Orion CDR Process: A Streamlined Approach Charles Armstrong National Aeronautics and Space Administration Orion VIO SE&I Plans & Processes Manager [email_address] 281-244-6315 Tony Byers Lockheed Martin Space Systems Company Systems Engineering – Program Integration Manager [email_address] 303-977-4389 NASA PM Challenge 2011
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Introduction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],If successful, this methodology will reduce the cost of conducting CDR to about one-third that of PDR and set the new standard for the conduct of major milestone reviews within the agency.
Current Context ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Throughout 2010, the Orion Project continued to stay focused on design and development.  The integration team quickly adapted to the changing landscape and routinely revisited CDR expectations.
Preliminary Design Review
PDR Process Refresher ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],500+ Review Participants 1500+ Review Participants Approximately 100,000 pages of design, process, and plan documentation reviewed. Included requirements, interface definition, verification details, drawings, general plans, etc.
Orion PDR Process DRD Update & Redeliver (Type 1 + Final Type 2) DRD Waterfall / Early Review (Tech Reviews & Peer Reviews) Project Orion SMR PDR KO 7/13 7/21 8/10 NASA Screening Team Concludes RID Screening All RIDs Dispositioned 8/20 4 wk DRD Review (RID Creation & Sponsor) System & Module Presentations Decision to Proceed to DAC-4 RIDs Captured Against Design DRDs Delivered 7/7  PDR -45 NASA Screening Team NASA Lvl III Review & Filter RIDs (Work disconnects with external stakeholders) (LM SEIT led SME team available to answer questions) RID Tool Open TBD RID Tool Close  (all RIDs Sponsored) 7/31 DRDs Redelivered NLT 2/1/10 Pre Board 5 1/2 Day Pre-Board to work issues in parallel with completion of RID Disposition  Orion PDR All RIDs receive product owner or lead recommended Disposition 8/17 Starts 8/3 Starts 8/12 Product Owner Recommend Disposition Starts 8/17 8/4 Board Decision Gate 8/10 Forward Daily Board Decision Gates S Integ Team PIT Lead with Module/IPT Support Starts 8/27 PIT War Room 8/31-9/1 PDR Board Review Team Disposition Dry- Runs Subsystem Design Reviews (SSDRs)  2-Wk SSDRs SMR Prep June July August Sep Oct
PDR Key Elements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Subsystem Design Reviews ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
System & Module Review (SMR) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PDR RID Process Flow
Orion PDR Data Package Review ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],A key CDR streamlining goal is to improve the overall quality of RIDs while reducing the number of RIDs against known, out of scope or duplicate issues.
PDR Lessons Learned ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Executing a Lessons Learned process made streamlining CDR much easier.  All stakeholders quickly aligned to ensure an efficient thorough CDR process was developed.
CDR Streamlining Focus
Incremental DRD Delivery ,[object Object],[object Object],[object Object],[object Object],[object Object],Action Item / RID Process Project DRD Review & Approval Process Process TBD Nearly half of all DRDs originally linked to CDR for delivery will be adjusted to allow delivery based on need (design, procurement, etc.).  This provides increased project flexibility in prioritizing work and increases overall CDR efficiency and review quality. * Component Specs & Supporting documents are developed & delivered based on procurement need. Reduced core set of DRDs to be reviewed and accepted as part of the SSDRs & CDR DRDs delivered per PIT managed schedule.  Reviewed and accepted through NASA’s normal C&DM process. Focus 1:  Improve the effectiveness of reviewing and accepting DRDs at CDR
Pre-CDR DRDs CDR Start CDR + 90 Redelivery DRD Delivery Draft DRD Posted on Portal  days who Note:  Days are in business days. 20 business days (4 weeks) Pre-CDR DRDs Include ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Pre-CDR DRD Review & Delivery Flow ,[object Object],[object Object],[object Object],[object Object],[object Object],Review & Delivery Details Tech/Peer Review Input Feedback LM CM/DM Post Portal DRD Review Consolidate Comments Comment Disposition VICB Summary Post Final Comments Contract Letter 1-2 15 5 <1 10 1 5 1 2 3 NASA & LM Tech POCs LM Book Owners LM  CM/DM NASA CM/DM NASA Reviewers NASA  CM/DM DRD POC (2), TCM (2), & IPT (1) VICB Outbrief NASA  CM/DM & DRD POC NASA COTR  & PIT Focus 1:  Improve the effectiveness of reviewing and accepting DRDs at CDR
