DEVELOPMENT OF A TALENT MANAGEMENT SYSTEM
Presentation
SUMMARY REPORT
• A company's HR staff has the most talent management concerns. A high staff
turnover rate might hurt a company. Offering training and development to staff
will help the firm retain top personnel. Implementing the "TMS" in a firm may
improve employee engagement and performance, assuring organizational
success. However, declining the proposal might harm the company's performance
and longevity. Talent management initiatives may solve HR managers' problems
during and after the epidemic.
The presentation is focused to provide the feasibility analysis of project while
working on the project schedule and indicating the difference between baseline
and modified schedule.
APPENDICES (CHANGES IN RISK RAID)
RAID
Risk
Type
Desc
ripto
r
Text
Cause Effects
Impact
Score
Probability
Score
Risk Score Risk Owner MitigationAction Contingency
R1
Failure
in
Comm
unicati
on
Poor
comm
unicati
on
Bad
managemen
t
Bad impact
on
performanc
e
4 3 12
Project
Manager
Effective communication
Alternate communication
plan
R2
Failure
in
Traini
ng
Lack
of
trainin
g
plans
Poor
planning
Total loss of
project
4 5 20
Project
Planner
Effective training plans Alternate training process
R3
Poor
Result
s
Lack
of
positiv
e
outco
mes
Poor
assessments
Total loss of
project
3 4 12
Project
Supervisor
Effective assessment process
Alternate assessment
method
Realigned
schedule
with
minimal
risk scores.
APPENDICES (CASHFLOW) (CONT.)
Item Description 2 Months 3 Month 2 Months 5 Months 6 Months 3 Months 2 Months 10 Months 2 Months 1 Month
1 Conduct a needs analysis £65,000 £0 £0 £0 £0 £0 £0 £0 £0 £0
Actual £70,000
2 Define KPIs £0 £15,000 £0 £0 £0 £0 £0 £0 £0 £0
Actual £19,000
3 Develop a strategy £0 £0 £70,000 £0 £0 £0 £0 £0 £0 £0
Actual £100,000
4 Design the system £0 £0 £0 £78,000 £0 £0 £0 £0 £0 £0
Actual £80,000
5 Identify roles and responsibilities £0 £0 £0 £0 £23,000 £0 £0 £0 £0 £0
Actual £25,000
6 Establish performance metrics £0 £0 £0 £0 £0 £200,000 £0 £0 £0 £0
Actual £100,000
7 Define development opportunities £0 £0 £0 £0 £0 £0 £140,000 £0 £0 £0
Actual £23,000
8 Create a communication plan £0 £0 £0 £0 £0 £0 £0 £180,000 £0 £0
Actual £71,000
9 Train managers and employees £0 £0 £0 £0 £0 £0 £0 £0 £90,000 £0
Actual £45,000
10 Launch and monitor the system £0 £0 £0 £0 £0 £0 £0 £0 £0 £35,000
Actual £10,000
Planned balance £65,000 £80,000 £150,000 £228,000 £251,000 £851,000 £991,000 £1,171,000 £1,261,000 £896,000
Difference in project
Cashflow
APPENDICES (CONT.) (GANTT CHART)
Schedule is
readjusted and
no resource
over allocation
was observed.
STAKEHOLDERS
Stakeholder Interests
Human
Resources
Management
Team
Effective talent management to improve retention and reduce turnover rates, boost engagement and productivity levels,
and ensure organizational success
Employees
Opportunities for personal and professional development, fair compensation, job security, and a positive work
environment
Top
Management
Talent management strategies that align with the organization's goals and objectives, effective workforce planning, and
talent retention
Customers High-quality products and services delivered by skilled and engaged employees
Shareholders Return on investment, sustained organizational growth and success, and effective talent management strategies
Labor Unions Fair treatment of employees, job security, and a positive working environment
Regulatory
Bodies
Compliance with labor laws and regulations regarding employment practices
Competitors Talent management strategies that provide a competitive edge and attract top talent in the industry
Society Ethical and socially responsible employment practices, job creation, and positive contribution to the community
LIST OF IDEAS
Project goals should be SMART—specific, measurable, attainable, relevant, and time-bound. This will
help the project team grasp goals and success metrics.
