Possible Occurrences of Fire:
Fire can start when sufficient heat is produced and this heat can ignite the materials
round it. Possible sources of ignition may be:
• Smoking
• Naked flames
• Gas, oil fired or electrical heaters
• Hot works such as welding
• Faulty electrical equipment or wiring
• Hot surfaces friction caused by drive belts or loose bearings
• lighting equipment such as halogen lamps
• Arson etc...
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
INTRODUCTION
Requirement of Fire Protection system
Fire protection is used as an insurance or foolproof security for not only
human lives but also for other MEP services against fire mishaps. When MEP
services such as Plumbing, Heating ventilation and Air Conditioning (HVAC)
duct work and Electrical systems are run parallel to one other in between false
ceiling and slab level there is a chance of fire mishaps to occur. Hence fire-
protection system reguired for the safety purpose, which can function
automatically and there by giving maximum protection to MEP services.
FIRE SUPPRESSION AGENT
1. WATER: Water is most common extinguishing agent because it has the ideal properties for
extinguishing the most common fires it is available in plenty and is cheap.
2. CARBON DIOXIDE (CO2): carbon dioxide (CO2) is an effective extinguishing agent, as it
reduces the oxygen content by dilution until support for combustion is not possible. It is used
for dousing electrical fires or other fires which cannot be put out with water. Being toxic,
central extinguishing systems using CO2 have need to be planned to ensure evacuation of
people in time before discharge of the gas in the effected area.
3. HALOGENATED AGENT(HALONS): halogenated extinguishing agent are
hydrocarbons in which one or more hydrogen atoms have been replaced by atoms of fluorine,
chlorine, bromine or iodine. these substitutions result in compounds which are the both non-
inflammable and good extinguishers. Halons have been largely used for electrical and
computer rooms application.
4. FOAM: Fire-fighting foam is an aggregate of gas filled bubbles formed from aqueous
solution of specially formulated concentrated liquid-foaming agents. Air is the commonly used
gas but an inert gas may also be used for certain applications. Foam is produced by mixing the
foaming agent with water and then aerating and agitating it to form the bubbles. Foams are
effective extinguishing agent for oil fires, as they cut out oxygen,besides acting as cooling
agent.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
INTRODUCTION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
FIRE SUPPRESSION AGENT
5. POWDER: A variety of dry chemical powers are used as extinguishing agents for
putting out fires of complex nature, e.g., burning metals, chemicals, etc. Most
chemical powers act by forming a stickly residue over the fire on burning, which seals
it from oxygen, thus helping to extinguish the fire and preventing re-ignition.
6. SAND: Sand which is commonly available, is an excellent suppression agent
which acts by smothering an incipient fire. It is particularly useful for electrical and
petroleum fires.
TYPES OF FIRES:
Class A: Organic materials (wood, paper, cloth, plastic, etc,)
Class B: Flammable liquids (petrol, paints, solvents)
Class C: Flammable gases (LPG, acetylene)
Class D: Combustible metals (Mg, Na, K)
Class E: Electrical fires, motors and switch gear.
INTRODUCTION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire
Detected Not detected for
some time
Automatically
Dect/spk
Manually/Visually
Alarm raised Ignored/
delayed
Fire well
developed
Local action
Check fire condition
Fire detected
Inform fire
brigade
No fire False alarm
Doused locally
Activate Suppression System
Automatic FF.
Operation
Manual of
operation
Internal /external
Hydrants & hoses
Hose reels
Fire
Extinguishers
Sand / water
Buckets
Sprinkler/halon/co2
System activated
Fire condition
End of operation
Fire brigade Take over
No
Extinguished
yes
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
INTRODUCTION
Fire Protection Systems: There are three types:
1. Fire Extinguishers: Fire extinguishers are hand-operated appliances which can
be operated by untrained persons to douse a fire. A fire may have different source of
fuels. Use of an incorrect type of fire extinguisher on an unknown source of fuel may
aggravate the fire and may actually harm the person using it and assist in spreading
the fire rather than extinguishing it.
2. Hydrant System:
a) Dry Risers: Dry risers, so called because they contain no water in the pipes, are
installed within a building and provided with a landing valve in the staircase lobby. The
riser terminates at the street level in the form of a fire brigade connection. The
connection enable the fire-brigade to connect the fire-brigade connection either to a
street fire-hydrant directly or to a fire-brigade pump and charge the dry riser with
water.
b) Wet Risers: Wet risers are fixed pipe-installations, installed within a building and
permanently charged with water under pressure from a reliable water supply source.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
3. Automatic Sprinklers System: Automatic sprinklers are devices for spraying
water uniformly over fire either to extinguish it entirely or to prevent it from
spreading. The system consists of a set of pipes suspended from a ceiling, with
sprinkler heads fixed at intervals along the pipe. The sprinkler head is a
temperature-sensitive device and operates with a fusible link or glass bulb. In
case of a fire, the fusible link melts or the bulb bursts at a desired temperature,
allowing the water to be sprayed on the fire.
a) Deluge System: Deluge systems are a total-flooding systems which come in
operation with help of a single heat-sensing sprinkler installed on a set of pipes
having large number of nozzles which spray water simultaneously to flood the
area or equipment. Deluge systems are commonly used for protection of
electrical transformers and other high hazard areas where flooding not only
extinguishes the fire but also lower the temperature of combustion and provides
cooling effect.
b) Pre-Action System: Pre-action systems are similar to dry systems, except
that valves release water to the pipes before any sprinkler head has opened.
INTRODUCTION
What is a Sprinkler?
When the material inside shed is under fire, temperature gets raises up to
predetermined temperature in the respective area. The radiation causes the
liquid inside the sprinkler bulb to expand and the bulb bursts throwing out water
under pressurized condition which gets sprayed over the area under fire. The
sprayed water provides cooling effect to the burning material and in turn
extinguishes the fire.
What is Riser?
A riser is a pipe which extends vertically one full storey or more to
convey water to branches or group of fixtures.
What is Riser Nipple?
A Riser Nipple is connected when there is sudden rise in elevations
(levels) between Sprinkler main pipe & branch pipe.
What are Pipe Supports?
Pipe Supports are used to Support pipes at specified intervals.
Typical representation of Pipe supports in Shop Floor drawing
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DEFINATION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DESIGN CRITERIA
Following are Design Codes & Standards for Fire
Fighting System:
 TAC Fire Protection Manual – 1998 Edition.
 NFPA 14 – Rules for Stand Pipe & Hose System.
 NFPA 13 – Standard For Installation Of Sprinkler Systems.