CDR DRDs CDR Board CDR + 90 Redelivery DRD Delivery Draft DRD Posted on PL  days who CDR Start Note:  Days are in business days. CDR DRDs Include ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CDR DRD Review & Delivery Flow ,[object Object],[object Object],[object Object],[object Object],[object Object],Review & Delivery Details Tech/Peer Review Input Feedback LM CM/DM Post on Portal DRD Review SSDR Caucus Reclama Loaded as IDE Action Contract Letter 1-2 15 5 <1 5+ 5 5 1 2 3 NASA & LM Tech POCs LM Book Owners LM  CM/DM NASA CM/DM NASA Tech POCs SSDR  Co-Chairs  & Joint PIT SSDR  Co-Chairs & Tech POCs MRT & Board, As Required LM PIT & MRI NASA COTR  & PIT Focus 1:  Improve the effectiveness of reviewing and accepting DRDs at CDR
Post-CDR DRDs CDR Board DRD Delivery Draft DRD Posted on Portal  days who Note:  Days are in business days. 20 business days (4 weeks) Post-CDR DRDs Include ,[object Object],[object Object],Post-CDR DRD Review & Delivery Flow ,[object Object],[object Object],[object Object],[object Object],[object Object],Review & Delivery Details Tech/Peer Review Input Feedback LM CM/DM Post Portal DRD Review Consolidate Comments Comment Disposition VICB Summary Post Final Comments Contract Letter 1-2 15 5 <1 10 1 5 1 2 3 NASA & LM Tech POCs LM Book Owners LM  CM/DM NASA CM/DM NASA Reviewers NASA  CM/DM DRD POC (2), TCM (2), & IPT (1) VICB Outbrief NASA  CM/DM & DRD POC NASA COTR  & PIT Focus 1:  Improve the effectiveness of reviewing and accepting DRDs at CDR
RID Quality & Quantity ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Focus 2:  Improve the quality of RIDs and reduce overall quantity
Action & RID Creation & Disposition ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Focus 2:  Improve the quality of RIDs and reduce overall quantity
CDR SSDR Action Item/RID Process  PROPOSED FLOW Path Legend 1. Reject  2. Reclama  3. Accept  4. Accept with Mod  5. Merge  6. Elevate for Discussion Process Details ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Focus 3:  Improve the efficiency of the Action/RID Process & lifecycle in CDR
SSDR Action Item/RID Process Flow ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Focus 3:  Improve the efficiency of the Action/RID Process & lifecycle in CDR
SSDR Action Item/RID Process Flow ,[object Object],[object Object],[object Object],[object Object],[object Object],Focus 3:  Improve the efficiency of the Action/RID Process & lifecycle in CDR
Action Item/RID/Comment Dispositions Reject Accept With Mod Accept Dispositions will be used in the Caucus and Review Teams All Approved Action Items/RIDs are expected to be incorporated in the CDR redelivery.  This ensures a consistent and well documented technical baseline. Disposition Definition ,[object Object],[object Object],[object Object],Design issue that needs to be resolved to ensure an appropriate level of CDR maturity is achieved along with resolution  EXACTLY AS WRITTEN BY INTIATOR Same as accept; however, additional tailoring or editing to the action or resolution is needed Focus 3:  Improve the efficiency of the Action/RID Process & lifecycle in CDR
Overall CDR Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Focus 4:  Improve the efficiency and effectiveness of the reviews.
SSDRs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],SSDR Chairs never chair a review on consecutive weeks.  Remain focused on an SSDR until Caucus completion. Project Management available throughout process to resolve issues quickly. Focus 4:  Improve the efficiency and effectiveness of the reviews.
Critical Design Review Process
CDR Management Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object]
CDR Management Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Keys to CDR Success (Operational Excellence) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CDR Objectives & Criteria ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PIT will mature CDR Objectives and Criteria, coordinate with all impacted stakeholders, and document in the CxP 72422 Orion CDR Plan.
