Ch.8 Project Quality
Management
Pages 226 - 254 of PMBOK Guide 5th
Edition
Ch.8 Project Quality Management
Quality Management includes creating and following policies and procedures to
ensure that a project meet the defined needs (from the customer’s perspective).
Quality definitions and concepts
Prevention is the better than control. Do it right the
first time. Zero Defects is the goal of quality. Philip
Crosby
Quality is defined as the degree to which the project
fulfills requirements. Or quality means fitness for
use. Joseph Juran
Quality relates to continues improvement of people
and procedures. Kaizan
Quality relates to processes
and procedures not people. Or
quality is the management’s
problem. Management needs
to provide the procedures and
resources for the employees
to produce quality product.
Edwards Deming
Quality Management is
applying the processes that
will ensure the project will
meet the needs for which it
was undertaken
Quality Vs Grade Vs Gold Plating?
Quality is the degree to which
a set of inherent characteristics fulfill
requirements” (ISO 9000)
Ch.8 Processes of Quality Management
• The process of identifying project’s quality requirements and how the
these requirements will be met.
8.1 Plan Quality Management
• Here we apply the quality requirements and audit results from quality
control process to ensure proper procedures are applied.
8.2 Perform Quality Assurance
• In this process we measure and record quality requirements to ensure
quality is achieved and recommend changes if needed.
8.3 Control Quality
8.1 Plan Quality Management: ITTOs
1. Project
Management Plan
2. Stakeholder register
3. Risk Register
4. Requirements
documentation
6. EEF/OPA
1. Cost benefit analysis
2. Cost of Quality (CoQ)
3. Benchmarking
4. Design of experiments
5. Statistical sampling
6. Additional quality
planning tools
7. Meetings
8. Seven basic quality
techniques
1. Quality
management
plan
2. Quality
metrics
3. Quality
checklists
4. Process
improvement
plan
5. Project
document
updates
Input Tools & Techniques Output
The process of identifying quality requirement and/or standards for the
project and product and documenting how the project will demonstrate
compliance.
What is quality for this project ? How will we ensure it?
• Scope Baseline: The Scope Statement of Scope Baseline gives us important
information related to project quality.
• The scope statements contains project deliverables and their acceptance
criteria
• Other elements of the PMP used for planning the quality are the Schedule
Baseline and Cost Baseline
8.1.1.1 Project Management Plan
• It tells us about the stakeholder that are concerned with quality aspect of
the project
8.1.1.2 Stakeholder Register
8.1 Plan Quality Management: Inputs
• It contains information about the risks that may affect the quality of the
project
8.1.1.3 Risk Register
• It includes requirements about quality of the product.
• It will help us better plan Control Quality Process
8.1.1.4 Requirements Documentation
• Government Regulations, Industry Standards, Policies and Procedures,
Historical Information etc
8.1.1.5 EEF/OPA
8.1 Plan Quality Management: Inputs
• We maintain quality to have less rework, lower costs, higher productivity,
and higher costumer satisfaction
• In Cost Benefit Analysis we compare benefits versus the cost of achieving
quality
8.1.2.1 Cost Benefit Analysis
• Balancing between the cost conformance and nonconformance
8.1.2.2 Cost of Quality
8.1.2 Plan Quality Management: T&Ts
Should be
less than
<
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
The whole process is conducted in
brainstorming sessions. The steps
involved are as follow:
1. Identify the problem.
2. Work out the major factors
involved.
3. Identify possible causes.
4. Analyze your diagram
You can also add factors such as
Environment, and Materials or any
other factor deemed related.
Major causes are further investigated. At the end
the whole diagram is analyzed and possible cause
or causes are identified.
1. Cause-and-effect Diagram: Cause-and-effect diagram or fishbone diagram
or Ishikawa diagram is used to find possible causes of a problem or failure
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
3. Checksheet: Used to collect useful data about a problem or its attributes when
performing inspections.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
4. Pareto Diagrams: Pareto thought 80 percent of the quality related problems
are effects of 20 percent of the causes.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
In this example the
distribution of data
is based on a bell
curve. The name
comes from it
shape which like a
bell.
In this example the
highest frequency
of the
measurement was
between 20 and
22. The
occurrence/freque
ncy for this
measurement is
5. Histograms: Histograms are special types of bar charts that show central
tendency, dispersion, and shape of statistical distribution.
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Control Charts are also
used to determine if a
management process is
in control by measuring
factors like schedule or
cost variances, or the
frequency of changes
into scope etc.
1.Upper control limit
2. Lower
control limit
3. Out of control
5.Specification limit: is point determines by
customer, not calculated based on control chart
4. Rule of seven: Out of control if 7
measurements are above or below the mean 6. Normal and expected
variation
Usually 3 or 6 sigma
6. Control Charts: Control Charts are used to know whether a process is stable or
has the desired performance. Control Charts are used for repetitive process e.g
manufacturing
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Once we know that there is a
correlation between the two
variables then we can estimate
how changes to independent
variable can result in a change
in the dependent variable.
Graph a, b, c, and d show
different correlation that may
exist between two variables. For
example in graph b the Y axis
may show number of iteration
and X axis may show number of
bugs found in the software.
7. Scatter Diagram: Scatter Diagram is used to check for correlation between
