Example 1:
Given d = 5 cm, Ho = 1.9 cm, Ws = 58 g, Gs = 2.7, constant, c = 1*10-4
cm
σ'
(kg/cm2
) 0 0.25 0.5 1.0 2.0 4.0
R 100 199 256 358 520 635
Determine: 1) void ratio for loading 2) compute parameters of consolidation
Solution:
cm094.1
1*2.7(2.5)*π
58
γAG
W
H
*
2
ws
s
s ===
806.0094.19.1HHH sov =−=−=
737.0
1.094
0.806
H
H
e
s
v
o
===
009.0
094.1
10*1*)100199(
H
H
e
4
s
1
1 =
−
=
∆
=∆
−
728.0009.0737.0eee 1o1 =−=∆−=
014.0
094.1
10*1*)100256(
H
H
e
4
s
2
2 =
−
=
∆
=∆
−
723.0014.0737.0eee 2o2 =−=∆−=
And so on
σ'
(kg/cm2
) 0 0.25 0.5 1.0 2.0 4.0
R 100 199 256 358 520 635
ΔH, cm 0 0.0099 0.0156 0.0258 0.042 0.0535
e 0.737 0.728 0.723 0.713 0.699 0.688
From figure (1)
014.0
12
713.0699.0
Δσ'
Δe
av =
−
−
−=−= cm2
/kg
0081.0
737.01
014.0
e1
a
m
o
v
v =
+
=
+
= cm2
/kg
From figure (2)
047.0
1
2log
713.0699.0
Δlogσ'
Δe
cc =
−
−=−= and
σ'c = 0.7 kg/cm2
Example 2:
The following compression readings were obtained in an oedometer test on a specimen
of saturated clay:
σ'
(kN/m2
) 0 54 107 214 429 858 1716 3432 0
Dial Guage after
24 hrs, mm
5.00
4.74
7
4.49
3
4.108
3.44
9
2.608 1.676 0.737 1.480
The initial thickness of the specimen was 19.0 mm and at the end of the test the water
content was 19.8% and the specific gravity was 2.73. Plot e-logσ curve and determine
the coefficient of compressibility between 100-200 and 1000-1500 kN/m2
. What is the
value of cc for the latter increment?
Solution:
Void ratio at the end of the test = ef = ωGs= 0.198*2.73 = 0.541
Void ratio at the start of the test = eo = ef + ∆e
Now,
ee1
e
e1
e
H
H
foo
∆++
∆
=
+
∆
=
∆
350.0e
e0.5411
e
0.19
48.15
=∆⇒
∆++
∆
=
−
eo = ef + ∆e = 0.541 + 0.35 = 0.891
In general the relationship between ∆e and ∆H is given by:
891.01
e
19.0
H
e1
e
H
H
oo
+
∆
=
∆
⇒
+
∆
=
∆
H0995.0e ∆=∆⇒ , and can be used to obtain the void ratio at the end of each
increment period.
σ'
(kN/m2
) 0 54 107 214 429 858 1716 3432 0
Dial Guage
after 24 hrs,
mm
5.00
4.74
7
4.49
3
4.108
3.44
9
2.608 1.676 0.737 1.480
∆H, mm 0
0.25
3
0.50
7
0.892
1.55
1
2.392 3.324 4.263 3.520
∆e 0
0.02
5
0.05
0
0.089
0.15
4
0.238 0.331 0.424 0.350
e
0.89
1
0.86
6
0.84
1
0.802
0.73
7
0.653 0.560 0.467 0.541
e1 = eo – ∆e = 0.891 – 0.025 =0.866
0.891 – 0.05 = 0.841
The e-logσ curve using these values is shown in figure below. Using Casagrande’s
construction the value of the preconsolidation pressure is 325 kN/m3
.
Between the pressure range
100 and 200 kN/m2
e100= 0.845 e200= 0.808, therefore
/kNm10*7.3
100200
808.0845.0
Δσ'
Δe
a 24
v
−
=
−
−
−=−=
/kNm10*005.2
845.01
10*7.3
e1
a
m 24
4
v
v
−
−
=
+
=
+
=
Between the pressure range
1000 and 1500 kN/m2
e1000= 0.632 e1500= 0.577, therefore
/kNm10*1.1
10001500
577.0632.0
Δσ'
Δe
a 24
v
−
=
−
−
−=−=
/kNm10*74.6
632.01
10*1.1
e1
a
m 25
4
v
v
−
−
=
+
=
+
=
and
312.0
100
1500log
577.0632.0
Δlogσ'
Δe
cc =
−
−=−=
Example 3:
Compute the expected settlement of a building constructed on a soil layer of 2.5m
thick its e = 0.72, the pressure increased from 1.5 kg/cm2
to 3.8 kg/cm2
and caused
reduction in void ratio by 15%.
Solution:
e1 = 0.72(1 – 0.15) = 0.612
method 1
cm15.7m157.05.2*
72.01
0.6120.72
H.
e1
Δe
S
o
c
==
+
−
=
+
=
method 2
047.0
5.18.3
612.072.0
Δσ'
Δe
av =
−
−
==
027.0
72.01
047.0
e1
a
m
o
v
v =
+
=
+
=
cm15.5m0.1551.5)(3.8*2.5*0.027σHmS **vc
===′∆= −
Example 4:
For the system shown below, determine the primary consolidation settlement if cs =
0.05 for the following:
1) σ'c = 100 kPa 2) σ'c = 150 kPa 3) σ'c = 175 kPa 4) σ'c = 250 kPa
Solution:
1) σ'c = 100 kPa
σ'o at midpoint of the clay layer
2
o
kN/m150.85
9.7*19.81)5(19.718.7*5'σ
=
++= −
1663.0
85.150
100
σ
σ
OCR '
o
'
c
<=== therefore, under
]
'Δσσ'
σ
log
σ'
σΔσ
[log
e1
Hc
S
avo
'
o
o
'
o
o
c
c
−
+
′+
+
=
425.25)10085.150(
2
1
)σσ(
2
1'Δσ '
c
'
oav
=−== − kPa
162mm0.162m]
25.425150.85
150.85
log
150.85
50150.85
[log
1.11
2*0.83
Sc
==+
+
+
=
−
2) σ'c = 150 kPa
1
85.150
150
σ
σ
OCR '
o
'
c
≈== normal
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm98m098.0
150.85
50150.85
log
1.11
2*0.83
Sc
==
+
+
=
3) σ'c = 175 kPa
16.1
85.150
175
σ
σ
OCR '
o
'
c ===
kPa200.855085.150σΔσ'
o =+=′+
σ'c = 175 kPa
Because kPa200.85σΔσ'
o =′+ > σ'c = 175 kPa
c
'
o
o
c
o
'
