Agenda
PM Challenge – 2011
Background: S&MA Audits
 OSMA/NSC AAO is responsible for conducting the
  following:
    –   Institutional/Facility/Operational (IFO) Safety Audit:
          – Independent verification that institutions, facilities, and operations at each Center,
            Component Facility, and JPL are compliance with applicable Agency’s SMA
            requirements as well as Federal, State, and local OSHA requirements
    –   Requirements Flow-down and SMA Engineering Design Audits and Assessments
        (REDAA)*:
          – Independent verification of SMA requirements flow-down to Centers, Component
            Facilities, and JPL; Programs/Projects down to NASA contracts
          – Independent evaluation of SMA requirements implemented on Programs/Projects for
            system safety, reliability/maintainability, risk analysis and management
    –   Quality Audit, Assessment, and Review (QAAR)*:
          – Independent verification that Center, Component Facility, JPL, and
            Programs/Projects down to the suppliers are compliant with SMA quality
            requirements
    –   Independent Assessments as requested


 *REDAA and QAAR activities began in FY10 (result of restructuring the scope of the audit program);
 Replaced the Institutional Programmatic Support (IPS) and Programmatic Audit and Review (PA&R)

                                                 3
Background: S&MA Audits (continue)




                                                                 PM Challenge – 2011
 Before 2009,
  OSMA/NSC AAO focus was on conducting audits and returning to
  the Center every 2-3 years

 Starting in 2009,
  OSMA/NSC AAO focus is to conduct audits
  –and- to help the Center prior to and after the audits




                                   4
2009/2010 Improvements and Collaboration




                                                                                                                             PM Challenge – 2011
                                                                          •2 year audit schedule: online
  Increased collaboration with stakeholders
                                                                          •Audit process defined/documented: online
                                                 COMMUNICATIONS           •Customer feedback
                                                                          •Annual Audit report: online
                                                                          •Annual AAO Workshop: online
        and improved audit processes




                                               KNOWLEDGE TRANSFER         •Audit data: online
                                                  ACROSS NASA             •Best practices: online




                                                                          •Audit cards: consistency, quality, etc.
                                                                          •Restructured/renamed IPS and PA&R to have a
                                                EVOLUTION: PROCESS         clear focus and to line up with Program/Project
                                                                           Lifecycle
                                                  IMPROVEMENT             •Corrective Action Plan (CAP): content, feedback
                                                                          •Real-time audit tool


                                                                          •Agency Systemic Issues
                                              ANALYZE AUDIT DATA – RISK   •Action Plan: update quarterly
                                                                          •Risk Factors
                                                    REDUCTION             •Correlating mishaps to audit findings
                                                                          •Repeat audit findings




                                                                     5
AAO Organization: Personnel




                                                                                                                   PM Challenge – 2011
                                                                 Cheevon (Mi-Mi) Lau
                                                                Audits & Assessments
                                                                       Director
                                                                         (NC)




                Paul Boldon
                 REDAA *                                           Brad Kaustinen
                                                                                                  Robert Cross
                 Manager                                                COTR
                                                                                                Analyst, Auditor
              (located at HQ)                                      (located at NSC)
                                                                                                (located at JSC)




              Brian Jackson
                  QAAR*                                                                          Michael Milbert
                 Manager                                                                        Analyst, Auditor
             (located at NSC)                                                                   (located at KSC)




              Arthur R. Lee
                IFO Safety
             Audit Manager
             (located at HQ)



Note: For audits, Center and OSMA personnel comprise the team
* Replaced Institutional Programmatic Support (IPS) and Programmatic Audits and Review (PA&R)



                                                                   6
PM Challenge – 2011
Yearly AAO Workshop (September timeframe)
 Key Focus:
   – Identify the Potential Systemic Issues (noncompliances for a
     specific requirement that occur across 3 or more Centers)
   – Address potential solutions and develop action plans
       • Session is co-chaired by OSMA requirements owner and
         OSMA/NSC Audit Manager
   – Discuss Best Practices tied to potential Agency systemic
     issues
   – Recommend list of Agency systemic issues to bring forward to
     an appropriate Headquarters Forum
       • Present to Headquarters in February and October
 In 2010, 130 Attendees from:
   – All NASA Centers, including JPL
   – Headquarters (OSMA, Procurement, OCHMO, OCE, OICMS,
     OSI)
   – NESC, NSC
                                   7
PM Challenge – 2011
IFO Safety Audit: Analysis of the
Noncompliances