CxP 72422 Orion CDR Plan ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room  (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs  Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes  Tool Closed for all DRDs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Verifier Rejects Verifier Closes Action Item/RID/Comment Closure Process Rework / Update LM IDE Assignee Works Issue & Submits Result to Initiator Process Detail ,[object Object],-  Approved Actions/RIDs/Comments are entered into the LM IDE Action tracking tool -  Estimated closure dates are established with rationale ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],-  If initiator, verifier, and assignee don’t agree that Action/RID/Comment is closed, the issue will be elevated to VICB/CPCB as required - Verifier dispositions as “Reject” or “Close” in the LM IDE Approved Action/RID/Comments Verifier Reviews Closure Rationale  VICB (if necessary)
CDR Action/RID Process Project Orion Initiator Action/RID Flow SSDR CDR Board Caucus MRT Withdrawn  Actions/RIDs Approved  Actions/RIDs CDR Disposition Process Reduce Number  of DRDs Structured Improvement Structured Improvement PDR Disposition Process PDR Process Elevated RIDs
CDR Streamlining Benefits ,[object Object],[object Object],[object Object],[object Object]
Closing Remarks
CDR Supporting Documentation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Throughout CDR planning and execution activities, frequent communication and easy access to CDR related data is essential to ensure success.
CDR Integration Team As the program nears the more active CDR planning phase, additional CDR Primary Integration Team (PIT) members will be identified.
Questions?
[object Object],[object Object],[object Object],[object Object]
OFT-1 Periodic Technical Review (PTR) Scope & Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Orion PTR Board Members ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PTR Board Members PTRs Project Management NASA & LM Tech Auth – Chief Engineer NASA & LM (Chair)  Tech Auth – S&MA NASA Tech Auth – AI&P NASA VIO/SEI NASA & LM  CSM NASA & LM  LAS NASA & LM  T&V NASA & LM  S&MA NASA & LM Production Ops NASA & LM  COTR NASA Mission Ops NASA
OFT-1 Data Flow ,[object Object],[object Object],[object Object],[object Object],OFT-1 DRDs OFT-1 Specification OFT-1 Verification Plan OFT-1 Post-Flight Data Package OFT-1 Data OFT-1 Integrated Data Plan OFT-1 Data Per the Integrated Data Plan Delivered to NASA Uploaded to ProjectLink Managed by LM ,[object Object],[object Object],[object Object],[object Object],Data Type 2 Data Type 2 Data Type 3 OFT-1 Integrated Data Schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],DRAFT
OFT-1 Data/Work Product Scheduling CSM Scheduling Managing LAS AVP Systems Analysis SEIT ATLO IPT/Lower Level Schedules Integrated Data Schedule Data Products not captured in Lower Level Schedules Lower Level Schedules are networked with the Integrated Data Schedule  ,[object Object],[object Object],[object Object],[object Object],[object Object],PIT Review -  SEIT, C&DM, Planning d  - IPTs  as needed Issue? Yes No Morning Tagup Briefing Review the IDS status and highlight any overdue data/work products Ensures changes to schedules align with project needs Developed based on the most current IDS Requires additional coordination with the lower-level scheduling team Stop DRAFT
Incremental DRD Sets for Orion CDR Timing Pre-CDR CDR Post-CDR Quantity 73 104 21 Types of DRDs Con Ops Ground Sys Reqt’s Safety Docs Fault Tree Analysis Lunar Upgrade Plan Workmanship Stds Model & Sims Plans Sw Dev Plan IRDs CAD Models Drawings MVP ICDs ADD Mass Properties Data & Cmd Dictionary Avionics DDB Ops Data Book Test Procedures Time to Review 2 weeks 2 weeks 2 weeks Review Team IPTs SSDR Caucus IPTs Re-delivery CDR + 90 days (Delivered DRD + Approved Comments are reference) CDR + 90 days TBD Comment Mechanism Spreadsheet or ConCERT* IDE Action Tool Spreadsheet or ConCERT*
PDR Assessment ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Yellow / Green ,[object Object],[object Object],Parachute Architecture Study was underway prior to entering PDR.  Assessment concluded in October 2009. Driven by significant post SDR requirements changes Procurement schedules were being updated to align with project funding profile
PDR Data Package Delivery ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],As of July 8, 2009 PDR -45 days
Action Item & RID Closure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PDR RIDs LAS 150 CM 241 SM 90 Av&Pwr&Wire 444 Software 38 T&V, Fac, GSE 411 AI&P 18 SR&QA 91 Systems 566 Total 2049 SSDR Actions AV&SW 140 Crew Systems 39 ECLSS 49 EPS 97 GN&C 26 LAS AM 60 LAS ACM 96 LAS JM 60 LAS SE&I AVP 12 LRS 42 Mechanisms 56 Propulsion 150 PTC 33 Pyro 26 Structures 141 TPS 20 Wiring 14 Total 1061