c
o
s
c σ'
σΔσ
log
e1
Hc
σ'
σ
log
e1
Hc
S
′+
+
+
+
=
mm50.4m.05040
175
50150.85
log
1.11
2*0.83
150.85
175
log
1.11
2*0.05
Sc
==
+
+
+
+
=
4) σ'c = 250 kPa
Because kPa200.85σΔσ'
o =′+ < σ'c = 250 kPa
o
'
o
o
s
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm6m0.006
150.85
50150.85
log
1.11
2*0.05
Sc
==
+
+
=
Example 5:
A soil profile shown in figure below, if a uniform distributed load,Δσ , is applied at
the ground surface, what is the settlement of the clay layer caused by primary
consolidation if:
1. The clay is normally consolidated
2. The preconsolidation pressure (σ'c) = 190 kN/m2
3. σ'c = 170 kN/m2
Use cs=1/6 cc
Solution:
1. The clay is normally consolidated
the average effective stress at the middle
of the clay layer is
2
o
kN/m79.14
9.81)-2(199.81)-4(1814*2'σ
=
++=
cc = 0.009(LL-10) = 0.009 (40 – 10) = 0.27
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm132m321.0
79.14
10079.14
log
0.81
4*0.27
Sc
==
+
+
=
2. The preconsolidation pressure (σ'c) = 190 kN/m2
2'
o kN/m179.14σΔσ =′+
σ'c = 190 kN/m2
Because 2'
o kN/m179.14σΔσ =′+ < σ'c = 190 kN/m2
o
'
o
o
s
c σ'
σΔσ
log
e1
Hc
S
′+
+
= , cs = 1/6 cc = 1/6 * 0.27 = 0.045
mm36m0.036
79.14
179.14
log
0.81
4*0.045
Sc
==
+
=
3. σ'c = 170 kN/m2
Because '
o
'
c
'
o σσσΔσ >>′+
c
'
o
o
c
o
'
c
o
s
c σ'
σΔσ
log
e1
Hc
σ'
σ
log
e1
Hc
S
′+
+
+
+
=
mm46.9m.04690
170
179.14
log
0.81
4*0.27
179.14
170
log
0.81
4*0.045
Sc
==
+
+
+
=
Example 6:
For the foundation shown, estimate the consolidation settlement.
Solution:
The average effective stress at the middle of the clay layer is
2
o
kN/m52.833
9.81)-(16
2
2.5
9.81)0.5(17.516.5*2.5'σ
=
++= −
Using approximate method to calculate the 'Δσ at
mid-point of clay layer
2
v kN/m445.13
)25.32)(25.31(
1*2*150
z)z)(L(B
qBL
Δσ =
++
=
++
=
Or using m,n method
15.0
25.3
5.0
z
L
m === , and 31.0
25.3
1
z
B
n === f(m,n) = 0.02
2
kN/m124*150*02.0'Δσ ==
1.0
0.5
2.5
Sand
B*L=1m*2m
G.W.T
?=16.5kN/m3
?sat=17.5kN/m
3
Sand
Clay(N.C.)
q=150kN/m
1.5
?sat=16kN/m3
cc=0.32
cs=0.09
eo=0.8
2
1.5
1.5
2.5
Sand
B*L G.W.T
?=15kN/m
3
?sat=18kN/m
3
Sand
Clay(N.C.)
Gs=2.7,LL=38%
?=35%
Q
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm43.8m3804.0
52.833
13.44552.833
log
0.81
2.5*0.32
Sc
==
+
+
=
Example 7:
In the previous example, if the foundation is circular in shape with diameter of 2.5m,
estimate the consolidation settlement.
Solution:
Using approximate method to calculate the 'Δσ at mid point of clay layer
2
2
2
2
2
kN/m355.28
)25.35.2(
5.2*150
Z)(D
qD
σΔ =
+
=
+
=′
or using
2.6
1.25
3.25
R
z
== , and 0
1.25
0
R
x
== from figure 0.18
q
Δσv
≈
2
kN/m27150*18.0σΔ ==′
mm82.9m8290.0
52.833
28.35552.833
log
0.81
2.5*0.32
Sc
==
+
+
=
Example 8:
Refer to figure shown below, given that B=1.5m, L=2.5m, and Q=120 kN. Calculate
the primary consolidation settlement of the foundation.
Solution:
0.945
1
2.7*0.35
S
sωG
eo
===
3
w
s
sat
clay kN/m18.49.81*
0.9451
0.9452.7
γ
e1
eG
γ =
+
+
=
+
+
=
2
o
kN/m5.5234
9.81)-(18.4
2
2.5
9.81)-1.5(1815*1.5'σ
=
++=
'Δσ at the base of the foundation = 2
32kN/m
2.5*1.5
120
=
To determine the net consolidation pressure at mid height of clay layer under the
center of the foundation, the foundation's base must be divided into four equal
0.75*1.25 rectangular areas.
z = 1.5+2.5/2 = 2.75m from the foundation's base
45.0
75.2
25.1
z
L
m === , and 27.0
75.2
75.0
z
B
n === f(m,n) = 0.047
2
kN/m016.64*32*047.0'Δσ ==
2'
o kN/m51.5396.01645.523σΔσ =+=′+
cc = 0.009(LL-10) = 0.009 (38 – 10) = 0.252
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm4.17m0174.0
45.523
51.539
log
0.9451
2.5*0.252
Sc
==
+
=
Example 9:
A building is supporting on a raft 45m x 30m, the net foundation pressure being 125
kN/m2
. The soil profile is shown in figure below. The value of mv = 0.35 m2
/MN.
Determine the final settlement under the center of the raft due to consolidation of the
clay.
Solution: at mid point of clay layer,
z = 24 – 3.5 + 2 = 23.5m
96.0
5.23
5.22
z
L
m === , and 64.0
5.23
15
z
B
n === f(m,n) = 0.14
2
kN/m704*125*14.0'Δσ ==
mm98m0.09870*4*10*0.35σHmS 3-
**vc
===′∆=
Example 10:
A stratum of normally loaded clay of 7m thick is located at a depth 12m below
