Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
MCB Camp Lejeune Energy Briefing
1. MCB CAMP LEJEUNE
MCAS NEW RIVER
ENERGY PROGRAM
OCTOBER 2012 UPDATE
2. FEDERAL GOALS / REQTS
I. PRIMARY GOALS:
- 30% Reduction of Energy Intensity by 2015 (2003 BL)
- Advanced Metering of Federal Facilities by 2012
- Energy Audits Completed Annually on 25% of Facilities
- 26% Reduction of Water Usage by 2020 (2007 BL)
II. OTHER GOALS
- New Construction Designed to 30% Below ASHRAE 90.1
- Produce 25% of Energy from Renewables by 2025
- Facilities Designed for Net-Zero Energy Usage in 2020
- Reduce Fossil Fuel Usage at Facilities 55% by 2010;
100% by 2030
- + Many More…
3. PROJECTS
I. STEAM DECENTRALIZATION
A. MCAS NEW RIVER / CAMP JOHNSON
- AWARDED WHITING TURNER
B. 24 H-STYLE BLDGS
- AWARDED NORTH STATE MECH
C. CAMP GEIGER
– RFP RELEASED – NAVFAC D/B MACC
D. 18 BLDGS - HVAC / DHW UPGRADES – D/B/B - AQ
TBD
E. 14 BLDGS - FRENCH CK BEQs - D/B/B - AQ TBD
F. 31 BLDGS - COURTHOUSE BAY – D/B/B - AQ TBD
G. 160 BLDGS - HADNOT PT / FRENCH CK