Más contenido relacionado

La actualidad más candente

Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbainNASAPMC
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1NASAPMC
 
Dumbacher2012 pmchallenge
Dumbacher2012 pmchallengeDumbacher2012 pmchallenge
Dumbacher2012 pmchallengeNASAPMC
 
Dennehy richard mrozinski
Dennehy richard mrozinskiDennehy richard mrozinski
Dennehy richard mrozinskiNASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frankNASAPMC
 
David.oberhettinger
David.oberhettingerDavid.oberhettinger
David.oberhettingerNASAPMC
 
Costello kenneth
Costello kennethCostello kenneth
Costello kennethNASAPMC
 
Dusterwald
DusterwaldDusterwald
DusterwaldNASAPMC
 
Majerowicz
MajerowiczMajerowicz
MajerowiczNASAPMC
 
Kremic.tibor
Kremic.tiborKremic.tibor
Kremic.tiborNASAPMC
 
Mullane stanley-hamilton-wise
Mullane stanley-hamilton-wiseMullane stanley-hamilton-wise
Mullane stanley-hamilton-wiseNASAPMC
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshornNASAPMC
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNASAPMC
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbleyNASAPMC
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.muellerNASAPMC
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristenNASAPMC
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.johnNASAPMC
 
Jim.free
Jim.freeJim.free
Jim.freeNASAPMC
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susanNASAPMC
 

La actualidad más candente (20)

Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
 
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
 
Dumbacher2012 pmchallenge
Dumbacher2012 pmchallengeDumbacher2012 pmchallenge
Dumbacher2012 pmchallenge
 
Dennehy richard mrozinski
Dennehy richard mrozinskiDennehy richard mrozinski
Dennehy richard mrozinski
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
David.oberhettinger
David.oberhettingerDavid.oberhettinger
David.oberhettinger
 
Costello kenneth
Costello kennethCostello kenneth
Costello kenneth
 
Shinn
ShinnShinn
Shinn
 
Dusterwald
DusterwaldDusterwald
Dusterwald
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
 
Kremic.tibor
Kremic.tiborKremic.tibor
Kremic.tibor
 
Mullane stanley-hamilton-wise
Mullane stanley-hamilton-wiseMullane stanley-hamilton-wise
Mullane stanley-hamilton-wise
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.mueller
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.john
 
Jim.free
Jim.freeJim.free
Jim.free
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susan
 

