Application of Project Simulation to
    Optimize Ares I–X Upper Stage
 Simulator Project Implementation

          APPEL PM Challenge Conference
                          February 2008

                   Vince Bilardo
     NASA Glenn Research Center

                      Chuck Sander
                              ePM

                      George Culver
                              SAIC
Ares I-X Mission – First Ares I Test Flight!
Glenn Research Center



                    CM/LAS
                                   Spacecraft Adapter and
                    Simulator
                                      Service Module
                                        Simulators
     USS to CMLAS
     Interface
                                     Upper Stage

            Upper Stage
             Simulator




                                    RoCS
                                    USS to RoCS Interface
         Frustum
                                    USS to FS Interface

            Avionics
                                    Forward Skirts
           (internal)

                                    Simulated fifth segment


                        FS

                                 Four-segment motor




PMC 2008                               Ares I-X Upper Stage Simulator Team
Glenn Research Center




PMC 2008                Ares I-X Upper Stage Simulator Team   3
Purpose of Analysis
Glenn Research Center



  1. SAIC and ePM were tasked to investigate the Upper
     Stage Simulator manufacturing processes.
         a. ePM looked organizationally across entire manufacturing process.
         b. SAIC focused on manufacturing process details in GRC’s Ares
            Manufacturing Facility (AMF).

  2. Following approach was used by both teams to
     conduct analysis:
         a. Solicited and received process flow and resource use data from
            customer (NASA USS Project Team).
         b. Used Simulation techniques to model process execution.
               1) ePM used organizational simulation techniques with NASA SimVision® .
               2) SAIC used SIMUL8 Discrete Event Simulation (DES) software.
         c. Iteratively revised models as process matured.
               1) NASA SimVision informing the DES model and vice versa.
               2) Modeling workshops informed the project team and the modelers.

PMC 2008                         Ares I-X Upper Stage Simulator Team                     4
DES Model of USS Manufacturing Process
Glenn Research Center

 Segment manufacturing process modeled with SIMUL8 DES software.
                                                                  Resources



    Flange Mfg Processes               Segment Build Processes




               Skin Mfg                                                       Paint-
               Processes                                                      ing and
                                                                              Secdry
                                                                              Struct
                                                                              Install




PMC 2008                    Ares I-X Upper Stage Simulator Team                     5
Results: Sensitivity to Number of Workers
Glenn Research Center


  1. Process is highly sensitive to                                   Welders
                                                        Fabri-                  Charge
     changes in number of both                          cators                  Duration
     fabricators and welders.                                                   (days)
  2. To meet deadline with
                                                          10            6         56.6
     minimum personnel, data
     suggests good baseline with:                          8            6         57.9
         a. 8 Fabricators per shift                        6            6         61.7
         b. 6 Welders per shift                           10            5         58.4
                                                           8            5         59.6
                                                           6            5         64.8
                                                          10            4         61.4
                                                           8            4         62.4
                                                           6            4         68.0

                                                           Each Charge duration reflects
                                                          average of 50 independent trials
PMC 2008                        Ares I-X Upper Stage Simulator Team                          6
Investigation of Non-Destructive Inspection
Glenn Research Center

 Mandatory Inspection Points (MIPs) highlighted.




PMC 2008                    Ares I-X Upper Stage Simulator Team   7
Results: NDE Inspection Sensitivities
Glenn Research Center


