COMPLIANCE MATRIX
08/30/2019 Page 1 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
NA Volume I – Price Proposal
a. Offeror will complete section B.5 Price
Schedule, with offeror’s proposed contract line
item prices inserted in appropriate spaces.
Firm, fixed pricing for each line item is
required.
1 Price Schedule
2 Standard Form (SF) 1449
3 Representation and Certification
4 B.1 – Contract Administration
Data
NA Volume II – Technical Proposal
a. Provide (3) references of work, similar in
scope and size with the requirement detailed
in the Performance Work Statement.
References must include contact information;
brief description of the work completed, and
contract # (if relevant).
References may be checked by the
Contracting Officer to ensure your company is
capable of performing the required services.
The Government also reserves the right to
obtain information for use in the evaluation of
past performance from any and all sources.
1 Past Performance
1.1 Contract #1 – Title
1.2 Contract #2 – Title
1.3 Contract #3 – Title
2 Technical Approach
a. Performance plan that illustrates how
the needs of the Government will be met.
GENERAL: Contractor will furnish Monday-Friday
(business hours) Wheelchair (w/c) Van
Transportation Service for the beneficiaries of the
VA Maine Healthcare System.
Service to include transport to and from Togus
VA as well as our Community Based Outpatient
Clinics (CBOC’s) in Bangor, Rumford, Lewiston &
Saco. Based on the history of need, rarely a trip
to Caribou or Calais and out of state VA Medical
Centers in Massachusetts, may occur.
2.1 Performance Plan
COMPLIANCE MATRIX
08/30/2019 Page 2 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
1. NUMBER OF PATIENTS: It is
understood and agreed that 1 or 2 patients can
be transported together (combined trip) by the
request of VA Maine as long as vendor’s vehicle
can appropriately & safely accommodate patients
including their w/c’s. An authorized official of VA
Maine may, in the interest of the patient, allow a
relative or aide to accompany him/her at no extra
charge to the Government.
The contractor must ensure that the pick-ups and
drop-offs are scheduled so that the total distance
traveled will result in the most economical charge
to the Government.
2.1.1 Number of Patients
2. WAITING TIME: For time lost in waiting
at either end or both ends of a trip due to causes
beyond their control (patient not ready for pick
up) the Contractor will be reimbursed at the rate
of one-fourth the hourly rate quoted in their bid
for each quarter hour or fraction thereof in excess
of one-quarter hour from the time Contractor
reports to the designated person.
For Round Trips, a scheduled pick up time will be
given for the Contracted Driver to return to pick
up patient.
There is no waiting time reimbursement while
patient is attending appointments. If the pickup is
other than at the VA Maine, the Contractor will
call the Mobility Manager (MM) or Administrator
on Duty (AOD) after hours as soon as they
anticipate that a delay may develop for which
they expect to claim reimbursement.
2.1.2 Waiting Time
COMPLIANCE MATRIX
08/30/2019 Page 3 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
This call is only for the purpose of verifying arrival
time at the pickup point and is not necessary if
the Contractor anticipates no delay for which they
will claim reimbursement.
3. COMPLETED TRIP: When w/c van
service under the terms of this contract involves
pick-up of a patient who is to be brought to Togus
VA, a CBOC or to a VA Community Care appt
(VACC) the trip will be considered complete
when the patient is delivered by driver to the
requested destination.
2.1.3 Completed Trip
4. NON-PICKUP OF PATIENT: When w/c
van service involves a trip to or from Togus or
transfer from community hospital or patient’s
residence and patient refuses transport or due to
unforeseen circumstances or the patient unstable
for pick-up, the Contractor will collect for the trip
at the rates applicable under the schedule portion
of this contract.
2.1.4 Non-Pickup of Patient