ground level. The (ωn) of the clay is 43% and its LL is 48%. The Gs of the solid particles
is 2.76. the water table is located at a depth of 5m below the ground surface. The soil is
sand above the clay stratum. The submerged unit weight of sand is 11 kN/m3
and the
same weighs 18 kN/m3
above water table. The average increase in pressure at the center
of the clay stratum is 120 kN/m2
due to the weight of a building that will be constructed
on the sand above the clay stratum. Estimate the expected settlement of the structure.
Solution:
1) Determination of e and γsub for clay
s
w
W
W
ω = , kN076.2781.9*76.2*1γGVW wsss ===
kN643.11076.27*43.0ωWW sw ===
kN719.38076.27643.11WWW swt =+=+=
187.1
1
76.2*43.0
S
ωG
e s
o
===
3
o
t
t kN/m704.17
187.11
719.38
e1
W
γ =
+
=
+
= , equal to γsat or wsat γ
e1
esG
γ
+
+
=
3
sub kN/m7.8949.8117.704γ =−=
2) Determination of overburden pressure '
oσ
2'
o kN/m194.6293.5*7.8947*1118*5σ =+++=
3) Compression index
cc = 0.009(LL-10) = 0.009(48-10) = 0.342
4) Excess pressure ∆σ' = 120 kN/m2
5) Total Settlement
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm228m228.0
194.629
120194.629
log
1.1871
7*0.342
Sc
==
+
+
=
Example 11:
Soil investigation at a site gave the following information. Top soil up to a depth of
10.6m is fine sand, and below this lies soft clay layer of 7.6m thick. The water table is
at 4.6m below the ground surface. The submerged unit weight of sand is 10.4 kN/m3
,
and wet unit weight above water table is 17.6 kN/m3
. The water content of normally
consolidated clay is 40%, its LL is 45% and Gs is 2.78. The proposed construction will
transmit a net pressure of 120 kN/m2
. Find the average settlement of the clay layer.
Solution:
cc = 0.009(LL-10) = 0.009(45-10) = 0.315
112.1
1
78.2*4.0
S
ωG
e s
o
===
3
wsat kN/m078.189.81*
1.1121
1.1122.78γ
e1
esG
γ =
+
+=
+
+
=
3
sub
kN/m8.2689.8118.078γ =−=
Effective overburden pressure at the mid height of the clay layer is
2'
o kN/m174.7783.8*8.26810.4*617.6*4.6σ =+++=
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm257m257.0
174.778
120174.778
log
1.1121
7.6*0.315
Sc
==
+
+
=
Example 12:
Two points on a curve for normally consolidated clay have the following
coordinates: Point 1: e1 = 0.7, σ1 = 1 kg/cm2
Point 2: e2 = 0.6, σ2 = 3 kg/cm2
If the average overburden pressure on a 6m thick clay layer is 1.5 kg/cm2
, how much
settlement the clay layer experience due to additional load intensity of 1.6 kg/cm2
.
Solution:
21.0
13log
6.07.0
σ
σ
log
ee
c
1
2
21
c =
−
=
−
=
We need the initial void ratio eo at an overburden pressure of 1.5 kg/cm2
.
5.1
3
log21.0)6.0e(21.0
σ
σ
log
ee
c o
o
2
2o
c =−⇒=
−
=
0.6630.0630.6eo =+=⇒
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm239m239.0
1.5
1.61.5
log
0.6631
6*0.21
Sc
==
+
+
=
Example 13:
A footing has a size of 3m by 1.5m and it causes a pressure increment of 200 kN/m2
at its base. Determine the consolidation settlement at the middle of the clay layer.
Assume 2:1 pressure distribution.
Solution:
2
'
o
kN/m1.885
5.19*1.58.19*0.516*2.5σ
=
+++=
2
v
kN/m692.27
)5.33)(5.35.1(
3*5.1*200
z)z)(L(B
qBL
Δσ
=
++
=
++
=
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm93m093.0
51.88
27.69251.88
log
0.81
3*0.3
Sc
==
+
+
=
Point 2: e2 = 0.6, σ2 = 3 kg/cm2
If the average overburden pressure on a 6m thick clay layer is 1.5 kg/cm2
, how much
settlement the clay layer experience due to additional load intensity of 1.6 kg/cm2
.
Solution:
21.0
13log
6.07.0
σ
σ
log
ee
c
1
2
21
c =
−
=
−
=
We need the initial void ratio eo at an overburden pressure of 1.5 kg/cm2
.
5.1
3
log21.0)6.0e(21.0
σ
σ
log
ee
c o
o
2
2o
c =−⇒=
−
=
0.6630.0630.6eo =+=⇒
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm239m239.0
1.5
1.61.5
log
0.6631
6*0.21
Sc
==
+
+
=
Example 13:
A footing has a size of 3m by 1.5m and it causes a pressure increment of 200 kN/m2
at its base. Determine the consolidation settlement at the middle of the clay layer.
Assume 2:1 pressure distribution.
Solution:
2
'
o
kN/m1.885
5.19*1.58.19*0.516*2.5σ
=
+++=
2
v
kN/m692.27
)5.33)(5.35.1(
3*5.1*200
z)z)(L(B
qBL
Δσ
=
++
=
++
=
o
'
o
o
c
c σ'
σΔσ
log
e1
Hc
S
′+
+
=
mm93m093.0
51.88
27.69251.88
log
0.81
3*0.3
Sc
==
+
+
=