Destacado

Integrating CPOE Orders - A Guide to Moving Mountains
Integrating CPOE Orders - A Guide to Moving MountainsIntegrating CPOE Orders - A Guide to Moving Mountains
Integrating CPOE Orders - A Guide to Moving MountainsBoston Software Systems
 
Emerging Health Care Technology: CPOE
Emerging Health Care Technology: CPOEEmerging Health Care Technology: CPOE
Emerging Health Care Technology: CPOELor Kelley
 
An overview of clinical data repository
An overview of clinical data repositoryAn overview of clinical data repository
An overview of clinical data repositoryNetrah Laxminarayanan
 
Benefits Of EHR/CPOE
Benefits Of EHR/CPOEBenefits Of EHR/CPOE
Benefits Of EHR/CPOEguestd4bbab
 
Standards Driven Healthcare Information Integration Infrastructure
Standards Driven Healthcare Information Integration InfrastructureStandards Driven Healthcare Information Integration Infrastructure
Standards Driven Healthcare Information Integration InfrastructureAbdul-Malik Shakir
 
Data Management Systems for Area-based Health Systems Research
Data Management Systems for Area-based Health Systems ResearchData Management Systems for Area-based Health Systems Research
Data Management Systems for Area-based Health Systems ResearchNawanan Theera-Ampornpunt
 
Database vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative ReviewDatabase vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative ReviewHealth Catalyst
 
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?Clinical Data Repository vs. A Data Warehouse - Which Do You Need?
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?Health Catalyst
 
CPOE - Computerized Physician Order Entry
CPOE - Computerized Physician Order EntryCPOE - Computerized Physician Order Entry
CPOE - Computerized Physician Order EntryKristie Brown
 

Destacado (15)

HySynth Biotechnologies
HySynth  BiotechnologiesHySynth  Biotechnologies
HySynth Biotechnologies
 
Integrating CPOE Orders - A Guide to Moving Mountains
Integrating CPOE Orders - A Guide to Moving MountainsIntegrating CPOE Orders - A Guide to Moving Mountains
Integrating CPOE Orders - A Guide to Moving Mountains
 
HySynth Clinical Data Repository
HySynth Clinical Data RepositoryHySynth Clinical Data Repository
HySynth Clinical Data Repository
 
Emerging Health Care Technology: CPOE
Emerging Health Care Technology: CPOEEmerging Health Care Technology: CPOE
Emerging Health Care Technology: CPOE
 
An overview of clinical data repository
An overview of clinical data repositoryAn overview of clinical data repository
An overview of clinical data repository
 
HIE technical infrastructure
HIE technical infrastructureHIE technical infrastructure
HIE technical infrastructure
 
Benefits Of EHR/CPOE
Benefits Of EHR/CPOEBenefits Of EHR/CPOE
Benefits Of EHR/CPOE
 
Standards Driven Healthcare Information Integration Infrastructure
Standards Driven Healthcare Information Integration InfrastructureStandards Driven Healthcare Information Integration Infrastructure
Standards Driven Healthcare Information Integration Infrastructure
 
Data Management Systems for Area-based Health Systems Research
Data Management Systems for Area-based Health Systems ResearchData Management Systems for Area-based Health Systems Research
Data Management Systems for Area-based Health Systems Research
 
power point informatics
power point informaticspower point informatics
power point informatics
 
XDS - Cross-Enterprise Document Sharing
XDS - Cross-Enterprise Document SharingXDS - Cross-Enterprise Document Sharing
XDS - Cross-Enterprise Document Sharing
 
CPOE
CPOECPOE
CPOE
 
Database vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative ReviewDatabase vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative Review
 
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?Clinical Data Repository vs. A Data Warehouse - Which Do You Need?
Clinical Data Repository vs. A Data Warehouse - Which Do You Need?
 