two variables
• Comparing the project in hand with similar projects completed in the past
in order to identify best practices, and generate new ideas.
8.1.2.4 Benchmarking
• DOE is used to identify factors that can influence different variables of the
product or process
• DOE is used in Plan Quality Management to determine the number and
type of tests needed to achieve the required quality
8.1.2.5 Design of Experiment
8.1 Plan Quality Management: T&Ts
In DOE we can change multiple
variables at a time. In doing so we find
optimal condition for product or process.
Imagine the example on the left is about
producing brick under different
conditions or with an input of different
proportions of the materials
Once we know that various factors can
influence our product in various ways,
we will develop tests or quality check list
for them.
• Statistical Sampling refers to choosing few items as a sample from a
larger group of items.
• Here we do not do the actual sampling but decide on how we will do how
sampling in the coming quality processes
• This will help us in correctly determining the cost of quality.
8.1.2.6 Statistical Sampling
• Brainstorming: Used for generating ideas
• Force Field Analysis: Diagrams of forces for and against change
• Nominal Group Technique: In this technique we vote for ideas to be further
discussed by a larger group of people
• Quality Control and Management Tools: This tools will be explained in the
next process.
8.1.2.7 Other Quality Tools
• Quality related meetings are attended by the project sponsor, project
management, selected project team member, selected stakeholders, team
members that are responsible for quality of the project.
8.1.2.8 Meetings
8.1 Plan Quality Management: T&Ts
8.1 Plan Quality Management: T&Ts
Below is an example of force-field diagram
• Quality management plans explains how organizations quality policies will
be implemented.
• Depending on the project, the plan can be very detailed or simple.
8.1.3.1 Quality Management Plan
• Process Improvement Plan is part of the PMP
• This plan details the steps that will help as in improving various process in
our project.
• The plan is implemented in the QA and QC processes
8.1.3.2 Process Improvement Plan
8.1 Plan Quality Management: Outputs
Areas included in the Process Improvement Plan are as follow:
1. Process Boundaries: The propose of the process, the start and end date, the inputs
and outputs of the process
2. Process Configuration: Graphical depiction of the process
3. Process Metric: Used for measuring process efficiency
4. Targets for Improved Performance: Targets for improvement
• It describes the project or product attributes and how the quality
control process will measure it.
• Examples of quality metrics are finishing the project within the
budget and time, the frequency of defects, failure rate, etc.
• The metrics and the tolerance level for variation is set in Plan Quality
• The attributes are measured in control quality
8.1.3.3 Quality Metrics
• Based on the product requirements a checklist is developed
• The checklist will list the steps to be followed to achieve the
desired quality for the product
• The checklist should also contain the product requirements
8.1.3.4 Quality Checklists
• Risk Register, Requirement Traceability Matrix, and WBS dictionary
are updated
8.1.3.5 Document Update
8.1 Plan Quality Management: Outputs
• It describes the project or product attributes and how the quality
control process will measure it.
• Examples of quality metrics are finishing the project within the
budget and time, the frequency of defects, failure rate, etc.
• The metrics and the tolerance level for variation is set in Plan Quality
• The attributes are measured in control quality
8.1.3.3 Quality Metrics
8.1 Plan Quality Management: Outputs
Metric Standard Frequency Report
Tensile Strength ≥500 MPa Per prototype Monthly Quality
Management
Review (QMR)
Shear Strength ≥ 375 MPa Per prototype Monthly QMR
Customer Satisfaction 8/10 or higher with no
individual score below
7
Per prototype Monthly QMR
Material Waste < 1% based on total
material used per tool
Per prototype Monthly QMR
Product Defect Rate < 1 out of 500 Per production of 500 tools As achieved
• It describes the project or product attributes and how the quality
control process will measure it.
• Examples of quality metrics are finishing the project within the
budget and time, the frequency of defects, failure rate, etc.
• The metrics and the tolerance level for variation is set in Plan Quality
• The attributes are measured in control quality
8.1.3.3 Quality Metrics
8.1 Plan Quality Management: Outputs
Tactical Measure Question Answered Sample Indicator
Time How are we doing against the
schedule?
Schedule Performance Index (SPI) = Earned Value ÷
Planned Value
Cost How are we doing against the
budget?
Cost Performance Index (CPI) = Earned Value ÷ Actual Cost
Resources Are we within anticipated
limits of staff-hours spent?
Amount of hours overspent per software iteration
Scope Have the scope changes
been more than expected?
Number of Change Requests
Action Items Are we keeping up with our
action item list?
Number of action items behind schedule for resolution
8.2 Perform Quality Assurance: ITTOs
1. Quality
Management Plan
2. Process
Improvement Plan
Quality metrics
3.Quality control
measurement
4. Project Documents
1. Quality
Management and
Control Tools
2. Quality audits
3. Process analysis
1.Change Requests
2. Project
management plan
updates
3. Project document
updates
4. OPA updates
Input Tools & Techniques Output
In Quality Assurance we ensure the proper quality related procedures are
followed. We do this by auditing the quality requirements and results received
from Quality Control Process
8.2 Perform Quality Assurance: Data Flow
Diagram
8.2.1 Perform Quality Assurance: Inputs
• It contains plan for quality assurance and process improvement
8.2.1.1 Quality Management Plan
• This will tell us about the project’s process improvement plan which
needs to be aligned with quality assurance process.
8.2.1.2 Process Improvement Plan