                  8
PM Challenge – 2011
IFO Safety Audit Findings: Analysis
 Reviewed audit data from FY2007 - FY2010




      - 2010
      - 2009
      - 2008
      - 2007
   Total number of noncompliances reviewed: 1,349
   Total number of noncompliances related to Potential Systemic Issues (PSI): 930 (69%)
   Majority of the IFO Safety Audit’s PSI were in Electrical Safety


                                                9
PM Challenge – 2011
QAAR: Analysis of the
Noncompliances




                 10
PM Challenge – 2011
QAAR Audit Findings: Analysis
 Reviewed audit data from FY2007 - FY2010




       - 2010
       - 2009
       - 2008
       - 2007
   Total number of noncompliances reviewed: 244
   Total number of noncompliances related to PSI: 182 (75%)
   Majority of the QAAR’s PSI were in Inspection/Work Records

* NOTE: Previous audit data was removed from calculation
                                                       11
PM Challenge – 2011
REDAA: Analysis of the
Noncompliances




                12
PM Challenge – 2011
REDAA (IPS Design) Audit Findings: Analysis
 Reviewed IPS design audit data from FY2007 - FY2009




      - 2009
      - 2008
      - 2007
   Total number of design noncompliances reviewed: 15
   Total number of design noncompliances related to PSI: 6 (40%)
   Majority of the PSI in design was related to Probabilistic Risk Assessment (PRA)


                                                 13
2009/2010 Potential Agency Systemic Issues and




                                                                            PM Challenge – 2011
Action Items
                                                  2009          2010
Potential Agency Systemic Issues                   44            21
                                     Closed         7             2
                           Work in Progress        34            19
                             Not Addressed          3             0
                  Proposed for Elevation to         0             0
                Headquarters Forum (action
                                required)**
Action Items*                                      56            25
                                     Closed        30             0
                           Work in Progress        25            25
                             Not Addressed          1             0
 *For each issue, an action plan was developed that has at least 1 action
 item
 **In October 2010, the Pressure Vessel Systems and Software
 Assurance/Engineering concerns were addressed at the Headquarters’
 forum as “Information Only”          14
PM Challenge – 2011
Backup Information




                15
PM Challenge – 2011
Online Audit Information
   Integrated Audit Schedule available at http://secureworkgroups.grc.nasa.gov/ifo-
    sa?go=333384, http://secureworkgroups.grc.nasa.gov/redaa?go=424238, and
    http://secureworkgroups.grc.nasa.gov/qaar?go=434005
   Integrated Audit Schedule also available at
      – OSMA homepage http://www.hq.nasa.gov/office/codeq
      – Agency Calendar http://aci.nssc.nasa.gov/index.cfm?event=monthView
   Milestone Templates defining the audit process
    http://secureworkgroups.grc.nasa.gov/ifo-sa?go=344812 and
    http://secureworkgroups.grc.nasa.gov/qaar?go=440698
   All Centers (designated personnel) have access to their own and other Centers’
    audit data as well as best practices (except JPL)
    http://secureworkgroups.grc.nasa.gov/ifo-sa?go=z51072 ,
    http://secureworkgroups.grc.nasa.gov/ips-audit?go=z65494,
    http://secureworkgroups.grc.nasa.gov/redaa?go=z67204 and
    http://secureworkgroups.grc.nasa.gov/qaar?go=z58387
   Annual Audit Report – audit and analysis results
    http://secureworkgroups.grc.nasa.gov/nsc-audit-assmt-ows?go=393554
   Annual AAO Workshop – potential Agency systemic issues, work towards
    compliance http://secureworkgroups.grc.nasa.gov/nsc-audit-assmt-
    ows?go=z56696

