SlideShare una empresa de Scribd logo
1 de 5
NABIL NASSAR
21 Holiday Avenue London, Ontario N6E 1M9 050-1445170 nabil.nassar@parsons .com
OBJECTIVE
Municipal Environmental
SUMMARY OF QUALIFICATIONS
 Proficient in Municipal Engineering over 25 years experiences in water and waste water treatment
and infrastructures projects (Passed PEO technical examinations in Municipal Engineers, water and
Waste treatment plants
 Project management experience combined with many courses in project management passed all PMP
on line courses through Parsons University / SKILLSOFT (see courses result attached herewith )
 Construction Management Experience , in the process to be a member of The Construction
Management Association of America CMAA (See courses result attached herewith )
 EIT, Professional Engineers Ontario
ENGINEERING EXPERIENCE
Project Planning
 Studied contract documents: tenders, contract terms, drawings, bills of quantity, quotations, suppliers’
prices, and project requirements including labor, material, equipment and site mobilization
 Prepared project schedule according to relevant documents using Primavera Project Planner
 Planned site mobilization including personnel, equipment, supplies and temporary offices
 Reviewed project design criteria factoring in actual conditions and experience as contractor and
submitted report to consultant
 Prepared materials submittal for executive manager, consultant and client approval
 Prepared material take off list according to approved materials and delivery schedule for one month,
three months, six months as well as entire project
 Prepared shop drawing for consultant approval with AutoCAD operator and quantity surveyor
Construction Management
 Led team for site development, road work, construction of structures: secondary settlement tanks,
degassing distribution structure, aeration tanks, storm water storage tanks, aerobic digestion storage
tanks, dewatered sludge storage, inlet works building, ferric chloride storage, odor control building,
activated sludge recirculation pumping station, aeration air blower building, electrical building, piping
 Oversaw all civil works; led civil works team and technical site office to solve on-site technical issues;
forwarded to engineering for approval; filed change request or request for information
 Supervised all aspects of construction: surveying, excavation, pipe laying, water testing, backfilling,
asphalt restoration, site grading, soil stabilization for embankments, compaction tests
 Monitored subcontractors’ activities, material submission and reviewed statement of work method
 Managed handover of site and oversaw demolition, site clearance, site mobilization and surveying
 Coordinated communication among all subcontractors: civil, mechanical, electrical and instruments
 Monitored construction progress; followed up daily work progress, prepared daily, weekly, monthly
reports, took proactive action to prevent delays and implemented strategies to deal with delays
 Implemented Quality Control and Health and Safety policies ensuring compliance to standards
 Checked shop drawings, prepared as built drawings, provided records and other related documents
 Prepared monthly payment certificates for client with quantity surveyor
 Followed up on project progress through daily checks and weekly meetings with consultant and client
Nabil Nassar 519-208-0625
Page 2 of 5
HISTORY OF EXPERIENCE
Assistant Residences Engineer / Civil 2014 - to date
Parsons International Limited MEA(Middle East Africa ) /UAE
Client ADSSC/Abu Dhabi Sewerage Service Company /UAE
Project ; Construction Management for the project of Design and Build Alruwais Waste water
Treatment Plant with Capacity of 15000 m/day and associated Treated water Effluent Line ( 600mm
Dia & 10 km length )
Project scope of works Construction Management & Consultant Engineering .
Construction Manager 2011 – 2014
Kharafi National, Ismalia, Egypt
Client: Ministry of Electricity (East Delta Electricity Production Company); Consultant: PGESCO
Project: Al-Shabab Power Plant – 1000 MW simple cycle gas turbine units; part of emergency plan for
Ministry of Electricity to add 3500 megawatts into power grid
Engineering, procurement and construction project consisted of eight gas turbines, 1000 megawatts, 125
mw each. Completed in six months, setting world record
Construction work – electromechanical, instrument and civil works; approximately 40,000m3 reinforced