Engage workers, supervisors, HR staff, and senior leaders in the initiative. This will guarantee that the
project meets stakeholder requirements and expectations and develop project support.
Create a communication strategy to report project status, milestones, and successes regularly. This
keeps stakeholders informed and involved throughout the process.
Use a TMS or other technology to help the project. Performance management, learning and
development, talent acquisition, and succession planning are examples. Technology may boost
efficiency and project success.
Check the project's progress and outcomes periodically. This may entail gathering and evaluating KPI
data to make project modifications. Regular monitoring and assessment may help the project succeed.
REFLECTIVE LEARNING NOTES
I learnt from his talent management effort that important stakeholders—employees, managers, and
senior leaders—must be involved.
Their involvement and support may assist generate momentum and ensure the project meets the
organization's goals and expectations.
A thorough project plan with goals, objectives, and dates is essential. This ensures that the project team is
working toward the same goals and can detect any barriers or problems.
Technology was useful for talent management. The project team used a TMS and other technologies to
simplify operations, boost productivity, and monitor and manage performance and development
objectives.
I learnt that project monitoring and assessment are critical to keep on track and provide outcomes. Key
performance indicator data is collected and analyzed to make project modifications.
I also learned that a detailed communication strategy is necessary to keep stakeholders informed and
involved throughout the project. Regular updates on project progress, milestones, and successes may
boost support and ensure everyone is working toward the same objectives.
REFERENCES
 Audenaert, M., Decramer, A., George, B., Verschuere, B. and Van Waeyenberg, T., 2019. When employee performance management affects individual
innovation in public organizations:The role of consistency and LMX. The International Journal of Human Resource Management, 30(5), pp.815-834.
 Claus, L., 2019. HR disruption—Time already to reinvent talent management. BRQ Business Research Quarterly, 22(3), pp.207-215.
 Collings, D.G., Mellahi, K. and Cascio, W.F., 2019. Global talent management and performance in multinational enterprises: A multilevel perspective.
Journal of management, 45(2), pp.540-566.
 Gallardo-Gallardo, E., Thunnissen, M. and Scullion, H., 2020. Talent management: context matters. The International Journal of Human Resource
Management, 31(4), pp.457-473.
 Harsch, K. and Festing, M., 2020. Dynamic talent management capabilities and organizational agility—A qualitative exploration. Human Resource
Management, 59(1), pp.43-61.
 Hooi, L.W., 2021. SME performance: does organizational learning capability really matter?. International Journal of Organizational Analysis, 29(5),
pp.1093-1116.
 Ikram, M., Zhou, P., Shah, S.A.A. and Liu, G.Q., 2019. Do environmental management systems help improve corporate sustainable development?
Evidence from manufacturing companies in Pakistan. Journal of Cleaner Production, 226, pp.628-641.
 Mousa, S.K. and Othman, M., 2020. The impact of green human resource management practices on sustainable performance in healthcare
organisations: A conceptual framework. Journal of Cleaner Production, 243, p.118595.
 Roscoe, S., Subramanian, N., Jabbour, C.J. and Chong, T., 2019. Green human resource management and the enablers of green organisational culture:
Enhancing a firm's environmental performance for sustainable development. BusinessStrategy and the Environment, 28(5), pp.737-749.
 Whysall, Z., Owtram, M. and Brittain, S., 2019.The new talent management challenges of Industry 4.0. Journal of management development.

