Month Unplanned
Maintenance
Downtime
(hrs)
No of failures Total
working hrs
Reliability
%
Jan-09 215 70 660 68.25
Feb-09 215.5 52 660 68.17
March-09 182.3 60 660 73.26
April-09 195 72 660 71.31
May-09 192 68 660 71.77
June-09 188.8 100 660 72.26
• Process Reliability=Available Time/Planned Time= total Working time-total
downtime/total Working time-planned downtime.
• Planned Downtime=8hrs/monthly.
Month Unplanned
Maintenance
Downtime (hr/month)
Downtime ratio %
Jan-09 215 32.57
Feb-09 217 32.87
March-09 181.3 27.46
April-09 194.5 29.64
May-09 192 29.09
June-09 188.8 28.60
Total 1188.6 (Range 27-33%)
Average 198.1 30.03
Downtime Ratio=Total Downtime/Total Working Time
UCL = X’+3 sigma= 30.03+ 3x2.2 =36.63%
LCL = X’ +3 sigma=30.03 - 3x2.2 =23.43%
Lower Control Limit
Upper Control Limit
27
28
29
30
31
32
33
34
0 1 2 3 4 5 6 7
DowntimeRatio%
Months
36.63%
23.43%
Standard Deviation σ = √∑(X-Mean)2 / n-1
=2.2
Mean (x’)= ∑X/n
=30.03%
30.03%
Zone A
Zone B
Zone C
X’
LCL
UCL
Zone C
Eng. Mohammed Hamed
X’+3σ
X’+2σ
X’+1σ
X’-1σ
X’-2σ
X’-3σ
36.63
32.23
30.03%
27.83
25.63
23.43
34.43
Target
Current
6σ 6σ
Downtime Analysis
Equip Code Problem Average Monthly
Downtime (hr)
Failure
Frequency
Weight % Classification
304K1 Centrifugal
Fan
54.9 18 27% A
304T1 Bucket
Elevator
38.5 22 19% A
304Z2 Granulator
Drum
35 22 17% A
304WG1 Feed Belt
Conveyor
27 15 13.5 B
304N3 Recycle Belt
Conveyor
13.75 26 6.8% B
304F1 Bag Filter 12.95 11 6.4% B
304U1 Burner 6.5 7 3.2% C
304N7 Belt
Conveyor
3.75 3 1.8% D
304N4 Belt
Conveyor
3.5 3 1.7% D
304T2 Bucket
Elevator
2.25 2 1.2% D
Total 198.1 100%
ROOT CAUSE ANALYSIS
for Main Failures
Level1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7 Level 8
Equip Fan K1
failure
crack in the
foundation
bolts
looseness
poor maint Poor maint
high vibration
unbalance
Process
problem
operation
desgin
poor maint
misalignment Poor maint
foundation
supports
problem
poor maint
high Vibration unbalance
Process
problem
operation
design
Poor maint
bearing noise
Bearing wear
bearing
cocked
high vibration
misalignment Poor maint
unbalance
Process
problem
operation
design
Poor maint
Sealing
damage
Spare parts
reliability
Poor maint
B.housing
problem
Spare parts
reliability
Poor maint
Lubrication
problem
Poor maint
Incorrect
lubricant
Poor maint
Insufficient
lubricant
Poor maint
Fan failure cause No of
failures
% of total Criticality MTBF (hrs)
Bearing 10 55.5 A 66
High noise 4 22.2 B 180
Foundation cracks 2 11.11 B 360
B.housing 1 5.5 C 720
Sealing 1 5.5 C 270
MTBF=Total working time/total no of failures
Main Cause Priority Weight % Root Cause
Vibration 70 Unbalance 40%
Process 20%
High Temp 15 Bad PM 10%
Insufficient lubricant 5%
Others 10 Training
Greasing 5 Routine Maintenance 2.5%
Bad lubricant type 2.5%
What cause
defect?
High Temp
Others
VibrationGreasing
Unbalance
Eng. Mohammed Hamed
Routine Maintenance
Bad lubricant type Process
Failure mode Failure cause Source of
failure
Root cause Failure
characteristics
Failure Effect
Maintenance System
Fan operate
with high
vibration level
Bearing fails Bearing seized Poor Maint Wear in&out High
maintenance
cost
Unexpected
plant
shutdown
Housing wear Deterioration Poor Maint Wear in&out High
maintenance
cost
Unexpected
plant
shutdown
Unbalance fan
blade
Shaft wear Poor Maint Wear in&out High
maintenance
cost
Unexpected
plant
shutdown
Looseness in
foundation
Poor Maint Wear in&out High
maintenance
cost
Unexpected
plant
shutdown
Shaft wear Deterioration Poor Maint Wear in&out High
maintenance
cost
Unexpected
plant
shutdown
The Fan Equip is Critical Grade A….why?
Company’s priorities
Fan Equip
Inspection Sheet Sample:
Check Sheet for PM Maintenance
Sector
(C) Part has been adjusted and
working fine
)Ф(Part is working but with
problem
(O)Part working good