 NFPA 231 – Standard For General Storage.
 TAC Manual Of Sprinkler System.
 NFPA 72 – Standard For National Fire Alarm Code.
 NFPA 2001 – Standard For Clean Agent Fire extinguishing System.
Spacing of sprinklers is determined on the basis of hazard
classification, exposure and the height at which it is installed. Water is
applied at a density measured in mm / min. Standards used by the tariff
advisory committee (TAC) of the insurance association of India for installing
automatic sprinklers given in table 13.2.
Design Densities and Spacing of Sprinklers
Hazards
Design
density
(mm/min
)
Assumed
max. area of
operation
(sqm)
Max. area
covered
per
sprinkler
Maximum
distance
between
sprinklers
1. Extra Light Hazard
1.1 Non-industrial occupancy 2.25 84
where fire-load is low 17 9.2
a) Sidewall sprinklers 21 4.6
b) Other sprinklers
1.2 Areas like kitchen, boiler 5 84
room, attics, basements,
and storage areas where
fire-load is higher
1.3 Other sprinklers 9 3.7
2. Ordinary Hazard
2.1 Commercial and industrial 5 360
occupancies handling
and processing ordinary combustible
materials
a) Sidewall Sprinklers 9 7.4
b) Other sprinklers 12 4
3. Extra high hazards and other types of risks require special attention
according to TAC/code requirements.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DESIGN CRITERIA
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DESIGN CRITERIA
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DESIGN CRITERIA
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
GENERAL NOTES
1. The distance between sprinkler to wall shall not exceed 2.3 mtr.
2. The distance between sprinkler deflector and the slab shall not exceed 300 mm.
3. Upright sprinklers shall be installed with frame arms parallel to the branch line.
4. The distance between an upright sprinkler and hanger shall not be less than 80 mm.
5. Hexagonal reducing bushes shall not be used for changing the size of pipe.
6. All pipe shall be to Astm a-53, sch.40 grade-b, galvanised seamless.
7. Threaded fittings shall be used for pipes up to 50 mm and grooved fittings for pipes 65
mm and above.
8. All tamper switches and water flow detectors shall be interfaced with fire alarm system
9. Piping shall be pitched to drain. (branches to be sloped 4mm/mtr. & mains by 2mm/mtr.)
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Under Ground
Water Tank
SCHEMATIC DIAGRAM OF OVERALL
BUILDING FIRE FIGHTING SYSTEM
Main Supply from
City Line`
Water Transfer
Pumps
Main Supply Header to
Over Head tank
Fire Protection ABBREVATIONS An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire Protection ABBREVATIONS & SYMBOLS An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Drawings from
consultant
Arch. drawings
Structural
drawings
Services design
drawings
Shop drawings
(ISD Dwgs.)
MEP Coordination
Drawings
(CSD Dwgs.)
Builders work
drawings
As built drawings
Comments
updated
Approved
Rejected
Approved
Material
Submittals
PROCESS FLOW DIAGRAM FOR
FIRE FIGHTING SHOP DRAWING
SHOP DRAWING PROCEDURE
DESCRIPTION: Shop drawings are also called as Detail drawings are used to
guide the construction and Erection members. Complete shop drawings show
the levels, pipe sizes, setting out dimensions and typical details, sections being
co-ordinated with all services. Since the shop drawings are intended only for use
in the shop, they generally contain little or no information about the erection and
installation of the MEP members they depict.
The following are steps to be adopted while preparing the Fire fighting
Shop Drawing.
STEP1.
PREPARE ARCHITECTURAL DRAWING:- Prepared the Architectural X-Ref
drawings.
STEP 2.
CONVERT DOUBLE LINE WITH FITTINGS:- Converting the single pipeline into
double line pipe with fittings whose Dia are above 65mm.
STEP3
ASSIGNED THE LEVELS:-Assign the levels after co-ordinating with structural
drawings and other services drawings to all sp
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP 4.
SETTING OUT DIMENSIONS & PIPE SUPPORTS:- Give the reference
dimension from gird or the wall whichever nearest to the fixtures,
pipes and accessories. Provide the pipe supports to the pipe and
details for support.
STEP 5.
SECTION VIEWS:- Prepared the section at a critical area where the
density of pipe work is more.
STEP 6.
STANDARD DETAILS:- Show all the typical fixing details of different
fixtures and accessories.
STEP 7.
TITLE SHEET WITH GENERAL NOTES:- Show all the general notes and
legends in the title block and a creating view port for the drawing as
per the required scale.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
Before starting the shop drawing refer all Input and material
submittals for the project.
1. Study the architectural, structural drawings for the FFL, beam
depths and architectural sections.
2. Study the Reflected ceiling plan (RCP) drawing for the False ceiling
level (FCL) and floor pattern drawings.
3. Study the Schematic riser diagram for Sanitary ,storm and Vent
pipes.
4. Study all approved material submittals for example type of
fixture, pipe fitting, accessories and pipe support etc,.
5. Study client’s CAD standards, Legends.
6. Refer the Sample drawing given by client.
GUIDELINES TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
Client will provide the architectural drawing for each floor. It
contains all information like room names & partitions, walls,
columns, beams, door, windows etc., So create one arch
drawing for reference purpose.
PREPARATION OF ARCHITECTURAL DRAWING
1. Delete unwanted text and dimensions.
2. Change text height as per shop drawing scale.
3. Change grid bubbles as per shop drawing scale.
4. Change all entities colour as 8.
5. Attach this Arch file as X-reference file for shop drawing.
PROCEDURE:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP 1:-
SHOP DRAWING
 SEE BELOW SCREEN SHOT FOR INPUT ARCHITECTURAL DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
 SEE BELOW SCREEN SHOT FOR OUTPUT ARCHITECTURAL DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
1. Before starting the double line refer client specification
they wants pipe sizes are Nominal diameter or Outer
diameter. If they are asking Outer diameter, refer below
table.
 CONVERSION OF DOUBLE LINE WITH FITTINGS
2. Start making the double lines for the pipes as per the sizes
mentioned in the contract drawing.
3. Place the pipe fittings like 90, 45 degree elbows, Tee
connections etc., according to the nfpa standards. All fittings
as per approved client submittals.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP 2:-
Number of Sprinklers on branch can be decided with
respect to Sprinkler pipe size as shown below:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
4. Reroute if necessary where ever clashes found with structures
columns and fittings are not inserted within that distance.
5. Avoid the Elbows and ‘Y’ fittings in walls.
6. Show the flow direction as per schematic drawing.
7. After completion of the double line and fittings change the
layers and line type as per client CAD standards.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
STANDARD FIRE FIGHTING FITTINGS
SHOP DRAWING
SEE BELOW SCREEN SHOT FOR INPUT FIRE FIGHTING DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
SEE BELOW SCREEN SHOT FOR OUTPUT DOUBLE LINE DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
BOTTOM OF PIPE:- The distance from the finished floor level(ffl) to
the bottom of insulated pipe is bop. The Sprinkler pipes hangs between
slab and false ceiling level with supporters. If is interference & fouling