5. RATES: Rates will apply Monday-
Friday, normal business hours (7am – 6pm).
Payment for mileage traveled beyond a base trip
(25 miles) will be limited to “One Way Only” for
the distance over which the patient is
transported.
Such mileage costs will be paid in addition to the
applicable rate per trip for any trip entirely within
the county limits. Trip mileage shall be
determined by the latest edition of the Google
Maps. The Contractor shall receive the base rate
2.1.5 Rates
COMPLIANCE MATRIX
08/30/2019 Page 4 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
quoted in the schedule for all one-way trips
ordered.
The base rate shall constitute full compensation
for one-way trips which do not exceed the
mileage threshold as defined herein.
6. TOLL CHARGES: It is agreed and
understood that the prices quoted in the
Schedule do not include any ferry, bridge, tunnel
or road toll charges. Any such legitimate toll
charges incurred shall be limited to ONE-WAY
ONLY and shall be listed separately on
Contractor's invoice.
2.1.6 Toll Charges
7. PROBLEMS IN TRANSPORT: Any
adverse events incurred during the transport of
our patients will be recorded and reported to the
Mobility Manager at the Togus VA and recorded
in the incident reporting system within 24 hours
of transport.
2.1.7 Problems in Transport
8. PATIENT WELFARE AND ABUSE: The
contractor shall be held responsible for patient
welfare during transport. The contractor shall be
held responsible for patient and/or Government
property during transport. Any damaged or lost
wheelchairs, walkers, crutches or personal
belongings will be replaced by the contractor at
no additional cost to the Government or
beneficiary.
The Government requires the contractor to
exercise extreme caution and care in the
handling of patients. Any abuse of patients will be
grounds for default action or Termination of the
2.1.8 Patient Welfare and Abuse
COMPLIANCE MATRIX
08/30/2019 Page 5 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
contract. In the event a patient's develops a
medical condition during transport, the Contractor
shall transport the patient to the closest facility
appropriate for the required care.
9. NO IDLE POLICY: At no time will the
Contractor leave vehicles on VA premises unless
a pick-up or delivery is in process. Once a patient
has been removed from vehicle and the running
vehicle will be removed from the drop off point. If
driver is waiting for patient, he is to remain with
vehicle (not idling) until patient arrives for return
ride.
2.1.9 No Idle Policy
b. Identify subcontractors needed for
completion of this requirement. In all quotes
submitted, the quoting vendor shall identify if
they will self-perform the contract
requirements or if they will subcontract any
part of it. If subcontracting, the quoting vendor
shall identify the percentage (%) of proposed
contract value the prime and the
subcontractor(s) will account for, as well as
what key tasks will be performed by which
party.
2.2 Proposed Subcontractor and
Assigned Tasks
4. Veterans Preference Factor (per
852.215-70): The Government will assign
evaluation credit for an Offeror (prime
contractor) which is a Service-Disabled
Veteran-Owned (SDVOSB) or a Veteran-
Owned Small Business (VOSB). Non-
SDVOSB/VOSB Offeror’s proposing to use
SDVOSBs or VOSBs as subcontractors will
receive some consideration under this
evaluation Factor.
3 Veterans Preference Factor
COMPLIANCE MATRIX
08/30/2019 Page 6 of 6
RFP Sections Proposal Sections
Proposal
Instructions L
Evaluation Criteria SOW Para # Proposal Heading
a. For SDVOSBS/VOSBs: In order to
receive credit under this Factor, an Offeror
shall submit a statement of compliance that it
qualifies as a SDVOSB or VOSB in
accordance with VAAR 852.215-70, “Service-
Disabled Veteran-Owned and Veteran-Owned
Small Business Evaluation Factors”. Offeror’s
are cautioned that they must be registered and
verified in Vendor Information Pages (VIP)
database (http://www.VetBiz.gov).
i. Verified SDVOSBs will receive a 3% price
credit
ii. Verified VOSBs will received a 2% price
credit