(X( part require maintenance or
change
‫فحصه‬ ‫المراد‬ ‫البند‬ ‫تاريخ‬
‫وساعه‬
‫الفحص‬
1May
2May
3May
4May
5May
6May
Fan K1
Check
vibration
Check Temp
Check Grease
Level
Check all bolts
& nuts
Clean the fan
blade
Grease the
bearing
Visual
inspection
(noise,
leakage..etc)
Notes
Signature
Routine
Maintenance
Checklists
Cleaning
Visual Inspection
Tighten Bolts & Nuts
Adjusting
Greasing & Oiling
Overall Equipment Test
Advantages of Checklists
Checklists or routine maintenance planning:
Policy Routine
Maintenance
Level Duration (hr) Required Labor
Routine
Maintenance
Check Vibration
Daily 1 2
Check Temp
Check Grease Level
Check all bolts & nuts
Clean the fan blade
Visual inspect (check
for noise, leakage,
seals condition…etc
To be done during the
daily shutdown
What is Preventive Maintenance (PM)?
Perform maintenance in a specific part of the equipment whether the equipment
need it or not in a specific time period.
TPM
Maximize your resources usage.
Make all feel about the importance of the maintenance.
Reduce gap between production & maintenance teams.
TPM Benefits:
Total Productive Maintenance (TPM) is the maintenance sub-
system of Lean Manufacturing. TPM improves manufacturing
performance by reducing cost, improving quality and increasing
productivity.
A useful 5S tools to be
used with maintenance
& production
Red Tag Can be Used as a useful tool to apply the 5S in maintenance
Illustrate
equip
status
illustrate what type
of maintenance done
today
Red Tag is Called
the Silent Talker
1) Check the job description and the organization chart.
2) Check the working procedures in place.
3) Calibration process( as the auditee to explain the calibration process).
4) Check if there is calibration procedure in place.
5) Check the equipment calibration list.
6) Ask the auditee about the input and out put of the calibration process.
7) Check if there is a system for ensuring the competency of maintenance
personnel.
8) Check if the maintenance personnel will be provided with special training.
9) Ask the auditee to describe the process of the preventive maintenance.
10)Check if there is a preventive maintenance plan.
11)Check the bases for determining the extent and frequency of maintenance
tasks.
12)Ask the planner to describe the process of planning.
13)Check who is responsible for planning of the preventive maintenance works.
14)Check the code structure of the work orders.
Maintenance Policy Ideal Asfour
Now
Reactive 10% 50%
Preventive 25-35% 50%
Predictive 45-55% 0%
Proactive Balance 0%
“Reliability Magazines Report”
Worse Maintenance Policy “fix when it broke down”
Eng. Mohammed Hamed
Target should be reducing reactive & increase planned maintenance
Japan called it
Fire Fighting
FF
JAPAN Consider it the worst
maintenance policy in the world!!
More than 50% of Maintenance work is considered as Reactive.
Reactive or corrective maintenance has negative effect on the system, resources,
and equipments.
Best case Performance Analysis
Mean Time Between Failure
Best Condition (Manufacturer) MTBF
Reliable Bearing 2160
Worst Condition MTBF
Current Bearing 66
If we managed to achieve the manufacturer rate this will reduce the
downtime average to 170.65hrs instead of 198.1
Zone A
Zone B
Zone C
X’
LCL
UCL
Zone C
Eng. Mohammed Hamed
X’+3σ
X’+2σ
X’+1σ
X’-1σ
X’-2σ
X’-3σ
36.63
32.23
30.03%
27.83
25.63
23.43
34.43
170/660= 25.75% (In the Excellent Area).
Change
Management
 Changing the maintenance team & production labor’s culture from reactive to
preventive & proactive policies.
 Give training to the maintenance technicians & to the operators.
 Applying the TPM will reduce the resources required to do the routine
maintenance.
RECOMMENDATIONS
A POWERFUL FACTORY
Prepared by: Eng. Mohammed Hamed
Email: mhamed206@yahoo.com