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
 
Geotech2.pptx
Geotech2.pptxGeotech2.pptx
Geotech2.pptx
 
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
 
Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]
 
Void Ratio Correlations
Void Ratio CorrelationsVoid Ratio Correlations
Void Ratio Correlations
 
Shrinkage Limit Test
Shrinkage Limit TestShrinkage Limit Test
Shrinkage Limit Test
 
Lateral Earth pressure
Lateral Earth pressureLateral Earth pressure
Lateral Earth pressure
 
Class 8 Triaxial Test ( Geotechnical Engineering )
Class 8    Triaxial Test ( Geotechnical Engineering )Class 8    Triaxial Test ( Geotechnical Engineering )
Class 8 Triaxial Test ( Geotechnical Engineering )
 
Influence lines (structural analysis theories)
Influence lines (structural analysis theories)Influence lines (structural analysis theories)
Influence lines (structural analysis theories)
 
Examples on soil classification
Examples on soil classification Examples on soil classification
Examples on soil classification
 
Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]
 
Sums on Rigid Pavement Design
Sums on Rigid Pavement DesignSums on Rigid Pavement Design
Sums on Rigid Pavement Design
 
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
 
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
Numerical problem and solution on pile capacity (usefulsearch.org) ( usefuls...
 
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
 

Similar a Examples on total consolidation

Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
Tyler Edgington
 
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdfSolucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
DannyCoronel5
 
Solutions completo elementos de maquinas de shigley 8th edition
Solutions completo elementos de maquinas de shigley 8th editionSolutions completo elementos de maquinas de shigley 8th edition
Solutions completo elementos de maquinas de shigley 8th edition
fercrotti
 
Fluid mechanic white (cap2.1)
Fluid mechanic   white (cap2.1)Fluid mechanic   white (cap2.1)
Fluid mechanic white (cap2.1)
Raul Garcia
 

Similar a Examples on total consolidation (20)

Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
 
Muro contension raul1
Muro contension raul1Muro contension raul1
Muro contension raul1
 
Foundationeng deep-foundations_ps
Foundationeng deep-foundations_psFoundationeng deep-foundations_ps
Foundationeng deep-foundations_ps
 
Ch.4-Examples 2.pdf
Ch.4-Examples 2.pdfCh.4-Examples 2.pdf
Ch.4-Examples 2.pdf
 
Calculation template
Calculation templateCalculation template
Calculation template
 
Solucionario_Felder.pdf
Solucionario_Felder.pdfSolucionario_Felder.pdf
Solucionario_Felder.pdf
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
project designa.docx
project designa.docxproject designa.docx
project designa.docx
 