with duct or other equipment, in that case we use to bend the pipe as up
& down, then follows the routing.
FOR CALCULATING THE BOP VALUE:-
FFL of current floor______________(from arch. Layout) ssl & slab
thickness of the above floor__________(from structural layout) false
ceiling level must be greater than 2400mm from ffl.
Considering the false ceiling level Sprinkler pipes running 100mm apart.
Assigned the levels
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP3:-
SHOP DRAWING
• Bottom of pipe must be given from the starting point that is from
riser to the till end of the water supply to fixtures and should be
given to all individual pipe lines.
For Example: let ø65 pipe is running to the apartment from riser
considering the bottom of level at starting point for hot water
2850 mm and for cold water 2750 mm from finished floor level.
• After some distance it reduces to ø42 mm
• Calculating the bop 65-42=23mm/2=11.5mm
Rounding it to 12 mm appx.
• Means ø42 mm hot water pipes bop 2850-12= 2838 mm from
finished floor level.
• Similarly for ø12 mm cold water 2750-12= 27385mm from
finished floor level.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
•Assigned the levels
SHOP DRAWING
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP 3:- Assigned the levels
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Give the reference dimension to the sprinkler to sprinkler, pipes and accessories from wall, gird,
Column or Beams, whichever nearest, for the installation of pipe and accessories etc. purpose.
STEP 4:- SETTING OUT DIMENSIONS:
SHOP DRAWING
Pipe supports are generally provided for sprinklers pipe at an interval of 1 to 3 meters
distance or as per client requirement.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Pipe Support
SHOP DRAWING
STEP 4:- PIPE SUPPORTS
Typical Channel Support for every 3 meter & pipe support on vertical structure
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Pipe hanger & Rod Details
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Typical Clevis Hanger & C-Clamp Details used as Pipe Support
Pipe hanger & Rod Details
SHOP DRAWING
SHOP DRAWING An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
STEP6:- STANDARD DETAILS
Classification of Sprinklers
 Upright sprinklers
 Pendent sprinklers
 Sidewall sprinklers
Pendent & Upright sprinklers (combined)
The following are the main types of sprinklers available in
Fire Protection System:
Pendent type sprinklers were used basically beneath the
false ceiling where as upright sprinklers and sidewall
sprinklers are used in parking areas.
SHOP DRAWING An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Standard detail Upright Sprinkler
SHOP DRAWING An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Standard detail Pendent Sprinkler
Pendent Sprinkler
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
Pendent Sprinkler
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
Pendent & Upright sprinklers (combined)
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
This is how Sprinkler ‘Main Pipe’ and ‘Branch Pipe’ are
connected by Riser Nipple:
SPRINKLER HEAD
NIPPLE
SPRINKLER MAIN PIPE
PENDANT TYPE
BRANCH PIPE
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
The Riser Nipple size with respect to Number of
sprinklers can be found from following table:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
PIPE
SIZE
BHS
AREA
OTHER
AREA
25
32
40
50
65
80 11
ABOVE
21
ABOVE
1 2
2 3
3 4-5
4-8 6-10
9-10 11-20
Typical FM-200 System used in Fire
Protection System by using FM-200 Gas
Gas Extinguishing System
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Some special premises, e.g. server rooms, were equipped with gas
extinguishing system in addition to the sprinkler system according to the
special instructions of the premises.
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
FLEXIBLE PIPE CONNECTOR / EXPANSION JOINT
SHOP DRAWING
P & I diagram of FM-200 container
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire Extinguisher
Fire Extinguishers are represented in the following manner in shop floor drawing:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire Extinguisher is used to destroy or minimize fire by using Carbon Dioxide, Dry
Powder or film foam Extinguishing compound.
CO2 extinguishers are selected typically for spaces where the aim is to prevent damage
caused by the extinguishing compound itself.
Dry powder and film foam extinguishers were designed for premises where there is a
large potential fire load and where the damage by the extinguishing compound would
not be significant.
Fire Hose Reel was installed for area with high fire load
(warehouses & production areas). Hose reel was mounted
inside a wall/column mounted M.S. Box.
Fire Hose reel
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Deluge System
Deluge System is generally used near electrical equipment such as cable trays
etc., where fire protection is required.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
DATAILS
TITLE BLOCK
KEY PLAN
REF DWG. NO’S.
LEGENDS
GENERAL
NOTES
SEE BELOW SAMPLE SHOP DRAWING FOR FIRE FIGHTING LAYOUT:
SHOP DRAWING
PLAN
•VIEW PORT CREATION
Scaling is used to depict objects on paper that are either larger or smaller than
the paper. Creation of view port is done in Paper space. Generally shop
drawings in 1:50 scale and sections are 1:25 scale. View port is create by
using the command “MVIEW”.
•TITLE BLOCK UPDATING
Title block is provided by client as required size (A0, A1, A2 A4). Generally the
title block details are…...
Notes: Show the any specific notes in the Notes column related to this
shop drawing. See below snap shot….
HVAC
PLUMBING
ELECTRICAL
NOTES:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
PLAN
SEE BELOW SCREEN SHOT FOR OUTPUT PLAN:
SHOP DRAWING
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SEE BELOW SCREEN SHOT FOR OUTPUT DATAILS:
SHOP DRAWING
DATAILS
REF. DWG. NOS.: Update the Reference Drawing Nos. what ever the
drawings are referred while preparing this shop drawing I.e. Architectural,
structural, schematic, design drawing.. See below snap shot….
•KEY PLAN: Hatching the location in key plan, the area is covered in this
sheet.
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
• DRAWING TITLE: Update the Drawing Title information I.e. Floor, Level,
service, Drawn By, Checked By, Approved By, Revision, Drawing Scale and
Drawing No... See below snap shot….
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
SHOP DRAWING
FIRE FIGHTING PIPE MATERIALS
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire Hose cabinet shown like this in input drawing:
Fire Hose Cabinet
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Fire Hose cabinet shown like this in output drawing:
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
Typical Sectional Details of
Fire Fighting System
FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION
(BRANCH PIPE PASSING BELOW BEAM)
(APPLICABLE ONLY IN AREAS WHERE BOTTOM OF BEAM CLOSE TO CEILING)
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
(BRANCH PIPE PASSING BELOW BEAM)
FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
(AREAS WITHOUT CABLE TRAY)
FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
CABLE TRAY INSTALLED 300mm BELOW SOFFIT OF SLAB)
FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com
(CABLE TRAY INSTALLED AT DIFFERENT LEVEL) - MORE THAN 300mm BELOW SOFFIT OF SLAB)
FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION
An ISO 9001:2000
Certified Organization
www.ramtech-corp.com