Más contenido relacionado

La actualidad más candente

An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)abasathab
 
Project Proposal for Predictive Maintenance Power Plant
Project Proposal for Predictive Maintenance Power PlantProject Proposal for Predictive Maintenance Power Plant
Project Proposal for Predictive Maintenance Power PlantFerdous Kabir
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and ProgramRicky Smith CMRP
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered MaintenanceRonald Shewchuk
 
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibrationคาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar CalibrationPrecision Tooling Services Co., Ltd.
 
Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...MECandPMV
 
MTM & Lean Application Case Studies
MTM & Lean Application Case StudiesMTM & Lean Application Case Studies
MTM & Lean Application Case StudiesTmtm Tmtm
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
Maintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking DataMaintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking DataRicky Smith CMRP, CMRT
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Priyanshu
 
Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Luis Cabrera
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeMatthew Clemens
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenancefljungbe
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2Matthew Clemens
 

La actualidad más candente (20)

An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)
 
RCM
RCMRCM
RCM
 
Project Proposal for Predictive Maintenance Power Plant
Project Proposal for Predictive Maintenance Power PlantProject Proposal for Predictive Maintenance Power Plant
Project Proposal for Predictive Maintenance Power Plant
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibrationคาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
คาลิเบรท เครื่องจักร CNC ด้วย Renishaw QC20 Ballbar Calibration
 
Maintenance cost
Maintenance costMaintenance cost
Maintenance cost
 
Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...
 
MTM & Lean Application Case Studies
MTM & Lean Application Case StudiesMTM & Lean Application Case Studies
MTM & Lean Application Case Studies
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Maintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking DataMaintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking Data
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...
 
Ques i
Ques iQues i
Ques i
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best Practice
 
Preventive maintenance
Preventive maintenance Preventive maintenance
Preventive maintenance
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
SMED Jabil Juarez
SMED Jabil JuarezSMED Jabil Juarez
SMED Jabil Juarez
 
7 2prevent main
7 2prevent main7 2prevent main
7 2prevent main
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 

Destacado

Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Mohammed Hamed Ahmed Soliman
 
Proceso de Comunicación (explicación para ancianos)
Proceso de Comunicación (explicación para ancianos)Proceso de Comunicación (explicación para ancianos)
Proceso de Comunicación (explicación para ancianos)Daniel Vergara Ramirez
 
Geometric leaf classification
Geometric leaf classificationGeometric leaf classification
Geometric leaf classificationramin swat
 
Things Factory Introduction (한글)
Things Factory Introduction (한글)Things Factory Introduction (한글)
Things Factory Introduction (한글)Hatio, Lab.
 
Six reasons why oil analysis programs fail
Six reasons why oil analysis programs failSix reasons why oil analysis programs fail
Six reasons why oil analysis programs failTESTOIL
 
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스GE코리아
 
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...Jeremy Jay V. Lim, MBB, PMP
 

Destacado (20)

Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...
 