CPOE - Computerized Physician Order Entry
CPOE - Computerized Physician Order EntryCPOE - Computerized Physician Order Entry
CPOE - Computerized Physician Order Entry
 

Similar a Armstrong

An Alternative Approach to DO-178B
An Alternative Approach to DO-178BAn Alternative Approach to DO-178B
An Alternative Approach to DO-178BAdaCore
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...ssuser835d1a
 
How Meark as an enterprise leverages DSDM?
How Meark as an enterprise leverages DSDM?How Meark as an enterprise leverages DSDM?
How Meark as an enterprise leverages DSDM?AgileNetwork
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyersNASAPMC
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2pmimkecomm
 
Final Presentation Kappus
Final Presentation KappusFinal Presentation Kappus
Final Presentation Kappusskappus
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec domsBabasab Patil
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8Anoush Ghamsari
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...shawncarner
 
Phase gate review development model august 8 2017 - dave litwiller
Phase gate review development model   august 8 2017 - dave litwillerPhase gate review development model   august 8 2017 - dave litwiller
Phase gate review development model august 8 2017 - dave litwillerDave Litwiller
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Rals freedom project management methodologies training
Rals freedom project management methodologies trainingRals freedom project management methodologies training
Rals freedom project management methodologies trainingfrankdrake
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrongNASAPMC
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrongNASAPMC
 
Open-DO: Towards a Lean Approach for Certification (Cyrille Comar)
Open-DO: Towards a Lean Approach for Certification  (Cyrille Comar)Open-DO: Towards a Lean Approach for Certification  (Cyrille Comar)
Open-DO: Towards a Lean Approach for Certification (Cyrille Comar)AdaCore
 

Similar a Armstrong (20)

An Alternative Approach to DO-178B
An Alternative Approach to DO-178BAn Alternative Approach to DO-178B
An Alternative Approach to DO-178B
 
Remade Slides.pptx
Remade Slides.pptxRemade Slides.pptx
Remade Slides.pptx
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 
How Meark as an enterprise leverages DSDM?
How Meark as an enterprise leverages DSDM?How Meark as an enterprise leverages DSDM?
How Meark as an enterprise leverages DSDM?
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyers
 
Integrating agile into sdlc presentation pmi v2
Integrating agile into sdlc presentation   pmi v2Integrating agile into sdlc presentation   pmi v2
Integrating agile into sdlc presentation pmi v2
 
Final Presentation Kappus
Final Presentation KappusFinal Presentation Kappus
Final Presentation Kappus
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec doms
 
Testing And Commissioning
Testing And CommissioningTesting And Commissioning
Testing And Commissioning
 
Pmp Complete Diagrams
Pmp Complete DiagramsPmp Complete Diagrams
Pmp Complete Diagrams
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
Phase gate review development model august 8 2017 - dave litwiller
Phase gate review development model   august 8 2017 - dave litwillerPhase gate review development model   august 8 2017 - dave litwiller
Phase gate review development model august 8 2017 - dave litwiller
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Rals freedom project management methodologies training
Rals freedom project management methodologies trainingRals freedom project management methodologies training
Rals freedom project management methodologies training
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrong
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrong
 
Open-DO: Towards a Lean Approach for Certification (Cyrille Comar)
Open-DO: Towards a Lean Approach for Certification  (Cyrille Comar)Open-DO: Towards a Lean Approach for Certification  (Cyrille Comar)
Open-DO: Towards a Lean Approach for Certification (Cyrille Comar)
 
Ch07
Ch07Ch07
Ch07
 
Harvinder Singh-Resume
Harvinder Singh-ResumeHarvinder Singh-Resume
Harvinder Singh-Resume
 

Más de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Más de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Último