  1. This sensitivity analysis assesses NDE defect rate, NDE repair
     time per defect, and NDE Inspection time.
         a. Subsequent charts show specific sensitivities for each factor.
  2. Following results are average of 50 trials each of 72 cases
     obtained varying:
         a. NDE defect rate between 0.1% and 10%.
         b. NDE repair time at 1, 2, 4, or 10 hours.
         c. NDE inspection time at 8, 24 or 40 hours.
  3. Aggregate results indicate Defect Rate is driving factor.
         a. Tornado Plot below indicates Defect Rate has higher relative importance.
         b. Model-Fit of all data indicates Defect Rate has highest coefficient.
                                                         Relative Effect of Inputs on System Duration
                                                          Pareto Plot of Estimates
                                                          Term                 t Ratio
  1. System Duration is 1,193 hrs                         NDEDefectRate    10.702772
                                                          NDERepairTime     7.211215
           + 159 hrs per defect percent                   NDEInspectTime    2.517328
           + 106 hrs per NDE repair hour
           + 10 hrs per NDE inspection hour
  2. Defect rate affects the system duration more than the other variables.

PMC 2008                           Ares I-X Upper Stage Simulator Team                                  8
Result: NDE Sensitivities to Baseline
Glenn Research Center


  1. These charts show impact of                                                                                                                 NDE Defect Rate Sensitivity


     changing each NDE factor and                                                                                        3500

                                                                                                                         3000
     holding others factors constant




                                                                                                      Duration (hours)
                                                                                                                         2500
     to their baseline.                                                                                                  2000

  2. Model Baseline includes:                                                                                            1500

                          a.       NDE Defect Rate = 5%                                                                  1000

                          b.       NDE Inspection = 8 hrs                                                                 500

                          c.       NDE Repair per Defect = 4 hrs                                                            0
                                                                                                                                0%        2%          4%           6%          8%             10%        12%
                          d.       Baseline shown with markers in                                                                                          NDE Defect Rate

                                   each chart                                                                                            Total Duration     Inspect Duration        Repair Duration



                                            NDE Repair Time Sensitivity                                                                        NDE Inspection Time Sensitivity

                        4000                                                                                             3000

                        3500
                                                                                                                         2500
                        3000
     Duration (hours)




                                                                                                      Duration (hours)
                                                                                                                         2000
                        2500

                        2000                                                                                             1500

                        1500
                                                                                                                         1000
                        1000
                                                                                                                          500
                         500

                           0                                                                                                0
                               0        2           4         6            8           10        12                             0    5         10     15      20        25     30        35         40    45
                                             NDE Repair Time per Defect (hours)                                                                       Inspection Time (hours)

                                      Total Duration    Inspect Duration       Repair Duration                                           Total Duration     Inspect Duration    Repair Duration

PMC 2008                                                                   Ares I-X Upper Stage Simulator Team                                                                                                 9
DES Results and Conclusions
Glenn Research Center



  1. Process is sensitive to number of fabricators and
     welders.
         a. Suggested baseline using 8 fabricators and 6 welders per shift.
  2. Flanges, Gussets, & Lugs process matches closely to
     planned schedule when two full shifts are used.
  3. Segment manufacturing Charges match closely to
     planned schedule when two full shifts are used.
  4. Previous analysis has shown process is sensitive to
     NDE defect rate, NDE repair time, and NDE inspection
     time.
         a. Each percent of NDE defect rate adds 159 hours to process
            duration.
         b. NDE Repair time increasing by 1 hour adds 106 hours to process
            duration.
         c. NDE Inspection time increasing by 1 hour adds 10 hours to process
            duration.
PMC 2008                     Ares I-X Upper Stage Simulator Team              10
What SimVision® Does
Glenn Research Center
                         Inputs             Model Simulation                  Predictions
                        Milestones
                                                                               Critical Path
               Activities and
                                                                               Project schedule
     Activity Characteristics

                                                                               Cost (Work, rework, wait,
      Activity Dependencies
                                                                               communication)

   Position Characteristics
                                                                               Quality Risks (Work,
                                                                               communication)
                   Organization

                                                                               Position and people
             Task Assignment
                                                                               work load

                         Meetings                                  • Individual behavior
                                                                   • Organization theory
              Decision-Making Policy                               • Performance measures
                        Communication Policy                       • Discrete event simulation
                             Organizational Dynamics

