SlideShare una empresa de Scribd logo
1 de 6
<Project Name>
Quality Assurance Plan
Version <1.0>
Revision History
Date Version Description Author
<dd/mmm/yy> <x.x> <details> <name>
Table of Contents
1. Introduction
1.1 Purpose
1.2 Scope
1.3 Definitions, Acronyms, and Abbreviations
1.4 References
1.5 Overview
2. Quality Objectives
3. Management
3.1 Organization
3.2 Tasks and Responsibilities
4. Documentation
5. Standards and Guidelines
6. Metrics
7. Review and Audit Plan
8. Evaluation and Test
9. Problem Resolution and Corrective Action
10. Tools, Techniques, and Methodologies
11. Configuration Management
12. Supplier and Subcontractor Controls
13. Quality Records
14. Training
15. Risk Management
Quality Assurance Plan
1. Introduction
[The introduction of the Quality Assurance Plan provides an overview of the entire document. It
includes the purpose, scope, definitions, acronyms, abbreviations, references, and overview of this
Quality Assurance Plan.]
1.1 Purpose
[Specify the purpose of this Quality Assurance Plan.]
1.2 Scope
[A brief description of the scope of this Quality Assurance Plan; what Project(s) it is associated
with and anything else that is affected or influenced by this document.]
1.3 Definitions, Acronyms and Abbreviations
[This subsection provides the definitions of all terms, acronyms, and abbreviations required to
properly interpret the Quality Assurance Plan. This information may be provided by reference to
the project's Glossary.]
1.4 References
[This subsection provides a complete list of all documents referenced elsewhere in the Quality
Assurance Plan. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can be obtained. This
information may be provided by reference to an appendix or to another document. For the Quality
Assurance Plan, this should include:
• Documentation Plan
• Measurement Plan
• Test Plan
• Software Development Plan
• Problem Resolution Plan
• Configuration Management Plan
• Subcontractor Management Plan
• Risk Management Plan]
1.5 Overview
[This subsection describes what the rest of the Quality Assurance Plan contains and explains how
the document is organized.]
2. Quality Objectives
[This section needs to reference the section of the Software Requirements Specification that deals
with quality requirements.]
3. Management
3.1 Organization
[Describe the structure of the organization responsible for Quality Assurance. The Rational
Unified Process recommends that the Software Engineering Process Authority (SEPA) be
responsible for the process component of Quality Assurance. The Rational Unified Process
further recommends that the evaluation of product be done within the project (most notably by an
independent test team) and by joint customer/developer review.]
3.2 Tasks and Responsibilities
[Describe the various Quality Assurance tasks that will be carried out for this project and
indicate how they are synchronized with the project's major and minor milestones. These tasks
will include:
• Joint Reviews
• Process Audits
• Process Reviews
• Customer Audits
For each task, identify the team member responsible for its execution.]
4. Documentation
[Enclose the Documentation Plan artifact by reference.
Also, list the minimum documentation that must be produced during the project to ensure that the
software product that is developed satisfies the requirements. The suggested minimum set is:
• Software Development Plan (SDP)
• Test Plan
• Iteration Plans
• Software Requirements Specification (SRS)
• Software Architecture Document
• User Documentation (for example, manuals, guides)
• Configuration Management Plan
Provide pointers to the Development Case to show where in the process the adequacy of these
documents is evaluated.]
5. Standards and Guidelines
[This section references any standards and guidelines that are expected to be used on the project,
and addresses how compliance with these standards and guidelines is to be determined. The
relevant artifacts are enclosed by reference. The suggested set for the Rational Unified Process
is:
• Development Case
• Business Modeling Guidelines
• User-Interface Guidelines
• Use-Case Modeling Guidelines
• Design Guidelines
• Programming Guidelines
• Test Guidelines
• Manual Style Guide]
6. Metrics
[This section describes the product, project, and process metrics that are to be captured and
monitored for the project. This is usually addressed by enclosing the Measurement Plan artifact
by reference.]
7. Review and Audit Plan
[This section contains the Review and Audit Plan. The Review and Audit Plan specifies the
schedule, resources, and methods and procedures to be used in conducting project reviews and
audits. The plan details the various types of reviews and audits to be carried out during the
project, and identifies any external agencies that are expected to approve or regulate the artifacts
produced by the project.
This section should identify:
• Review and Audit Tasks
Describe briefly each type of review and audit that will be carried out on the project. For
each type, identify the project artifacts that will be the subject of the review or audit. These
may include Joint Customer-Developer Technical and Management Reviews, Process
Reviews and Audits, Customer Audits, Internal Technical and Management Reviews.
• Schedule
Detail here the schedule for the reviews and audits. This should include reviews and audits