• This will tells what we need to measure and what are the allowable
variation for our measurements.
8.2.1.3 Quality Metrics
• These are the measurements taken in the Control Quality Process
• The measurements are used fed back to Quality Assurance in order
to evaluate the effectiveness of quality assurance
procedures/processes
8.2.1.4 Quality Control Measurements
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we use all the tools
that are used in Plan Quality Management and Control Quality
Processes
8.2.2.1 Quality Management and Control Tools
Affinity Diagram……?
• Classifying large number of ideas into groups
8.2.2 Perform Quality Assurance: T&Ts
• In Quality Assurance we use tools used in Plan Quality Management
and Control Quality Processes plus the tools below
8.2.2.1 Quality Management and Control Tools
Process Decision Program Chart (PDPC)
PDPC systematically identifies what might go wrong in a plan under development.
1. You divided in and subdivide a
complex plan into more simple steps
3. You identify possible problems that
will hinder implementing the plan.
4. You identify possible problems that
will hinder implementing the plan.
5. You put O in front of the solutions
that are practical and you put X in
front of the solutions that are not
practical
At the end you either change your plan where there is
no practical solution or prepare yourself accordingly
8.2.2 Perform Quality Assurance: T&Ts
• In Quality Assurance we use tools used in Plan Quality Management
and Control Quality Processes plus the tools below
8.2.2.1 Quality Management and Control Tools
Interrelationship Digraph
It is used for problem identification and problem solving in
complex systems Interrelationship Digraph is usually
used after Case-and-effect diagram,
idea mind mapping, affinity diagram.
Here we construct how different
problems are related to each other.
After constructing the Digraph we start
interpreting it.
Interpretation can be as:
1. An item with large number of outputs e. g “Poor
Scheduling Practice” can be cause of many
effect
2. An item with large number of inputs e. g “Poor
Scheduling of Trucker” can be source of
Quality metrics.
8.2.2 Perform Quality Assurance: T&Ts
• In Quality Assurance we use tools used in Plan Quality Management
and Control Quality Processes plus the tools below
8.2.2.1 Quality Management and Control Tools
Tree Diagram
It is used to show how the general plan is related to specific parts e. g in WBS.
Also it is used to see the results of different decision that we might be making in
our project.
Through Tree Diagram we learn how
different decision can affect our project.
How doing a process in different way
can have an effect on our product. Or
Tree Diagram will help us in better
understanding of the situation and our
future decisions.
8.2.2 Perform Quality Assurance: T&Ts
• In Quality Assurance we use tools used in Plan Quality Management
and Control Quality Processes plus the tools below
8.2.2.1 Quality Management and Control Tools
Network Diagram: Network Diagram shows
how activates are connected to each other. It
helps us understand when are we going to
apply our quality procedures
Matrix Diagram: The matrix diagram shows
relationship between factors, causes, and
objectives.
8.2.2 Perform Quality Assurance: T&Ts
• Quality audits are independent reviews of the quality processes and
procedures of an organization.
• Quality audits can done randomly or on scheduled bases and can be
carried externally or internally.
• Quality audits can confirm implementation of approved changes,
corrective actions, preventive action, or defect repairs.
8.2.2.2 Quality Audits
• In Process Analysis we implement the plan outlined as “Process
Improvement Plan” which was an output to Plan Quality Management
process
• Here we use root-cause analysis which will help us identify problems in our
processes and take preventive actions.
8.2.2.3 Process Analysis
• Change requests related to corrective, preventive, and defect repair
are made.
8.2.3.1 Change Requests
• Quality Management Plan, Scope Management Plan, Schedule
Management Plan, and Cost Management Plan are updated.
8.2.3.2 Project Management Plan updates
• Audit Reports, Training Plans, and Process Documentation are
updated.
8.2.3.3 Project Document Update
• Organization quality standards and quality management systems are
updated
8.2.3.4 OPA Updates
8.2.3 Perform Quality Assurance: Outputs
8.3 Control Quality: ITTOs
1. Project
Management Plan
2. Quality Metrics
3. Quality Checklists
4. Work Performance
Data
5. Approved Change
Requests
6. Deliverables
7. Project
Documents
8. OPA
1. Seven Basic
Quality Tools
2. Statistical
Sampling
3. Inspection
4. Approved
change requests
review
1. Quality Control
Measurements
2. Validated changes
3. Verified deliverables
4. Work Perf Info
5. Change Requests
6. Project Doc updates
7. Project Mangtm Plan
updates
8. OPA updates
Input Tools & Techniques Output
In Control Quality we monitor and record results from executing the quality
activities. We do this mainly for two reason:
1. To identify the cause for poor quality and request change, and 2 Validate the
deliverables to be accepted by stakeholders.
8.3 Control Quality
More Quality Concepts
Prevention Vs
Inspection
Prevention is about
keeping errors out of
process, and
Inspection is about
keeping errors out of
hands of the
customer
Tolerance Vs Control
Limits
Tolerance is a
specified range of
acceptable results,
and Control Limits is
about specifying
boundaries for a
stable process
Attribute Sampling
Vs Variable Sampling
The result of an
attribute either
conforms or does not
conforms, and the
result of variable is
on continue scale
with a degree
conformity
• Quality Management Plan of the Project Management Plan is used
8.3.1.1 Project Management Plan
• It describes project or products attributes and how they will be measured.
• Some examples are: Function Points, Mean Time Between Failure (MTBF),
and Mean Time to Repair (MTTR)
8.3.1.2 Quality Metrics
8.3.1 Control Quality: Inputs
Function Points: In IT, Function Points are used a unit of measurement to count the
