1
Fill materials
Fill
material
Unhappy
client
Unhappy
you
2
Cleanout
The removal of wellbore-fill material such as
sand , scale or organic materials , and other
debris from the wellbore . Many reservoirs
produce some sand or fines that may not be
carried to surface in the produced fluid .
Accumulation of fill material may
eventually increase in concentration within
the lower wellbore possibly restricting
production .
3
Junk
4
Mill
Before defining mill , we need to know what
is junk ! . Junk is anything in wellbore that is
not supposed to be there . The term is
usually reserved for small pieces of steel
such as hand tools , small parts , bit nozzles ,
pieces of bits or another down-hole tools. A
mill is usually used to remove junk in the
hole or to grind away all or parts of casing
string .
5
In the case of junk , the metal must be broken
into smaller pieces to facilitate removal from
the wellbore so that drilling can continue .
When milling casing , the intent is to cut a
window through the side of the casing or to
remove a continuous section of the casing so
that the wellbore may be deviated from the
original well through the window or section
removed depending on the type of grinding or
metal removal required . The shape of the
cutting structures of mills varies .virtually all
mills, however utilizes tungsten carbine cutting
surfaces.
6
So , It’s time to talk about something allows
fill material cleanout , mill and other very
important uses .
Coiled Tubing
- Definition
-main component
-uses & advantages
-Disadvantages
7
Definition
Coiled tubing refers to a continuous length of
small diameter steel pipe and related surface
equipment as well as associated drilling ,
completion and work over or remediation ,
techniques . Coiled tubing oilfield technology
was initially developed for working on live ,
producing wells . More recently , this
technology has gained wider acceptance . The
trend toward extended reach wells favors
coiled tubing for its ability to drill or convey
tools and equipment in high angle wellbores .
8
Main component
1.Injector and tubing guide arch
2.Service reel with CT
3.Power supply / Prime mover
4.Control console
5.Control and monitoring equipment
6.Downhole CT connectors and bottom-hole
assembly(BHA)
7.Well-control stack equipment
9
10
Power pack unit
Provides hydraulic power to control and operate a coiled tubing unit
and pressure control equipment “ has independent electric or
diesel power source”
11
Control unit
Control unit is located behind a coiled tubing reel “ or any location that is
safe when operating the unit “ . Level of control and instrumentation
depend on the type of operation being performed .
12
Injector head
Consists of several hydraulic systems that allow a coiled tubing
unit to operate with a high degree of operational variability . Its
function “ Pulling and pushing “ .
13
Coiled tubing reel
Main function; store a coiled tubing . It’s hydraulically driven . A reel
driven system is designed to keep the coiled tubing in a dynamic
tension between gooseneck and the reel . Its capacity depends on
tubing size , weight and length of coiled tubing14
CT BOP
The BOP is used to secure the coiled tubing and isolate the wellbore
pressure during normal and emergency situations . Consists of
Blind ram , Shear ram , Slip ram and pipe ram
15
Functions or uses
Innovative services conveyed on CT are designed to improve
your well and reservoir performance .
Applications
Matrix and fracture stimulation
Wellbore cleanout
Logging
Perforating
Nitrogen kickoff
Sand control
Drilling ‘’highly deviated and horizontal wells’’
Cementing
Well circulation
Mechanical isolation
16
Distributed temperature sensing
17
DTS
Surveys to guide fluid placement and
identify zones for acid stimulation . With
selective diversion stages temporarily
sealing off treated zones to ensure effective
stimulation of all targeted intervals .
18
Fluid conveyance
Nitrogen kickoff
Fill removal
Cement placement “ reduction of slurry
contamination”
Stimulation “ improving permeability “
19
Nitrogen kickoff
The most popular use for coiled tubing is
circulation or deliquification . A hydrostatic
head may be restricting flow of formation
fluids due to its weight “ well is said to be
killed “ . The safest , not cheapest , solution
would be to attempt to circulate out the
fluid using a gas “frequently nitrogen” often
called Nitrogen kickoff and allow cleaning
the hole .
20
Tool conveyance
Coiled tubing fishing and milling
Down-hole valve manipulation
Blasting service
Zonal isolation
CT logging
CT drilling
Control
flow from
various
zones
Real time
data
Acid wash,
scale removal
Separation of
zones via
packer
Enable horizontal
drilling
21
Coiled tubing drilling
A relatively modern drilling techniques
involves using coiled tubing instead of
conventional drill pipe . This has the
advantage of requiring less effort to trip in
and out of the well “ the coil can simply be run
in and pulled out while drill pipe must be
assembled and dismantled joint by joint while
tripping in and out”
22
Instead of rotating the drill bit by using a
rotary table or top drive at the surface . It’s
turned by a down-hole Mud motor ,
powered by the motion of drilling fluid
pumped from surface . Drilling which is
powered by mud motor instead of rotating
pipe is called slide drilling .
23
Coiled tubing logging
Coiled tubing allow directional surveys ,
gamma ray , pressure and temperature
measurements.
24
Coiled tubing production
Coiled tubing is often used as production
string in shallow gas wells that produce
some water . The narrow internal diameter
results in a much higher velocity than
would occur inside conventional tubing or
inside casing . This higher velocity assists in
lifting liquids to surface .
25
DisadvantagesAdvantages
Fatigue life limitNo rig required
Pressure and tensionNo connections – fast
Diameter and ovalityMoney saving
More tortuous pathPumping flexibility
fluid placement
Reduced formation
damage
Allow MPD & UBD
26
Coiled Tubing
27
Thank you
Presented by
Mohammed Bahaa
Mohammed Esmail
28