      SimVision permits effective front loaded project design by facilitating planning and
      organizational design with meaningful scenario analysis.
PMC 2008                                Ares I-X Upper Stage Simulator Team                                11
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo
Vince.bilardo

Más contenido relacionado

La actualidad más candente (20)

Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.john
 
Tim.honeycutt
Tim.honeycuttTim.honeycutt
Tim.honeycutt
 
Costello kenneth
Costello kennethCostello kenneth
Costello kenneth
 
Dumbacher2012 pmchallenge
Dumbacher2012 pmchallengeDumbacher2012 pmchallenge
Dumbacher2012 pmchallenge
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Kapruch steve
Kapruch steveKapruch steve
Kapruch steve
 
Unger massey
Unger masseyUnger massey
Unger massey
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
 
Oberhettinger
OberhettingerOberhettinger
Oberhettinger
 
Ray.ronald
Ray.ronaldRay.ronald
Ray.ronald
 
Lawrence.jim
Lawrence.jimLawrence.jim
Lawrence.jim
 
DFR a case study using a physics of failure
DFR a case study using a physics of failure DFR a case study using a physics of failure
DFR a case study using a physics of failure
 
Schaible.dawn
Schaible.dawnSchaible.dawn
Schaible.dawn
 
Dfr Presentation
Dfr   PresentationDfr   Presentation
Dfr Presentation
 
Smith.marshall.bryant
Smith.marshall.bryantSmith.marshall.bryant
Smith.marshall.bryant
 
Mitchell.michael
Mitchell.michaelMitchell.michael
Mitchell.michael
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.rita
 
Rider.stephen
Rider.stephenRider.stephen
Rider.stephen
 
Shinn
ShinnShinn
Shinn
 

Destacado

Claunch.cathy
Claunch.cathyClaunch.cathy
Claunch.cathy
NASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
NASAPMC
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
NASAPMC
 
Inter mitchell
Inter mitchellInter mitchell
Inter mitchell
NASAPMC
 
Newman.steve
Newman.steveNewman.steve
Newman.steve
NASAPMC
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butler
NASAPMC
 
David.atwell
David.atwellDavid.atwell
David.atwell
NASAPMC
 
Sand.steven
Sand.stevenSand.steven
Sand.steven
NASAPMC
 
Book.steve
Book.steveBook.steve
Book.steve
NASAPMC
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
NASAPMC
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarick
NASAPMC
 
Terri tramel 01-27-12
Terri tramel 01-27-12Terri tramel 01-27-12
Terri tramel 01-27-12
NASAPMC
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
NASAPMC
 
Nick.chrissotimos
Nick.chrissotimosNick.chrissotimos
Nick.chrissotimos
NASAPMC
 
Rothenberg.joe
Rothenberg.joeRothenberg.joe
Rothenberg.joe
NASAPMC
 
Adesh.jain
Adesh.jainAdesh.jain
Adesh.jain
NASAPMC
 
Diaz franklin
Diaz franklinDiaz franklin
Diaz franklin
NASAPMC
 
Alfred mecum
Alfred mecumAlfred mecum
Alfred mecum
NASAPMC
 
John.baniszewski
John.baniszewskiJohn.baniszewski
John.baniszewski
NASAPMC
 
2012 02-22 rittweger orlando ipmc
2012 02-22 rittweger orlando ipmc2012 02-22 rittweger orlando ipmc
2012 02-22 rittweger orlando ipmc
NASAPMC
 

Destacado (20)

Claunch.cathy
Claunch.cathyClaunch.cathy
Claunch.cathy
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
 
Inter mitchell
Inter mitchellInter mitchell
Inter mitchell
 
Newman.steve
Newman.steveNewman.steve
Newman.steve
 
Sharyl butler
Sharyl butlerSharyl butler
Sharyl butler
 
David.atwell
David.atwellDavid.atwell
David.atwell
 
Sand.steven
Sand.stevenSand.steven
Sand.steven
 
Book.steve
Book.steveBook.steve
Book.steve
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
Sally godfreyheatherrarick
Sally godfreyheatherrarickSally godfreyheatherrarick
Sally godfreyheatherrarick
 