number of function an information system providing to a business. The same as we use
hours to measure time.
MTBF: it shows the reliability of product. It specifies the time between two failures that a
product can have. For example an hard disk will have a failure after 300,000 hours.
MTTR: is the average amount of time a device or product will need to be repaired for a
given failure.
• A list that will help us verify that our work will fulfill the requirements
of the product.
8.3.1.3 Quality Checklists
• The data gather from actual which can include planned Vs actual
schedule performance, cost performance and technical performance
8.3.1.4 Work Performance Data
• The changes requested may include defect repairs which needs to
quality controlled and verified
8.1.3.5 Approved Change Requests
8.3 Control Quality: Inputs
• Deliverables are validated in Control Quality process.
8.3.1.6 Deliverables
• Agreements, quality audit documents, training plans and their
assessment, process documentation
8.3.1.7 Project Documents
• Organization’s quality policies, defect reporting procedure, and
communication policy
8.3.1.8 OPA
8.3 Control Quality: Inputs
• These were explained in 8.1.2.3
8.3.2.1 The Seven Basic Quality Tools
• As defined in the Quality Management Plan, samples are selected and tested
8.3.2.2 Statistical Sampling
• Inspection refers to the examination of the product in order to determine
whether it according to the documented standards.
• Inspection can be related to a single activity, part of product, or the whole
product.
• Inspection are also called, review, peer reviews, audits, or walkthroughs.
• Inspections are also used to validate defect repairs.
8.3.2.3 Inspection
• All the approved change requests are reviewed to verify they are
implemented as approved.
8.3.2.4 Approved Change Request Reviews
8.3.2 Control Quality: T&Ts
• Control Quality Measurements are the results of Control Quality process
• These are input to Perform Quality Assurance process
8.3.3.1 Control Quality Measurements
• When a product is changed or repaired after approved changes are
implemented, the change or repair is validated in Control Quality process.
• This is done using Review Approved Change Requests technique
• The change or repaired done is either validated or rejected
8.3.3.2 Validated Changes
• Of the goals of Control Quality is to verify the correctness of deliverables
• Thus deliverables are either verified or rejected for repair or change
• The verified deliverables becomes input to Validate Scope process where
they are formally accepted or rejected.
8.3.3.3 Verified Deliverables
8.3.3 Control Quality: Outputs
• WPI is performance related data that is output to many monitoring
and controlling processes
• In this process WPI will show projects achievement of the
requirements, information about rejections and reasons for the
rejections, also rework required and need for change in quality
processes
8.3.3.4. Work Performance Information
• Change requests in the form of rework, repair, change to management plan
etc are made.
8.3.3.5 Change Requests
• Quality Management Plan, and
• Process Improvement Plans might be updated
8.3.3.6 Project Management Plan Updates
8.3.3 Control Quality: Outputs
• Agreements, quality audit documents, training plans and their assessment,
process documentation
8.3.3.7 Project Document Updates
• Completed Checklists: When checklists are used, the documented
checklist becomes part of project document and OPA
• Lesson Learned Doc: The causes of variances, the reasoning behind the
corrective action selected, and other types of lessons learned stored as
OPA
8.3.3.8 OPA updates
8.3.3 Control Quality: Outputs
Exercise
No Situation What
tool/technique is
used
Which process it is
1 Looking at other similar projects
2 Measuring 4 out of 250 doors
3 Identifying factors that influence
particular variables of a product or
process
4 Finding the most frequent problems
5 Comparing the cost of quality
improvement against the benefits that
it can bring
6 Determining what will be an acceptable
range to define a stable performance
Exercise
No Situation Technique used Which process it is
1 Looking at other similar projects Benchmarking Plan Quality
Management
2 Measuring 4 out of 250 doors Statistical
Smapling
Control Quality
3 Identifying factors that influence
particular variables of a product or
process
Design of
experiments
Plan Quality
Management
4 Finding the most frequent problems Pareto diagram Perform Quality
Assurance
5 Comparing the cost of quality
improvement against the benefits that
it can bring
Cost-benefit
analysis
Plan Quality
Managmeent
6 Determining what will be an acceptable
range to define a stable performance
Control Charts Plan Quality
Management
Exercise
No Situation What
tool/technique is
used
Which process it is
7 Comparing what was done to what was
documented to be done
8 Graphically representing a process to
determine where a process that is
achieving low-quality results might be
failing
9 Taking measurements and comparing
them to the upper and lower
thresholds of variance
10 Collecting data about defects
discovered during inspection
11 Analyzing a graphic with an organized
series of lines displaying issues that
might have led to a defect to examine if
Exercise
No Situation Technique used Which
process it is
7 Comparing what was done to what was
documented to be done
Checksheet Control
Quality
8 Graphically representing a process to determine
where a process that is achieving low-quality
results might be failing
Flowcharting Control
Quality
9 Taking measurements and comparing them to the
upper and lower thresholds of variance
Control chart Control
Quality
10 Collecting data about defects discovered during
inspection
Checksheet Control
Quality
11 Analyzing a graphic with an organized series of
lines displaying issues that might have led to a
defect to examine if the proper process was
followed
Cause and
effect diagram
Perform
Quality
Assurance
12 Collecting many data point to look at the pattern
of relationships or correlation between two
variable
Scatter diagram Control
Quality