concrete; works included GT pedestal and auxiliary foundations, RO plant, sewage treatment plant,
industrial water treatment plant, two solar tanks - 10,000 m3 each, service water tank - 23,800m3 ,
RO tank – 7400 m3, and demineralization tank – 6400m3, GIS (control-switch), gantry yard, administration
and warehouse buildings, MV & LV sub stations, underground utilities, landscaping and roads
Site Manager 2008 – 2011
Khadafy National, Abu Dhabi, UAE
Client: Abu Dhabi Sewage Services Company
Project: ISTP-1 Sewage Treatment BOOT Project, Al-Saad (capacity: 80,000 m3 per day) and Al Wathba
(capacity: 300,000 m3 per day) Sewage Treatment Plants, Abu Dhabi
Project involved financing, designing, constructing, operating and maintaining sewage treatment plants.
Both plants use combined treatment processes, including biological and advanced treatment units with
primary, secondary and tertiary treatments. Sludge treatment utilizes anaerobic digestion and bio gas
cogeneration facilities. Both plants produce effluent to maximum level of 2.0 nephelometric turbidity units.
Engineer-in-Training 2007
LAW Engineering London, Inc., London, Ontario
Client: Ministry of Transportation Ontario and City of London
Project: Asphalt and concrete study, Highway 8, 14 km, Waterloo; Highland Subdivision, London
Project Manager 2002 – 2006
Mohamed Abdul - Moshsin Al Kharfi Sons Co., Saudi Arabia
Client: Ministry of Industry and Electricity
Project: Development of 4th stage of industrial city, Riyadh; approximately 1,000,000 m2 including sanitary
sewer network, storm sewer network, medium voltage cables, lightning poles, lighting cables, telephone
cables, road work (cut and fill), curb stones, sidewalks (tile) and asphalt laying. Replacement of drinking
water network, 24,000 m in length and existing asphalt, 200,000 m2
Nabil Nassar 519-208-0625
Page 3 of 5
HISTORY OF EXPERIENCE
Project Manager 1998 – 2002
Mohamed Abdul Moshsin Al Kharfi Sons Co., Saudi Arabia
Client: Ministry of Industry and Electricity
Project: Expansion of industrial wastewater treatment plant. Increased capacity from 14000 m3 / day to
54000 m3 / day; improved treated water result to comply with international standard BOD 10 mm / L and
TSS 10 mm / L. Project included civil and electromechanical works for new aeration tank, four primary
clarifiers, two secondary clarifiers, two aerobic digesters, restoration of two existing aeration tanks, four
sludge lagoons and existing pump stations
Project Manager 1996 – 1998
Misfer Bin Kademes Construction, Saudi Arabia
Client: Ministry of Defense and Aviation
Project: Replacement of wastewater and drinking water network of King Faisal Air Academy, restoration of
asphalt for roadways and addition of wastewater pump station and storm sewer system with storage bond
for storm water. Project included sewer pipeline, diameter, 200 mm to 600 mm, length, 10000m; drinking
water pipeline, diameter, 50 mm to 200 mm, length, 12000 m; pump station with concrete and
electromechanical work; storm water pipeline, diameter, 300 mm to 600 mm, length, 6000m; storm water
storage bond, 150000 m3
Site Engineer 1993 – 1996
Misfer Bin Kademes, Construction, Saudi Arabia
Client: Ministry of Municipalities
Project: Construction of main pipelines for sewer system to Al Aziza, diameter, 500 mm to 900 mm, length,
15000m and two pump stations as well as asphalt restoration
Project Manager 1990 – 1993
Misfer Bin Kademes Construction, Saudi Arabia
Client: Ministry of Defense and Aviation
Project: Construction of firing range including earth works, artificial targets, asphalt work for entrance road
of two km and small storage building
Nabil Nassar 519-208-0625
Page 4 of 5
EDUCATION
PMI (Project Management institute /PMP ) . 2015
Project Management professional certifications courses / Parsons university .
CMAA (THE Construction Management Association of America ) 2015
Construction Management certifications Courses /Parsons university
Professional Engineeing Ontario 2007
(Technical &Law and Ethics Exams )
Project Management Courses 2007
Fanshawe College, London, Ontario
Certificate of Qualifications, Construction Craft Worker 2007
Ministry of Colleges, Training and Universities, Ontario
Bachelor’s Degree in Civil Engineering 1986
Mansoura University, Mansoura, Egypt
MEMBERSHIPS
 Egyptian Engineering Council Member of Egyptian of Engineers Syndicate.
 Member of Arab Canadian Engineers Association
 Professional Engineers Ontario (EIT)
Nabil Nassar 519-208-0625
Page 5 of 5

