Kategori Lokasi Perkara yang
Perlu Ada
Spesifikasi Gambarajah
Dental
Air
Dental
room
- Effluent
discharge .
 All gravity drainage from spittoons etc should
discharge into the foul drain via a tun-dish and
full depth trap.
 Discharge from separators should similarly be
taken to a full-depth S-trap connected to the foul
drain.
Rujuk Rajah.
- Pipeline
materials
- The pipeline system can be of either copper
in accordance with HTM 2022 ‘Design
considerations’ or nylon such as Tecalon.
For larger installations, that is, more than 2/3
dental chairs, copper is preferred. The
copper pipelines should be installed in
accordance with the installations guidance
given in HTM 2022 ‘Design considerations’.
- If nylon pipes are used, care must be taken
to ensure that fire safety is not
compromised.
- Where dental compressed air is installed
with medical gas pipeline systems, the
validation and verification procedures as
set out in HTM 2022 ‘Validation and
verification’ should be followed.
- Where work is to be carried out on an existing dental
system, the permit-to-work should be followed as set
out in HTM 2022 ‘Operational management’; the parts
which do not apply should be clearly marked “not
applicable”.
Dental
Plant
Room
Compressor
systems
- In order to achieve the quality specification set out in
Table 1, it will be necessary for a dryer system to be
incorporated into the plant as well as appropriate
filtration. The major components of a dental air system
are shown in Figure 2.
Siting - The plant should have all-round access for
maintenance purposes, and allowance
should be made for changing major
components.
- Air inlet filters should be fitted immediately
upstream of the compressor. In exceptional
circumstances additional screens, filters
and silencers may be required.
- The air filters should comply with
BS7226:1989 and be either medium filters
or grade CA paper element filters.
- The compressor and drier plant should
ideally be installed in a dust-free, dry, cool
room. The room should be well ventilated
as shown in Figure 3.
- The optimum temperature range is 10–
15°C; additional forced ventilation will be
required if the ambient temperature
exceeds 35°C.
- An air compressor gives off approximately
70% of its generated power as heat energy;
a compressor system designed to develop
500 litres/minute at 5 bar generates
approximately 3 kW. This will need to be
taken into account when considering the
room ventilation.
- The performance of the compressor and
dryer is seriously impaired if the ambient
temperature rises above 35°C; the
temperature must not fall below +5°C to
prevent condensation forming and the
control mechanism and the dryer system
freezing.
Noise - The noise level of the system will obviously increase with
the capacity of the supply systems. The maximum free
field noise level at 1 m distance for unsilenced
compressed air plant varies with the type and power of
the plant. Typical noise levels are given in Table 2.
Air intake - The air intake for the compressor plant should be
located to minimise contamination from internal
combustion engine exhausts and the discharge from
vacuum systems, anaesthetic gas scavenging systems
and ventilation systems or other potential sources of
contamination.
Plant
Ventilation
- A duplex dryer system would not normally be required
for dental surgeries, although it would be considered for
a dental school or large department where downtime for
maintenance would cause unacceptable disruption.
Dental
Vacuum
Vacuum
pipeline
materials
- The pipelines are only clean between the vacuum
plant and the separators. The maximum vacuum is –
0.25 bar (approx. –190 mm Hg).
- The choice of material is governed by: a. the
requirement that the material must withstand –0.25
bar (approx
- –190 mm Hg); b. fire safety; c. cost.
- The vacuum and exhaust lines can be either copper
– as medical vacuum lines, see HTM 2022 ‘Design
considerations’ – or polythene and polypropylene or
uPVC.
- Where non-metallic pipelines pass through fire
compartmental walls/barriers they should be
suitably sleeved.
- Pipes made from ABS/ASA material are not suitable
for use with the medications and solutions used in
dental systems.
Dental
vacuum plant
exhaust
- The exhaust pipe from the vacuum system must be
sited outside at roof level away from air intakes,
opening windows etc. It should be clearly labelled
“Dental vacuum discharge point – do not obstruct”.
- The exhaust pipe should turn down to prevent influx
of rainwater and have a mesh to protect against
ingress of insects, vermin, birds etc.
- The exhaust pipe should be provided with a drain
valve at its lowest point.
- Noise from the exhaust should be considered and a
silencer fitted if required.
- The exhaust from a duplex (or triplex) system may
be manifolded together to one external exhaust.
- The vacuum pumps should be sized to take into
account the back-pressure of the exhaust system
and the resistance of the bacterial filter.
Condensate
water
separator
- In order to avoid considerable water condensation
due to large temperature differences, it is advisable
not to install the vacuum lines close to outside walls.
- All vacuum lines should be provided with a
condensation water separator.
- This should be installed as close as possible to the
vacuum plant and at the lowest point of the vacuum
line.
- The separator should be easily accessible and
preferably fitted with an automatic drain.
- The pressure loss caused by the water separator
should not exceed 1.5 mm Hg under maximum flow
conditions.
Electricity Earthing - Pipelines should be bonded to the consumer’s earth
terminal as required by Regulation 413-2 of the IEE
Regulations. This bonding should be made as near as
possible to the point at which the pipeline enters
the building from the plant. The size of the bonding
conductor should be in accordance with Table 54f of
the Regulations. The pipelines should not
themselves be used for earthing the electrical
equipment.
- Flexible pipeline connections between the
compressors or vacuum pumping plant and the fixed
pipelines should be bonded across to comply with
this requirement. Flexible connections in the fixed
pipelines should not normally be used, but if they
are specially approved they should be similarly
bonded across.