Más contenido relacionado

Similar a Project Planning.pptx

Scott Taviner CV - LinkedIn Jan 2016
Scott Taviner CV - LinkedIn Jan 2016Scott Taviner CV - LinkedIn Jan 2016
Scott Taviner CV - LinkedIn Jan 2016
Scott Taviner
 
Managing talent
Managing talentManaging talent
Managing talent
City Union Bank Ltd
 
Kenneth Herndon Resume Updated
Kenneth Herndon Resume UpdatedKenneth Herndon Resume Updated
Kenneth Herndon Resume Updated
Ken Herndon
 
Liesl_Malone_HR_Transform_Change_Resume
Liesl_Malone_HR_Transform_Change_ResumeLiesl_Malone_HR_Transform_Change_Resume
Liesl_Malone_HR_Transform_Change_Resume
HRNecessities
 
Pillars of talent and engagement dr. lawrence ndombi
Pillars of talent and engagement  dr. lawrence ndombiPillars of talent and engagement  dr. lawrence ndombi
Pillars of talent and engagement dr. lawrence ndombi
Ciarafrica
 
Career briefing
Career briefingCareer briefing
Career briefing
livparis89
 

Similar a Project Planning.pptx (20)

Bl Matthews CV
Bl Matthews CVBl Matthews CV
Bl Matthews CV
 
Health Care HR
Health Care HRHealth Care HR
Health Care HR
 
Scott Taviner CV - LinkedIn Jan 2016
Scott Taviner CV - LinkedIn Jan 2016Scott Taviner CV - LinkedIn Jan 2016
Scott Taviner CV - LinkedIn Jan 2016
 
Managing talent
Managing talentManaging talent
Managing talent
 
Performance Management - Keeping it Flexible
Performance Management - Keeping it FlexiblePerformance Management - Keeping it Flexible
Performance Management - Keeping it Flexible
 
A Study On Talent Management Strategies In IT Industry
A Study On Talent Management Strategies In IT IndustryA Study On Talent Management Strategies In IT Industry
A Study On Talent Management Strategies In IT Industry
 
Deepa cv pmo.
Deepa cv pmo.Deepa cv pmo.
Deepa cv pmo.
 
Deepa CV-PMO.
Deepa CV-PMO.Deepa CV-PMO.
Deepa CV-PMO.
 
Kenneth Herndon Resume Updated
Kenneth Herndon Resume UpdatedKenneth Herndon Resume Updated
Kenneth Herndon Resume Updated
 
21st Century Talent Management: The New Ways Companies Hire, Engage, and Lead
21st Century Talent Management:  The New Ways Companies Hire, Engage, and Lead21st Century Talent Management:  The New Ways Companies Hire, Engage, and Lead
21st Century Talent Management: The New Ways Companies Hire, Engage, and Lead
 
RANJITH KUMAR PERFORMANCE MAIN.docx
RANJITH KUMAR PERFORMANCE MAIN.docxRANJITH KUMAR PERFORMANCE MAIN.docx
RANJITH KUMAR PERFORMANCE MAIN.docx
 
Strategic Talent Management and Development.pdf
Strategic Talent Management and Development.pdfStrategic Talent Management and Development.pdf
Strategic Talent Management and Development.pdf
 
Liesl_Malone_HR_Transform_Change_Resume
Liesl_Malone_HR_Transform_Change_ResumeLiesl_Malone_HR_Transform_Change_Resume
Liesl_Malone_HR_Transform_Change_Resume
 
Case Study - Excelleration, how to build
Case Study - Excelleration, how to buildCase Study - Excelleration, how to build
Case Study - Excelleration, how to build
 
Performance Management - InspireOne
Performance Management - InspireOnePerformance Management - InspireOne
Performance Management - InspireOne
 
Seven HR Capabilities that Drive Performance Leadership - Hackett Group June ...
Seven HR Capabilities that Drive Performance Leadership - Hackett Group June ...Seven HR Capabilities that Drive Performance Leadership - Hackett Group June ...
Seven HR Capabilities that Drive Performance Leadership - Hackett Group June ...
 
