Step 1: Consult your local fire department or government agency for code
requirements.
• Number and size of exits
• Aisle width
• Number of square feet allotted per customer
Step 2: Measure the dining room
• Square footage for a rectangular area, multiply the length times the width.
• If there are adjoining areas or alcoves, measure them and calculate the
square footage
• Add the results of each measurement together to find the total area in
square feet.
Step 3: Allocate space for wait stations.
• Small wait station needs about 6 to 10 square feet
• Larger station may require 20 to 40 square feet.
• Do the same for other areas where customers will not be seated, such as a
decorative fountain or customer waiting area.
• Subtract the square footage of these areas from the total area of the
dining room
Calculating Square Footage and number of Seats
ChefMichaelScott
LeadChefInstructorAESCA
Boulder
Step 4: Measure the length of the bar, if there is one.
• Allow a strip of floor space along the bar 3 1/2 to 4 feet wide and
multiply this figure by the length of the bar.
• Subtract this area from the square footage available for customer
seating.
Step 5: Choose an appropriate amount of space to allocate per customer.
• For fine dining, you should allow 18 to 20 square feet per customer.
• Full-service restaurants typically have about one seat per 12 to 15
square feet, while fast-food operations reduce this figure to as little as
11 square feet.
• Divide the figure you select into the square footage from step 4.
• Divide total square footage for seating by 12 to 15 for full service.
• Divide total square footage for seating by 11 for fast-food
Step 6: Allow 2 feet of bar length per barstool.
• If the bar is 24 feet long, you can fit 12 barstools in the bar area.
• Add the number of barstools to the seating from step 5 to calculate
seating capacity for the restaurant.
Ratio of square footage for Kitchen compared to Dining Room
40% - Kitchen 60% - Dining
30% - Kitchen 70% - Dining
25% - Kitchen 75% - Dining
ChefMichaelScott
LeadChefInstructorAESCA
Boulder

Más contenido relacionado

Similar a 54 restaurant seating

Cafeteria design Literature Review
Cafeteria design Literature Review Cafeteria design Literature Review
Cafeteria design Literature Review RafiaMShahzad
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannahLakesVillage
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannahLakesVillage
 
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaCHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaMerrileeDelvalle969
 
Design and Layout Presentation.pptx
Design and Layout Presentation.pptxDesign and Layout Presentation.pptx
Design and Layout Presentation.pptxNadiaAbbas7
 
London Borough of Hillingdon
London Borough of Hillingdon London Borough of Hillingdon
London Borough of Hillingdon Foundations
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working DrawingGeeva Chandana
 
Toilet and Bath Working Drawing
Toilet and Bath Working DrawingToilet and Bath Working Drawing
Toilet and Bath Working DrawingGeeva Chandana
 
Kitchen methodology
Kitchen methodologyKitchen methodology
Kitchen methodologykhawaaja
 
PM Assignment Group - 2.pptx
PM Assignment Group - 2.pptxPM Assignment Group - 2.pptx
PM Assignment Group - 2.pptxSUPRIYOBANERJEE31
 
Lawn and Ornamental Equpment and Applications.pptx
Lawn and Ornamental Equpment and Applications.pptxLawn and Ornamental Equpment and Applications.pptx
Lawn and Ornamental Equpment and Applications.pptxPestCEUs
 
Lawn and Ornamental Equpment and Applications.pdf
Lawn and Ornamental Equpment and Applications.pdfLawn and Ornamental Equpment and Applications.pdf
Lawn and Ornamental Equpment and Applications.pdfPestCEUs
 
DPR Lawn and Ornamental Equpment and Applications.pdf
DPR Lawn and Ornamental Equpment and Applications.pdfDPR Lawn and Ornamental Equpment and Applications.pdf
DPR Lawn and Ornamental Equpment and Applications.pdfPestCEUs
 
ITP March 2013 - Paul Wass - Shelter building & minimum needs
ITP March 2013 - Paul Wass - Shelter building & minimum needsITP March 2013 - Paul Wass - Shelter building & minimum needs
ITP March 2013 - Paul Wass - Shelter building & minimum needsDogs Trust
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityAmr El-Ganainy
 