Más contenido relacionado

La actualidad más candente

Fire Fighting PPT
Fire Fighting PPTFire Fighting PPT
Fire Fighting PPT
SELVAN J
 

La actualidad más candente (20)

Fire water netowrk presentation
Fire water netowrk presentationFire water netowrk presentation
Fire water netowrk presentation
 
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONFIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systems
 
Fire Protection
Fire ProtectionFire Protection
Fire Protection
 
Fire protection system ppt.
Fire protection system ppt.Fire protection system ppt.
Fire protection system ppt.
 
Fire Fighting system
Fire Fighting systemFire Fighting system
Fire Fighting system
 
Fire protection
Fire protectionFire protection
Fire protection
 
fire protection
fire protectionfire protection
fire protection
 
Fire protection in construction
Fire protection in constructionFire protection in construction
Fire protection in construction
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS by Dr.Mahboob ali khan Phd
FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS by Dr.Mahboob ali khan Phd FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS by Dr.Mahboob ali khan Phd
FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS by Dr.Mahboob ali khan Phd
 
Fire Fighting PPT
Fire Fighting PPTFire Fighting PPT
Fire Fighting PPT
 
Fire fighting systems
Fire fighting systemsFire fighting systems
Fire fighting systems
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Fire Protection System Design
Fire Protection System DesignFire Protection System Design
Fire Protection System Design
 
Active and passive fire protection system
Active and passive fire protection systemActive and passive fire protection system
Active and passive fire protection system
 
Fire Fighting systems - Advanced Services
Fire Fighting systems - Advanced ServicesFire Fighting systems - Advanced Services
Fire Fighting systems - Advanced Services
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant system
 

Similar a 57910334-5-MEP-Fire-Protection-rev.ppt

System fire safety
System fire safetySystem fire safety
System fire safety
Damia Atieka
 
GEWINN Company Profile
GEWINN Company ProfileGEWINN Company Profile
GEWINN Company Profile
Dinesh Kumar
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Esa Shaikh
 

Similar a 57910334-5-MEP-Fire-Protection-rev.ppt (20)

Fire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. EzazFire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. Ezaz
 
System fire safety
System fire safetySystem fire safety
System fire safety
 
ODR0
ODR0ODR0
ODR0
 
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT.pptxFIRE PREVENTION & FIRE FIGHTING EQUIPMENT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT.pptx
 
Fire Detection & Alarm System28-08-20 .pdf
Fire Detection & Alarm System28-08-20 .pdfFire Detection & Alarm System28-08-20 .pdf
Fire Detection & Alarm System28-08-20 .pdf
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
 
FIRE FIGHTING NOTES PART 01 BY ER. EZAZUL HAQUE SIDDIQUE pptx
FIRE FIGHTING NOTES PART 01 BY ER. EZAZUL HAQUE SIDDIQUE pptxFIRE FIGHTING NOTES PART 01 BY ER. EZAZUL HAQUE SIDDIQUE pptx
FIRE FIGHTING NOTES PART 01 BY ER. EZAZUL HAQUE SIDDIQUE pptx
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
fire fitghing.pptx
fire fitghing.pptxfire fitghing.pptx
fire fitghing.pptx
 
GEWINN Company Profile
GEWINN Company ProfileGEWINN Company Profile
GEWINN Company Profile
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)
 
a-one fire(Fire saftey Services)
a-one fire(Fire saftey Services)a-one fire(Fire saftey Services)
a-one fire(Fire saftey Services)
 
Fire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptxFire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptx
 
fire fighting and fire extinguishing systems .pptx
fire fighting and fire extinguishing systems .pptxfire fighting and fire extinguishing systems .pptx
fire fighting and fire extinguishing systems .pptx
 
Fire smokedampers
Fire smokedampersFire smokedampers
Fire smokedampers
 
21.3_Active Fire Protection and Suppression_MAGDUA&MANILA.pptx
21.3_Active Fire Protection and Suppression_MAGDUA&MANILA.pptx21.3_Active Fire Protection and Suppression_MAGDUA&MANILA.pptx
21.3_Active Fire Protection and Suppression_MAGDUA&MANILA.pptx
 
