SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
Version 8.5.0.1133
Plaxis 8.5
Finite Element Code for Soil and Rock Analyses
PLAXIS
Project description
Project name Step Date User name
REV03
EAST 17 08/19/15 Koxhiyoki Kabuto, Japan
A A
-10.00 0.00 10.00 20.00 30.00 40.00 50.00-10.00 0.00 10.00 20.00 30.00 40.00 50.00-10.00 0.00 10.00 20.00 30.00 40.00 50.00
0.00
10.00
20.00
30.00
40.00
Horizontal displacements (Ux)
Extreme Ux 9.31*10
-3
m
[*10
-3
m]
-1.000
-0.500
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
5.000
5.500
6.000
6.500
7.000
7.500
8.000
8.500
9.000
9.500

Más contenido relacionado

Destacado

Chuong 3 nm (dat yeu)
Chuong 3 nm (dat yeu)Chuong 3 nm (dat yeu)
Chuong 3 nm (dat yeu)robinking277
 
chuyên đề về cừ thép
chuyên đề về cừ thépchuyên đề về cừ thép
chuyên đề về cừ thépluuguxd
 
Da tốt nghiệp
Da tốt nghiệpDa tốt nghiệp
Da tốt nghiệpluuguxd
 
Chuyendetuongchandat7382 120207041112-phpapp01
Chuyendetuongchandat7382 120207041112-phpapp01Chuyendetuongchandat7382 120207041112-phpapp01
Chuyendetuongchandat7382 120207041112-phpapp01Dinh Vuong
 
197521758 146043958-pengoperasian-plaxis-8-2
197521758 146043958-pengoperasian-plaxis-8-2197521758 146043958-pengoperasian-plaxis-8-2
197521758 146043958-pengoperasian-plaxis-8-2WSKT
 
standard materials price list 2011 (PP)
standard materials price list 2011 (PP)standard materials price list 2011 (PP)
standard materials price list 2011 (PP)Chhay Teng
 
Autodesk Revit Structure 2015 Certified Professional Certificate
Autodesk Revit Structure 2015 Certified Professional CertificateAutodesk Revit Structure 2015 Certified Professional Certificate
Autodesk Revit Structure 2015 Certified Professional CertificateMohamed Fouad
 
Vii development length of reinfocing bars
Vii development length of reinfocing barsVii development length of reinfocing bars
Vii development length of reinfocing barsChhay Teng
 
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់National Polytechnic institute of Cambodia
 
Concrete basics
Concrete basicsConcrete basics
Concrete basicsChhay Teng
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-camChhay Teng
 
Geotechnical behaviour of shell foundations
Geotechnical behaviour of shell foundationsGeotechnical behaviour of shell foundations
Geotechnical behaviour of shell foundationsSabna Thilakan
 

Destacado (18)

Chuong 3 nm (dat yeu)
Chuong 3 nm (dat yeu)Chuong 3 nm (dat yeu)
Chuong 3 nm (dat yeu)
 
Do an Geo slope
Do an  Geo slopeDo an  Geo slope
Do an Geo slope
 
chuyên đề về cừ thép
chuyên đề về cừ thépchuyên đề về cừ thép
chuyên đề về cừ thép
 
Da tốt nghiệp
Da tốt nghiệpDa tốt nghiệp
Da tốt nghiệp
 
Chuyendetuongchandat7382 120207041112-phpapp01
Chuyendetuongchandat7382 120207041112-phpapp01Chuyendetuongchandat7382 120207041112-phpapp01
Chuyendetuongchandat7382 120207041112-phpapp01
 
Chuong 4 nm
Chuong 4 nmChuong 4 nm
Chuong 4 nm
 
197521758 146043958-pengoperasian-plaxis-8-2
197521758 146043958-pengoperasian-plaxis-8-2197521758 146043958-pengoperasian-plaxis-8-2
197521758 146043958-pengoperasian-plaxis-8-2
 
standard materials price list 2011 (PP)
standard materials price list 2011 (PP)standard materials price list 2011 (PP)
standard materials price list 2011 (PP)
 
3 d2012 1-tutorial
3 d2012 1-tutorial3 d2012 1-tutorial
3 d2012 1-tutorial
 
TANKS
TANKSTANKS
TANKS
 
Chuyen de tuong_chan_dat_7382
Chuyen de tuong_chan_dat_7382Chuyen de tuong_chan_dat_7382
Chuyen de tuong_chan_dat_7382
 
Pile Group(Total)
Pile Group(Total)Pile Group(Total)
Pile Group(Total)
 
Autodesk Revit Structure 2015 Certified Professional Certificate
Autodesk Revit Structure 2015 Certified Professional CertificateAutodesk Revit Structure 2015 Certified Professional Certificate
Autodesk Revit Structure 2015 Certified Professional Certificate
 
Vii development length of reinfocing bars
Vii development length of reinfocing barsVii development length of reinfocing bars
Vii development length of reinfocing bars
 
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់
វិធីសាស្រ្តក្នុងការគណនារកម៉ាស៊ីនត្រជាក់
 
Concrete basics
Concrete basicsConcrete basics
Concrete basics
 
Available steel-section-list-in-cam
Available steel-section-list-in-camAvailable steel-section-list-in-cam
Available steel-section-list-in-cam
 
Geotechnical behaviour of shell foundations
Geotechnical behaviour of shell foundationsGeotechnical behaviour of shell foundations
Geotechnical behaviour of shell foundations
 

Más de Mohammadhossein Gholampoor (12)

Mohammadhossein gholampoor-CV
Mohammadhossein gholampoor-CVMohammadhossein gholampoor-CV
Mohammadhossein gholampoor-CV
 
Total Geometry
Total GeometryTotal Geometry
Total Geometry
 
FS
FSFS
FS
 
BH6(2m)
BH6(2m)BH6(2m)
BH6(2m)
 
GeoStudio
GeoStudioGeoStudio
GeoStudio
 
kx,ky=0.1,10-4
kx,ky=0.1,10-4kx,ky=0.1,10-4
kx,ky=0.1,10-4
 
AALBORG
AALBORGAALBORG
AALBORG
 
RECOM2
RECOM2RECOM2
RECOM2
 
RECOM1
RECOM1RECOM1
RECOM1
 
Bucket Foundation(Lid+Skirt)
Bucket Foundation(Lid+Skirt)Bucket Foundation(Lid+Skirt)
Bucket Foundation(Lid+Skirt)
 
FLAC 4
FLAC 4FLAC 4
FLAC 4
 
GeoStudio
GeoStudioGeoStudio
GeoStudio
 

Plaxis 8.5 Output_ EAST

  • 1. Version 8.5.0.1133 Plaxis 8.5 Finite Element Code for Soil and Rock Analyses PLAXIS Project description Project name Step Date User name REV03 EAST 17 08/19/15 Koxhiyoki Kabuto, Japan A A -10.00 0.00 10.00 20.00 30.00 40.00 50.00-10.00 0.00 10.00 20.00 30.00 40.00 50.00-10.00 0.00 10.00 20.00 30.00 40.00 50.00 0.00 10.00 20.00 30.00 40.00 Horizontal displacements (Ux) Extreme Ux 9.31*10 -3 m [*10 -3 m] -1.000 -0.500 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000 5.500 6.000 6.500 7.000 7.500 8.000 8.500 9.000 9.500