Maths book2 Text book answer
Maths book2 Text book answerMaths book2 Text book answer
Maths book2 Text book answer
 
Capítulo 02 considerações estatísticas
Capítulo 02   considerações estatísticasCapítulo 02   considerações estatísticas
Capítulo 02 considerações estatísticas
 
Ch.3-Examples 3.pdf
Ch.3-Examples 3.pdfCh.3-Examples 3.pdf
Ch.3-Examples 3.pdf
 
smLecture7 Calculation of Settlement.pptx
smLecture7 Calculation of Settlement.pptxsmLecture7 Calculation of Settlement.pptx
smLecture7 Calculation of Settlement.pptx
 
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdfSolucionario_Diseno_en_Ingenieria_Mecani (1).pdf
Solucionario_Diseno_en_Ingenieria_Mecani (1).pdf
 
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdfSolucionario_Diseno_en_Ingenieria_Mecani.pdf
Solucionario_Diseno_en_Ingenieria_Mecani.pdf
 
Mechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions ManualMechanics Of Fluids 4th Edition Potter Solutions Manual
Mechanics Of Fluids 4th Edition Potter Solutions Manual
 
Solution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chinSolution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chin
 
Solutions completo elementos de maquinas de shigley 8th edition
Solutions completo elementos de maquinas de shigley 8th editionSolutions completo elementos de maquinas de shigley 8th edition
Solutions completo elementos de maquinas de shigley 8th edition
 
Ch02
Ch02Ch02
Ch02
 
66.-Merle C. Potter, David C. Wiggert, Bassem H. Ramadan - Mechanics of Fluid...
66.-Merle C. Potter, David C. Wiggert, Bassem H. Ramadan - Mechanics of Fluid...66.-Merle C. Potter, David C. Wiggert, Bassem H. Ramadan - Mechanics of Fluid...
66.-Merle C. Potter, David C. Wiggert, Bassem H. Ramadan - Mechanics of Fluid...
 
Fluid mechanic white (cap2.1)
Fluid mechanic   white (cap2.1)Fluid mechanic   white (cap2.1)
Fluid mechanic white (cap2.1)
 

Más de Malika khalil (14)

Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
 
Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)
 
Twri3 a5
Twri3 a5Twri3 a5
Twri3 a5
 
Ch.1 fluid dynamic
Ch.1 fluid dynamicCh.1 fluid dynamic
Ch.1 fluid dynamic
 
Chap 26 isometric drawing
Chap 26 isometric drawingChap 26 isometric drawing
Chap 26 isometric drawing
 
Simple formulas excel
Simple formulas excelSimple formulas excel
Simple formulas excel
 
Cash flow using excel
Cash flow using excelCash flow using excel
Cash flow using excel
 
Examples on seepage
Examples on seepageExamples on seepage
Examples on seepage
 
1 reinforced concrete lectures-t-beam2
1 reinforced concrete lectures-t-beam21 reinforced concrete lectures-t-beam2
1 reinforced concrete lectures-t-beam2
 
4 pages from matlab an introduction with app.-2
4 pages from matlab an introduction with app.-24 pages from matlab an introduction with app.-2
4 pages from matlab an introduction with app.-2
 
Design of column trail and error example
Design of column trail and error exampleDesign of column trail and error example
Design of column trail and error example
 
Design of one way slab exampe
Design of one way slab exampeDesign of one way slab exampe
Design of one way slab exampe
 
Phase relations soil analysis
Phase relations soil analysisPhase relations soil analysis
Phase relations soil analysis
 
Lec 4 solids environment
Lec 4 solids environmentLec 4 solids environment
Lec 4 solids environment
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Examples on total consolidation