Más contenido relacionado

La actualidad más candente

C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014San Diego County Water Authority
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstNeil Herbst
 
TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003Thomas Fosnaught
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015Gary Hall
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Fairfax County
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _BriefMark Fayle
 

La actualidad más candente (20)

eng.ramy
eng.ramy eng.ramy
eng.ramy
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
RichmondApande PM
RichmondApande PMRichmondApande PM
RichmondApande PM
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
CV-EBSantos
CV-EBSantosCV-EBSantos
CV-EBSantos
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Final TEAM SLIDE PRESENTATION (1)
Final TEAM  SLIDE PRESENTATION (1)Final TEAM  SLIDE PRESENTATION (1)
Final TEAM SLIDE PRESENTATION (1)
 
Curriculum Vitea Neil Herbst
Curriculum Vitea Neil HerbstCurriculum Vitea Neil Herbst
Curriculum Vitea Neil Herbst
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
CV
CVCV
CV
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 

Similar a - Nabil Resume - Civil - Construction-1 (3)( 2)

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016ASHRAF GOMAH MOHAMED
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxHedi Ben Mohamed
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 

Similar a - Nabil Resume - Civil - Construction-1 (3)( 2) (20)

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptx
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV
CVCV
CV
 

- Nabil Resume - Civil - Construction-1 (3)( 2)