Más contenido relacionado

La actualidad más candente

Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4Moustafa Ismail Abu Dief
 
Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration PresentationYanet Ormeno
 
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power ProjectsFIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power ProjectsFrancis Ho
 
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...Project Controls Expo
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN PanigrahiSN Panigrahi, PMP
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay AnalysisChris Carson
 
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfDelay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfAssociation for Project Management
 
Tender processing
Tender processingTender processing
Tender processingdnyandev_d
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesCNC
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني M Maged Hegazy, LLM, MBA, CCP, P3O
 

La actualidad más candente (20)

Contract Risks
Contract RisksContract Risks
Contract Risks
 
Project authority
Project authorityProject authority
Project authority
 
Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4
 
Concurrent Delay in Construction
Concurrent Delay in ConstructionConcurrent Delay in Construction
Concurrent Delay in Construction
 
Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration Presentation
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power ProjectsFIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
 
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
 
CCP Technical Paper and Application
CCP Technical Paper and ApplicationCCP Technical Paper and Application
CCP Technical Paper and Application
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
 
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfDelay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
 
Tender processing
Tender processingTender processing
Tender processing
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Contract management
Contract managementContract management
Contract management
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable Changes
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
 

Similar a Compliance matrix

Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsAmitava Nag
 
W2W County Durham specification for quotes may 2016
W2W County Durham specification for quotes  may 2016W2W County Durham specification for quotes  may 2016
W2W County Durham specification for quotes may 2016Wheels 2 Work Association
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Jay Ranvir
 
17 annexes for mobile service resale
17  annexes for mobile service resale17  annexes for mobile service resale
17 annexes for mobile service resaletraoman
 
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514Josh Kalov
 
1202 Task Force DQ
1202 Task Force DQ1202 Task Force DQ
1202 Task Force DQJoshua Sharf
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...Shane Emerson
 
Public consultation on access deficit contribution
Public consultation on access deficit contributionPublic consultation on access deficit contribution
Public consultation on access deficit contributiontraoman
 
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit Vehicles
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit VehiclesVVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit Vehicles
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit VehiclesVictor Valley Transit Authority
 
Tariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsTariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsAmitava Nag
 
Presentation rcm
Presentation rcmPresentation rcm
Presentation rcmgovind_94
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Shane Emerson
 
Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017Dheeraj Sehgal
 

Similar a Compliance matrix (20)

Document samples
Document samplesDocument samples
Document samples
 
TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
 
AVAITION SANG QASP
AVAITION SANG QASPAVAITION SANG QASP
AVAITION SANG QASP
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
 
W2W County Durham specification for quotes may 2016
W2W County Durham specification for quotes  may 2016W2W County Durham specification for quotes  may 2016
W2W County Durham specification for quotes may 2016
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)
 
17 annexes for mobile service resale
17  annexes for mobile service resale17  annexes for mobile service resale
17 annexes for mobile service resale
 
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
 
1202 Task Force DQ
1202 Task Force DQ1202 Task Force DQ
1202 Task Force DQ
 
td_arr.pdf
td_arr.pdftd_arr.pdf
td_arr.pdf
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...
 
Planning bid oc
Planning bid ocPlanning bid oc
Planning bid oc
 
NCRB AFRS proposal
NCRB AFRS proposalNCRB AFRS proposal
NCRB AFRS proposal
 
Public consultation on access deficit contribution
Public consultation on access deficit contributionPublic consultation on access deficit contribution
Public consultation on access deficit contribution
 
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit Vehicles
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit VehiclesVVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit Vehicles
VVTA RFP 2015-05: Maintenance of VVTA Partner Non-Profit Paratransit Vehicles
 
Tariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsTariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projects
 
Presentation rcm
Presentation rcmPresentation rcm
Presentation rcm
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017
 
AFCS_PQConference.pdf
AFCS_PQConference.pdfAFCS_PQConference.pdf
AFCS_PQConference.pdf
 

Más de Muhammad Zakariya

Más de Muhammad Zakariya (9)

Lone Star Off Road Park
Lone Star Off Road ParkLone Star Off Road Park
Lone Star Off Road Park
 