scheduled at project milestones, as well as reviews that are triggered by delivery of project
artifacts. This subsection may reference the project or iteration plan.
• Organization and Responsibilities
List here the specific groups or individuals to be involved in each of the identified review
and audit activities. Describe briefly the tasks and responsibilities of each. Also, list any
external agencies that are expected to approve or regulate any product of the project.
• Problem Resolution and Corrective Action
This subsection describes the procedures for reporting and handling problems identified
during project reviews and audits. The Problem Resolution Plan may be referenced.
• Tools, Techniques and Methodologies
Describe here any specific tools, techniques or methodologies that are to be used to carry
out the review and audit activities identified in this plan. You should describe the explicit
process to be followed for each type of review or audit. Your organization may have a
standard Review and Audit Procedures Manual, which may be referenced. These procedure
descriptions should also address the collection, storage and archiving of the project’s
Review Records.
A suggested set of reviews and audits (drawn from the Rational Unified Process) to use as a basis
for planning is:
• Requirements Review (maps to the traditional Software Specification Review)
• Architecture Review (maps to the traditional Preliminary Design Review)
• Design Review (maps to the traditional Critical Design Review)
Note that the product-, technique-, criteria-, and metrics- related aspects of these reviews is
addressed in the Rational Unified Process itself and instantiated in the Evaluation Plan
section of the Software Development Plan. The Review and Audit Plan section of the Quality
Assurance Plan will concern itself with the Joint (customer, developer) Review aspects, for
example, artifacts required, responsibilities, conduct of the review meeting, pass or fail
criteria.
• Functional Configuration audit (to verify all requirements in the SRS have been met)
• Physical configuration audit (to verify that the software and its documentation are complete
and ready for delivery)
• Process audits
• Process reviews
• Managerial reviews (Project Approval Review, Project Planning Review, Iteration Plan
Review, PRA Project Review)
• Post-mortem reviews (Iteration Acceptance Review, Lifecycle Milestone Review, Project
Acceptance Review).]
8. Evaluation and Test
[This section references the Software Development Plan (Evaluation Plan section) and the Test
Plan.]
9. Problem Resolution and Corrective Action
[This section references the Problem Resolution Plan.]
10. Tools, Techniques, and Methodologies
[A list of any tools, techniques and methodologies that are to be used when performing Quality
Assurance activities.]
11. Configuration Management
[This section references the Configuration Management Plan.]
12. Supplier and Subcontractor Controls
[This section references the Subcontractor Management Plan.]
13. Quality Records
[Descriptions of the various quality records that will be maintained during the project, including
how and where each type of record will be stored and for how long.]
14. Training
[List here any training activities necessary for the project team to achieve the needs of the Quality
Assurance Plan.]
15. Risk Management
[This section references the Risk Management Plan.]
Note that the product-, technique-, criteria-, and metrics- related aspects of these reviews is
addressed in the Rational Unified Process itself and instantiated in the Evaluation Plan
section of the Software Development Plan. The Review and Audit Plan section of the Quality
Assurance Plan will concern itself with the Joint (customer, developer) Review aspects, for
example, artifacts required, responsibilities, conduct of the review meeting, pass or fail
criteria.
• Functional Configuration audit (to verify all requirements in the SRS have been met)
• Physical configuration audit (to verify that the software and its documentation are complete
and ready for delivery)
• Process audits
• Process reviews
• Managerial reviews (Project Approval Review, Project Planning Review, Iteration Plan
Review, PRA Project Review)
• Post-mortem reviews (Iteration Acceptance Review, Lifecycle Milestone Review, Project
Acceptance Review).]
8. Evaluation and Test
[This section references the Software Development Plan (Evaluation Plan section) and the Test
Plan.]
9. Problem Resolution and Corrective Action
[This section references the Problem Resolution Plan.]
10. Tools, Techniques, and Methodologies
[A list of any tools, techniques and methodologies that are to be used when performing Quality
Assurance activities.]
11. Configuration Management
[This section references the Configuration Management Plan.]
12. Supplier and Subcontractor Controls
[This section references the Subcontractor Management Plan.]
13. Quality Records
[Descriptions of the various quality records that will be maintained during the project, including
how and where each type of record will be stored and for how long.]
14. Training
[List here any training activities necessary for the project team to achieve the needs of the Quality
Assurance Plan.]
15. Risk Management
[This section references the Risk Management Plan.]