Más contenido relacionado

Similar a Dental_Chair_2.doc

Webasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation InstructionsWebasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation InstructionsButler Technik
 
Prima Smooth flue system installation instructions
Prima Smooth flue system installation instructionsPrima Smooth flue system installation instructions
Prima Smooth flue system installation instructionsSchiedel UK
 
Energy efficiency improvement opportunities in compressed air systems
Energy efficiency improvement opportunities in compressed air systemsEnergy efficiency improvement opportunities in compressed air systems
Energy efficiency improvement opportunities in compressed air systemsPratik Bhoir
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2خالد محمود
 
Technical data sheet heat exchanger BOUL
Technical data sheet heat exchanger BOULTechnical data sheet heat exchanger BOUL
Technical data sheet heat exchanger BOULBoulKharkiv
 
S3 Supply Air Duct System Assignment
S3 Supply Air Duct System AssignmentS3 Supply Air Duct System Assignment
S3 Supply Air Duct System Assignmentno suhaila
 
MAXAIR Product Catalogue and Technical Manual
MAXAIR Product Catalogue and Technical ManualMAXAIR Product Catalogue and Technical Manual
MAXAIR Product Catalogue and Technical ManualJarryd Lockhart
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentationLee Chun Yee
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsAbhishek Padiyar
 
Amcor dsr12 manual
Amcor dsr12 manualAmcor dsr12 manual
Amcor dsr12 manualmoisturecare
 
Amcor dsr20 manual
Amcor dsr20 manualAmcor dsr20 manual
Amcor dsr20 manualmoisturecare
 
HVAC Install - Trust But Verify
HVAC Install  - Trust But VerifyHVAC Install  - Trust But Verify
HVAC Install - Trust But VerifyERH West
 
Cda chaktaikhal pump_ technical specification_1
Cda chaktaikhal pump_ technical specification_1Cda chaktaikhal pump_ technical specification_1
Cda chaktaikhal pump_ technical specification_1Jakir Hossain
 
Fire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptxFire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptxAreeba Siddiqui
 

Similar a Dental_Chair_2.doc (20)

Webasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation InstructionsWebasto AIRTOP 3500/5000 Installation Instructions
Webasto AIRTOP 3500/5000 Installation Instructions
 
Prima Smooth flue system installation instructions
Prima Smooth flue system installation instructionsPrima Smooth flue system installation instructions
Prima Smooth flue system installation instructions
 
Hose
HoseHose
Hose
 
Energy efficiency improvement opportunities in compressed air systems
Energy efficiency improvement opportunities in compressed air systemsEnergy efficiency improvement opportunities in compressed air systems
Energy efficiency improvement opportunities in compressed air systems
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2
 
Technical data sheet heat exchanger BOUL
Technical data sheet heat exchanger BOULTechnical data sheet heat exchanger BOUL
Technical data sheet heat exchanger BOUL
 