Terri tramel 01-27-12
Terri tramel 01-27-12Terri tramel 01-27-12
Terri tramel 01-27-12
 
Sandra smalley
Sandra smalleySandra smalley
Sandra smalley
 
Nick.chrissotimos
Nick.chrissotimosNick.chrissotimos
Nick.chrissotimos
 
Rothenberg.joe
Rothenberg.joeRothenberg.joe
Rothenberg.joe
 
Adesh.jain
Adesh.jainAdesh.jain
Adesh.jain
 
Diaz franklin
Diaz franklinDiaz franklin
Diaz franklin
 
Alfred mecum
Alfred mecumAlfred mecum
Alfred mecum
 
John.baniszewski
John.baniszewskiJohn.baniszewski
John.baniszewski
 
2012 02-22 rittweger orlando ipmc
2012 02-22 rittweger orlando ipmc2012 02-22 rittweger orlando ipmc
2012 02-22 rittweger orlando ipmc
 

Similar a Vince.bilardo

DesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudyDesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudy
Justin Hernandez
 
Periodic
PeriodicPeriodic
Periodic
visu64
 
Soft Error Study of ARM SoC at 28 Nanometers
Soft Error Study of ARM SoC at 28 NanometersSoft Error Study of ARM SoC at 28 Nanometers
Soft Error Study of ARM SoC at 28 Nanometers
Wojciech Koszek
 
Tempest scenariotests 20140512
Tempest scenariotests 20140512Tempest scenariotests 20140512
Tempest scenariotests 20140512
Masayuki Igawa
 
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
ijceronline
 

Similar a Vince.bilardo (20)

DesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudyDesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudy
 
FlexRay Product Days RTaW
FlexRay Product Days RTaWFlexRay Product Days RTaW
FlexRay Product Days RTaW
 
Automating the Configuration of the FlexRay Communication Cycle
Automating the Configuration of the FlexRay Communication CycleAutomating the Configuration of the FlexRay Communication Cycle
Automating the Configuration of the FlexRay Communication Cycle
 
Periodic
PeriodicPeriodic
Periodic
 
New Features in GeniE, DeepC and HydroD
New Features in GeniE, DeepC and HydroDNew Features in GeniE, DeepC and HydroD
New Features in GeniE, DeepC and HydroD
 
Soft Error Study of ARM SoC at 28 Nanometers
Soft Error Study of ARM SoC at 28 NanometersSoft Error Study of ARM SoC at 28 Nanometers
Soft Error Study of ARM SoC at 28 Nanometers
 
Cray HPC Environments for Leading Edge Simulations
Cray HPC Environments for Leading Edge SimulationsCray HPC Environments for Leading Edge Simulations
Cray HPC Environments for Leading Edge Simulations
 
LVTS Projects
LVTS ProjectsLVTS Projects
LVTS Projects
 
Presentation of the open source CFD code Code_Saturne
Presentation of the open source CFD code Code_SaturnePresentation of the open source CFD code Code_Saturne
Presentation of the open source CFD code Code_Saturne
 
Paper on experimental setup for verifying - "Slow Learners are Fast"
Paper  on experimental setup for verifying  - "Slow Learners are Fast"Paper  on experimental setup for verifying  - "Slow Learners are Fast"
Paper on experimental setup for verifying - "Slow Learners are Fast"
 
Challenges in Assessing Single Event Upset Impact on Processor Systems
Challenges in Assessing Single Event Upset Impact on Processor SystemsChallenges in Assessing Single Event Upset Impact on Processor Systems
Challenges in Assessing Single Event Upset Impact on Processor Systems
 
Qualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional SafetyQualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional Safety
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Tempest scenariotests 20140512
Tempest scenariotests 20140512Tempest scenariotests 20140512
Tempest scenariotests 20140512
 
Automatic Test Generation for Space
Automatic Test Generation for SpaceAutomatic Test Generation for Space
Automatic Test Generation for Space
 
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
 
Kubeinvaders & Chaos Engineering practices for Kubernetes-1.pdf
Kubeinvaders & Chaos Engineering practices for Kubernetes-1.pdfKubeinvaders & Chaos Engineering practices for Kubernetes-1.pdf
Kubeinvaders & Chaos Engineering practices for Kubernetes-1.pdf
 
Parallel Vector Tile-Optimized Library (PVTOL) Architecture-v3.pdf
Parallel Vector Tile-Optimized Library (PVTOL) Architecture-v3.pdfParallel Vector Tile-Optimized Library (PVTOL) Architecture-v3.pdf
Parallel Vector Tile-Optimized Library (PVTOL) Architecture-v3.pdf
 
Shanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and OptimisationShanghai Automotive - Application of Process Automation and Optimisation
Shanghai Automotive - Application of Process Automation and Optimisation
 
Aniruddha_More_Resume
Aniruddha_More_ResumeAniruddha_More_Resume
Aniruddha_More_Resume
 