Más contenido relacionado

La actualidad más candente

Quality assurance review check list
Quality assurance review check listQuality assurance review check list
Quality assurance review check listzeitgeistr2
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality ManagementGiO Friginal
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2sharon elgarat
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907ahmady
 
Project Quality Planning and KickOff
Project Quality Planning and KickOffProject Quality Planning and KickOff
Project Quality Planning and KickOffkaushikanirudh
 
Introduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsIntroduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsQUONTRASOLUTIONS
 
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...LN Mishra CBAP
 
Ensuring Project Quality Powerpoint Presentation Slides
Ensuring Project Quality Powerpoint Presentation SlidesEnsuring Project Quality Powerpoint Presentation Slides
Ensuring Project Quality Powerpoint Presentation SlidesSlideTeam
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_constructionAdhitomo Wirawan
 
Process_Modeling
Process_ModelingProcess_Modeling
Process_ModelingAshok Kumar
 
Quality in project management
Quality in project management Quality in project management
Quality in project management Zeeshan Azhar
 

La actualidad más candente (20)

Quality assurance review check list
Quality assurance review check listQuality assurance review check list
Quality assurance review check list
 
Ch 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqaCh 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqa
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2
 
Ch 9(spi)cm mi reqm
Ch 9(spi)cm mi reqmCh 9(spi)cm mi reqm
Ch 9(spi)cm mi reqm
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907
 
Project Quality Planning and KickOff
Project Quality Planning and KickOffProject Quality Planning and KickOff
Project Quality Planning and KickOff
 
Introduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsIntroduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutions
 
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
 
Ensuring Project Quality Powerpoint Presentation Slides
Ensuring Project Quality Powerpoint Presentation SlidesEnsuring Project Quality Powerpoint Presentation Slides
Ensuring Project Quality Powerpoint Presentation Slides
 
PMP_Project Quality Management
PMP_Project Quality ManagementPMP_Project Quality Management
PMP_Project Quality Management
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_construction
 
Quality management
Quality managementQuality management
Quality management
 
4 integration
4 integration4 integration
4 integration
 
Process_Modeling
Process_ModelingProcess_Modeling
Process_Modeling
 
Quality in project management
Quality in project management Quality in project management
Quality in project management
 

Similar a QualityAssurancePlan

PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assuranceruth_reategui
 
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.pptChapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.pptBule Hora University
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality planKittitouch Suteeca
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan templateRina Wijaya
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1Jonathan Joyce
 
Spm life cycle phase
Spm life cycle phaseSpm life cycle phase
Spm life cycle phasegollasaidulu1
 
Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
Quality management strategy example
Quality management strategy exampleQuality management strategy example
Quality management strategy exampleselinasimpson1201
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdfAddisu15
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler QualityKumaran637735
 
Quality management strategy prince2
Quality management strategy prince2Quality management strategy prince2
Quality management strategy prince2selinasimpson2601
 

Similar a QualityAssurancePlan (20)

PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assurance
 
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.pptChapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan template
 
Testplan
TestplanTestplan
Testplan
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Chapter 3 - Reviews
Chapter 3 - ReviewsChapter 3 - Reviews
Chapter 3 - Reviews
 
Test plan
Test planTest plan
Test plan
 
Pmb
PmbPmb
Pmb
 
Spm life cycle phase
Spm life cycle phaseSpm life cycle phase
Spm life cycle phase
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
Software Test Planning.pptx
Software Test Planning.pptxSoftware Test Planning.pptx
Software Test Planning.pptx
 
Quality management strategy example
Quality management strategy exampleQuality management strategy example
Quality management strategy example
 
Quality Control
Quality ControlQuality Control
Quality Control
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality
 
Quality management strategy prince2
Quality management strategy prince2Quality management strategy prince2
Quality management strategy prince2
 