Volume V compliance
Volume V complianceVolume V compliance
Volume V compliance
 
Volume IV price proposal
Volume IV price proposalVolume IV price proposal
Volume IV price proposal
 
Volume III past performance
Volume III past performanceVolume III past performance
Volume III past performance
 
Volume II technical proposal
Volume II technical proposalVolume II technical proposal
Volume II technical proposal
 
Volume I general documents
Volume I   general documentsVolume I   general documents
Volume I general documents
 
Volume iii past performance
Volume iii   past performanceVolume iii   past performance
Volume iii past performance
 
Volume ii technical proposal
Volume ii   technical proposalVolume ii   technical proposal
Volume ii technical proposal
 
Cross reference documents
Cross reference documentsCross reference documents
Cross reference documents
 

Último

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Último (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 

Compliance matrix

  • 1. COMPLIANCE MATRIX 08/30/2019 Page 1 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading NA Volume I – Price Proposal a. Offeror will complete section B.5 Price Schedule, with offeror’s proposed contract line item prices inserted in appropriate spaces. Firm, fixed pricing for each line item is required. 1 Price Schedule 2 Standard Form (SF) 1449 3 Representation and Certification 4 B.1 – Contract Administration Data NA Volume II – Technical Proposal a. Provide (3) references of work, similar in scope and size with the requirement detailed in the Performance Work Statement. References must include contact information; brief description of the work completed, and contract # (if relevant). References may be checked by the Contracting Officer to ensure your company is capable of performing the required services. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. 1 Past Performance 1.1 Contract #1 – Title 1.2 Contract #2 – Title 1.3 Contract #3 – Title 2 Technical Approach a. Performance plan that illustrates how the needs of the Government will be met. GENERAL: Contractor will furnish Monday-Friday (business hours) Wheelchair (w/c) Van Transportation Service for the beneficiaries of the VA Maine Healthcare System. Service to include transport to and from Togus VA as well as our Community Based Outpatient Clinics (CBOC’s) in Bangor, Rumford, Lewiston & Saco. Based on the history of need, rarely a trip to Caribou or Calais and out of state VA Medical Centers in Massachusetts, may occur. 2.1 Performance Plan
  • 2. COMPLIANCE MATRIX 08/30/2019 Page 2 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading 1. NUMBER OF PATIENTS: It is understood and agreed that 1 or 2 patients can be transported together (combined trip) by the request of VA Maine as long as vendor’s vehicle can appropriately & safely accommodate patients including their w/c’s. An authorized official of VA Maine may, in the interest of the patient, allow a relative or aide to accompany him/her at no extra charge to the Government. The contractor must ensure that the pick-ups and drop-offs are scheduled so that the total distance traveled will result in the most economical charge to the Government. 2.1.1 Number of Patients 2. WAITING TIME: For time lost in waiting at either end or both ends of a trip due to causes beyond their control (patient not ready for pick up) the Contractor will be reimbursed at the rate of one-fourth the hourly rate quoted in their bid for each quarter hour or fraction thereof in excess of one-quarter hour from the time Contractor reports to the designated person. For Round Trips, a scheduled pick up time will be given for the Contracted Driver to return to pick up patient. There is no waiting time reimbursement while patient is attending appointments. If the pickup is other than at the VA Maine, the Contractor will call the Mobility Manager (MM) or Administrator on Duty (AOD) after hours as soon as they anticipate that a delay may develop for which they expect to claim reimbursement. 2.1.2 Waiting Time