Más contenido relacionado

La actualidad más candente

Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaImran Jamil
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control ChecklistAnand Subramaniam
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality ManagementGiO Friginal
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management OverviewDavidMcLachlan1
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardJavid Hamdard
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
Project team management
Project team managementProject team management
Project team managementsirjana Tiwari
 
Project integration management
Project  integration managementProject  integration management
Project integration managementdeep sharma
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution ProcessC K Vishwakarma
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementMohamed Loey
 

La actualidad más candente (20)

Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management Overview
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
 
Project team management
Project team managementProject team management
Project team management
 
Project integration management
Project  integration managementProject  integration management
Project integration management
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 

Similar a Project quality management

projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxHamzaKhawar4
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management proceduresselinasimpson1201
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8Muzette Charles, PMP
 
Quality assurance
Quality assuranceQuality assurance
Quality assuranceSahil Shah
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
 
Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project managementselinasimpson0501
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy templateselinasimpson2701
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagementDhamo daran
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementmzedan
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
romi-pm-08-quality-april2013.pptx
romi-pm-08-quality-april2013.pptxromi-pm-08-quality-april2013.pptx
romi-pm-08-quality-april2013.pptxfauzi chayo
 

Similar a Project quality management (20)

Project quality management
Project quality managementProject quality management
Project quality management
 
projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptx
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
Pmb
PmbPmb
Pmb
 
PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
 
Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project management
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy template
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
romi-pm-08-quality-april2013.pptx
romi-pm-08-quality-april2013.pptxromi-pm-08-quality-april2013.pptx
romi-pm-08-quality-april2013.pptx
 
Session 13 4th edition PMP
Session 13 4th edition PMPSession 13 4th edition PMP
Session 13 4th edition PMP
 

Más de Mohammad Ashraf Khan, PMP (11)

Selecting the Right Project Management Software
Selecting the Right Project Management SoftwareSelecting the Right Project Management Software
Selecting the Right Project Management Software
 
PM FrameWork: Module 4
PM FrameWork: Module 4PM FrameWork: Module 4
PM FrameWork: Module 4
 
PM FrameWork: Module 3
PM FrameWork: Module 3PM FrameWork: Module 3
PM FrameWork: Module 3
 
PM FrameWork: Module 2
PM FrameWork: Module 2PM FrameWork: Module 2
PM FrameWork: Module 2
 
PM FrameWork: Module 1
PM FrameWork: Module 1PM FrameWork: Module 1
PM FrameWork: Module 1
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Project time management 3 final
Project time management 3 finalProject time management 3 final
Project time management 3 final
 
Project time management 2 final
Project time management 2 finalProject time management 2 final
Project time management 2 final
 
Project time management 1 final
Project time management 1 finalProject time management 1 final
Project time management 1 final
 
Project scope management 2
Project scope management 2Project scope management 2
Project scope management 2
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 