QualityAssurancePlan

  • 1. <Project Name> Quality Assurance Plan Version <1.0> Revision History Date Version Description Author <dd/mmm/yy> <x.x> <details> <name> Table of Contents 1. Introduction 1.1 Purpose 1.2 Scope 1.3 Definitions, Acronyms, and Abbreviations 1.4 References 1.5 Overview 2. Quality Objectives 3. Management 3.1 Organization 3.2 Tasks and Responsibilities 4. Documentation 5. Standards and Guidelines 6. Metrics 7. Review and Audit Plan 8. Evaluation and Test 9. Problem Resolution and Corrective Action 10. Tools, Techniques, and Methodologies 11. Configuration Management 12. Supplier and Subcontractor Controls
  • 2. 13. Quality Records 14. Training 15. Risk Management Quality Assurance Plan 1. Introduction [The introduction of the Quality Assurance Plan provides an overview of the entire document. It includes the purpose, scope, definitions, acronyms, abbreviations, references, and overview of this Quality Assurance Plan.] 1.1 Purpose [Specify the purpose of this Quality Assurance Plan.] 1.2 Scope [A brief description of the scope of this Quality Assurance Plan; what Project(s) it is associated with and anything else that is affected or influenced by this document.] 1.3 Definitions, Acronyms and Abbreviations [This subsection provides the definitions of all terms, acronyms, and abbreviations required to properly interpret the Quality Assurance Plan. This information may be provided by reference to the project's Glossary.] 1.4 References [This subsection provides a complete list of all documents referenced elsewhere in the Quality Assurance Plan. Identify each document by title, report number (if applicable), date, and publishing organization. Specify the sources from which the references can be obtained. This information may be provided by reference to an appendix or to another document. For the Quality Assurance Plan, this should include: • Documentation Plan • Measurement Plan • Test Plan • Software Development Plan • Problem Resolution Plan • Configuration Management Plan • Subcontractor Management Plan • Risk Management Plan] 1.5 Overview [This subsection describes what the rest of the Quality Assurance Plan contains and explains how the document is organized.] 2. Quality Objectives [This section needs to reference the section of the Software Requirements Specification that deals with quality requirements.]
  • 3. 3. Management 3.1 Organization [Describe the structure of the organization responsible for Quality Assurance. The Rational Unified Process recommends that the Software Engineering Process Authority (SEPA) be responsible for the process component of Quality Assurance. The Rational Unified Process further recommends that the evaluation of product be done within the project (most notably by an independent test team) and by joint customer/developer review.] 3.2 Tasks and Responsibilities [Describe the various Quality Assurance tasks that will be carried out for this project and indicate how they are synchronized with the project's major and minor milestones. These tasks will include: • Joint Reviews • Process Audits • Process Reviews • Customer Audits For each task, identify the team member responsible for its execution.] 4. Documentation [Enclose the Documentation Plan artifact by reference. Also, list the minimum documentation that must be produced during the project to ensure that the software product that is developed satisfies the requirements. The suggested minimum set is: • Software Development Plan (SDP) • Test Plan • Iteration Plans • Software Requirements Specification (SRS) • Software Architecture Document • User Documentation (for example, manuals, guides) • Configuration Management Plan Provide pointers to the Development Case to show where in the process the adequacy of these documents is evaluated.] 5. Standards and Guidelines [This section references any standards and guidelines that are expected to be used on the project, and addresses how compliance with these standards and guidelines is to be determined. The relevant artifacts are enclosed by reference. The suggested set for the Rational Unified Process is: • Development Case • Business Modeling Guidelines • User-Interface Guidelines • Use-Case Modeling Guidelines • Design Guidelines • Programming Guidelines
  • 4. • Test Guidelines • Manual Style Guide] 6. Metrics [This section describes the product, project, and process metrics that are to be captured and monitored for the project. This is usually addressed by enclosing the Measurement Plan artifact by reference.] 7. Review and Audit Plan [This section contains the Review and Audit Plan. The Review and Audit Plan specifies the schedule, resources, and methods and procedures to be used in conducting project reviews and audits. The plan details the various types of reviews and audits to be carried out during the project, and identifies any external agencies that are expected to approve or regulate the artifacts produced by the project. This section should identify: • Review and Audit Tasks Describe briefly each type of review and audit that will be carried out on the project. For each type, identify the project artifacts that will be the subject of the review or audit. These may include Joint Customer-Developer Technical and Management Reviews, Process Reviews and Audits, Customer Audits, Internal Technical and Management Reviews. • Schedule Detail here the