Más contenido relacionado

La actualidad más candente

A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
tmhsweb
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
Muhammad Hassaan
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
Akhilesh Maurya
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
mmody4
 

La actualidad más candente (20)

Drilling tools
Drilling toolsDrilling tools
Drilling tools
 
Well Control
Well ControlWell Control
Well Control
 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Packers
PackersPackers
Packers
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
04 gas lift_equipment
04 gas lift_equipment04 gas lift_equipment
04 gas lift_equipment
 
Wellhead
WellheadWellhead
Wellhead
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Wireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas IndustryWireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas Industry
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
 
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 

Similar a Well intervention

1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
ahmdrabymnswr
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
Ahmed Radwan
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
odiliagilby
 

Similar a Well intervention (20)

Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
Coring chapter 5
Coring   chapter 5Coring   chapter 5
Coring chapter 5
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx
 
Casing design
Casing designCasing design
Casing design
 
Tripping out automatic
Tripping out automaticTripping out automatic
Tripping out automatic
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsرضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Well intervention

  • 1. Well intervention Under supervision of prof Ahmed elgebally 1
  • 3. Cleanout The removal of wellbore-fill material such as sand , scale or organic materials , and other debris from the wellbore . Many reservoirs produce some sand or fines that may not be carried to surface in the produced fluid . Accumulation of fill material may eventually increase in concentration within the lower wellbore possibly restricting production . 3
  • 5. Mill Before defining mill , we need to know what is junk ! . Junk is anything in wellbore that is not supposed to be there . The term is usually reserved for small pieces of steel such as hand tools , small parts , bit nozzles , pieces of bits or another down-hole tools. A mill is usually used to remove junk in the hole or to grind away all or parts of casing string . 5
  • 6. In the case of junk , the metal must be broken into smaller pieces to facilitate removal from the wellbore so that drilling can continue . When milling casing , the intent is to cut a window through the side of the casing or to remove a continuous section of the casing so that the wellbore may be deviated from the original well through the window or section removed depending on the type of grinding or metal removal required . The shape of the cutting structures of mills varies .virtually all mills, however utilizes tungsten carbine cutting surfaces. 6
  • 7. So , It’s time to talk about something allows fill material cleanout , mill and other very important uses . Coiled Tubing - Definition -main component -uses & advantages -Disadvantages 7
  • 8. Definition Coiled tubing refers to a continuous length of small diameter steel pipe and related surface equipment as well as associated drilling , completion and work over or remediation , techniques . Coiled tubing oilfield technology was initially developed for working on live , producing wells . More recently , this technology has gained wider acceptance . The trend toward extended reach wells favors coiled tubing for its ability to drill or convey tools and equipment in high angle wellbores . 8
  • 9. Main component 1.Injector and tubing guide arch 2.Service reel with CT 3.Power supply / Prime mover 4.Control console 5.Control and monitoring equipment 6.Downhole CT connectors and bottom-hole assembly(BHA) 7.Well-control stack equipment 9