  • 1. NABIL NASSAR 21 Holiday Avenue London, Ontario N6E 1M9 050-1445170 nabil.nassar@parsons .com OBJECTIVE Municipal Environmental SUMMARY OF QUALIFICATIONS  Proficient in Municipal Engineering over 25 years experiences in water and waste water treatment and infrastructures projects (Passed PEO technical examinations in Municipal Engineers, water and Waste treatment plants  Project management experience combined with many courses in project management passed all PMP on line courses through Parsons University / SKILLSOFT (see courses result attached herewith )  Construction Management Experience , in the process to be a member of The Construction Management Association of America CMAA (See courses result attached herewith )  EIT, Professional Engineers Ontario ENGINEERING EXPERIENCE Project Planning  Studied contract documents: tenders, contract terms, drawings, bills of quantity, quotations, suppliers’ prices, and project requirements including labor, material, equipment and site mobilization  Prepared project schedule according to relevant documents using Primavera Project Planner  Planned site mobilization including personnel, equipment, supplies and temporary offices  Reviewed project design criteria factoring in actual conditions and experience as contractor and submitted report to consultant  Prepared materials submittal for executive manager, consultant and client approval  Prepared material take off list according to approved materials and delivery schedule for one month, three months, six months as well as entire project  Prepared shop drawing for consultant approval with AutoCAD operator and quantity surveyor Construction Management  Led team for site development, road work, construction of structures: secondary settlement tanks, degassing distribution structure, aeration tanks, storm water storage tanks, aerobic digestion storage tanks, dewatered sludge storage, inlet works building, ferric chloride storage, odor control building, activated sludge recirculation pumping station, aeration air blower building, electrical building, piping  Oversaw all civil works; led civil works team and technical site office to solve on-site technical issues; forwarded to engineering for approval; filed change request or request for information  Supervised all aspects of construction: surveying, excavation, pipe laying, water testing, backfilling, asphalt restoration, site grading, soil stabilization for embankments, compaction tests  Monitored subcontractors’ activities, material submission and reviewed statement of work method  Managed handover of site and oversaw demolition, site clearance, site mobilization and surveying  Coordinated communication among all subcontractors: civil, mechanical, electrical and instruments  Monitored construction progress; followed up daily work progress, prepared daily, weekly, monthly reports, took proactive action to prevent delays and implemented strategies to deal with delays  Implemented Quality Control and Health and Safety policies ensuring compliance to standards  Checked shop drawings, prepared as built drawings, provided records and other related documents  Prepared monthly payment certificates for client with quantity surveyor  Followed up on project progress through daily checks and weekly meetings with consultant and client
  • 2. Nabil Nassar 519-208-0625 Page 2 of 5 HISTORY OF EXPERIENCE Assistant Residences Engineer / Civil 2014 - to date Parsons International Limited MEA(Middle East Africa ) /UAE Client ADSSC/Abu Dhabi Sewerage Service Company /UAE Project ; Construction Management for the project of Design and Build Alruwais Waste water Treatment Plant with Capacity of 15000 m/day and associated Treated water Effluent Line ( 600mm Dia & 10 km length ) Project scope of works Construction Management & Consultant Engineering . Construction Manager 2011 – 2014 Kharafi National, Ismalia, Egypt Client: Ministry of Electricity (East Delta Electricity Production Company); Consultant: PGESCO Project: Al-Shabab Power Plant – 1000 MW simple cycle gas turbine units; part of emergency plan for Ministry of Electricity to add 3500 megawatts into power grid Engineering, procurement and construction project consisted of eight gas turbines, 1000 megawatts, 125 mw each. Completed in six months, setting world record Construction work – electromechanical, instrument and civil works; approximately 40,000m3 reinforced concrete; works included GT pedestal and auxiliary foundations, RO plant, sewage treatment plant, industrial water treatment plant, two solar tanks - 10,000 m3 each, service water tank - 23,800m3 , RO tank – 7400 m3, and demineralization tank – 6400m3, GIS (control-switch), gantry yard, administration and warehouse buildings, MV & LV sub stations, underground utilities, landscaping and roads Site Manager 2008 – 2011 Khadafy National, Abu Dhabi, UAE Client: Abu Dhabi Sewage Services Company Project: ISTP-1 Sewage Treatment BOOT Project, Al-Saad (capacity: 80,000 m3 per day) and Al Wathba (capacity: 300,000 m3 per day) Sewage Treatment Plants, Abu Dhabi Project involved financing, designing, constructing, operating and maintaining sewage treatment plants. Both plants use combined treatment processes, including biological and advanced treatment units with primary, secondary and tertiary treatments. Sludge treatment utilizes anaerobic digestion and bio gas cogeneration facilities. Both plants produce effluent to maximum level of 2.0 nephelometric turbidity units. Engineer-in-Training 2007 LAW Engineering London, Inc., London, Ontario Client: Ministry of Transportation Ontario and City of London Project: Asphalt and concrete study, Highway 8, 14 km, Waterloo; Highland Subdivision, London Project Manager 2002 – 2006 Mohamed Abdul - Moshsin Al Kharfi Sons Co., Saudi Arabia Client: Ministry of Industry and Electricity Project: Development of 4th stage of industrial city, Riyadh; approximately 1,000,000 m2 including sanitary sewer network, storm sewer network, medium voltage cables, lightning poles, lighting cables, telephone cables, road work (cut and fill), curb stones, sidewalks (tile) and asphalt laying. Replacement of drinking water network, 24,000 m in length and existing asphalt, 200,000 m2
  • 3. Nabil Nassar 519-208-0625 Page 3 of 5 HISTORY OF EXPERIENCE Project Manager 1998 – 2002 Mohamed Abdul Moshsin Al Kharfi Sons Co., Saudi Arabia Client: Ministry of Industry and Electricity Project: Expansion of industrial wastewater treatment plant. Increased capacity from 14000 m3 / day to 54000 m3 / day; improved treated water result to comply with international standard BOD 10 mm / L and TSS 10 mm / L. Project included civil and electromechanical works for new aeration tank, four primary clarifiers, two secondary clarifiers, two aerobic digesters, restoration of two existing aeration tanks, four sludge lagoons and existing pump stations Project Manager 1996 – 1998 Misfer Bin Kademes Construction, Saudi Arabia Client: Ministry of Defense and Aviation Project: Replacement of wastewater and drinking water network of King Faisal Air Academy, restoration of asphalt for roadways and addition of wastewater pump station and storm sewer system with storage bond for storm water. Project included sewer pipeline, diameter, 200 mm to 600 mm, length, 10000m; drinking water pipeline, diameter, 50 mm to 200 mm, length, 12000 m; pump station with concrete and electromechanical work; storm water pipeline, diameter, 300 mm to 600 mm, length, 6000m; storm water storage bond, 150000 m3 Site Engineer 1993 – 1996 Misfer Bin Kademes, Construction, Saudi Arabia Client: Ministry of Municipalities Project: Construction of main pipelines for sewer system to Al Aziza, diameter, 500 mm to 900 mm, length, 15000m and two pump stations as well as asphalt restoration Project Manager 1990 – 1993 Misfer Bin Kademes Construction, Saudi Arabia Client: Ministry of Defense and Aviation Project: Construction of firing range including earth works, artificial targets, asphalt work for entrance road of two km and small storage building
  • 4. Nabil Nassar 519-208-0625 Page 4 of 5 EDUCATION PMI (Project Management institute /PMP ) . 2015 Project Management professional certifications courses / Parsons university . CMAA (THE Construction Management Association of America ) 2015 Construction Management certifications Courses /Parsons university Professional Engineeing Ontario 2007 (Technical &Law and Ethics Exams ) Project Management Courses 2007 Fanshawe College, London, Ontario Certificate of Qualifications, Construction Craft Worker 2007 Ministry of Colleges, Training and Universities, Ontario Bachelor’s Degree in Civil Engineering 1986 Mansoura University, Mansoura, Egypt MEMBERSHIPS  Egyptian Engineering Council Member of Egyptian of Engineers Syndicate.  Member of Arab Canadian Engineers Association  Professional Engineers Ontario (EIT)