Understanding Industrial Flame Arrestors
Understanding Industrial Flame ArrestorsUnderstanding Industrial Flame Arrestors
Understanding Industrial Flame Arrestors
 
Flame arrestor
Flame arrestorFlame arrestor
Flame arrestor
 
Fire_Fighting_Course_Prepared_by.pdf
Fire_Fighting_Course_Prepared_by.pdfFire_Fighting_Course_Prepared_by.pdf
Fire_Fighting_Course_Prepared_by.pdf
 
Essential training on non water based fire protection
Essential training on non water based fire protection Essential training on non water based fire protection
Essential training on non water based fire protection
 

Más de Mohd Zulhairi Mohd Noor

273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
Mohd Zulhairi Mohd Noor
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
Mohd Zulhairi Mohd Noor
 

Más de Mohd Zulhairi Mohd Noor (20)

(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf
 
ASAS_KAWALAN.ppt
ASAS_KAWALAN.pptASAS_KAWALAN.ppt
ASAS_KAWALAN.ppt
 
Dental_Chair_2.doc
Dental_Chair_2.docDental_Chair_2.doc
Dental_Chair_2.doc
 
CONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.pptCONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.ppt
 
120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx
 
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
 
All-about-Tokyo.pptx
All-about-Tokyo.pptxAll-about-Tokyo.pptx
All-about-Tokyo.pptx
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
 
61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
 
22513791-Lantai.ppt
22513791-Lantai.ppt22513791-Lantai.ppt
22513791-Lantai.ppt
 
95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt
 
372601839 boq-vrf
372601839 boq-vrf372601839 boq-vrf
372601839 boq-vrf
 
29629597 psychrometric-course
29629597 psychrometric-course29629597 psychrometric-course
29629597 psychrometric-course
 
316825480 diffuser-tech data
316825480 diffuser-tech data316825480 diffuser-tech data
316825480 diffuser-tech data
 