Más de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
NASAPMC
 

Más de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 

Vince.bilardo

  • 1. Application of Project Simulation to Optimize Ares I–X Upper Stage Simulator Project Implementation APPEL PM Challenge Conference February 2008 Vince Bilardo NASA Glenn Research Center Chuck Sander ePM George Culver SAIC
  • 2. Ares I-X Mission – First Ares I Test Flight! Glenn Research Center CM/LAS Spacecraft Adapter and Simulator Service Module Simulators USS to CMLAS Interface Upper Stage Upper Stage Simulator RoCS USS to RoCS Interface Frustum USS to FS Interface Avionics Forward Skirts (internal) Simulated fifth segment FS Four-segment motor PMC 2008 Ares I-X Upper Stage Simulator Team
  • 3. Glenn Research Center PMC 2008 Ares I-X Upper Stage Simulator Team 3
  • 4. Purpose of Analysis Glenn Research Center 1. SAIC and ePM were tasked to investigate the Upper Stage Simulator manufacturing processes. a. ePM looked organizationally across entire manufacturing process. b. SAIC focused on manufacturing process details in GRC’s Ares Manufacturing Facility (AMF). 2. Following approach was used by both teams to conduct analysis: a. Solicited and received process flow and resource use data from customer (NASA USS Project Team). b. Used Simulation techniques to model process execution. 1) ePM used organizational simulation techniques with NASA SimVision® . 2) SAIC used SIMUL8 Discrete Event Simulation (DES) software. c. Iteratively revised models as process matured. 1) NASA SimVision informing the DES model and vice versa. 2) Modeling workshops informed the project team and the modelers. PMC 2008 Ares I-X Upper Stage Simulator Team 4
  • 5. DES Model of USS Manufacturing Process Glenn Research Center Segment manufacturing process modeled with SIMUL8 DES software. Resources Flange Mfg Processes Segment Build Processes Skin Mfg Paint- Processes ing and Secdry Struct Install PMC 2008 Ares I-X Upper Stage Simulator Team 5
  • 6. Results: Sensitivity to Number of Workers Glenn Research Center 1. Process is highly sensitive to Welders Fabri- Charge changes in number of both cators Duration fabricators and welders. (days) 2. To meet deadline with 10 6 56.6 minimum personnel, data suggests good baseline with: 8 6 57.9 a. 8 Fabricators per shift 6 6 61.7 b. 6 Welders per shift 10 5 58.4 8 5 59.6 6 5 64.8 10 4 61.4 8 4 62.4 6 4 68.0 Each Charge duration reflects average of 50 independent trials PMC 2008 Ares I-X Upper Stage Simulator Team 6
  • 7. Investigation of Non-Destructive Inspection Glenn Research Center Mandatory Inspection Points (MIPs) highlighted. PMC 2008 Ares I-X Upper Stage Simulator Team 7
  • 8. Results: NDE Inspection Sensitivities Glenn Research Center 1. This sensitivity analysis assesses NDE defect rate, NDE repair time per defect, and NDE Inspection time. a. Subsequent charts show specific sensitivities for each factor. 2. Following results are average of 50 trials each of 72 cases obtained varying: a. NDE defect rate between 0.1% and 10%. b. NDE repair time at 1, 2, 4, or 10 hours. c. NDE inspection time at 8, 24 or 40 hours. 3. Aggregate results indicate Defect Rate is driving factor. a. Tornado Plot below indicates Defect Rate has higher relative importance. b. Model-Fit of all data indicates Defect Rate has highest coefficient. Relative Effect of Inputs on System Duration Pareto Plot of Estimates Term t Ratio 1. System Duration is 1,193 hrs NDEDefectRate 10.702772 NDERepairTime 7.211215 + 159 hrs per defect percent NDEInspectTime 2.517328 + 106 hrs per NDE repair hour + 10 hrs per NDE inspection hour 2. Defect rate affects the system duration more than the other variables. PMC 2008 Ares I-X Upper Stage Simulator Team 8
  • 9. Result: NDE Sensitivities to Baseline Glenn Research Center 1. These charts show impact of NDE Defect Rate Sensitivity changing each NDE factor and 3500 3000 holding others factors constant Duration (hours) 2500 to their baseline. 2000 2. Model Baseline includes: 1500 a. NDE Defect Rate = 5% 1000 b. NDE Inspection = 8 hrs 500 c. NDE Repair per Defect = 4 hrs 0 0% 2% 4% 6% 8% 10% 12% d. Baseline shown with markers in NDE Defect Rate each chart Total Duration Inspect Duration Repair Duration NDE Repair Time Sensitivity NDE Inspection Time Sensitivity 4000 3000 3500 2500 3000 Duration (hours) Duration (hours) 2000 2500 2000 1500 1500 1000 1000 500 500 0 0 0 2 4 6 8 10 12 0 5 10 15 20 25 30 35 40 45 NDE Repair Time per Defect (hours) Inspection Time (hours) Total Duration Inspect Duration Repair Duration Total Duration Inspect Duration Repair Duration PMC 2008 Ares I-X Upper Stage Simulator Team 9
  • 10. DES Results and Conclusions Glenn Research Center 1. Process is sensitive to number of fabricators and welders. a. Suggested baseline using 8 fabricators and 6 welders per shift. 2. Flanges, Gussets, & Lugs process matches closely to planned schedule when two full shifts are used. 3. Segment manufacturing Charges match closely to planned schedule when two full shifts are used. 4. Previous analysis has shown process is sensitive to NDE defect rate, NDE repair time, and NDE inspection time. a. Each percent of NDE defect rate adds 159 hours to process duration. b. NDE Repair time increasing by 1 hour adds 106 hours to process duration. c. NDE Inspection time increasing by 1 hour adds 10 hours to process duration. PMC 2008 Ares I-X Upper Stage Simulator Team 10
  • 11. What SimVision® Does Glenn Research Center Inputs Model Simulation Predictions Milestones Critical Path Activities and Project schedule Activity Characteristics Cost (Work, rework, wait, Activity Dependencies communication) Position Characteristics Quality Risks (Work, communication) Organization Position and people Task Assignment work load Meetings • Individual behavior • Organization theory Decision-Making Policy • Performance measures Communication Policy • Discrete event simulation Organizational Dynamics SimVision permits effective front loaded project design by facilitating planning and organizational design with meaningful scenario analysis. PMC 2008 Ares I-X Upper Stage Simulator Team 11