Último

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 

Último (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 

Project quality management

  • 1. Ch.8 Project Quality Management Pages 226 - 254 of PMBOK Guide 5th Edition
  • 2. Ch.8 Project Quality Management Quality Management includes creating and following policies and procedures to ensure that a project meet the defined needs (from the customer’s perspective). Quality definitions and concepts Prevention is the better than control. Do it right the first time. Zero Defects is the goal of quality. Philip Crosby Quality is defined as the degree to which the project fulfills requirements. Or quality means fitness for use. Joseph Juran Quality relates to continues improvement of people and procedures. Kaizan Quality relates to processes and procedures not people. Or quality is the management’s problem. Management needs to provide the procedures and resources for the employees to produce quality product. Edwards Deming Quality Management is applying the processes that will ensure the project will meet the needs for which it was undertaken Quality Vs Grade Vs Gold Plating? Quality is the degree to which a set of inherent characteristics fulfill requirements” (ISO 9000)
  • 3. Ch.8 Processes of Quality Management • The process of identifying project’s quality requirements and how the these requirements will be met. 8.1 Plan Quality Management • Here we apply the quality requirements and audit results from quality control process to ensure proper procedures are applied. 8.2 Perform Quality Assurance • In this process we measure and record quality requirements to ensure quality is achieved and recommend changes if needed. 8.3 Control Quality
  • 4. 8.1 Plan Quality Management: ITTOs 1. Project Management Plan 2. Stakeholder register 3. Risk Register 4. Requirements documentation 6. EEF/OPA 1. Cost benefit analysis 2. Cost of Quality (CoQ) 3. Benchmarking 4. Design of experiments 5. Statistical sampling 6. Additional quality planning tools 7. Meetings 8. Seven basic quality techniques 1. Quality management plan 2. Quality metrics 3. Quality checklists 4. Process improvement plan 5. Project document updates Input Tools & Techniques Output The process of identifying quality requirement and/or standards for the project and product and documenting how the project will demonstrate compliance. What is quality for this project ? How will we ensure it?
  • 5. • Scope Baseline: The Scope Statement of Scope Baseline gives us important information related to project quality. • The scope statements contains project deliverables and their acceptance criteria • Other elements of the PMP used for planning the quality are the Schedule Baseline and Cost Baseline 8.1.1.1 Project Management Plan • It tells us about the stakeholder that are concerned with quality aspect of the project 8.1.1.2 Stakeholder Register 8.1 Plan Quality Management: Inputs
  • 6. • It contains information about the risks that may affect the quality of the project 8.1.1.3 Risk Register • It includes requirements about quality of the product. • It will help us better plan Control Quality Process 8.1.1.4 Requirements Documentation • Government Regulations, Industry Standards, Policies and Procedures, Historical Information etc 8.1.1.5 EEF/OPA 8.1 Plan Quality Management: Inputs
  • 7. • We maintain quality to have less rework, lower costs, higher productivity, and higher costumer satisfaction • In Cost Benefit Analysis we compare benefits versus the cost of achieving quality 8.1.2.1 Cost Benefit Analysis • Balancing between the cost conformance and nonconformance 8.1.2.2 Cost of Quality 8.1.2 Plan Quality Management: T&Ts Should be less than <
  • 8. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts The whole process is conducted in brainstorming sessions. The steps involved are as follow: 1. Identify the problem. 2. Work out the major factors involved. 3. Identify possible causes. 4. Analyze your diagram You can also add factors such as Environment, and Materials or any other factor deemed related. Major causes are further investigated. At the end the whole diagram is analyzed and possible cause or causes are identified. 1. Cause-and-effect Diagram: Cause-and-effect diagram or fishbone diagram or Ishikawa diagram is used to find possible causes of a problem or failure
  • 9. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 10. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 11. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 12. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 3. Checksheet: Used to collect useful data about a problem or its attributes when performing inspections.
  • 13. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 4. Pareto Diagrams: Pareto thought 80 percent of the quality related problems are effects of 20 percent of the causes.
  • 14. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts In this example the distribution of data is based on a bell curve. The name comes from it shape which like a bell. In this example the highest frequency of the measurement was between 20 and 22. The occurrence/freque ncy for this measurement is 5. Histograms: Histograms are special types of bar charts that show central tendency, dispersion, and shape of statistical distribution.
  • 15. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Control Charts are also used to determine if a management process is in control by measuring factors like schedule or cost variances, or the frequency of changes into scope etc. 1.Upper control limit 2. Lower control limit 3. Out of control 5.Specification limit: is point determines by customer, not calculated based on control chart 4. Rule of seven: Out of control if 7 measurements are above or below the mean 6. Normal and expected variation Usually 3 or 6 sigma 6. Control Charts: Control Charts are used to know whether a process is stable or has the desired performance. Control Charts are used for repetitive process e.g manufacturing
  • 16. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Once we know that there is a correlation between the two variables then we can estimate how changes to independent variable can result in a change in the dependent variable. Graph a, b, c, and d show different correlation that may exist between two variables. For example in graph b the Y axis may show number of iteration and X axis may show number of bugs found in the software. 7. Scatter Diagram: Scatter Diagram is used to check for correlation between two variables
  • 17. • Comparing the project in hand with similar projects completed in the past in order to identify best practices, and generate new ideas. 8.1.2.4 Benchmarking • DOE is used to identify factors that can influence different variables of the product or process • DOE is used in Plan Quality Management to determine the number and type of tests needed to achieve the required quality 8.1.2.5 Design of Experiment 8.1 Plan Quality Management: T&Ts In DOE we can change multiple variables at a time. In doing so we find optimal condition for product or process. Imagine the example on the left is about producing brick under different conditions or with an input of different proportions of the materials Once we know that various factors can influence our product in various ways, we will develop tests or quality check list for them.
  • 18. • Statistical Sampling refers to choosing few items as a sample from a larger group of items. • Here we do not do the actual sampling but decide on how we will do how sampling in the coming quality processes • This will help us in correctly determining the cost of quality. 8.1.2.6 Statistical Sampling • Brainstorming: Used for generating ideas • Force Field Analysis: Diagrams of forces for and against change • Nominal Group Technique: In this technique we vote for ideas to be further discussed by a larger group of people • Quality Control and Management Tools: This tools will be explained in the next process. 8.1.2.7 Other Quality Tools • Quality related meetings are attended by the project sponsor, project management, selected project team member, selected stakeholders, team members that are responsible for quality of the project. 8.1.2.8 Meetings 8.1 Plan Quality Management: T&Ts