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 

Último (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 

Armstrong

  • 1. Orion CDR Process: A Streamlined Approach Charles Armstrong National Aeronautics and Space Administration Orion VIO SE&I Plans & Processes Manager [email_address] 281-244-6315 Tony Byers Lockheed Martin Space Systems Company Systems Engineering – Program Integration Manager [email_address] 303-977-4389 NASA PM Challenge 2011
  • 2.
  • 3.
  • 4.
  • 6.
  • 7. Orion PDR Process DRD Update & Redeliver (Type 1 + Final Type 2) DRD Waterfall / Early Review (Tech Reviews & Peer Reviews) Project Orion SMR PDR KO 7/13 7/21 8/10 NASA Screening Team Concludes RID Screening All RIDs Dispositioned 8/20 4 wk DRD Review (RID Creation & Sponsor) System & Module Presentations Decision to Proceed to DAC-4 RIDs Captured Against Design DRDs Delivered 7/7 PDR -45 NASA Screening Team NASA Lvl III Review & Filter RIDs (Work disconnects with external stakeholders) (LM SEIT led SME team available to answer questions) RID Tool Open TBD RID Tool Close (all RIDs Sponsored) 7/31 DRDs Redelivered NLT 2/1/10 Pre Board 5 1/2 Day Pre-Board to work issues in parallel with completion of RID Disposition Orion PDR All RIDs receive product owner or lead recommended Disposition 8/17 Starts 8/3 Starts 8/12 Product Owner Recommend Disposition Starts 8/17 8/4 Board Decision Gate 8/10 Forward Daily Board Decision Gates S Integ Team PIT Lead with Module/IPT Support Starts 8/27 PIT War Room 8/31-9/1 PDR Board Review Team Disposition Dry- Runs Subsystem Design Reviews (SSDRs) 2-Wk SSDRs SMR Prep June July August Sep Oct
  • 8.
  • 9.
  • 10.
  • 12.
  • 13.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33. Orion CDR Process CDR Kickoff CDR DRDs Review Interactive Reading Room (DRDs, Drawings, Etc.) SSDRs SSDR Caucuses System Analysis Review / T&V / S&MA (1 to 2 days) Reviews Begin (Interactive Reading Rooms available) Pre-Board Board Integrated Vehicle Design Review IVDR SSDR Material Dropped Tool Closed for all SSDR DRDs Only Major Issues and Disagreements are brought Post-CDR DRDs Component reviews Executed or a Interim Design Review conducted for those reviews not scheduled prior to CDR Management Review Team (as needed) IVDR Caucus Product Owners/SS Leads provide action plan and feedback to Caucuses Pre-CDR DRDs Tool Closes for SSDR Products as SSDR concludes Tool Closed for all DRDs Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42. CDR Action/RID Process Project Orion Initiator Action/RID Flow SSDR CDR Board Caucus MRT Withdrawn Actions/RIDs Approved Actions/RIDs CDR Disposition Process Reduce Number of DRDs Structured Improvement Structured Improvement PDR Disposition Process PDR Process Elevated RIDs
  • 43.
  • 45.
  • 46. CDR Integration Team As the program nears the more active CDR planning phase, additional CDR Primary Integration Team (PIT) members will be identified.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53. Incremental DRD Sets for Orion CDR Timing Pre-CDR CDR Post-CDR Quantity 73 104 21 Types of DRDs Con Ops Ground Sys Reqt’s Safety Docs Fault Tree Analysis Lunar Upgrade Plan Workmanship Stds Model & Sims Plans Sw Dev Plan IRDs CAD Models Drawings MVP ICDs ADD Mass Properties Data & Cmd Dictionary Avionics DDB Ops Data Book Test Procedures Time to Review 2 weeks 2 weeks 2 weeks Review Team IPTs SSDR Caucus IPTs Re-delivery CDR + 90 days (Delivered DRD + Approved Comments are reference) CDR + 90 days TBD Comment Mechanism Spreadsheet or ConCERT* IDE Action Tool Spreadsheet or ConCERT*
  • 54.
  • 55.
  • 56.

Notas del editor

  1. CDR DRDs go through the Action Item/RID Process Each Action Item/RID will be screened during the applicable design review. Pre- and Post-CDR DRDs go through the Orion DRD Review and Approval Process Each DRD will be routed through the applicable SMEs for review Issues/Comments for incorporation into the DRD will be identified and reviewed (IPT) DRD issues/comments for incorporation into the DRD will be approved by the VICB