Último

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

57910334-5-MEP-Fire-Protection-rev.ppt

  • 1. Fire Protection System An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 2. Possible Occurrences of Fire: Fire can start when sufficient heat is produced and this heat can ignite the materials round it. Possible sources of ignition may be: • Smoking • Naked flames • Gas, oil fired or electrical heaters • Hot works such as welding • Faulty electrical equipment or wiring • Hot surfaces friction caused by drive belts or loose bearings • lighting equipment such as halogen lamps • Arson etc... An ISO 9001:2000 Certified Organization www.ramtech-corp.com INTRODUCTION Requirement of Fire Protection system Fire protection is used as an insurance or foolproof security for not only human lives but also for other MEP services against fire mishaps. When MEP services such as Plumbing, Heating ventilation and Air Conditioning (HVAC) duct work and Electrical systems are run parallel to one other in between false ceiling and slab level there is a chance of fire mishaps to occur. Hence fire- protection system reguired for the safety purpose, which can function automatically and there by giving maximum protection to MEP services.
  • 3. FIRE SUPPRESSION AGENT 1. WATER: Water is most common extinguishing agent because it has the ideal properties for extinguishing the most common fires it is available in plenty and is cheap. 2. CARBON DIOXIDE (CO2): carbon dioxide (CO2) is an effective extinguishing agent, as it reduces the oxygen content by dilution until support for combustion is not possible. It is used for dousing electrical fires or other fires which cannot be put out with water. Being toxic, central extinguishing systems using CO2 have need to be planned to ensure evacuation of people in time before discharge of the gas in the effected area. 3. HALOGENATED AGENT(HALONS): halogenated extinguishing agent are hydrocarbons in which one or more hydrogen atoms have been replaced by atoms of fluorine, chlorine, bromine or iodine. these substitutions result in compounds which are the both non- inflammable and good extinguishers. Halons have been largely used for electrical and computer rooms application. 4. FOAM: Fire-fighting foam is an aggregate of gas filled bubbles formed from aqueous solution of specially formulated concentrated liquid-foaming agents. Air is the commonly used gas but an inert gas may also be used for certain applications. Foam is produced by mixing the foaming agent with water and then aerating and agitating it to form the bubbles. Foams are effective extinguishing agent for oil fires, as they cut out oxygen,besides acting as cooling agent. An ISO 9001:2000 Certified Organization www.ramtech-corp.com INTRODUCTION
  • 4. An ISO 9001:2000 Certified Organization www.ramtech-corp.com FIRE SUPPRESSION AGENT 5. POWDER: A variety of dry chemical powers are used as extinguishing agents for putting out fires of complex nature, e.g., burning metals, chemicals, etc. Most chemical powers act by forming a stickly residue over the fire on burning, which seals it from oxygen, thus helping to extinguish the fire and preventing re-ignition. 6. SAND: Sand which is commonly available, is an excellent suppression agent which acts by smothering an incipient fire. It is particularly useful for electrical and petroleum fires. TYPES OF FIRES: Class A: Organic materials (wood, paper, cloth, plastic, etc,) Class B: Flammable liquids (petrol, paints, solvents) Class C: Flammable gases (LPG, acetylene) Class D: Combustible metals (Mg, Na, K) Class E: Electrical fires, motors and switch gear. INTRODUCTION
  • 5. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Fire Detected Not detected for some time Automatically Dect/spk Manually/Visually Alarm raised Ignored/ delayed Fire well developed Local action Check fire condition Fire detected Inform fire brigade No fire False alarm Doused locally Activate Suppression System Automatic FF. Operation Manual of operation Internal /external Hydrants & hoses Hose reels Fire Extinguishers Sand / water Buckets Sprinkler/halon/co2 System activated Fire condition End of operation Fire brigade Take over No Extinguished yes
  • 6. An ISO 9001:2000 Certified Organization www.ramtech-corp.com INTRODUCTION Fire Protection Systems: There are three types: 1. Fire Extinguishers: Fire extinguishers are hand-operated appliances which can be operated by untrained persons to douse a fire. A fire may have different source of fuels. Use of an incorrect type of fire extinguisher on an unknown source of fuel may aggravate the fire and may actually harm the person using it and assist in spreading the fire rather than extinguishing it. 2. Hydrant System: a) Dry Risers: Dry risers, so called because they contain no water in the pipes, are installed within a building and provided with a landing valve in the staircase lobby. The riser terminates at the street level in the form of a fire brigade connection. The connection enable the fire-brigade to connect the fire-brigade connection either to a street fire-hydrant directly or to a fire-brigade pump and charge the dry riser with water. b) Wet Risers: Wet risers are fixed pipe-installations, installed within a building and permanently charged with water under pressure from a reliable water supply source.
  • 7. An ISO 9001:2000 Certified Organization www.ramtech-corp.com 3. Automatic Sprinklers System: Automatic sprinklers are devices for spraying water uniformly over fire either to extinguish it entirely or to prevent it from spreading. The system consists of a set of pipes suspended from a ceiling, with sprinkler heads fixed at intervals along the pipe. The sprinkler head is a temperature-sensitive device and operates with a fusible link or glass bulb. In case of a fire, the fusible link melts or the bulb bursts at a desired temperature, allowing the water to be sprayed on the fire. a) Deluge System: Deluge systems are a total-flooding systems which come in operation with help of a single heat-sensing sprinkler installed on a set of pipes having large number of nozzles which spray water simultaneously to flood the area or equipment. Deluge systems are commonly used for protection of electrical transformers and other high hazard areas where flooding not only extinguishes the fire but also lower the temperature of combustion and provides cooling effect. b) Pre-Action System: Pre-action systems are similar to dry systems, except that valves release water to the pipes before any sprinkler head has opened. INTRODUCTION
  • 8. What is a Sprinkler? When the material inside shed is under fire, temperature gets raises up to predetermined temperature in the respective area. The radiation causes the liquid inside the sprinkler bulb to expand and the bulb bursts throwing out water under pressurized condition which gets sprayed over the area under fire. The sprayed water provides cooling effect to the burning material and in turn extinguishes the fire. What is Riser? A riser is a pipe which extends vertically one full storey or more to convey water to branches or group of fixtures. What is Riser Nipple? A Riser Nipple is connected when there is sudden rise in elevations (levels) between Sprinkler main pipe & branch pipe. What are Pipe Supports? Pipe Supports are used to Support pipes at specified intervals. Typical representation of Pipe supports in Shop Floor drawing An ISO 9001:2000 Certified Organization www.ramtech-corp.com DEFINATION
  • 9. An ISO 9001:2000 Certified Organization www.ramtech-corp.com DESIGN CRITERIA Following are Design Codes & Standards for Fire Fighting System:  TAC Fire Protection Manual – 1998 Edition.  NFPA 14 – Rules for Stand Pipe & Hose System.  NFPA 13 – Standard For Installation Of Sprinkler Systems.  NFPA 231 – Standard For General Storage.  TAC Manual Of Sprinkler System.  NFPA 72 – Standard For National Fire Alarm Code.  NFPA 2001 – Standard For Clean Agent Fire extinguishing System. Spacing of sprinklers is determined on the basis of hazard classification, exposure and the height at which it is installed. Water is applied at a density measured in mm / min. Standards used by the tariff advisory committee (TAC) of the insurance association of India for installing automatic sprinklers given in table 13.2.