Dogs Trust ITP: Paul Wass - Building a Shelter
Dogs Trust ITP: Paul Wass - Building a ShelterDogs Trust ITP: Paul Wass - Building a Shelter
Dogs Trust ITP: Paul Wass - Building a ShelterDogs Trust
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PMerrileeDelvalle969
 

Similar a 54 restaurant seating (20)

Facility design 1
Facility design   1Facility design   1
Facility design 1
 
Cafeteria design Literature Review
Cafeteria design Literature Review Cafeteria design Literature Review
Cafeteria design Literature Review
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse Renovation
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse Renovation
 
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaCHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
 
Design and Layout Presentation.pptx
Design and Layout Presentation.pptxDesign and Layout Presentation.pptx
Design and Layout Presentation.pptx
 
London Borough of Hillingdon
London Borough of Hillingdon London Borough of Hillingdon
London Borough of Hillingdon
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working Drawing
 
kitchen-200908101834.pdf
kitchen-200908101834.pdfkitchen-200908101834.pdf
kitchen-200908101834.pdf
 
Toilet and Bath Working Drawing
Toilet and Bath Working DrawingToilet and Bath Working Drawing
Toilet and Bath Working Drawing
 
Kitchen methodology
Kitchen methodologyKitchen methodology
Kitchen methodology
 
calibfull.ppt
calibfull.pptcalibfull.ppt
calibfull.ppt
 
PM Assignment Group - 2.pptx
PM Assignment Group - 2.pptxPM Assignment Group - 2.pptx
PM Assignment Group - 2.pptx
 
Lawn and Ornamental Equpment and Applications.pptx
Lawn and Ornamental Equpment and Applications.pptxLawn and Ornamental Equpment and Applications.pptx
Lawn and Ornamental Equpment and Applications.pptx
 
Lawn and Ornamental Equpment and Applications.pdf
Lawn and Ornamental Equpment and Applications.pdfLawn and Ornamental Equpment and Applications.pdf
Lawn and Ornamental Equpment and Applications.pdf
 
DPR Lawn and Ornamental Equpment and Applications.pdf
DPR Lawn and Ornamental Equpment and Applications.pdfDPR Lawn and Ornamental Equpment and Applications.pdf
DPR Lawn and Ornamental Equpment and Applications.pdf
 
ITP March 2013 - Paul Wass - Shelter building & minimum needs
ITP March 2013 - Paul Wass - Shelter building & minimum needsITP March 2013 - Paul Wass - Shelter building & minimum needs
ITP March 2013 - Paul Wass - Shelter building & minimum needs
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing Facility
 
Dogs Trust ITP: Paul Wass - Building a Shelter
Dogs Trust ITP: Paul Wass - Building a ShelterDogs Trust ITP: Paul Wass - Building a Shelter
Dogs Trust ITP: Paul Wass - Building a Shelter
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space P
 

Más de Michael Scott

01 flash cards sample
01 flash cards sample01 flash cards sample
01 flash cards sampleMichael Scott
 
Basic agricultural practices
Basic agricultural practicesBasic agricultural practices
Basic agricultural practicesMichael Scott
 
Inventory with costs
Inventory with costsInventory with costs
Inventory with costsMichael Scott
 
Charcuterie – preserving the hog
Charcuterie – preserving the hogCharcuterie – preserving the hog
Charcuterie – preserving the hogMichael Scott
 
42 tuiles gelatin & foams
42 tuiles gelatin & foams42 tuiles gelatin & foams
42 tuiles gelatin & foamsMichael Scott
 
Day 38 cookies, cakes, pastries
Day 38 cookies, cakes, pastriesDay 38 cookies, cakes, pastries
Day 38 cookies, cakes, pastriesMichael Scott
 
Day 36 custards & laminated dough
Day 36 custards & laminated doughDay 36 custards & laminated dough
Day 36 custards & laminated doughMichael Scott
 
32 breakfast cookery
32 breakfast cookery32 breakfast cookery
32 breakfast cookeryMichael Scott
 