                                            16
Audit Trends: Electrical Safety




                                                                                                                                                                  PM Challenge – 2011
  (Based on Total Number of Noncompliances)
             Percent/Number of Total Noncompliances by
                  IFO Safety Audit Functional Area                                     Percent/Number of Total Noncompliances by IFO Safety
                                                                                               Audit Electrical Safety Functional Area
70.0% 61.1% / 824                                                            35.0%
                                                                                      32.9%/271
60.0%
50.0%                                                                        30.0%
40.0%
30.0%                                                                        25.0%
                 16% / 216
20.0%                                                                                     18.7%/154
                          7.56% / 102 7.2%/97 5.63%/76                       20.0%
10.0%                                                  2.52%/34                                   15.4%/127
 0.0%
                                                                             15.0%
        Electrical   PVS   Facility   LDE     Mishap      Fire                                          11.7% /96
         Safety            System            Reporting Protection                                             10.2%/84
                                                                             10.0%
                           Safety
                                                                                                                    5.3%/44
                                                                             5.0%                                        2.1%/17
                                                                                                                               1.1%/9 .8%/7 0.6%/50.6%/50.6%/5
                                                                             0.0%


          Percent/Number of Total Noncompliances by IFO
         Safety Audit Electrical Safety Functional Area with
        Potential Systemic Issues across Centers by Clause
35.0%    32.9%/271
30.0%

25.0%
               18.7%/154
20.0%
                       15.4%/127
15.0%                          11.7%/96
10.0%
                                       10.2%/84                                                        ANSI – American National Standards Institute
                                                  5.3%/44                                              NEC – National Electrical Code
5.0%                                                        2.1%/17 1.1%/9                             NESC – National Electric Safety Code
0.0%                                                                                                   IEEE – Institute of Electrical and Electronics Engineers
                                                                                                       NFPA – National Fire Protection Agency
                                                                                                       OSHA – Occupational Safety and Health Administration



                                                                                 17
Audit Trends: Electrical Safety




                                                                                                                                                                                                                          PM Challenge – 2011
             Potential Systemic Issues
                                          Potential Systemic Issues: Details by Clause/Paragraph
                            60
                                                                                                                                52
 Number of Noncompliances




                            50   46
                                                                                                                                                                                     40
                            40        37 35                                                     37 37

                            30                                                                                                                                26
                                              24
                                                                                                        22                                                         22
                                                                                                                                                                                          20
                            20                     17                                                                                16
                                                        14 14                                                                             14                                                           13
                                                                11                                                                             12                       12
                                                                                                             10 11                                                                             9
                                                                     7 6 6                                           8 8                            8
                            10                                             5 5 4                                            6                                                5 5 4                          6
                                                                                 3 3 3                                                                  5 4                                        4            4 3 5 5

                            0

                                                                                   Percent/Number of Total Noncompliances by IFO Safety Audit Electrical Safety Functional
                                                                                                  Area with Agency Potential Systemic Issues by Clause

                                                                          35.0%                               Clause/Paragraph
                                                                                     32.9%/271
                                                                          30.0%
.147(c)(5) Protective materials and hardware                                 .147(f)(1) Testing or positioning                  7.4.6 Certification Requirements                                        29 CFR 1910.147
                                                                          25.0%
.147(c)(6) Periodic inspection                                               .303 Installation and use                          7.3 Plan/Implement-Safety Training Program                              29 CFR 1910
.147(c)(4) Energy control procedure                                          .269        18.7%/154
                                                                          20.0% Safety of power gen, trans, and dist            3.6.1 Electrical Safety
                                                                                                      15.4%/127                                                                                         NEC
.147(c)(7) Training and communication                                        .146 Employee protection-confined spaces   3.8.2 Hazardous Operations
                                                                          15.0%                                11.7%/96 3.17.4 Confined Spaces
.147(f)(3) Group lockout or tagout                                           .335 Personal protective equipment                                                                                         NPR 8715.3
                                                                                                                      10.2%/84
.147(c)(3) Full employee protection                                       10.0% Flexible cords and cables
                                                                             .305                                       8.3.1 Facility safety
                                                                                                                                               5.3%/44                                                  NFPA 70E
.147(e)(3) Lockout or tagout devices removal                               5.0% Use of Equipment
                                                                             .334                                               130 Electrical work hazards
                                                                                                                                                         2.1%/17
                                                                                                                                                             1.1%/9                                     NESC&IEEE
.147(b) Definitions to section                                               .137 Electrical Protective Equipment               400 General requirements- electrical installs
                                                                           0.0%
.147(f)(2) Outside personnel (contractors, etc.)                             .332 Training requirements                         110 General requirements-electrical safety                              ASTM F496
.147(a)(1) Servicing and maintenance                                         110 Requirements for electrical installations      120 Electrically safe work
                                                                                                                                                                                                        ANSI
.147(a)(3) Purpose                                                           408 Switch boards and panel boards                 110A Necessary description for safety signs
.147 Control of hazardous energy                                             400 Flexible cords and cables                      180B11 Safety sign application
.147(f)(4) Shift or personnel changes                                        314 Electrical devices                             146B Safety signs for battery room
.147(c)(2) Lockout/tagout                                                    406 Receptacles, cords and plugs                   .445 Protective grounds
.147(a)(2) Application                                                       300 Wiring Methods and Materials                   7.1Dimensions
.147(d)(6) Verification of isolation                                         348 Flexible metal conduit                         .1-.5 Obeyance of Safety Signage
                                                                                                                       18