  • 10. Design Densities and Spacing of Sprinklers Hazards Design density (mm/min ) Assumed max. area of operation (sqm) Max. area covered per sprinkler Maximum distance between sprinklers 1. Extra Light Hazard 1.1 Non-industrial occupancy 2.25 84 where fire-load is low 17 9.2 a) Sidewall sprinklers 21 4.6 b) Other sprinklers 1.2 Areas like kitchen, boiler 5 84 room, attics, basements, and storage areas where fire-load is higher 1.3 Other sprinklers 9 3.7 2. Ordinary Hazard 2.1 Commercial and industrial 5 360 occupancies handling and processing ordinary combustible materials a) Sidewall Sprinklers 9 7.4 b) Other sprinklers 12 4 3. Extra high hazards and other types of risks require special attention according to TAC/code requirements. An ISO 9001:2000 Certified Organization www.ramtech-corp.com DESIGN CRITERIA
  • 11. An ISO 9001:2000 Certified Organization www.ramtech-corp.com DESIGN CRITERIA
  • 12. An ISO 9001:2000 Certified Organization www.ramtech-corp.com DESIGN CRITERIA
  • 13. An ISO 9001:2000 Certified Organization www.ramtech-corp.com GENERAL NOTES 1. The distance between sprinkler to wall shall not exceed 2.3 mtr. 2. The distance between sprinkler deflector and the slab shall not exceed 300 mm. 3. Upright sprinklers shall be installed with frame arms parallel to the branch line. 4. The distance between an upright sprinkler and hanger shall not be less than 80 mm. 5. Hexagonal reducing bushes shall not be used for changing the size of pipe. 6. All pipe shall be to Astm a-53, sch.40 grade-b, galvanised seamless. 7. Threaded fittings shall be used for pipes up to 50 mm and grooved fittings for pipes 65 mm and above. 8. All tamper switches and water flow detectors shall be interfaced with fire alarm system 9. Piping shall be pitched to drain. (branches to be sloped 4mm/mtr. & mains by 2mm/mtr.)
  • 14. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Under Ground Water Tank SCHEMATIC DIAGRAM OF OVERALL BUILDING FIRE FIGHTING SYSTEM Main Supply from City Line` Water Transfer Pumps Main Supply Header to Over Head tank
  • 15. Fire Protection ABBREVATIONS An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 16. Fire Protection ABBREVATIONS & SYMBOLS An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 17. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Drawings from consultant Arch. drawings Structural drawings Services design drawings Shop drawings (ISD Dwgs.) MEP Coordination Drawings (CSD Dwgs.) Builders work drawings As built drawings Comments updated Approved Rejected Approved Material Submittals PROCESS FLOW DIAGRAM FOR FIRE FIGHTING SHOP DRAWING
  • 18. SHOP DRAWING PROCEDURE DESCRIPTION: Shop drawings are also called as Detail drawings are used to guide the construction and Erection members. Complete shop drawings show the levels, pipe sizes, setting out dimensions and typical details, sections being co-ordinated with all services. Since the shop drawings are intended only for use in the shop, they generally contain little or no information about the erection and installation of the MEP members they depict. The following are steps to be adopted while preparing the Fire fighting Shop Drawing. STEP1. PREPARE ARCHITECTURAL DRAWING:- Prepared the Architectural X-Ref drawings. STEP 2. CONVERT DOUBLE LINE WITH FITTINGS:- Converting the single pipeline into double line pipe with fittings whose Dia are above 65mm. STEP3 ASSIGNED THE LEVELS:-Assign the levels after co-ordinating with structural drawings and other services drawings to all sp An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 19. STEP 4. SETTING OUT DIMENSIONS & PIPE SUPPORTS:- Give the reference dimension from gird or the wall whichever nearest to the fixtures, pipes and accessories. Provide the pipe supports to the pipe and details for support. STEP 5. SECTION VIEWS:- Prepared the section at a critical area where the density of pipe work is more. STEP 6. STANDARD DETAILS:- Show all the typical fixing details of different fixtures and accessories. STEP 7. TITLE SHEET WITH GENERAL NOTES:- Show all the general notes and legends in the title block and a creating view port for the drawing as per the required scale. An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 20. SHOP DRAWING Before starting the shop drawing refer all Input and material submittals for the project. 1. Study the architectural, structural drawings for the FFL, beam depths and architectural sections. 2. Study the Reflected ceiling plan (RCP) drawing for the False ceiling level (FCL) and floor pattern drawings. 3. Study the Schematic riser diagram for Sanitary ,storm and Vent pipes. 4. Study all approved material submittals for example type of fixture, pipe fitting, accessories and pipe support etc,. 5. Study client’s CAD standards, Legends. 6. Refer the Sample drawing given by client. GUIDELINES TO PREPARE A SHOP DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 21. SHOP DRAWING Client will provide the architectural drawing for each floor. It contains all information like room names & partitions, walls, columns, beams, door, windows etc., So create one arch drawing for reference purpose. PREPARATION OF ARCHITECTURAL DRAWING 1. Delete unwanted text and dimensions. 2. Change text height as per shop drawing scale. 3. Change grid bubbles as per shop drawing scale. 4. Change all entities colour as 8. 5. Attach this Arch file as X-reference file for shop drawing. PROCEDURE: An ISO 9001:2000 Certified Organization www.ramtech-corp.com STEP 1:-
  • 22. SHOP DRAWING  SEE BELOW SCREEN SHOT FOR INPUT ARCHITECTURAL DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 23. SHOP DRAWING  SEE BELOW SCREEN SHOT FOR OUTPUT ARCHITECTURAL DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 24. SHOP DRAWING 1. Before starting the double line refer client specification they wants pipe sizes are Nominal diameter or Outer diameter. If they are asking Outer diameter, refer below table.  CONVERSION OF DOUBLE LINE WITH FITTINGS 2. Start making the double lines for the pipes as per the sizes mentioned in the contract drawing. 3. Place the pipe fittings like 90, 45 degree elbows, Tee connections etc., according to the nfpa standards. All fittings as per approved client submittals. An ISO 9001:2000 Certified Organization www.ramtech-corp.com STEP 2:-
  • 25. Number of Sprinklers on branch can be decided with respect to Sprinkler pipe size as shown below: An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 26. 4. Reroute if necessary where ever clashes found with structures columns and fittings are not inserted within that distance. 5. Avoid the Elbows and ‘Y’ fittings in walls. 6. Show the flow direction as per schematic drawing. 7. After completion of the double line and fittings change the layers and line type as per client CAD standards. An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 27. An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING STANDARD FIRE FIGHTING FITTINGS
  • 28. SHOP DRAWING SEE BELOW SCREEN SHOT FOR INPUT FIRE FIGHTING DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 29. SHOP DRAWING SEE BELOW SCREEN SHOT FOR OUTPUT DOUBLE LINE DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 30. BOTTOM OF PIPE:- The distance from the finished floor level(ffl) to the bottom of insulated pipe is bop. The Sprinkler pipes hangs between slab and false ceiling level with supporters. If is interference & fouling with duct or other equipment, in that case we use to bend the pipe as up & down, then follows the routing. FOR CALCULATING THE BOP VALUE:- FFL of current floor______________(from arch. Layout) ssl & slab thickness of the above floor__________(from structural layout) false ceiling level must be greater than 2400mm from ffl. Considering the false ceiling level Sprinkler pipes running 100mm apart. Assigned the levels An ISO 9001:2000 Certified Organization www.ramtech-corp.com STEP3:- SHOP DRAWING