  • 10. 10
  • 11. Power pack unit Provides hydraulic power to control and operate a coiled tubing unit and pressure control equipment “ has independent electric or diesel power source” 11
  • 12. Control unit Control unit is located behind a coiled tubing reel “ or any location that is safe when operating the unit “ . Level of control and instrumentation depend on the type of operation being performed . 12
  • 13. Injector head Consists of several hydraulic systems that allow a coiled tubing unit to operate with a high degree of operational variability . Its function “ Pulling and pushing “ . 13
  • 14. Coiled tubing reel Main function; store a coiled tubing . It’s hydraulically driven . A reel driven system is designed to keep the coiled tubing in a dynamic tension between gooseneck and the reel . Its capacity depends on tubing size , weight and length of coiled tubing14
  • 15. CT BOP The BOP is used to secure the coiled tubing and isolate the wellbore pressure during normal and emergency situations . Consists of Blind ram , Shear ram , Slip ram and pipe ram 15
  • 16. Functions or uses Innovative services conveyed on CT are designed to improve your well and reservoir performance . Applications Matrix and fracture stimulation Wellbore cleanout Logging Perforating Nitrogen kickoff Sand control Drilling ‘’highly deviated and horizontal wells’’ Cementing Well circulation Mechanical isolation 16
  • 18. DTS Surveys to guide fluid placement and identify zones for acid stimulation . With selective diversion stages temporarily sealing off treated zones to ensure effective stimulation of all targeted intervals . 18
  • 19. Fluid conveyance Nitrogen kickoff Fill removal Cement placement “ reduction of slurry contamination” Stimulation “ improving permeability “ 19
  • 20. Nitrogen kickoff The most popular use for coiled tubing is circulation or deliquification . A hydrostatic head may be restricting flow of formation fluids due to its weight “ well is said to be killed “ . The safest , not cheapest , solution would be to attempt to circulate out the fluid using a gas “frequently nitrogen” often called Nitrogen kickoff and allow cleaning the hole . 20
  • 21. Tool conveyance Coiled tubing fishing and milling Down-hole valve manipulation Blasting service Zonal isolation CT logging CT drilling Control flow from various zones Real time data Acid wash, scale removal Separation of zones via packer Enable horizontal drilling 21
  • 22. Coiled tubing drilling A relatively modern drilling techniques involves using coiled tubing instead of conventional drill pipe . This has the advantage of requiring less effort to trip in and out of the well “ the coil can simply be run in and pulled out while drill pipe must be assembled and dismantled joint by joint while tripping in and out” 22
  • 23. Instead of rotating the drill bit by using a rotary table or top drive at the surface . It’s turned by a down-hole Mud motor , powered by the motion of drilling fluid pumped from surface . Drilling which is powered by mud motor instead of rotating pipe is called slide drilling . 23
  • 24. Coiled tubing logging Coiled tubing allow directional surveys , gamma ray , pressure and temperature measurements. 24
  • 25. Coiled tubing production Coiled tubing is often used as production string in shallow gas wells that produce some water . The narrow internal diameter results in a much higher velocity than would occur inside conventional tubing or inside casing . This higher velocity assists in lifting liquids to surface . 25
  • 26. DisadvantagesAdvantages Fatigue life limitNo rig required Pressure and tensionNo connections – fast Diameter and ovalityMoney saving More tortuous pathPumping flexibility fluid placement Reduced formation damage Allow MPD & UBD 26
  • 28. Thank you Presented by Mohammed Bahaa Mohammed Esmail 28