schedule for the reviews and audits. This should include reviews and audits scheduled at project milestones, as well as reviews that are triggered by delivery of project artifacts. This subsection may reference the project or iteration plan. • Organization and Responsibilities List here the specific groups or individuals to be involved in each of the identified review and audit activities. Describe briefly the tasks and responsibilities of each. Also, list any external agencies that are expected to approve or regulate any product of the project. • Problem Resolution and Corrective Action This subsection describes the procedures for reporting and handling problems identified during project reviews and audits. The Problem Resolution Plan may be referenced. • Tools, Techniques and Methodologies Describe here any specific tools, techniques or methodologies that are to be used to carry out the review and audit activities identified in this plan. You should describe the explicit process to be followed for each type of review or audit. Your organization may have a standard Review and Audit Procedures Manual, which may be referenced. These procedure descriptions should also address the collection, storage and archiving of the project’s Review Records. A suggested set of reviews and audits (drawn from the Rational Unified Process) to use as a basis for planning is: • Requirements Review (maps to the traditional Software Specification Review) • Architecture Review (maps to the traditional Preliminary Design Review) • Design Review (maps to the traditional Critical Design Review)
  • 5. Note that the product-, technique-, criteria-, and metrics- related aspects of these reviews is addressed in the Rational Unified Process itself and instantiated in the Evaluation Plan section of the Software Development Plan. The Review and Audit Plan section of the Quality Assurance Plan will concern itself with the Joint (customer, developer) Review aspects, for example, artifacts required, responsibilities, conduct of the review meeting, pass or fail criteria. • Functional Configuration audit (to verify all requirements in the SRS have been met) • Physical configuration audit (to verify that the software and its documentation are complete and ready for delivery) • Process audits • Process reviews • Managerial reviews (Project Approval Review, Project Planning Review, Iteration Plan Review, PRA Project Review) • Post-mortem reviews (Iteration Acceptance Review, Lifecycle Milestone Review, Project Acceptance Review).] 8. Evaluation and Test [This section references the Software Development Plan (Evaluation Plan section) and the Test Plan.] 9. Problem Resolution and Corrective Action [This section references the Problem Resolution Plan.] 10. Tools, Techniques, and Methodologies [A list of any tools, techniques and methodologies that are to be used when performing Quality Assurance activities.] 11. Configuration Management [This section references the Configuration Management Plan.] 12. Supplier and Subcontractor Controls [This section references the Subcontractor Management Plan.] 13. Quality Records [Descriptions of the various quality records that will be maintained during the project, including how and where each type of record will be stored and for how long.] 14. Training [List here any training activities necessary for the project team to achieve the needs of the Quality Assurance Plan.] 15. Risk Management [This section references the Risk Management Plan.]
  • 6. Note that the product-, technique-, criteria-, and metrics- related aspects of these reviews is addressed in the Rational Unified Process itself and instantiated in the Evaluation Plan section of the Software Development Plan. The Review and Audit Plan section of the Quality Assurance Plan will concern itself with the Joint (customer, developer) Review aspects, for example, artifacts required, responsibilities, conduct of the review meeting, pass or fail criteria. • Functional Configuration audit (to verify all requirements in the SRS have been met) • Physical configuration audit (to verify that the software and its documentation are complete and ready for delivery) • Process audits • Process reviews • Managerial reviews (Project Approval Review, Project Planning Review, Iteration Plan Review, PRA Project Review) • Post-mortem reviews (Iteration Acceptance Review, Lifecycle Milestone Review, Project Acceptance Review).] 8. Evaluation and Test [This section references the Software Development Plan (Evaluation Plan section) and the Test Plan.] 9. Problem Resolution and Corrective Action [This section references the Problem Resolution Plan.] 10. Tools, Techniques, and Methodologies [A list of any tools, techniques and methodologies that are to be used when performing Quality Assurance activities.] 11. Configuration Management [This section references the Configuration Management Plan.] 12. Supplier and Subcontractor Controls [This section references the Subcontractor Management Plan.] 13. Quality Records [Descriptions of the various quality records that will be maintained during the project, including how and where each type of record will be stored and for how long.] 14. Training [List here any training activities necessary for the project team to achieve the needs of the Quality Assurance Plan.] 15. Risk Management [This section references the Risk Management Plan.]