  • 19. 8.1 Plan Quality Management: T&Ts Below is an example of force-field diagram
  • 20. • Quality management plans explains how organizations quality policies will be implemented. • Depending on the project, the plan can be very detailed or simple. 8.1.3.1 Quality Management Plan • Process Improvement Plan is part of the PMP • This plan details the steps that will help as in improving various process in our project. • The plan is implemented in the QA and QC processes 8.1.3.2 Process Improvement Plan 8.1 Plan Quality Management: Outputs Areas included in the Process Improvement Plan are as follow: 1. Process Boundaries: The propose of the process, the start and end date, the inputs and outputs of the process 2. Process Configuration: Graphical depiction of the process 3. Process Metric: Used for measuring process efficiency 4. Targets for Improved Performance: Targets for improvement
  • 21. • It describes the project or product attributes and how the quality control process will measure it. • Examples of quality metrics are finishing the project within the budget and time, the frequency of defects, failure rate, etc. • The metrics and the tolerance level for variation is set in Plan Quality • The attributes are measured in control quality 8.1.3.3 Quality Metrics • Based on the product requirements a checklist is developed • The checklist will list the steps to be followed to achieve the desired quality for the product • The checklist should also contain the product requirements 8.1.3.4 Quality Checklists • Risk Register, Requirement Traceability Matrix, and WBS dictionary are updated 8.1.3.5 Document Update 8.1 Plan Quality Management: Outputs
  • 22. • It describes the project or product attributes and how the quality control process will measure it. • Examples of quality metrics are finishing the project within the budget and time, the frequency of defects, failure rate, etc. • The metrics and the tolerance level for variation is set in Plan Quality • The attributes are measured in control quality 8.1.3.3 Quality Metrics 8.1 Plan Quality Management: Outputs Metric Standard Frequency Report Tensile Strength ≥500 MPa Per prototype Monthly Quality Management Review (QMR) Shear Strength ≥ 375 MPa Per prototype Monthly QMR Customer Satisfaction 8/10 or higher with no individual score below 7 Per prototype Monthly QMR Material Waste < 1% based on total material used per tool Per prototype Monthly QMR Product Defect Rate < 1 out of 500 Per production of 500 tools As achieved
  • 23. • It describes the project or product attributes and how the quality control process will measure it. • Examples of quality metrics are finishing the project within the budget and time, the frequency of defects, failure rate, etc. • The metrics and the tolerance level for variation is set in Plan Quality • The attributes are measured in control quality 8.1.3.3 Quality Metrics 8.1 Plan Quality Management: Outputs Tactical Measure Question Answered Sample Indicator Time How are we doing against the schedule? Schedule Performance Index (SPI) = Earned Value ÷ Planned Value Cost How are we doing against the budget? Cost Performance Index (CPI) = Earned Value ÷ Actual Cost Resources Are we within anticipated limits of staff-hours spent? Amount of hours overspent per software iteration Scope Have the scope changes been more than expected? Number of Change Requests Action Items Are we keeping up with our action item list? Number of action items behind schedule for resolution
  • 24. 8.2 Perform Quality Assurance: ITTOs 1. Quality Management Plan 2. Process Improvement Plan Quality metrics 3.Quality control measurement 4. Project Documents 1. Quality Management and Control Tools 2. Quality audits 3. Process analysis 1.Change Requests 2. Project management plan updates 3. Project document updates 4. OPA updates Input Tools & Techniques Output In Quality Assurance we ensure the proper quality related procedures are followed. We do this by auditing the quality requirements and results received from Quality Control Process
  • 25. 8.2 Perform Quality Assurance: Data Flow Diagram
  • 26. 8.2.1 Perform Quality Assurance: Inputs • It contains plan for quality assurance and process improvement 8.2.1.1 Quality Management Plan • This will tell us about the project’s process improvement plan which needs to be aligned with quality assurance process. 8.2.1.2 Process Improvement Plan • This will tells what we need to measure and what are the allowable variation for our measurements. 8.2.1.3 Quality Metrics • These are the measurements taken in the Control Quality Process • The measurements are used fed back to Quality Assurance in order to evaluate the effectiveness of quality assurance procedures/processes 8.2.1.4 Quality Control Measurements
  • 27. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we use all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Affinity Diagram……? • Classifying large number of ideas into groups
  • 28. 8.2.2 Perform Quality Assurance: T&Ts • In Quality Assurance we use tools used in Plan Quality Management and Control Quality Processes plus the tools below 8.2.2.1 Quality Management and Control Tools Process Decision Program Chart (PDPC) PDPC systematically identifies what might go wrong in a plan under development. 1. You divided in and subdivide a complex plan into more simple steps 3. You identify possible problems that will hinder implementing the plan. 4. You identify possible problems that will hinder implementing the plan. 5. You put O in front of the solutions that are practical and you put X in front of the solutions that are not practical At the end you either change your plan where there is no practical solution or prepare yourself accordingly
  • 29. 8.2.2 Perform Quality Assurance: T&Ts • In Quality Assurance we use tools used in Plan Quality Management and Control Quality Processes plus the tools below 8.2.2.1 Quality Management and Control Tools Interrelationship Digraph It is used for problem identification and problem solving in complex systems Interrelationship Digraph is usually used after Case-and-effect diagram, idea mind mapping, affinity diagram. Here we construct how different problems are related to each other. After constructing the Digraph we start interpreting it. Interpretation can be as: 1. An item with large number of outputs e. g “Poor Scheduling Practice” can be cause of many effect 2. An item with large number of inputs e. g “Poor Scheduling of Trucker” can be source of Quality metrics.
  • 30. 8.2.2 Perform Quality Assurance: T&Ts • In Quality Assurance we use tools used in Plan Quality Management and Control Quality Processes plus the tools below 8.2.2.1 Quality Management and Control Tools Tree Diagram It is used to show how the general plan is related to specific parts e. g in WBS. Also it is used to see the results of different decision that we might be making in our project. Through Tree Diagram we learn how different decision can affect our project. How doing a process in different way can have an effect on our product. Or Tree Diagram will help us in better understanding of the situation and our future decisions.
  • 31. 8.2.2 Perform Quality Assurance: T&Ts • In Quality Assurance we use tools used in Plan Quality Management and Control Quality Processes plus the tools below 8.2.2.1 Quality Management and Control Tools Network Diagram: Network Diagram shows how activates are connected to each other. It helps us understand when are we going to apply our quality procedures Matrix Diagram: The matrix diagram shows relationship between factors, causes, and objectives.
  • 32. 8.2.2 Perform Quality Assurance: T&Ts • Quality audits are independent reviews of the quality processes and procedures of an organization. • Quality audits can done randomly or on scheduled bases and can be carried externally or internally. • Quality audits can confirm implementation of approved changes, corrective actions, preventive action, or defect repairs. 8.2.2.2 Quality Audits • In Process Analysis we implement the plan outlined as “Process Improvement Plan” which was an output to Plan Quality Management process • Here we use root-cause analysis which will help us identify problems in our processes and take preventive actions. 8.2.2.3 Process Analysis