CV-3
CV-3CV-3
CV-3
 
Thai
ThaiThai
Thai
 
ประวัติส่วนตัว
ประวัติส่วนตัวประวัติส่วนตัว
ประวัติส่วนตัว
 
America got talent new
America got talent newAmerica got talent new
America got talent new
 
เฉลยคณิต
เฉลยคณิตเฉลยคณิต
เฉลยคณิต
 
ชีววะ
ชีววะชีววะ
ชีววะ
 
Proceso de Comunicación (explicación para ancianos)
Proceso de Comunicación (explicación para ancianos)Proceso de Comunicación (explicación para ancianos)
Proceso de Comunicación (explicación para ancianos)
 
America got talent
America got talentAmerica got talent
America got talent
 
Geometric leaf classification
Geometric leaf classificationGeometric leaf classification
Geometric leaf classification
 
America's got talent
America's got talent America's got talent
America's got talent
 
America's got talent
America's got talent America's got talent
America's got talent
 
The Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business successThe Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business success
 
Things Factory Introduction (한글)
Things Factory Introduction (한글)Things Factory Introduction (한글)
Things Factory Introduction (한글)
 
Six reasons why oil analysis programs fail
Six reasons why oil analysis programs failSix reasons why oil analysis programs fail
Six reasons why oil analysis programs fail
 
Rca Case Study R6
Rca Case Study R6Rca Case Study R6
Rca Case Study R6
 
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스
산업용 클라우드 플랫폼 - 프레딕스, Industrial cloud platform – Predix, 2016스마트공장 국제 컨퍼런스
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
OEE
OEEOEE
OEE
 
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
 

Similar a 6Sigma

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentationematzan
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenanceFELIX JONATHAN
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTmihirpatel306953
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentationguest03d3e3
 
Lecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptxLecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptxdeivabalan1
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptxEzraDhigo
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATIONUttam Misra
 

Similar a 6Sigma (20)

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentation
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPT
 
CLT ver1.00
CLT ver1.00CLT ver1.00
CLT ver1.00
 
CLT ver1.00
CLT ver1.00CLT ver1.00
CLT ver1.00
 
Lecture 1 - part 1.pptx
Lecture 1 - part 1.pptxLecture 1 - part 1.pptx
Lecture 1 - part 1.pptx
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
 
Lecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptxLecture_01_Intruduction_to_Plant_Mainten.pptx
Lecture_01_Intruduction_to_Plant_Mainten.pptx
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
 
lean & agile
lean & agilelean & agile
lean & agile
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATION
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 

Más de Mohammed Hamed Ahmed Soliman

Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsMohammed Hamed Ahmed Soliman
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

Más de Mohammed Hamed Ahmed Soliman (20)

Lean accounting VS Financial Management
Lean accounting VS Financial ManagementLean accounting VS Financial Management
Lean accounting VS Financial Management
 
Healthcare is ripe for lean
Healthcare is ripe for leanHealthcare is ripe for lean
Healthcare is ripe for lean
 
Pareto Analysis
Pareto AnalysisPareto Analysis
Pareto Analysis
 
Brainstorming Technique
Brainstorming TechniqueBrainstorming Technique
Brainstorming Technique
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
 
Root Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case StudyRoot Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case Study
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
5S Complete Implementation Guide
5S Complete Implementation Guide 5S Complete Implementation Guide
5S Complete Implementation Guide
 
Maintenance Work Order Sheet
Maintenance Work Order SheetMaintenance Work Order Sheet
Maintenance Work Order Sheet
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Problems Solving Techniques
Problems Solving TechniquesProblems Solving Techniques
Problems Solving Techniques
 
Advanced Maintenance Management
Advanced Maintenance ManagementAdvanced Maintenance Management
Advanced Maintenance Management
 
Ultrasound Detection - Applications
Ultrasound Detection - ApplicationsUltrasound Detection - Applications
Ultrasound Detection - Applications
 
Machinery Oil Analysis
Machinery Oil AnalysisMachinery Oil Analysis
Machinery Oil Analysis
 
Machine Vibration Analysis
Machine Vibration AnalysisMachine Vibration Analysis
Machine Vibration Analysis
 