Más contenido relacionado

La actualidad más candente

Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petzeNASAPMC
 
Healy edward
Healy edwardHealy edward
Healy edwardNASAPMC
 
Armstrong
ArmstrongArmstrong
ArmstrongNASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidyNASAPMC
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonceNASAPMC
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran websterNASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliottNASAPMC
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susanNASAPMC
 
Jenks.ken
Jenks.kenJenks.ken
Jenks.kenNASAPMC
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.rNASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinalNASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.bethNASAPMC
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrongNASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbleyNASAPMC
 
Blythe ortiz7120 5e handbooks 2 15-2012 final
Blythe ortiz7120 5e handbooks 2 15-2012 finalBlythe ortiz7120 5e handbooks 2 15-2012 final
Blythe ortiz7120 5e handbooks 2 15-2012 finalNASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson markNASAPMC
 

La actualidad más candente (20)

Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
 
Healy edward
Healy edwardHealy edward
Healy edward
 
Armstrong
ArmstrongArmstrong
Armstrong
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonce
 
Corcoran webster
Corcoran websterCorcoran webster
Corcoran webster
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Semancik.susan
Semancik.susanSemancik.susan
Semancik.susan
 
Jenks.ken
Jenks.kenJenks.ken
Jenks.ken
 
Thomas.a.greathouse.r
Thomas.a.greathouse.rThomas.a.greathouse.r
Thomas.a.greathouse.r
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Ortiz
OrtizOrtiz
Ortiz
 
Charles.armstrong
Charles.armstrongCharles.armstrong
Charles.armstrong
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
 
Blythe ortiz7120 5e handbooks 2 15-2012 final
Blythe ortiz7120 5e handbooks 2 15-2012 finalBlythe ortiz7120 5e handbooks 2 15-2012 final
Blythe ortiz7120 5e handbooks 2 15-2012 final
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 

Destacado

Hoffman kohut
Hoffman kohutHoffman kohut
Hoffman kohutNASAPMC
 
Gavin.tom
Gavin.tomGavin.tom
Gavin.tomNASAPMC
 
Kahn.theodore
Kahn.theodoreKahn.theodore
Kahn.theodoreNASAPMC
 
Barbra.calvert
Barbra.calvertBarbra.calvert
Barbra.calvertNASAPMC
 
Jeff davis
Jeff davisJeff davis
Jeff davisNASAPMC
 
Hopkins.marghi
Hopkins.marghiHopkins.marghi
Hopkins.marghiNASAPMC
 
Lyver.john
Lyver.johnLyver.john
Lyver.johnNASAPMC
 
Backup ronniegoodinchampionsinventors
Backup ronniegoodinchampionsinventorsBackup ronniegoodinchampionsinventors
Backup ronniegoodinchampionsinventorsNASAPMC
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.jNASAPMC
 
Terry.cooke davies
Terry.cooke daviesTerry.cooke davies
Terry.cooke daviesNASAPMC
 
Ronnie goodin.ronnie contracts
Ronnie goodin.ronnie contractsRonnie goodin.ronnie contracts
Ronnie goodin.ronnie contractsNASAPMC
 
Taylor.ron
Taylor.ronTaylor.ron
Taylor.ronNASAPMC
 
Kerby.jerald
Kerby.jeraldKerby.jerald
Kerby.jeraldNASAPMC
 
Arceneaux
ArceneauxArceneaux
ArceneauxNASAPMC
 
Ann over
Ann overAnn over
Ann overNASAPMC
 
Dezfuli youngblood
Dezfuli youngbloodDezfuli youngblood
Dezfuli youngbloodNASAPMC
 