  • 33. • Change requests related to corrective, preventive, and defect repair are made. 8.2.3.1 Change Requests • Quality Management Plan, Scope Management Plan, Schedule Management Plan, and Cost Management Plan are updated. 8.2.3.2 Project Management Plan updates • Audit Reports, Training Plans, and Process Documentation are updated. 8.2.3.3 Project Document Update • Organization quality standards and quality management systems are updated 8.2.3.4 OPA Updates 8.2.3 Perform Quality Assurance: Outputs
  • 34. 8.3 Control Quality: ITTOs 1. Project Management Plan 2. Quality Metrics 3. Quality Checklists 4. Work Performance Data 5. Approved Change Requests 6. Deliverables 7. Project Documents 8. OPA 1. Seven Basic Quality Tools 2. Statistical Sampling 3. Inspection 4. Approved change requests review 1. Quality Control Measurements 2. Validated changes 3. Verified deliverables 4. Work Perf Info 5. Change Requests 6. Project Doc updates 7. Project Mangtm Plan updates 8. OPA updates Input Tools & Techniques Output In Control Quality we monitor and record results from executing the quality activities. We do this mainly for two reason: 1. To identify the cause for poor quality and request change, and 2 Validate the deliverables to be accepted by stakeholders.
  • 35. 8.3 Control Quality More Quality Concepts Prevention Vs Inspection Prevention is about keeping errors out of process, and Inspection is about keeping errors out of hands of the customer Tolerance Vs Control Limits Tolerance is a specified range of acceptable results, and Control Limits is about specifying boundaries for a stable process Attribute Sampling Vs Variable Sampling The result of an attribute either conforms or does not conforms, and the result of variable is on continue scale with a degree conformity
  • 36. • Quality Management Plan of the Project Management Plan is used 8.3.1.1 Project Management Plan • It describes project or products attributes and how they will be measured. • Some examples are: Function Points, Mean Time Between Failure (MTBF), and Mean Time to Repair (MTTR) 8.3.1.2 Quality Metrics 8.3.1 Control Quality: Inputs Function Points: In IT, Function Points are used a unit of measurement to count the number of function an information system providing to a business. The same as we use hours to measure time. MTBF: it shows the reliability of product. It specifies the time between two failures that a product can have. For example an hard disk will have a failure after 300,000 hours. MTTR: is the average amount of time a device or product will need to be repaired for a given failure.
  • 37. • A list that will help us verify that our work will fulfill the requirements of the product. 8.3.1.3 Quality Checklists • The data gather from actual which can include planned Vs actual schedule performance, cost performance and technical performance 8.3.1.4 Work Performance Data • The changes requested may include defect repairs which needs to quality controlled and verified 8.1.3.5 Approved Change Requests 8.3 Control Quality: Inputs
  • 38. • Deliverables are validated in Control Quality process. 8.3.1.6 Deliverables • Agreements, quality audit documents, training plans and their assessment, process documentation 8.3.1.7 Project Documents • Organization’s quality policies, defect reporting procedure, and communication policy 8.3.1.8 OPA 8.3 Control Quality: Inputs
  • 39. • These were explained in 8.1.2.3 8.3.2.1 The Seven Basic Quality Tools • As defined in the Quality Management Plan, samples are selected and tested 8.3.2.2 Statistical Sampling • Inspection refers to the examination of the product in order to determine whether it according to the documented standards. • Inspection can be related to a single activity, part of product, or the whole product. • Inspection are also called, review, peer reviews, audits, or walkthroughs. • Inspections are also used to validate defect repairs. 8.3.2.3 Inspection • All the approved change requests are reviewed to verify they are implemented as approved. 8.3.2.4 Approved Change Request Reviews 8.3.2 Control Quality: T&Ts
  • 40. • Control Quality Measurements are the results of Control Quality process • These are input to Perform Quality Assurance process 8.3.3.1 Control Quality Measurements • When a product is changed or repaired after approved changes are implemented, the change or repair is validated in Control Quality process. • This is done using Review Approved Change Requests technique • The change or repaired done is either validated or rejected 8.3.3.2 Validated Changes • Of the goals of Control Quality is to verify the correctness of deliverables • Thus deliverables are either verified or rejected for repair or change • The verified deliverables becomes input to Validate Scope process where they are formally accepted or rejected. 8.3.3.3 Verified Deliverables 8.3.3 Control Quality: Outputs
  • 41. • WPI is performance related data that is output to many monitoring and controlling processes • In this process WPI will show projects achievement of the requirements, information about rejections and reasons for the rejections, also rework required and need for change in quality processes 8.3.3.4. Work Performance Information • Change requests in the form of rework, repair, change to management plan etc are made. 8.3.3.5 Change Requests • Quality Management Plan, and • Process Improvement Plans might be updated 8.3.3.6 Project Management Plan Updates 8.3.3 Control Quality: Outputs
  • 42. • Agreements, quality audit documents, training plans and their assessment, process documentation 8.3.3.7 Project Document Updates • Completed Checklists: When checklists are used, the documented checklist becomes part of project document and OPA • Lesson Learned Doc: The causes of variances, the reasoning behind the corrective action selected, and other types of lessons learned stored as OPA 8.3.3.8 OPA updates 8.3.3 Control Quality: Outputs
  • 43. Exercise No Situation What tool/technique is used Which process it is 1 Looking at other similar projects 2 Measuring 4 out of 250 doors 3 Identifying factors that influence particular variables of a product or process 4 Finding the most frequent problems 5 Comparing the cost of quality improvement against the benefits that it can bring 6 Determining what will be an acceptable range to define a stable performance
  • 44. Exercise No Situation Technique used Which process it is 1 Looking at other similar projects Benchmarking Plan Quality Management 2 Measuring 4 out of 250 doors Statistical Smapling Control Quality 3 Identifying factors that influence particular variables of a product or process Design of experiments Plan Quality Management 4 Finding the most frequent problems Pareto diagram Perform Quality Assurance 5 Comparing the cost of quality improvement against the benefits that it can bring Cost-benefit analysis Plan Quality Managmeent 6 Determining what will be an acceptable range to define a stable performance Control Charts Plan Quality Management
  • 45. Exercise No Situation What tool/technique is used Which process it is 7 Comparing what was done to what was documented to be done 8 Graphically representing a process to determine where a process that is achieving low-quality results might be failing 9 Taking measurements and comparing them to the upper and lower thresholds of variance 10 Collecting data about defects discovered during inspection 11 Analyzing a graphic with an organized series of lines displaying issues that might have led to a defect to examine if
  • 46. Exercise No Situation Technique used Which process it is 7 Comparing what was done to what was documented to be done Checksheet Control Quality 8 Graphically representing a process to determine where a process that is achieving low-quality results might be failing Flowcharting Control Quality 9 Taking measurements and comparing them to the upper and lower thresholds of variance Control chart Control Quality 10 Collecting data about defects discovered during inspection Checksheet Control Quality 11 Analyzing a graphic with an organized series of lines displaying issues that might have led to a defect to examine if the proper process was followed Cause and effect diagram Perform Quality Assurance 12 Collecting many data point to look at the pattern of relationships or correlation between two variable Scatter diagram Control Quality