S3 Supply Air Duct System Assignment
S3 Supply Air Duct System AssignmentS3 Supply Air Duct System Assignment
S3 Supply Air Duct System Assignment
 
MAXAIR Product Catalogue and Technical Manual
MAXAIR Product Catalogue and Technical ManualMAXAIR Product Catalogue and Technical Manual
MAXAIR Product Catalogue and Technical Manual
 
Chapter4.pdf
Chapter4.pdfChapter4.pdf
Chapter4.pdf
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
dayline__1_
dayline__1_dayline__1_
dayline__1_
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety Standards
 
Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)
 
Amcor dsr12 manual
Amcor dsr12 manualAmcor dsr12 manual
Amcor dsr12 manual
 
Amcor dsr20 manual
Amcor dsr20 manualAmcor dsr20 manual
Amcor dsr20 manual
 
HVAC Install - Trust But Verify
HVAC Install  - Trust But VerifyHVAC Install  - Trust But Verify
HVAC Install - Trust But Verify
 
Manual filtro pentair
Manual filtro pentair Manual filtro pentair
Manual filtro pentair
 
Cda chaktaikhal pump_ technical specification_1
Cda chaktaikhal pump_ technical specification_1Cda chaktaikhal pump_ technical specification_1
Cda chaktaikhal pump_ technical specification_1
 
Natural gas safety for engineer in abroad
Natural gas safety for engineer in abroadNatural gas safety for engineer in abroad
Natural gas safety for engineer in abroad
 
Fire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptxFire Protection Systems Areeba Siddiqui.pptx
Fire Protection Systems Areeba Siddiqui.pptx
 

Más de Mohd Zulhairi Mohd Noor

273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptxMohd Zulhairi Mohd Noor
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxMohd Zulhairi Mohd Noor
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).pptMohd Zulhairi Mohd Noor
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.pptMohd Zulhairi Mohd Noor
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.pptMohd Zulhairi Mohd Noor
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.pptMohd Zulhairi Mohd Noor
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.pptMohd Zulhairi Mohd Noor
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.pptMohd Zulhairi Mohd Noor
 

Más de Mohd Zulhairi Mohd Noor (20)

(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf
 
ASAS_KAWALAN.ppt
ASAS_KAWALAN.pptASAS_KAWALAN.ppt
ASAS_KAWALAN.ppt
 
CONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.pptCONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.ppt
 
120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx
 
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
 
All-about-Tokyo.pptx
All-about-Tokyo.pptxAll-about-Tokyo.pptx
All-about-Tokyo.pptx
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
 
61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
 
22513791-Lantai.ppt
22513791-Lantai.ppt22513791-Lantai.ppt
22513791-Lantai.ppt
 
95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt
 
57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt
 
372601839 boq-vrf
372601839 boq-vrf372601839 boq-vrf
372601839 boq-vrf
 
29629597 psychrometric-course
29629597 psychrometric-course29629597 psychrometric-course
29629597 psychrometric-course
 
316825480 diffuser-tech data
316825480 diffuser-tech data316825480 diffuser-tech data
316825480 diffuser-tech data
 

Último

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Último (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Dental_Chair_2.doc