Gill.paul
Gill.paulGill.paul
Gill.paulNASAPMC
 
Krasa.lee
Krasa.leeKrasa.lee
Krasa.leeNASAPMC
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012NASAPMC
 
Augustin.debbie
Augustin.debbieAugustin.debbie
Augustin.debbieNASAPMC
 

Destacado (20)

Hoffman kohut
Hoffman kohutHoffman kohut
Hoffman kohut
 
Gavin.tom
Gavin.tomGavin.tom
Gavin.tom
 
Kahn.theodore
Kahn.theodoreKahn.theodore
Kahn.theodore
 
Barbra.calvert
Barbra.calvertBarbra.calvert
Barbra.calvert
 
Jeff davis
Jeff davisJeff davis
Jeff davis
 
Hopkins.marghi
Hopkins.marghiHopkins.marghi
Hopkins.marghi
 
Lyver.john
Lyver.johnLyver.john
Lyver.john
 
Backup ronniegoodinchampionsinventors
Backup ronniegoodinchampionsinventorsBackup ronniegoodinchampionsinventors
Backup ronniegoodinchampionsinventors
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.j
 
Terry.cooke davies
Terry.cooke daviesTerry.cooke davies
Terry.cooke davies
 
Ronnie goodin.ronnie contracts
Ronnie goodin.ronnie contractsRonnie goodin.ronnie contracts
Ronnie goodin.ronnie contracts
 
Taylor.ron
Taylor.ronTaylor.ron
Taylor.ron
 
Kerby.jerald
Kerby.jeraldKerby.jerald
Kerby.jerald
 
Arceneaux
ArceneauxArceneaux
Arceneaux
 
Ann over
Ann overAnn over
Ann over
 
Dezfuli youngblood
Dezfuli youngbloodDezfuli youngblood
Dezfuli youngblood
 
Gill.paul
Gill.paulGill.paul
Gill.paul
 
Krasa.lee
Krasa.leeKrasa.lee
Krasa.lee
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012
 
Augustin.debbie
Augustin.debbieAugustin.debbie
Augustin.debbie
 

Similar a Lau.cheevon

Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.jamesNASAPMC
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahaniNASAPMC
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.cNASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarieNASAPMC
 
Noneman.steven
Noneman.stevenNoneman.steven
Noneman.stevenNASAPMC
 
Framework for Analyzing Public Investment Management
Framework for Analyzing Public Investment ManagementFramework for Analyzing Public Investment Management
Framework for Analyzing Public Investment Managementicgfmconference
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
raytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning SessionraytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning Sessionfinance12
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 
oakland county parks cost recovery
oakland county parks cost recoveryoakland county parks cost recovery
oakland county parks cost recoveryocparks
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Lean Administration And Fast Closing
Lean Administration And Fast ClosingLean Administration And Fast Closing
Lean Administration And Fast Closingggiacoma
 
Lean Six Sigma Green Belt Services Certification Brochure
Lean Six Sigma Green Belt Services Certification BrochureLean Six Sigma Green Belt Services Certification Brochure
Lean Six Sigma Green Belt Services Certification BrochurePartner
 
Vestas QPEX Plan
Vestas QPEX PlanVestas QPEX Plan
Vestas QPEX PlanPeter Zhou
 
Oiac It Audit Wo Cartoons
Oiac It Audit Wo CartoonsOiac It Audit Wo Cartoons
Oiac It Audit Wo Cartoonsecarrow
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyersNASAPMC
 

Similar a Lau.cheevon (20)

Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.c
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 
Noneman.steven
Noneman.stevenNoneman.steven
Noneman.steven
 
Framework for Analyzing Public Investment Management
Framework for Analyzing Public Investment ManagementFramework for Analyzing Public Investment Management
Framework for Analyzing Public Investment Management
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
raytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning SessionraytheonInvestor Conference Presentation - Morning Session
raytheonInvestor Conference Presentation - Morning Session
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
oakland county parks cost recovery
oakland county parks cost recoveryoakland county parks cost recovery
oakland county parks cost recovery
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
P742
P742P742
P742
 
P742
P742P742
P742
 
Lean Administration And Fast Closing
Lean Administration And Fast ClosingLean Administration And Fast Closing
Lean Administration And Fast Closing
 