6Sigma

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. Month Unplanned Maintenance Downtime (hrs) No of failures Total working hrs Reliability % Jan-09 215 70 660 68.25 Feb-09 215.5 52 660 68.17 March-09 182.3 60 660 73.26 April-09 195 72 660 71.31 May-09 192 68 660 71.77 June-09 188.8 100 660 72.26 • Process Reliability=Available Time/Planned Time= total Working time-total downtime/total Working time-planned downtime. • Planned Downtime=8hrs/monthly.
  • 6. Month Unplanned Maintenance Downtime (hr/month) Downtime ratio % Jan-09 215 32.57 Feb-09 217 32.87 March-09 181.3 27.46 April-09 194.5 29.64 May-09 192 29.09 June-09 188.8 28.60 Total 1188.6 (Range 27-33%) Average 198.1 30.03 Downtime Ratio=Total Downtime/Total Working Time
  • 7. UCL = X’+3 sigma= 30.03+ 3x2.2 =36.63% LCL = X’ +3 sigma=30.03 - 3x2.2 =23.43% Lower Control Limit Upper Control Limit 27 28 29 30 31 32 33 34 0 1 2 3 4 5 6 7 DowntimeRatio% Months 36.63% 23.43% Standard Deviation σ = √∑(X-Mean)2 / n-1 =2.2 Mean (x’)= ∑X/n =30.03% 30.03%
  • 8. Zone A Zone B Zone C X’ LCL UCL Zone C Eng. Mohammed Hamed X’+3σ X’+2σ X’+1σ X’-1σ X’-2σ X’-3σ 36.63 32.23 30.03% 27.83 25.63 23.43 34.43
  • 10. Downtime Analysis Equip Code Problem Average Monthly Downtime (hr) Failure Frequency Weight % Classification 304K1 Centrifugal Fan 54.9 18 27% A 304T1 Bucket Elevator 38.5 22 19% A 304Z2 Granulator Drum 35 22 17% A 304WG1 Feed Belt Conveyor 27 15 13.5 B 304N3 Recycle Belt Conveyor 13.75 26 6.8% B 304F1 Bag Filter 12.95 11 6.4% B 304U1 Burner 6.5 7 3.2% C 304N7 Belt Conveyor 3.75 3 1.8% D 304N4 Belt Conveyor 3.5 3 1.7% D 304T2 Bucket Elevator 2.25 2 1.2% D Total 198.1 100%
  • 11. ROOT CAUSE ANALYSIS for Main Failures
  • 12. Level1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7 Level 8 Equip Fan K1 failure crack in the foundation bolts looseness poor maint Poor maint high vibration unbalance Process problem operation desgin poor maint misalignment Poor maint foundation supports problem poor maint high Vibration unbalance Process problem operation design Poor maint bearing noise Bearing wear bearing cocked high vibration misalignment Poor maint unbalance Process problem operation design Poor maint Sealing damage Spare parts reliability Poor maint B.housing problem Spare parts reliability Poor maint Lubrication problem Poor maint Incorrect lubricant Poor maint Insufficient lubricant Poor maint
  • 13. Fan failure cause No of failures % of total Criticality MTBF (hrs) Bearing 10 55.5 A 66 High noise 4 22.2 B 180 Foundation cracks 2 11.11 B 360 B.housing 1 5.5 C 720 Sealing 1 5.5 C 270 MTBF=Total working time/total no of failures
  • 14. Main Cause Priority Weight % Root Cause Vibration 70 Unbalance 40% Process 20% High Temp 15 Bad PM 10% Insufficient lubricant 5% Others 10 Training Greasing 5 Routine Maintenance 2.5% Bad lubricant type 2.5% What cause defect? High Temp Others VibrationGreasing Unbalance Eng. Mohammed Hamed Routine Maintenance Bad lubricant type Process
  • 15.
  • 16. Failure mode Failure cause Source of failure Root cause Failure characteristics Failure Effect Maintenance System Fan operate with high vibration level Bearing fails Bearing seized Poor Maint Wear in&out High maintenance cost Unexpected plant shutdown Housing wear Deterioration Poor Maint Wear in&out High maintenance cost Unexpected plant shutdown Unbalance fan blade Shaft wear Poor Maint Wear in&out High maintenance cost Unexpected plant shutdown Looseness in foundation Poor Maint Wear in&out High maintenance cost Unexpected plant shutdown Shaft wear Deterioration Poor Maint Wear in&out High maintenance cost Unexpected plant shutdown
  • 17. The Fan Equip is Critical Grade A….why? Company’s priorities Fan Equip
  • 18.