02 practical exam critique sheet foods of americas
02 practical exam critique sheet foods of americas02 practical exam critique sheet foods of americas
02 practical exam critique sheet foods of americasMichael Scott
 
Sour dough instructions
Sour dough instructionsSour dough instructions
Sour dough instructionsMichael Scott
 

Más de Michael Scott (20)

01 flash cards sample
01 flash cards sample01 flash cards sample
01 flash cards sample
 
Basic agricultural practices
Basic agricultural practicesBasic agricultural practices
Basic agricultural practices
 
Inventory with costs
Inventory with costsInventory with costs
Inventory with costs
 
52 costing
52 costing52 costing
52 costing
 
51 menus
51 menus51 menus
51 menus
 
50 introduction
50 introduction50 introduction
50 introduction
 
Hors D’oeuvres
Hors D’oeuvresHors D’oeuvres
Hors D’oeuvres
 
Charcuterie – preserving the hog
Charcuterie – preserving the hogCharcuterie – preserving the hog
Charcuterie – preserving the hog
 
42 tuiles gelatin & foams
42 tuiles gelatin & foams42 tuiles gelatin & foams
42 tuiles gelatin & foams
 
40 cakes
40 cakes40 cakes
40 cakes
 
Day 38 cookies, cakes, pastries
Day 38 cookies, cakes, pastriesDay 38 cookies, cakes, pastries
Day 38 cookies, cakes, pastries
 
Day 37 pies & tarts
Day 37 pies & tartsDay 37 pies & tarts
Day 37 pies & tarts
 
Baking techniques
Baking techniquesBaking techniques
Baking techniques
 
Day 36 custards & laminated dough
Day 36 custards & laminated doughDay 36 custards & laminated dough
Day 36 custards & laminated dough
 
32 breakfast cookery
32 breakfast cookery32 breakfast cookery
32 breakfast cookery
 
30 eggs
30 eggs30 eggs
30 eggs
 
31 breakfasgt
31 breakfasgt31 breakfasgt
31 breakfasgt
 
02 practical exam critique sheet foods of americas
02 practical exam critique sheet foods of americas02 practical exam critique sheet foods of americas
02 practical exam critique sheet foods of americas
 
Corned beef
Corned beefCorned beef
Corned beef
 
Sour dough instructions
Sour dough instructionsSour dough instructions
Sour dough instructions
 

54 restaurant seating

  • 1. Step 1: Consult your local fire department or government agency for code requirements. • Number and size of exits • Aisle width • Number of square feet allotted per customer Step 2: Measure the dining room • Square footage for a rectangular area, multiply the length times the width. • If there are adjoining areas or alcoves, measure them and calculate the square footage • Add the results of each measurement together to find the total area in square feet. Step 3: Allocate space for wait stations. • Small wait station needs about 6 to 10 square feet • Larger station may require 20 to 40 square feet. • Do the same for other areas where customers will not be seated, such as a decorative fountain or customer waiting area. • Subtract the square footage of these areas from the total area of the dining room Calculating Square Footage and number of Seats ChefMichaelScott LeadChefInstructorAESCA Boulder
  • 2. Step 4: Measure the length of the bar, if there is one. • Allow a strip of floor space along the bar 3 1/2 to 4 feet wide and multiply this figure by the length of the bar. • Subtract this area from the square footage available for customer seating. Step 5: Choose an appropriate amount of space to allocate per customer. • For fine dining, you should allow 18 to 20 square feet per customer. • Full-service restaurants typically have about one seat per 12 to 15 square feet, while fast-food operations reduce this figure to as little as 11 square feet. • Divide the figure you select into the square footage from step 4. • Divide total square footage for seating by 12 to 15 for full service. • Divide total square footage for seating by 11 for fast-food Step 6: Allow 2 feet of bar length per barstool. • If the bar is 24 feet long, you can fit 12 barstools in the bar area. • Add the number of barstools to the seating from step 5 to calculate seating capacity for the restaurant. Ratio of square footage for Kitchen compared to Dining Room 40% - Kitchen 60% - Dining 30% - Kitchen 70% - Dining 25% - Kitchen 75% - Dining ChefMichaelScott LeadChefInstructorAESCA Boulder