  • 1. Example 1: Given d = 5 cm, Ho = 1.9 cm, Ws = 58 g, Gs = 2.7, constant, c = 1*10-4 cm σ' (kg/cm2 ) 0 0.25 0.5 1.0 2.0 4.0 R 100 199 256 358 520 635 Determine: 1) void ratio for loading 2) compute parameters of consolidation Solution: cm094.1 1*2.7(2.5)*π 58 γAG W H * 2 ws s s === 806.0094.19.1HHH sov =−=−= 737.0 1.094 0.806 H H e s v o === 009.0 094.1 10*1*)100199( H H e 4 s 1 1 = − = ∆ =∆ − 728.0009.0737.0eee 1o1 =−=∆−= 014.0 094.1 10*1*)100256( H H e 4 s 2 2 = − = ∆ =∆ − 723.0014.0737.0eee 2o2 =−=∆−= And so on σ' (kg/cm2 ) 0 0.25 0.5 1.0 2.0 4.0 R 100 199 256 358 520 635 ΔH, cm 0 0.0099 0.0156 0.0258 0.042 0.0535 e 0.737 0.728 0.723 0.713 0.699 0.688 From figure (1) 014.0 12 713.0699.0 Δσ' Δe av = − − −=−= cm2 /kg 0081.0 737.01 014.0 e1 a m o v v = + = + = cm2 /kg From figure (2) 047.0 1 2log 713.0699.0 Δlogσ' Δe cc = − −=−= and σ'c = 0.7 kg/cm2 Example 2: The following compression readings were obtained in an oedometer test on a specimen of saturated clay: σ' (kN/m2 ) 0 54 107 214 429 858 1716 3432 0 Dial Guage after 24 hrs, mm 5.00 4.74 7 4.49 3 4.108 3.44 9 2.608 1.676 0.737 1.480 The initial thickness of the specimen was 19.0 mm and at the end of the test the water content was 19.8% and the specific gravity was 2.73. Plot e-logσ curve and determine
  • 2. the coefficient of compressibility between 100-200 and 1000-1500 kN/m2 . What is the value of cc for the latter increment? Solution: Void ratio at the end of the test = ef = ωGs= 0.198*2.73 = 0.541 Void ratio at the start of the test = eo = ef + ∆e Now, ee1 e e1 e H H foo ∆++ ∆ = + ∆ = ∆ 350.0e e0.5411 e 0.19 48.15 =∆⇒ ∆++ ∆ = − eo = ef + ∆e = 0.541 + 0.35 = 0.891 In general the relationship between ∆e and ∆H is given by: 891.01 e 19.0 H e1 e H H oo + ∆ = ∆ ⇒ + ∆ = ∆ H0995.0e ∆=∆⇒ , and can be used to obtain the void ratio at the end of each increment period. σ' (kN/m2 ) 0 54 107 214 429 858 1716 3432 0 Dial Guage after 24 hrs, mm 5.00 4.74 7 4.49 3 4.108 3.44 9 2.608 1.676 0.737 1.480 ∆H, mm 0 0.25 3 0.50 7 0.892 1.55 1 2.392 3.324 4.263 3.520 ∆e 0 0.02 5 0.05 0 0.089 0.15 4 0.238 0.331 0.424 0.350 e 0.89 1 0.86 6 0.84 1 0.802 0.73 7 0.653 0.560 0.467 0.541 e1 = eo – ∆e = 0.891 – 0.025 =0.866 0.891 – 0.05 = 0.841 The e-logσ curve using these values is shown in figure below. Using Casagrande’s construction the value of the preconsolidation pressure is 325 kN/m3 . Between the pressure range 100 and 200 kN/m2 e100= 0.845 e200= 0.808, therefore /kNm10*7.3 100200 808.0845.0 Δσ' Δe a 24 v − = − − −=−= /kNm10*005.2 845.01 10*7.3 e1 a m 24 4 v v − − = + = + = Between the pressure range 1000 and 1500 kN/m2 e1000= 0.632 e1500= 0.577, therefore /kNm10*1.1 10001500 577.0632.0 Δσ' Δe a 24 v − = − − −=−=
  • 3. /kNm10*74.6 632.01 10*1.1 e1 a m 25 4 v v − − = + = + = and 312.0 100 1500log 577.0632.0 Δlogσ' Δe cc = − −=−= Example 3: Compute the expected settlement of a building constructed on a soil layer of 2.5m thick its e = 0.72, the pressure increased from 1.5 kg/cm2 to 3.8 kg/cm2 and caused reduction in void ratio by 15%. Solution: e1 = 0.72(1 – 0.15) = 0.612 method 1 cm15.7m157.05.2* 72.01 0.6120.72 H. e1 Δe S o c == + − = + = method 2 047.0 5.18.3 612.072.0 Δσ' Δe av = − − == 027.0 72.01 047.0 e1 a m o v v = + = + = cm15.5m0.1551.5)(3.8*2.5*0.027σHmS **vc ===′∆= − Example 4: For the system shown below, determine the primary consolidation settlement if cs = 0.05 for the following: 1) σ'c = 100 kPa 2) σ'c = 150 kPa 3) σ'c = 175 kPa 4) σ'c = 250 kPa Solution: 1) σ'c = 100 kPa σ'o at midpoint of the clay layer 2 o kN/m150.85 9.7*19.81)5(19.718.7*5'σ = ++= − 1663.0 85.150 100 σ σ OCR ' o ' c <=== therefore, under ] 'Δσσ' σ log σ' σΔσ [log e1 Hc S avo ' o o ' o o c c − + ′+ + = 425.25)10085.150( 2 1 )σσ( 2 1'Δσ ' c ' oav =−== − kPa