  • 3. COMPLIANCE MATRIX 08/30/2019 Page 3 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading This call is only for the purpose of verifying arrival time at the pickup point and is not necessary if the Contractor anticipates no delay for which they will claim reimbursement. 3. COMPLETED TRIP: When w/c van service under the terms of this contract involves pick-up of a patient who is to be brought to Togus VA, a CBOC or to a VA Community Care appt (VACC) the trip will be considered complete when the patient is delivered by driver to the requested destination. 2.1.3 Completed Trip 4. NON-PICKUP OF PATIENT: When w/c van service involves a trip to or from Togus or transfer from community hospital or patient’s residence and patient refuses transport or due to unforeseen circumstances or the patient unstable for pick-up, the Contractor will collect for the trip at the rates applicable under the schedule portion of this contract. 2.1.4 Non-Pickup of Patient 5. RATES: Rates will apply Monday- Friday, normal business hours (7am – 6pm). Payment for mileage traveled beyond a base trip (25 miles) will be limited to “One Way Only” for the distance over which the patient is transported. Such mileage costs will be paid in addition to the applicable rate per trip for any trip entirely within the county limits. Trip mileage shall be determined by the latest edition of the Google Maps. The Contractor shall receive the base rate 2.1.5 Rates
  • 4. COMPLIANCE MATRIX 08/30/2019 Page 4 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading quoted in the schedule for all one-way trips ordered. The base rate shall constitute full compensation for one-way trips which do not exceed the mileage threshold as defined herein. 6. TOLL CHARGES: It is agreed and understood that the prices quoted in the Schedule do not include any ferry, bridge, tunnel or road toll charges. Any such legitimate toll charges incurred shall be limited to ONE-WAY ONLY and shall be listed separately on Contractor's invoice. 2.1.6 Toll Charges 7. PROBLEMS IN TRANSPORT: Any adverse events incurred during the transport of our patients will be recorded and reported to the Mobility Manager at the Togus VA and recorded in the incident reporting system within 24 hours of transport. 2.1.7 Problems in Transport 8. PATIENT WELFARE AND ABUSE: The contractor shall be held responsible for patient welfare during transport. The contractor shall be held responsible for patient and/or Government property during transport. Any damaged or lost wheelchairs, walkers, crutches or personal belongings will be replaced by the contractor at no additional cost to the Government or beneficiary. The Government requires the contractor to exercise extreme caution and care in the handling of patients. Any abuse of patients will be grounds for default action or Termination of the 2.1.8 Patient Welfare and Abuse
  • 5. COMPLIANCE MATRIX 08/30/2019 Page 5 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading contract. In the event a patient's develops a medical condition during transport, the Contractor shall transport the patient to the closest facility appropriate for the required care. 9. NO IDLE POLICY: At no time will the Contractor leave vehicles on VA premises unless a pick-up or delivery is in process. Once a patient has been removed from vehicle and the running vehicle will be removed from the drop off point. If driver is waiting for patient, he is to remain with vehicle (not idling) until patient arrives for return ride. 2.1.9 No Idle Policy b. Identify subcontractors needed for completion of this requirement. In all quotes submitted, the quoting vendor shall identify if they will self-perform the contract requirements or if they will subcontract any part of it. If subcontracting, the quoting vendor shall identify the percentage (%) of proposed contract value the prime and the subcontractor(s) will account for, as well as what key tasks will be performed by which party. 2.2 Proposed Subcontractor and Assigned Tasks 4. Veterans Preference Factor (per 852.215-70): The Government will assign evaluation credit for an Offeror (prime contractor) which is a Service-Disabled Veteran-Owned (SDVOSB) or a Veteran- Owned Small Business (VOSB). Non- SDVOSB/VOSB Offeror’s proposing to use SDVOSBs or VOSBs as subcontractors will receive some consideration under this evaluation Factor. 3 Veterans Preference Factor
  • 6. COMPLIANCE MATRIX 08/30/2019 Page 6 of 6 RFP Sections Proposal Sections Proposal Instructions L Evaluation Criteria SOW Para # Proposal Heading a. For SDVOSBS/VOSBs: In order to receive credit under this Factor, an Offeror shall submit a statement of compliance that it qualifies as a SDVOSB or VOSB in accordance with VAAR 852.215-70, “Service- Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors”. Offeror’s are cautioned that they must be registered and verified in Vendor Information Pages (VIP) database (http://www.VetBiz.gov). i. Verified SDVOSBs will receive a 3% price credit ii. Verified VOSBs will received a 2% price credit