Lean Six Sigma Green Belt Services Certification Brochure
Lean Six Sigma Green Belt Services Certification BrochureLean Six Sigma Green Belt Services Certification Brochure
Lean Six Sigma Green Belt Services Certification Brochure
 
Vestas QPEX Plan
Vestas QPEX PlanVestas QPEX Plan
Vestas QPEX Plan
 
Oiac It Audit Wo Cartoons
Oiac It Audit Wo CartoonsOiac It Audit Wo Cartoons
Oiac It Audit Wo Cartoons
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyers
 

Más de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Más de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Último

Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingScyllaDB
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandIES VE
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfFIDO Alliance
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfFIDO Alliance
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctBrainSell Technologies
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Paige Cruz
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...ScyllaDB
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024Stephen Perrenod
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightSafe Software
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data SciencePaolo Missier
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераMark Opanasiuk
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform EngineeringMarcus Vechiato
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...FIDO Alliance
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewDianaGray10
 

Último (20)

Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and Insight
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data Science
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 

Lau.cheevon

  • 1. NSC Audits & Assessments Workshop - September 9 - 10, 2009 National Aeronautics and Space Administration Safety & Mission Assurance (SMA) Audits: Here to Help you February 2011 PM Challenge Cheevon (Mi-Mi) B. Lau Director, NSC Audits and Assessments Office (AAO) cheevon.b.lau@nasa.gov (440) 962 – 3093
  • 2. PM Challenge – 2011 2 Agenda
  • 3. PM Challenge – 2011 Background: S&MA Audits  OSMA/NSC AAO is responsible for conducting the following: – Institutional/Facility/Operational (IFO) Safety Audit: – Independent verification that institutions, facilities, and operations at each Center, Component Facility, and JPL are compliance with applicable Agency’s SMA requirements as well as Federal, State, and local OSHA requirements – Requirements Flow-down and SMA Engineering Design Audits and Assessments (REDAA)*: – Independent verification of SMA requirements flow-down to Centers, Component Facilities, and JPL; Programs/Projects down to NASA contracts – Independent evaluation of SMA requirements implemented on Programs/Projects for system safety, reliability/maintainability, risk analysis and management – Quality Audit, Assessment, and Review (QAAR)*: – Independent verification that Center, Component Facility, JPL, and Programs/Projects down to the suppliers are compliant with SMA quality requirements – Independent Assessments as requested *REDAA and QAAR activities began in FY10 (result of restructuring the scope of the audit program); Replaced the Institutional Programmatic Support (IPS) and Programmatic Audit and Review (PA&R) 3
  • 4. Background: S&MA Audits (continue) PM Challenge – 2011  Before 2009, OSMA/NSC AAO focus was on conducting audits and returning to the Center every 2-3 years  Starting in 2009, OSMA/NSC AAO focus is to conduct audits –and- to help the Center prior to and after the audits 4
  • 5. 2009/2010 Improvements and Collaboration PM Challenge – 2011 •2 year audit schedule: online Increased collaboration with stakeholders •Audit process defined/documented: online COMMUNICATIONS •Customer feedback •Annual Audit report: online •Annual AAO Workshop: online and improved audit processes KNOWLEDGE TRANSFER •Audit data: online ACROSS NASA •Best practices: online •Audit cards: consistency, quality, etc. •Restructured/renamed IPS and PA&R to have a EVOLUTION: PROCESS clear focus and to line up with Program/Project Lifecycle IMPROVEMENT •Corrective Action Plan (CAP): content, feedback •Real-time audit tool •Agency Systemic Issues ANALYZE AUDIT DATA – RISK •Action Plan: update quarterly •Risk Factors REDUCTION •Correlating mishaps to audit findings •Repeat audit findings 5