  • 31. • Bottom of pipe must be given from the starting point that is from riser to the till end of the water supply to fixtures and should be given to all individual pipe lines. For Example: let ø65 pipe is running to the apartment from riser considering the bottom of level at starting point for hot water 2850 mm and for cold water 2750 mm from finished floor level. • After some distance it reduces to ø42 mm • Calculating the bop 65-42=23mm/2=11.5mm Rounding it to 12 mm appx. • Means ø42 mm hot water pipes bop 2850-12= 2838 mm from finished floor level. • Similarly for ø12 mm cold water 2750-12= 27385mm from finished floor level. An ISO 9001:2000 Certified Organization www.ramtech-corp.com •Assigned the levels SHOP DRAWING
  • 32. SHOP DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com STEP 3:- Assigned the levels
  • 33. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Give the reference dimension to the sprinkler to sprinkler, pipes and accessories from wall, gird, Column or Beams, whichever nearest, for the installation of pipe and accessories etc. purpose. STEP 4:- SETTING OUT DIMENSIONS: SHOP DRAWING
  • 34. Pipe supports are generally provided for sprinklers pipe at an interval of 1 to 3 meters distance or as per client requirement. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Pipe Support SHOP DRAWING STEP 4:- PIPE SUPPORTS
  • 35. Typical Channel Support for every 3 meter & pipe support on vertical structure An ISO 9001:2000 Certified Organization www.ramtech-corp.com Pipe hanger & Rod Details SHOP DRAWING
  • 36. An ISO 9001:2000 Certified Organization www.ramtech-corp.com Typical Clevis Hanger & C-Clamp Details used as Pipe Support Pipe hanger & Rod Details SHOP DRAWING
  • 37. SHOP DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com STEP6:- STANDARD DETAILS Classification of Sprinklers  Upright sprinklers  Pendent sprinklers  Sidewall sprinklers Pendent & Upright sprinklers (combined) The following are the main types of sprinklers available in Fire Protection System: Pendent type sprinklers were used basically beneath the false ceiling where as upright sprinklers and sidewall sprinklers are used in parking areas.
  • 38. SHOP DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com Standard detail Upright Sprinkler
  • 39. SHOP DRAWING An ISO 9001:2000 Certified Organization www.ramtech-corp.com Standard detail Pendent Sprinkler
  • 40. Pendent Sprinkler An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 41. Pendent Sprinkler An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 42. Pendent & Upright sprinklers (combined) An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 43. This is how Sprinkler ‘Main Pipe’ and ‘Branch Pipe’ are connected by Riser Nipple: SPRINKLER HEAD NIPPLE SPRINKLER MAIN PIPE PENDANT TYPE BRANCH PIPE An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 44. The Riser Nipple size with respect to Number of sprinklers can be found from following table: An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING PIPE SIZE BHS AREA OTHER AREA 25 32 40 50 65 80 11 ABOVE 21 ABOVE 1 2 2 3 3 4-5 4-8 6-10 9-10 11-20
  • 45. Typical FM-200 System used in Fire Protection System by using FM-200 Gas Gas Extinguishing System An ISO 9001:2000 Certified Organization www.ramtech-corp.com Some special premises, e.g. server rooms, were equipped with gas extinguishing system in addition to the sprinkler system according to the special instructions of the premises. SHOP DRAWING
  • 46. An ISO 9001:2000 Certified Organization www.ramtech-corp.com FLEXIBLE PIPE CONNECTOR / EXPANSION JOINT SHOP DRAWING
  • 47. P & I diagram of FM-200 container An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 48. Fire Extinguisher Fire Extinguishers are represented in the following manner in shop floor drawing: An ISO 9001:2000 Certified Organization www.ramtech-corp.com Fire Extinguisher is used to destroy or minimize fire by using Carbon Dioxide, Dry Powder or film foam Extinguishing compound. CO2 extinguishers are selected typically for spaces where the aim is to prevent damage caused by the extinguishing compound itself. Dry powder and film foam extinguishers were designed for premises where there is a large potential fire load and where the damage by the extinguishing compound would not be significant.
  • 49. Fire Hose Reel was installed for area with high fire load (warehouses & production areas). Hose reel was mounted inside a wall/column mounted M.S. Box. Fire Hose reel An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 50. Deluge System Deluge System is generally used near electrical equipment such as cable trays etc., where fire protection is required. An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 51. An ISO 9001:2000 Certified Organization www.ramtech-corp.com DATAILS TITLE BLOCK KEY PLAN REF DWG. NO’S. LEGENDS GENERAL NOTES SEE BELOW SAMPLE SHOP DRAWING FOR FIRE FIGHTING LAYOUT: SHOP DRAWING PLAN
  • 52. •VIEW PORT CREATION Scaling is used to depict objects on paper that are either larger or smaller than the paper. Creation of view port is done in Paper space. Generally shop drawings in 1:50 scale and sections are 1:25 scale. View port is create by using the command “MVIEW”. •TITLE BLOCK UPDATING Title block is provided by client as required size (A0, A1, A2 A4). Generally the title block details are…... Notes: Show the any specific notes in the Notes column related to this shop drawing. See below snap shot…. HVAC PLUMBING ELECTRICAL NOTES: An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 53. An ISO 9001:2000 Certified Organization www.ramtech-corp.com PLAN SEE BELOW SCREEN SHOT FOR OUTPUT PLAN: SHOP DRAWING
  • 54. An ISO 9001:2000 Certified Organization www.ramtech-corp.com SEE BELOW SCREEN SHOT FOR OUTPUT DATAILS: SHOP DRAWING DATAILS
  • 55. REF. DWG. NOS.: Update the Reference Drawing Nos. what ever the drawings are referred while preparing this shop drawing I.e. Architectural, structural, schematic, design drawing.. See below snap shot…. •KEY PLAN: Hatching the location in key plan, the area is covered in this sheet. An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 56. • DRAWING TITLE: Update the Drawing Title information I.e. Floor, Level, service, Drawn By, Checked By, Approved By, Revision, Drawing Scale and Drawing No... See below snap shot…. An ISO 9001:2000 Certified Organization www.ramtech-corp.com SHOP DRAWING
  • 57. FIRE FIGHTING PIPE MATERIALS An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 58. Fire Hose cabinet shown like this in input drawing: Fire Hose Cabinet An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 59. Fire Hose cabinet shown like this in output drawing: An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 60. Typical Sectional Details of Fire Fighting System FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION (BRANCH PIPE PASSING BELOW BEAM) (APPLICABLE ONLY IN AREAS WHERE BOTTOM OF BEAM CLOSE TO CEILING) An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 61. (BRANCH PIPE PASSING BELOW BEAM) FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 62. (AREAS WITHOUT CABLE TRAY) FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 63. CABLE TRAY INSTALLED 300mm BELOW SOFFIT OF SLAB) FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION An ISO 9001:2000 Certified Organization www.ramtech-corp.com
  • 64. (CABLE TRAY INSTALLED AT DIFFERENT LEVEL) - MORE THAN 300mm BELOW SOFFIT OF SLAB) FIRE FIGHTING DETAIL - FOR SETTING OF PIPE ELEVATION An ISO 9001:2000 Certified Organization www.ramtech-corp.com