  • 1. Medical Kategori Lokasi Perkara yang Perlu Ada Spesifikasi Gambarajah Dental Air Dental room - Effluent discharge .  All gravity drainage from spittoons etc should discharge into the foul drain via a tun-dish and full depth trap.  Discharge from separators should similarly be taken to a full-depth S-trap connected to the foul drain. Rujuk Rajah. - Pipeline materials - The pipeline system can be of either copper in accordance with HTM 2022 ‘Design considerations’ or nylon such as Tecalon. For larger installations, that is, more than 2/3 dental chairs, copper is preferred. The copper pipelines should be installed in accordance with the installations guidance given in HTM 2022 ‘Design considerations’. - If nylon pipes are used, care must be taken to ensure that fire safety is not compromised. - Where dental compressed air is installed with medical gas pipeline systems, the validation and verification procedures as set out in HTM 2022 ‘Validation and verification’ should be followed. - Where work is to be carried out on an existing dental system, the permit-to-work should be followed as set out in HTM 2022 ‘Operational management’; the parts which do not apply should be clearly marked “not applicable”.
  • 2. Dental Plant Room Compressor systems - In order to achieve the quality specification set out in Table 1, it will be necessary for a dryer system to be incorporated into the plant as well as appropriate filtration. The major components of a dental air system are shown in Figure 2. Siting - The plant should have all-round access for maintenance purposes, and allowance should be made for changing major components. - Air inlet filters should be fitted immediately upstream of the compressor. In exceptional circumstances additional screens, filters and silencers may be required. - The air filters should comply with BS7226:1989 and be either medium filters or grade CA paper element filters. - The compressor and drier plant should ideally be installed in a dust-free, dry, cool room. The room should be well ventilated as shown in Figure 3. - The optimum temperature range is 10– 15°C; additional forced ventilation will be required if the ambient temperature exceeds 35°C. - An air compressor gives off approximately 70% of its generated power as heat energy; a compressor system designed to develop 500 litres/minute at 5 bar generates approximately 3 kW. This will need to be taken into account when considering the
  • 3. room ventilation. - The performance of the compressor and dryer is seriously impaired if the ambient temperature rises above 35°C; the temperature must not fall below +5°C to prevent condensation forming and the control mechanism and the dryer system freezing. Noise - The noise level of the system will obviously increase with the capacity of the supply systems. The maximum free field noise level at 1 m distance for unsilenced compressed air plant varies with the type and power of the plant. Typical noise levels are given in Table 2. Air intake - The air intake for the compressor plant should be located to minimise contamination from internal combustion engine exhausts and the discharge from vacuum systems, anaesthetic gas scavenging systems and ventilation systems or other potential sources of contamination.
  • 4. Plant Ventilation - A duplex dryer system would not normally be required for dental surgeries, although it would be considered for a dental school or large department where downtime for maintenance would cause unacceptable disruption. Dental Vacuum Vacuum pipeline materials - The pipelines are only clean between the vacuum plant and the separators. The maximum vacuum is – 0.25 bar (approx. –190 mm Hg). - The choice of material is governed by: a. the requirement that the material must withstand –0.25 bar (approx - –190 mm Hg); b. fire safety; c. cost. - The vacuum and exhaust lines can be either copper – as medical vacuum lines, see HTM 2022 ‘Design considerations’ – or polythene and polypropylene or uPVC. - Where non-metallic pipelines pass through fire compartmental walls/barriers they should be suitably sleeved.
  • 5. - Pipes made from ABS/ASA material are not suitable for use with the medications and solutions used in dental systems. Dental vacuum plant exhaust - The exhaust pipe from the vacuum system must be sited outside at roof level away from air intakes, opening windows etc. It should be clearly labelled “Dental vacuum discharge point – do not obstruct”. - The exhaust pipe should turn down to prevent influx of rainwater and have a mesh to protect against ingress of insects, vermin, birds etc. - The exhaust pipe should be provided with a drain valve at its lowest point. - Noise from the exhaust should be considered and a silencer fitted if required. - The exhaust from a duplex (or triplex) system may be manifolded together to one external exhaust. - The vacuum pumps should be sized to take into account the back-pressure of the exhaust system and the resistance of the bacterial filter. Condensate water separator - In order to avoid considerable water condensation due to large temperature differences, it is advisable not to install the vacuum lines close to outside walls. - All vacuum lines should be provided with a condensation water separator. - This should be installed as close as possible to the vacuum plant and at the lowest point of the vacuum line. - The separator should be easily accessible and preferably fitted with an automatic drain.
  • 6. - The pressure loss caused by the water separator should not exceed 1.5 mm Hg under maximum flow conditions. Electricity Earthing - Pipelines should be bonded to the consumer’s earth terminal as required by Regulation 413-2 of the IEE Regulations. This bonding should be made as near as possible to the point at which the pipeline enters the building from the plant. The size of the bonding conductor should be in accordance with Table 54f of the Regulations. The pipelines should not themselves be used for earthing the electrical equipment. - Flexible pipeline connections between the compressors or vacuum pumping plant and the fixed pipelines should be bonded across to comply with this requirement. Flexible connections in the fixed pipelines should not normally be used, but if they are specially approved they should be similarly bonded across.