  • 6. AAO Organization: Personnel PM Challenge – 2011 Cheevon (Mi-Mi) Lau Audits & Assessments Director (NC) Paul Boldon REDAA * Brad Kaustinen Robert Cross Manager COTR Analyst, Auditor (located at HQ) (located at NSC) (located at JSC) Brian Jackson QAAR* Michael Milbert Manager Analyst, Auditor (located at NSC) (located at KSC) Arthur R. Lee IFO Safety Audit Manager (located at HQ) Note: For audits, Center and OSMA personnel comprise the team * Replaced Institutional Programmatic Support (IPS) and Programmatic Audits and Review (PA&R) 6
  • 7. PM Challenge – 2011 Yearly AAO Workshop (September timeframe)  Key Focus: – Identify the Potential Systemic Issues (noncompliances for a specific requirement that occur across 3 or more Centers) – Address potential solutions and develop action plans • Session is co-chaired by OSMA requirements owner and OSMA/NSC Audit Manager – Discuss Best Practices tied to potential Agency systemic issues – Recommend list of Agency systemic issues to bring forward to an appropriate Headquarters Forum • Present to Headquarters in February and October  In 2010, 130 Attendees from: – All NASA Centers, including JPL – Headquarters (OSMA, Procurement, OCHMO, OCE, OICMS, OSI) – NESC, NSC 7
  • 8. PM Challenge – 2011 IFO Safety Audit: Analysis of the Noncompliances 8
  • 9. PM Challenge – 2011 IFO Safety Audit Findings: Analysis  Reviewed audit data from FY2007 - FY2010 - 2010 - 2009 - 2008 - 2007  Total number of noncompliances reviewed: 1,349  Total number of noncompliances related to Potential Systemic Issues (PSI): 930 (69%)  Majority of the IFO Safety Audit’s PSI were in Electrical Safety 9
  • 10. PM Challenge – 2011 QAAR: Analysis of the Noncompliances 10
  • 11. PM Challenge – 2011 QAAR Audit Findings: Analysis  Reviewed audit data from FY2007 - FY2010 - 2010 - 2009 - 2008 - 2007  Total number of noncompliances reviewed: 244  Total number of noncompliances related to PSI: 182 (75%)  Majority of the QAAR’s PSI were in Inspection/Work Records * NOTE: Previous audit data was removed from calculation 11
  • 12. PM Challenge – 2011 REDAA: Analysis of the Noncompliances 12
  • 13. PM Challenge – 2011 REDAA (IPS Design) Audit Findings: Analysis  Reviewed IPS design audit data from FY2007 - FY2009 - 2009 - 2008 - 2007  Total number of design noncompliances reviewed: 15  Total number of design noncompliances related to PSI: 6 (40%)  Majority of the PSI in design was related to Probabilistic Risk Assessment (PRA) 13
  • 14. 2009/2010 Potential Agency Systemic Issues and PM Challenge – 2011 Action Items 2009 2010 Potential Agency Systemic Issues 44 21 Closed 7 2 Work in Progress 34 19 Not Addressed 3 0 Proposed for Elevation to 0 0 Headquarters Forum (action required)** Action Items* 56 25 Closed 30 0 Work in Progress 25 25 Not Addressed 1 0 *For each issue, an action plan was developed that has at least 1 action item **In October 2010, the Pressure Vessel Systems and Software Assurance/Engineering concerns were addressed at the Headquarters’ forum as “Information Only” 14
  • 15. PM Challenge – 2011 Backup Information 15
