping Period: Jan. 2007 - Jul. 2008 References: Mr. Elie Hany (Projects Director) Reporting to: Project Manager Key Responsibilities Responsible for all day to day activities for finishing contractors on site ensuring that project is delivered to the Client to the required quality standards and within agreed timescales. Major areas taking care of as followed: • Responsible of all Finishing works at 360 Kuwait Mall including all trades but not limited to ( Huge façade structure and stone cladding, block work, plaster work, painting work, granite cladding and flooring, handrails, bulkheads, false ceiling …. etc). 1. Project Delivery • Co-ordination between all finishing trades and electromechanical trades. • Achieve agreed Environmental targets. • Supervise Procurement schedules completion in line with project requirements. • Deliver the project within agreed programme timescales. 2. Health & Safety • Control Safery of Works and create a accident free working environemnt. 3. Quality • Zero defects from Finishing contractors at handover. • Achieve agreed Timelines. • Secure Compliance of all finishing trades. 4. Administration • Direct a team of employees, designed their time schedule and allotted daily and weekly tasks within the overall project objectives. • Conduct one on one session with the clients to assess client needs and expectations and ensure project delivery within deadline. • Maintained record of all production activities. • Monitor and report on progress of the project to all stakeholders. Job Title: Section Manager Employer: Depa Hotels and Interiors Co. Client: Holiday Inn Hotel, City Stars Industry: Hotels Period: Nov. 2005 - Dec. 2006 References: Mr. Walid Negm (Projects Manager) Reporting to: Project Manager Page 3 / 8 Printed on 20.05.15
  • 4. Key Responsibilities Responsible for all day to day activities for finishing contractors on site ensuring that project is delivered to the Client to the required quality standards and within agreed timescales. Major areas taking care of as followed: • Responsible of all Finishing works at half of the guest area of the project, leading a team composed of six junior engineers. • Responsible of some Structural elements at the project. • Responsible of Checking of all shopdrawings concerning the guest area. • Responsible of preparing some of the project methods of statement. • Responsible of Following up some of the Materials approval. • Responsible of the hotel swimming pool area. • Responsible of the sub contractors payments. 1. Project Delivery • Co-ordination between all finishing trades and electromechanical trades. • Achieve agreed Environmental targets. • Supervise Procurement schedules completion in line with project requirements. • Deliver the project within agreed programme timescales. 2. Health & Safety • Control Safery of Works and create a accident free working environemnt. 3. Quality • Zero defects from Finishing contractors at handover. • Achieve agreed Timelines. • Secure Compliance of all finishing trades. 4. Administration • Direct a team of employees, designed their time schedule and allotted daily and weekly tasks within the overall project objectives. • Conduct one on one session with the clients to assess client needs and expectations and ensure project delivery within deadline. • Maintained record of all production activities. • Monitor and report on progress of the project to all stakeholders. Job Title: Senior Site Engineer Employer: Samsung Samcrete JV Co. Client: American University new campus Industry: Public buildings Period: March 2005 - Nov. 2005 References: Mr. Nabil Shafiek (Projects Manager) Reporting to: Construction Manager Key Responsibilities Responsible for all day to day activities for civil and finishing trades on site ensuring that project is delivered to the Client to the required quality standards and within agreed timescales. Page 4 / 8 Printed on 20.05.15