  • 19. Inspection Sheet Sample: Check Sheet for PM Maintenance Sector (C) Part has been adjusted and working fine )Ф(Part is working but with problem (O)Part working good (X( part require maintenance or change ‫فحصه‬ ‫المراد‬ ‫البند‬ ‫تاريخ‬ ‫وساعه‬ ‫الفحص‬ 1May 2May 3May 4May 5May 6May Fan K1 Check vibration Check Temp Check Grease Level Check all bolts & nuts Clean the fan blade Grease the bearing Visual inspection (noise, leakage..etc) Notes Signature
  • 20. Routine Maintenance Checklists Cleaning Visual Inspection Tighten Bolts & Nuts Adjusting Greasing & Oiling Overall Equipment Test
  • 21. Advantages of Checklists Checklists or routine maintenance planning: Policy Routine Maintenance Level Duration (hr) Required Labor Routine Maintenance Check Vibration Daily 1 2 Check Temp Check Grease Level Check all bolts & nuts Clean the fan blade Visual inspect (check for noise, leakage, seals condition…etc To be done during the daily shutdown
  • 22. What is Preventive Maintenance (PM)? Perform maintenance in a specific part of the equipment whether the equipment need it or not in a specific time period.
  • 23. TPM Maximize your resources usage. Make all feel about the importance of the maintenance. Reduce gap between production & maintenance teams. TPM Benefits:
  • 24. Total Productive Maintenance (TPM) is the maintenance sub- system of Lean Manufacturing. TPM improves manufacturing performance by reducing cost, improving quality and increasing productivity.
  • 25.
  • 26.
  • 27. A useful 5S tools to be used with maintenance & production Red Tag Can be Used as a useful tool to apply the 5S in maintenance Illustrate equip status illustrate what type of maintenance done today Red Tag is Called the Silent Talker
  • 28. 1) Check the job description and the organization chart. 2) Check the working procedures in place. 3) Calibration process( as the auditee to explain the calibration process). 4) Check if there is calibration procedure in place. 5) Check the equipment calibration list. 6) Ask the auditee about the input and out put of the calibration process. 7) Check if there is a system for ensuring the competency of maintenance personnel. 8) Check if the maintenance personnel will be provided with special training. 9) Ask the auditee to describe the process of the preventive maintenance. 10)Check if there is a preventive maintenance plan.
  • 29. 11)Check the bases for determining the extent and frequency of maintenance tasks. 12)Ask the planner to describe the process of planning. 13)Check who is responsible for planning of the preventive maintenance works. 14)Check the code structure of the work orders.
  • 30. Maintenance Policy Ideal Asfour Now Reactive 10% 50% Preventive 25-35% 50% Predictive 45-55% 0% Proactive Balance 0% “Reliability Magazines Report” Worse Maintenance Policy “fix when it broke down” Eng. Mohammed Hamed Target should be reducing reactive & increase planned maintenance
  • 31.
  • 32. Japan called it Fire Fighting FF JAPAN Consider it the worst maintenance policy in the world!!
  • 33. More than 50% of Maintenance work is considered as Reactive. Reactive or corrective maintenance has negative effect on the system, resources, and equipments.
  • 35. Mean Time Between Failure Best Condition (Manufacturer) MTBF Reliable Bearing 2160 Worst Condition MTBF Current Bearing 66 If we managed to achieve the manufacturer rate this will reduce the downtime average to 170.65hrs instead of 198.1
  • 36. Zone A Zone B Zone C X’ LCL UCL Zone C Eng. Mohammed Hamed X’+3σ X’+2σ X’+1σ X’-1σ X’-2σ X’-3σ 36.63 32.23 30.03% 27.83 25.63 23.43 34.43 170/660= 25.75% (In the Excellent Area).
  • 37. Change Management  Changing the maintenance team & production labor’s culture from reactive to preventive & proactive policies.  Give training to the maintenance technicians & to the operators.  Applying the TPM will reduce the resources required to do the routine maintenance.