1. MUHAMMAD OSAMA IQBAL
House No: 309-304, QASIMABAD LIAQUATABAD, KARACHI
Cell: +92-3412439083
Residential:+92-21-34126145
Email: osamachouhan124@gmail.com
OBJECTIVE
To seek a challenging career by occupying a suitable position, utilizing my technical skills
and experience to contribute towards the progress of organization and at the same time has
the prospects for professional growth and development of my career
EDUCATION / QUALIFICATION
B.E in Electronics Engineering (1st
Division) 3.1CGPA
Usman Institute of Technology Karachi (Hamdard University) 2011 - 2015
Intermediate in Pre Engineering
D.J Sindh Govt Science College, Karachi 2009 – 2011
Matriculation in Science
Rukaiya Hajiani High School 2009
INTERNSHIP TRAININGS
• Internee in CIVIL AVIATION AUTHORITY 2nd Sept 2013 to 21st Sept 2013
• Internee in THE AUTOMATOR 3rd Feb 2014 to 14th Feb 2014
• Internee in PAKISTAN CABLE 27 June 2014 to 26 July 2014
PROFESSIONAL EXPERIENCE
Two years training experience in POWER WAVE. This is my part time outdoor
experience during my bachelors. During training I was learned following basic electrical
wiring and logics.
• Design Star/Delta Power Circuit & Control Circuit.
• Design Reverse/Forward Star/Delta Power Circuit & Control Circuit.
• Design 3-Phase Motor Power Circuit.
• Check and install all parameters of Toshiba, Siemens, Hitachi, KEB, Frenic Mega
inverters.
• Trouble shooting & Installation of control unit and power unit of DC drive.
• Reading and design Electrical panel/wiring diagrams.
• Little bit working on Siemens S7 300/400 PLC.
• Installation of 3 phases Direct Meter and CT Meter.
• Installation of AC Digital, Analog Ampere Meter & Volt Meter of both type i.e. Direct
and CT type.
• Connection of Welding Transformer and Ignition Transformer..
2. • Connection of group motors, expander motors, padder motor etc on Panel side with the
help of panel wiring diagram.
• Wiring of Industrial Plug.
• Wiring of Sewing Machine.
• Checking DB’s.
• Setting of Pressure Temperature (PT).
• Load Calibration of Load cell.
• Making JOG/Inching Control Circuit, DOL Control Circuit for motors.
• Erection of Panel.
• Check Cargo Lift Control Circuit.
• Industrial Load Calculation.
FINAL YEAR PROJECT
PLC CONTROL AND AC VARIABLE-FREQUENCY TECHNIQUE ON WATER
INTAKE SYSTEM
Based on the automatic water intake system, this chapter presents the application of a joined
PLC and frequency converter, hardware and software and so on. After implementation, the
system can auto regulate the water pumps amounts and rotate speed of the water intake
system based on the running loads change. All systems can hold optimal state of high
efficiency and saving power and through Human Machine Interface monitor major aspect of
the project.
ENGINEERING SKILLS
1. Electronic workbench MULTISIM
2. PCB Designing
3. Auto CAD
4. MATLAB
5. FATEK PLC
6. FPGA (Xilinx ISE 8.2i)
7. Soldering and defects searching of different Circuits
8. Protius
9. Electrical troubleshooting
10. MS office
KEY SKILL
• Participation in Electro fair 2012
• Participation in Ideas 2014
• Public speaking
3. • Managing skills, Interpersonal skills
• Communication skill
• Tolerance Power
• Building Confidence
PERSONAL INFORMATION:
Father’s Name : Muhammad Iqbal Ibrahim
Date of Birth : July- 25-1993
C.N.I.C No : 42101-3259392-1
Marital Status : Single
Nationality : Pakistani
Religion : Muslim
REFRENCES
Personal and professional references would be gladly furnished upon request