T Ciccodicola, Technology Leader
T Ciccodicola, Technology LeaderT Ciccodicola, Technology Leader
T Ciccodicola, Technology Leader
 
Pillars of talent and engagement dr. lawrence ndombi
Pillars of talent and engagement  dr. lawrence ndombiPillars of talent and engagement  dr. lawrence ndombi
Pillars of talent and engagement dr. lawrence ndombi
 
Career briefing
Career briefingCareer briefing
Career briefing
 
State of Workplace Learning and Development -2018
State of Workplace Learning and Development -2018State of Workplace Learning and Development -2018
State of Workplace Learning and Development -2018
 

Último

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Último (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 

Project Planning.pptx

  • 1. DEVELOPMENT OF A TALENT MANAGEMENT SYSTEM Presentation
  • 2. SUMMARY REPORT • A company's HR staff has the most talent management concerns. A high staff turnover rate might hurt a company. Offering training and development to staff will help the firm retain top personnel. Implementing the "TMS" in a firm may improve employee engagement and performance, assuring organizational success. However, declining the proposal might harm the company's performance and longevity. Talent management initiatives may solve HR managers' problems during and after the epidemic. The presentation is focused to provide the feasibility analysis of project while working on the project schedule and indicating the difference between baseline and modified schedule.
  • 3. APPENDICES (CHANGES IN RISK RAID) RAID Risk Type Desc ripto r Text Cause Effects Impact Score Probability Score Risk Score Risk Owner MitigationAction Contingency R1 Failure in Comm unicati on Poor comm unicati on Bad managemen t Bad impact on performanc e 4 3 12 Project Manager Effective communication Alternate communication plan R2 Failure in Traini ng Lack of trainin g plans Poor planning Total loss of project 4 5 20 Project Planner Effective training plans Alternate training process R3 Poor Result s Lack of positiv e outco mes Poor assessments Total loss of project 3 4 12 Project Supervisor Effective assessment process Alternate assessment method Realigned schedule with minimal risk scores.
  • 4. APPENDICES (CASHFLOW) (CONT.) Item Description 2 Months 3 Month 2 Months 5 Months 6 Months 3 Months 2 Months 10 Months 2 Months 1 Month 1 Conduct a needs analysis £65,000 £0 £0 £0 £0 £0 £0 £0 £0 £0 Actual £70,000 2 Define KPIs £0 £15,000 £0 £0 £0 £0 £0 £0 £0 £0 Actual £19,000 3 Develop a strategy £0 £0 £70,000 £0 £0 £0 £0 £0 £0 £0 Actual £100,000 4 Design the system £0 £0 £0 £78,000 £0 £0 £0 £0 £0 £0 Actual £80,000 5 Identify roles and responsibilities £0 £0 £0 £0 £23,000 £0 £0 £0 £0 £0 Actual £25,000 6 Establish performance metrics £0 £0 £0 £0 £0 £200,000 £0 £0 £0 £0 Actual £100,000 7 Define development opportunities £0 £0 £0 £0 £0 £0 £140,000 £0 £0 £0 Actual £23,000 8 Create a communication plan £0 £0 £0 £0 £0 £0 £0 £180,000 £0 £0 Actual £71,000 9 Train managers and employees £0 £0 £0 £0 £0 £0 £0 £0 £90,000 £0 Actual £45,000 10 Launch and monitor the system £0 £0 £0 £0 £0 £0 £0 £0 £0 £35,000 Actual £10,000 Planned balance £65,000 £80,000 £150,000 £228,000 £251,000 £851,000 £991,000 £1,171,000 £1,261,000 £896,000 Difference in project Cashflow
  • 5. APPENDICES (CONT.) (GANTT CHART) Schedule is readjusted and no resource over allocation was observed.
  • 6. STAKEHOLDERS Stakeholder Interests Human Resources Management Team Effective talent management to improve retention and reduce turnover rates, boost engagement and productivity levels, and ensure organizational success Employees Opportunities for personal and professional development, fair compensation, job security, and a positive work environment Top Management Talent management strategies that align with the organization's goals and objectives, effective workforce planning, and talent retention Customers High-quality products and services delivered by skilled and engaged employees Shareholders Return on investment, sustained organizational growth and success, and effective talent management strategies Labor Unions Fair treatment of employees, job security, and a positive working environment Regulatory Bodies Compliance with labor laws and regulations regarding employment practices Competitors Talent management strategies that provide a competitive edge and attract top talent in the industry Society Ethical and socially responsible employment practices, job creation, and positive contribution to the community