  • 16. PM Challenge – 2011 Online Audit Information  Integrated Audit Schedule available at http://secureworkgroups.grc.nasa.gov/ifo- sa?go=333384, http://secureworkgroups.grc.nasa.gov/redaa?go=424238, and http://secureworkgroups.grc.nasa.gov/qaar?go=434005  Integrated Audit Schedule also available at – OSMA homepage http://www.hq.nasa.gov/office/codeq – Agency Calendar http://aci.nssc.nasa.gov/index.cfm?event=monthView  Milestone Templates defining the audit process http://secureworkgroups.grc.nasa.gov/ifo-sa?go=344812 and http://secureworkgroups.grc.nasa.gov/qaar?go=440698  All Centers (designated personnel) have access to their own and other Centers’ audit data as well as best practices (except JPL) http://secureworkgroups.grc.nasa.gov/ifo-sa?go=z51072 , http://secureworkgroups.grc.nasa.gov/ips-audit?go=z65494, http://secureworkgroups.grc.nasa.gov/redaa?go=z67204 and http://secureworkgroups.grc.nasa.gov/qaar?go=z58387  Annual Audit Report – audit and analysis results http://secureworkgroups.grc.nasa.gov/nsc-audit-assmt-ows?go=393554  Annual AAO Workshop – potential Agency systemic issues, work towards compliance http://secureworkgroups.grc.nasa.gov/nsc-audit-assmt- ows?go=z56696 16
  • 17. Audit Trends: Electrical Safety PM Challenge – 2011 (Based on Total Number of Noncompliances) Percent/Number of Total Noncompliances by IFO Safety Audit Functional Area Percent/Number of Total Noncompliances by IFO Safety Audit Electrical Safety Functional Area 70.0% 61.1% / 824 35.0% 32.9%/271 60.0% 50.0% 30.0% 40.0% 30.0% 25.0% 16% / 216 20.0% 18.7%/154 7.56% / 102 7.2%/97 5.63%/76 20.0% 10.0% 2.52%/34 15.4%/127 0.0% 15.0% Electrical PVS Facility LDE Mishap Fire 11.7% /96 Safety System Reporting Protection 10.2%/84 10.0% Safety 5.3%/44 5.0% 2.1%/17 1.1%/9 .8%/7 0.6%/50.6%/50.6%/5 0.0% Percent/Number of Total Noncompliances by IFO Safety Audit Electrical Safety Functional Area with Potential Systemic Issues across Centers by Clause 35.0% 32.9%/271 30.0% 25.0% 18.7%/154 20.0% 15.4%/127 15.0% 11.7%/96 10.0% 10.2%/84 ANSI – American National Standards Institute 5.3%/44 NEC – National Electrical Code 5.0% 2.1%/17 1.1%/9 NESC – National Electric Safety Code 0.0% IEEE – Institute of Electrical and Electronics Engineers NFPA – National Fire Protection Agency OSHA – Occupational Safety and Health Administration 17
  • 18. Audit Trends: Electrical Safety PM Challenge – 2011 Potential Systemic Issues Potential Systemic Issues: Details by Clause/Paragraph 60 52 Number of Noncompliances 50 46 40 40 37 35 37 37 30 26 24 22 22 20 20 17 16 14 14 14 13 11 12 12 10 11 9 7 6 6 8 8 8 10 5 5 4 6 5 5 4 6 3 3 3 5 4 4 4 3 5 5 0 Percent/Number of Total Noncompliances by IFO Safety Audit Electrical Safety Functional Area with Agency Potential Systemic Issues by Clause 35.0% Clause/Paragraph 32.9%/271 30.0% .147(c)(5) Protective materials and hardware .147(f)(1) Testing or positioning 7.4.6 Certification Requirements 29 CFR 1910.147 25.0% .147(c)(6) Periodic inspection .303 Installation and use 7.3 Plan/Implement-Safety Training Program 29 CFR 1910 .147(c)(4) Energy control procedure .269 18.7%/154 20.0% Safety of power gen, trans, and dist 3.6.1 Electrical Safety 15.4%/127 NEC .147(c)(7) Training and communication .146 Employee protection-confined spaces 3.8.2 Hazardous Operations 15.0% 11.7%/96 3.17.4 Confined Spaces .147(f)(3) Group lockout or tagout .335 Personal protective equipment NPR 8715.3 10.2%/84 .147(c)(3) Full employee protection 10.0% Flexible cords and cables .305 8.3.1 Facility safety 5.3%/44 NFPA 70E .147(e)(3) Lockout or tagout devices removal 5.0% Use of Equipment .334 130 Electrical work hazards 2.1%/17 1.1%/9 NESC&IEEE .147(b) Definitions to section .137 Electrical Protective Equipment 400 General requirements- electrical installs 0.0% .147(f)(2) Outside personnel (contractors, etc.) .332 Training requirements 110 General requirements-electrical safety ASTM F496 .147(a)(1) Servicing and maintenance 110 Requirements for electrical installations 120 Electrically safe work ANSI .147(a)(3) Purpose 408 Switch boards and panel boards 110A Necessary description for safety signs .147 Control of hazardous energy 400 Flexible cords and cables 180B11 Safety sign application .147(f)(4) Shift or personnel changes 314 Electrical devices 146B Safety signs for battery room .147(c)(2) Lockout/tagout 406 Receptacles, cords and plugs .445 Protective grounds .147(a)(2) Application 300 Wiring Methods and Materials 7.1Dimensions .147(d)(6) Verification of isolation 348 Flexible metal conduit .1-.5 Obeyance of Safety Signage 18