  • 4. 162mm0.162m] 25.425150.85 150.85 log 150.85 50150.85 [log 1.11 2*0.83 Sc ==+ + + = − 2) σ'c = 150 kPa 1 85.150 150 σ σ OCR ' o ' c ≈== normal o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm98m098.0 150.85 50150.85 log 1.11 2*0.83 Sc == + + = 3) σ'c = 175 kPa 16.1 85.150 175 σ σ OCR ' o ' c === kPa200.855085.150σΔσ' o =+=′+ σ'c = 175 kPa Because kPa200.85σΔσ' o =′+ > σ'c = 175 kPa c ' o o c o ' c o s c σ' σΔσ log e1 Hc σ' σ log e1 Hc S ′+ + + + = mm50.4m.05040 175 50150.85 log 1.11 2*0.83 150.85 175 log 1.11 2*0.05 Sc == + + + + = 4) σ'c = 250 kPa Because kPa200.85σΔσ' o =′+ < σ'c = 250 kPa o ' o o s c σ' σΔσ log e1 Hc S ′+ + = mm6m0.006 150.85 50150.85 log 1.11 2*0.05 Sc == + + = Example 5: A soil profile shown in figure below, if a uniform distributed load,Δσ , is applied at the ground surface, what is the settlement of the clay layer caused by primary consolidation if: 1. The clay is normally consolidated 2. The preconsolidation pressure (σ'c) = 190 kN/m2 3. σ'c = 170 kN/m2 Use cs=1/6 cc Solution: 1. The clay is normally consolidated the average effective stress at the middle
  • 5. of the clay layer is 2 o kN/m79.14 9.81)-2(199.81)-4(1814*2'σ = ++= cc = 0.009(LL-10) = 0.009 (40 – 10) = 0.27 o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm132m321.0 79.14 10079.14 log 0.81 4*0.27 Sc == + + = 2. The preconsolidation pressure (σ'c) = 190 kN/m2 2' o kN/m179.14σΔσ =′+ σ'c = 190 kN/m2 Because 2' o kN/m179.14σΔσ =′+ < σ'c = 190 kN/m2 o ' o o s c σ' σΔσ log e1 Hc S ′+ + = , cs = 1/6 cc = 1/6 * 0.27 = 0.045 mm36m0.036 79.14 179.14 log 0.81 4*0.045 Sc == + = 3. σ'c = 170 kN/m2 Because ' o ' c ' o σσσΔσ >>′+ c ' o o c o ' c o s c σ' σΔσ log e1 Hc σ' σ log e1 Hc S ′+ + + + = mm46.9m.04690 170 179.14 log 0.81 4*0.27 179.14 170 log 0.81 4*0.045 Sc == + + + = Example 6: For the foundation shown, estimate the consolidation settlement. Solution: The average effective stress at the middle of the clay layer is 2 o kN/m52.833 9.81)-(16 2 2.5 9.81)0.5(17.516.5*2.5'σ = ++= − Using approximate method to calculate the 'Δσ at mid-point of clay layer 2 v kN/m445.13 )25.32)(25.31( 1*2*150 z)z)(L(B qBL Δσ = ++ = ++ = Or using m,n method 15.0 25.3 5.0 z L m === , and 31.0 25.3 1 z B n === f(m,n) = 0.02 2 kN/m124*150*02.0'Δσ == 1.0 0.5 2.5 Sand B*L=1m*2m G.W.T ?=16.5kN/m3 ?sat=17.5kN/m 3 Sand Clay(N.C.) q=150kN/m 1.5 ?sat=16kN/m3 cc=0.32 cs=0.09 eo=0.8 2
  • 6. 1.5 1.5 2.5 Sand B*L G.W.T ?=15kN/m 3 ?sat=18kN/m 3 Sand Clay(N.C.) Gs=2.7,LL=38% ?=35% Q o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm43.8m3804.0 52.833 13.44552.833 log 0.81 2.5*0.32 Sc == + + = Example 7: In the previous example, if the foundation is circular in shape with diameter of 2.5m, estimate the consolidation settlement. Solution: Using approximate method to calculate the 'Δσ at mid point of clay layer 2 2 2 2 2 kN/m355.28 )25.35.2( 5.2*150 Z)(D qD σΔ = + = + =′ or using 2.6 1.25 3.25 R z == , and 0 1.25 0 R x == from figure 0.18 q Δσv ≈ 2 kN/m27150*18.0σΔ ==′ mm82.9m8290.0 52.833 28.35552.833 log 0.81 2.5*0.32 Sc == + + = Example 8: Refer to figure shown below, given that B=1.5m, L=2.5m, and Q=120 kN. Calculate the primary consolidation settlement of the foundation. Solution: 0.945 1 2.7*0.35 S sωG eo === 3 w s sat clay kN/m18.49.81* 0.9451 0.9452.7 γ e1 eG γ = + + = + + = 2 o kN/m5.5234 9.81)-(18.4 2 2.5 9.81)-1.5(1815*1.5'σ = ++= 'Δσ at the base of the foundation = 2 32kN/m 2.5*1.5 120 = To determine the net consolidation pressure at mid height of clay layer under the center of the foundation, the foundation's base must be divided into four equal 0.75*1.25 rectangular areas. z = 1.5+2.5/2 = 2.75m from the foundation's base 45.0 75.2 25.1 z L m === , and 27.0 75.2 75.0 z B n === f(m,n) = 0.047 2 kN/m016.64*32*047.0'Δσ == 2' o kN/m51.5396.01645.523σΔσ =+=′+ cc = 0.009(LL-10) = 0.009 (38 – 10) = 0.252 o ' o o c c σ' σΔσ log e1 Hc S ′+ + =
  • 7. mm4.17m0174.0 45.523 51.539 log 0.9451 2.5*0.252 Sc == + = Example 9: A building is supporting on a raft 45m x 30m, the net foundation pressure being 125 kN/m2 . The soil profile is shown in figure below. The value of mv = 0.35 m2 /MN. Determine the final settlement under the center of the raft due to consolidation of the clay. Solution: at mid point of clay layer, z = 24 – 3.5 + 2 = 23.5m 96.0 5.23 5.22 z L m === , and 64.0 5.23 15 z B n === f(m,n) = 0.14 2 kN/m704*125*14.0'Δσ == mm98m0.09870*4*10*0.35σHmS 3- **vc ===′∆= Example 10: A stratum of normally loaded clay of 7m thick is located at a depth 12m below ground level. The (ωn) of the clay is 43% and its LL is 48%. The Gs of the solid particles is 2.76. the water table is located at a depth of 5m below the ground surface. The soil is sand above the clay stratum. The submerged unit weight of sand is 11 kN/m3 and the same weighs 18 kN/m3 above water table. The average increase in pressure at the center of the clay stratum is 120 kN/m2 due to the weight of a building that will be constructed on the sand above the clay stratum. Estimate the expected settlement of the structure. Solution: 1) Determination of e and γsub for clay s w W W ω = , kN076.2781.9*76.2*1γGVW wsss ===