  • 7. LIST OF IDEAS Project goals should be SMART—specific, measurable, attainable, relevant, and time-bound. This will help the project team grasp goals and success metrics. Engage workers, supervisors, HR staff, and senior leaders in the initiative. This will guarantee that the project meets stakeholder requirements and expectations and develop project support. Create a communication strategy to report project status, milestones, and successes regularly. This keeps stakeholders informed and involved throughout the process. Use a TMS or other technology to help the project. Performance management, learning and development, talent acquisition, and succession planning are examples. Technology may boost efficiency and project success. Check the project's progress and outcomes periodically. This may entail gathering and evaluating KPI data to make project modifications. Regular monitoring and assessment may help the project succeed.
  • 8. REFLECTIVE LEARNING NOTES I learnt from his talent management effort that important stakeholders—employees, managers, and senior leaders—must be involved. Their involvement and support may assist generate momentum and ensure the project meets the organization's goals and expectations. A thorough project plan with goals, objectives, and dates is essential. This ensures that the project team is working toward the same goals and can detect any barriers or problems. Technology was useful for talent management. The project team used a TMS and other technologies to simplify operations, boost productivity, and monitor and manage performance and development objectives. I learnt that project monitoring and assessment are critical to keep on track and provide outcomes. Key performance indicator data is collected and analyzed to make project modifications. I also learned that a detailed communication strategy is necessary to keep stakeholders informed and involved throughout the project. Regular updates on project progress, milestones, and successes may boost support and ensure everyone is working toward the same objectives.
  • 9. REFERENCES  Audenaert, M., Decramer, A., George, B., Verschuere, B. and Van Waeyenberg, T., 2019. When employee performance management affects individual innovation in public organizations:The role of consistency and LMX. The International Journal of Human Resource Management, 30(5), pp.815-834.  Claus, L., 2019. HR disruption—Time already to reinvent talent management. BRQ Business Research Quarterly, 22(3), pp.207-215.  Collings, D.G., Mellahi, K. and Cascio, W.F., 2019. Global talent management and performance in multinational enterprises: A multilevel perspective. Journal of management, 45(2), pp.540-566.  Gallardo-Gallardo, E., Thunnissen, M. and Scullion, H., 2020. Talent management: context matters. The International Journal of Human Resource Management, 31(4), pp.457-473.  Harsch, K. and Festing, M., 2020. Dynamic talent management capabilities and organizational agility—A qualitative exploration. Human Resource Management, 59(1), pp.43-61.  Hooi, L.W., 2021. SME performance: does organizational learning capability really matter?. International Journal of Organizational Analysis, 29(5), pp.1093-1116.  Ikram, M., Zhou, P., Shah, S.A.A. and Liu, G.Q., 2019. Do environmental management systems help improve corporate sustainable development? Evidence from manufacturing companies in Pakistan. Journal of Cleaner Production, 226, pp.628-641.  Mousa, S.K. and Othman, M., 2020. The impact of green human resource management practices on sustainable performance in healthcare organisations: A conceptual framework. Journal of Cleaner Production, 243, p.118595.  Roscoe, S., Subramanian, N., Jabbour, C.J. and Chong, T., 2019. Green human resource management and the enablers of green organisational culture: Enhancing a firm's environmental performance for sustainable development. BusinessStrategy and the Environment, 28(5), pp.737-749.  Whysall, Z., Owtram, M. and Brittain, S., 2019.The new talent management challenges of Industry 4.0. Journal of management development.

Notas del editor

  1. The reworked risk matrix is indicating reduction in the risk score and number of risks for the project. Therefore it fully justify the scenario of making perfect feasibility to the project completion.
  2. The project Cashflow is now indicating reduction in net amount required for completion of the project. The difference is clear between the planned and actual cost which is making it more feasible under budget.
  3. The project schedule was adjusted accordingly to make it perfectly feasible for the stakeholders. The Gantt chart is indicating slippage and that indicates difference between baselined and readjusted schedule.