  • 5. Major areas taking care of as followed: • Responsible of all civil works at the administration building for the new campus. • Responsible of Checking of some shopdrawings. • Coordination of multi-discipline finishing activities such as: marble & granite,block work, ceramic tiling, installation of expansion joint assembly, installation of door hardware & ironmongery, plastering, rendering, painting, millwork , steel structure, screed, suspended ceiling & gypsum partitions . • Responsible of the sub contractors payments. Job Title: Site Manager Employer: Alico Egypy, Aluminum construction Co. Client: Smart Village Industry: Public buildings Period: May 2004 - March 2005 References: Mr. Essam Swilam (Projects Manager) Reporting to: Projects Manager Key Responsibilities Totaly Responsible for two projects @ Egypt Smart Village • First for the Residintial building of the ministry of comunication -All outer and inner Curtain Walls. -All Flashing of Curtain Walls. -Clading for Columns. -Main Space frame Glass Clading. -Sky lights . -Aluminium Loovers. -Aluminium Doors and Windows. -Aluminium Gutter system. • Second For Pavilion Builbing -Main Spider Façade. -Inner Curtain Wall. -Aluminium Doors and Windows. -Handrails. -External Loovers. Key Responsibilities • Direct a team of employees, designed their time schedule and allotted daily and weekly tasks within the overall project objectives. • Conduct one on one session with the clients to assess client needs and expectations and ensure project delivery within deadline. • Maintained record of all production activities. • Monitor and report on progress of the project to all stakeholders. Job Title: Site Engineer Employer: CCC, Orascom JV Co. Page 5 / 8 Printed on 20.05.15
  • 6. Client: City Stars Mall Industry: Retail Shooping Period: Jan. 2003 - April 2004 References: Mr. Hazzem Kayyali (Project Manager) Reporting to: Project Manager Key Responsibilities • Direct & close monitoring of multi-discipline finishing activities such as: marble & granite cladding, bricks & ceramic tiling, installation of expansion joint assembly, installation of door hardware & ironmongery, plastering, rendering, painting, millwork. • Supervising several major subcontractors for the following activities: Marble & Granite, Aluminum, Millwork, Steel & Wood doors, Mirrors and E/M works. • Dealing with Marble & Granite Supplies, which involved preparation of material orders, follow up the deliveries, monitor the fabrication progress via factory visits and ensuring that the quality of the finished product is complying with the project specification. • Follow up attendance to punch list items in some parts of the project. • Reviewing the as built drawings related to the areas / activities under my supervision Job Title: Site Engineer Employer: Besix, Orascom JV Co. Client: Le Royal Meridien Industry: Hotels Period: Feb. 2001 – Dec. 2002 References: Mr. Alfred Rayniers (Project Manager) Reporting to: Project Manager Key Responsibilities Site FF&E Engineer: • FF&E Engineer department (Fitting, Furnishing and Equipment) responsible for coordination of Furniture Vendors (Wooden Furniture, Light Fixture, Artwork, and Signage) and SOE (Glass Ware, Cutlery, Silver Ware, Linen, etc.) • In charge of follow-up the installation of the above mentioned items. • Inspecting furniture at factories and reporting to the Client. • Following up the quantities delivered. • Supervising the finishing in rooms and public areas till final handing over. • Quantity control and comparing the deliveries with contract BOQ and purchase orders. • Dealing with Contract Terms & Conditions. • Monitoring and certifying SOE (Small Operating Equipment) handing over to the Operator. • Dealing with Contract Terms & Conditions of Marble Subcontractor & Responsible of its Quality Controle and Installation. • Dealing with All The Change Variation Orders Concerning The above mentioned subjects. • Issuing and follow-up of weekly delivery schedules for vendors. Page 6 / 8 Printed on 20.05.15
  • 7. • Follow-up of desnagging of FF&E works. Technical office Engineer: • Preparing electrical as built drawings. • Preparingmechanical as built drawings. • Preparing laundry as built drawings. • Preparing kitchen as built drawings. Site Engineer : • Following up the punch list. • Following up all the finishing at the guarenty period. Job Title: Technical Office Engineer Employer: Samcrete Egypt Co. Client: Cairo International Airport Developement Industry: Developement Period: July 2000 – Feb. 2001 References: Mr. Tareq Fahim (Project Manager) Reporting to: Technical Office Manager Key Responsibilities • Responsible for shop-drawing preparation of: 1- Service Buildings. 2- Gates. 3- Parking Areas. 4- Roods and General Layouts. Language Skills  Arabic: Native Speaker  English: Excellent  French: Good Computer Skills  WINDOWS / OFFICE: ALL VERSIONS  ARCHTIECT: AUTOCAD Courses  PMP introduction course (Certified hours from PMI) Page 7 / 8 Printed on 20.05.15
  • 8. Page 8 / 8 Printed on 20.05.15