  • 8. kN643.11076.27*43.0ωWW sw === kN719.38076.27643.11WWW swt =+=+= 187.1 1 76.2*43.0 S ωG e s o === 3 o t t kN/m704.17 187.11 719.38 e1 W γ = + = + = , equal to γsat or wsat γ e1 esG γ + + = 3 sub kN/m7.8949.8117.704γ =−= 2) Determination of overburden pressure ' oσ 2' o kN/m194.6293.5*7.8947*1118*5σ =+++= 3) Compression index cc = 0.009(LL-10) = 0.009(48-10) = 0.342 4) Excess pressure ∆σ' = 120 kN/m2 5) Total Settlement o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm228m228.0 194.629 120194.629 log 1.1871 7*0.342 Sc == + + = Example 11: Soil investigation at a site gave the following information. Top soil up to a depth of 10.6m is fine sand, and below this lies soft clay layer of 7.6m thick. The water table is at 4.6m below the ground surface. The submerged unit weight of sand is 10.4 kN/m3 , and wet unit weight above water table is 17.6 kN/m3 . The water content of normally consolidated clay is 40%, its LL is 45% and Gs is 2.78. The proposed construction will transmit a net pressure of 120 kN/m2 . Find the average settlement of the clay layer. Solution: cc = 0.009(LL-10) = 0.009(45-10) = 0.315 112.1 1 78.2*4.0 S ωG e s o === 3 wsat kN/m078.189.81* 1.1121 1.1122.78γ e1 esG γ = + += + + = 3 sub kN/m8.2689.8118.078γ =−= Effective overburden pressure at the mid height of the clay layer is 2' o kN/m174.7783.8*8.26810.4*617.6*4.6σ =+++= o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm257m257.0 174.778 120174.778 log 1.1121 7.6*0.315 Sc == + + = Example 12: Two points on a curve for normally consolidated clay have the following coordinates: Point 1: e1 = 0.7, σ1 = 1 kg/cm2
  • 9. Point 2: e2 = 0.6, σ2 = 3 kg/cm2 If the average overburden pressure on a 6m thick clay layer is 1.5 kg/cm2 , how much settlement the clay layer experience due to additional load intensity of 1.6 kg/cm2 . Solution: 21.0 13log 6.07.0 σ σ log ee c 1 2 21 c = − = − = We need the initial void ratio eo at an overburden pressure of 1.5 kg/cm2 . 5.1 3 log21.0)6.0e(21.0 σ σ log ee c o o 2 2o c =−⇒= − = 0.6630.0630.6eo =+=⇒ o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm239m239.0 1.5 1.61.5 log 0.6631 6*0.21 Sc == + + = Example 13: A footing has a size of 3m by 1.5m and it causes a pressure increment of 200 kN/m2 at its base. Determine the consolidation settlement at the middle of the clay layer. Assume 2:1 pressure distribution. Solution: 2 ' o kN/m1.885 5.19*1.58.19*0.516*2.5σ = +++= 2 v kN/m692.27 )5.33)(5.35.1( 3*5.1*200 z)z)(L(B qBL Δσ = ++ = ++ = o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm93m093.0 51.88 27.69251.88 log 0.81 3*0.3 Sc == + + =
  • 10. Point 2: e2 = 0.6, σ2 = 3 kg/cm2 If the average overburden pressure on a 6m thick clay layer is 1.5 kg/cm2 , how much settlement the clay layer experience due to additional load intensity of 1.6 kg/cm2 . Solution: 21.0 13log 6.07.0 σ σ log ee c 1 2 21 c = − = − = We need the initial void ratio eo at an overburden pressure of 1.5 kg/cm2 . 5.1 3 log21.0)6.0e(21.0 σ σ log ee c o o 2 2o c =−⇒= − = 0.6630.0630.6eo =+=⇒ o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm239m239.0 1.5 1.61.5 log 0.6631 6*0.21 Sc == + + = Example 13: A footing has a size of 3m by 1.5m and it causes a pressure increment of 200 kN/m2 at its base. Determine the consolidation settlement at the middle of the clay layer. Assume 2:1 pressure distribution. Solution: 2 ' o kN/m1.885 5.19*1.58.19*0.516*2.5σ = +++= 2 v kN/m692.27 )5.33)(5.35.1( 3*5.1*200 z)z)(L(B qBL Δσ = ++ = ++ = o ' o o c c σ' σΔσ log e1 Hc S ′+ + = mm93m093.0 51.88 27.69251.88 log 0.81 3*0.3 Sc == + + =