Developing and implementing
clinical standards for seven day
services
Celia Ingham Clark
National Director:
Reducing Premature
Mortality
11/12 June 2014
National seven day services Forum
• The national Seven Day Services Forum led by Bruce Keogh is
leading the approach to deliver seven day health care services
• It initially focussed on the acute inpatient pathway, although there
is recognition of the need for whole-system change.
• As such, there is alignment with other national work including the
Urgent and Emergency Care review, primary care transformation
and the integrated care programme.
• A clinical reference group reviewed the evidence base and
developed clinical standards for acute inpatients, based on
recommendations from professional bodies.
• The NHS England Board has agreed to the inclusion of these
clinical standards in the standard contract over the next three
years
2
Seven day services: Why?
• Illness happens seven days a week
• Currently outcomes differ at weekends
• Trainee feedback suggests variable consultant involvement in
acute care out of hours
• Hypothesis that patients admitted at weekends are sicker due to
limited access to primary care
• Importance of “failure to rescue” in defining the difference
between hospitals with high and low mortality rates
• Acute illness can occur at any time and patient expectations are
rising as other sectors (e.g. banking and retail) have moved to
offer seven day services
3
Key themes
• There is often inadequate involvement of senior medical
personnel in the assessment and subsequent management of
many acutely ill patients, particularly at the weekend
• Limited access to diagnostic services and allied health
professionals at weekends to establish multi-disciplinary
management plans and facilitate transfer out of hospital
• Poor weekend emergency service provision is associated with an
increased variation in outcomes such as:
• Mortality rates
• Patient experience
• Length of stay
4
Cause of the weekend effect - multifactorial
• Variable staffing levels in hospitals at the weekend
• Fewer senior decision makers of consultant level skill and
experience on site at the weekend
• A lack of consistent support services, such as diagnostic and
scientific services at weekends
• A lack of community, primary and social care services which
could prevent some unnecessary admissions and support
timely discharge
5
In London data shows higher mortality rates for
weekend emergency admissions than weekdays
Total
emergency
admissions
In hospital mortality
following emergency
admission
In hospital mortality
following emergency
admission (%)
Weekday 521,868 16,377 3.14
+0.32
Weekend 159,676 5,531 3.46
The 0.32% difference between weekday and weekend
mortality equates to 520 potentially avoidable deaths
London’s heart attack centres already operate a consultant
delivered service seven days per week and no observed
difference is found in mortality rates in the week and at the
weekend, suggesting where systems are in place to respond
seven days a week, there is a direct effect on mortality rates
6
Similarly elective surgical mortality is higher
for weekend admissions
Day of week of procedure and 30 day mortality for elective surgery: retrospective analysis of hospital episode statistics
BMJ 2013;346:f2424 (Published 28 May 2013)
7
Seven Day Services – What?
• What we mean by Seven Day Services
• Emergency care Must Do
• Urgent care Should Do
• Elective care Could Do
• ? All of the above
8
Seven day services: What?
9
True emergencies –
where minutes delay
can affect risk of death
• Cardiac arrest
• Ruptured aortic aneurysm
• Acute MI
• Extra-dural haematoma
Services provided
promptly
• Emergency laparotomy
• Fractured NOF (DH 2011 BPT to improve care)
• “hot” cholecystectomy
Routine services
• Endoscopy
• MRI scans
Services not
commonly provided
at weekends now
• Routine elective surgery
• Routine GP consultations
• Contact with specialist nurses
• Routine outpatient appointments
Similar spectrum applies to diagnostics and their reports: FBC, U&E, ECG,
CXR, CT, USS and cardiac echo, spirometry, histopathology
Spectrumofcare
Seven day services:
Not ‘should we’ but ‘how far should we go’?
10
• Care and services need to shift towards seven day services to
abolish differentials in:
• Patient safety
• Patient experience
• Clinical effectiveness
• Discussions underway: should this also address patient
convenience?
11
Review of literature
and College reports
Develop case for
change
Develop
standards
Commission
standards
Audit acute hospitals
against standards
Follow up with acute
hospitals
Engagementwithkeystakeholders
Development of the London acute care quality
standards
London quality standards – overview
• Addressing the variations in service arrangements and patient outcomes
between weekdays and weekends was identified by the NHS in London
as a key priority in 2012/13 and has remained as such.
• Scope of the standards:
12
Adult emergency
services (AES)
Paediatric emergency
services (PES)
Maternity
services
Emergency departments
Acute medicine
Emergency general surgery
Critical care
Fractured neck of femur
Emergency departments
Emergency inpatient
medicine
Emergency general
surgery
Specific parts of the
pathway requiring
specialist acute care:
- Labour
- Birth
- Immediate postnatal
care
London quality standards: Key themes
• Admissions seen by consultant <12 hours
• Twice daily ward rounds for all acute patients
• MDT plan within 24 hours including EDD
• Timely access to diagnostics and reports
• Timely access to interventions including theatre
• Good information for patients and their carers
• Timely transfer to next place of care
13
London quality standards:
consultant-delivered care
• All patients seen and assessed by a consultant within 12 hours
of admission
• Emergency admissions to be managed in MAU, SAU or Critical
Care Unit
• Rotas constructed to maximise continuity of patient care
• Access to all key diagnostic services in a timely manner 24
hours a day, seven days a week to support clinical decision making
• Access to Interventional Radiology 24 hours a day, seven days
a week within 1 hour for critical patients
• Access to comprehensive endoscopy 24 hours a day, seven
days a week
14
London quality standards:
consultant-delivered care
• All health professionals use unitary document for medical record
• EDD set within 24 hours of admission
• All patients on MAU/SAU seen and reviewed by a consultant
during twice daily ward rounds
• All referrals to intensive care should have consultant involvement
• Structured handovers should take place twice a day and at every
handover between consultant teams
Patient experience
• Consultant-led communications and information to patients,
including patient information leaflets
• Patient experience data recorded, analysed and acted on
15
National approach
The National Seven Day Services Forum established by
Professor Sir Bruce Keogh in 2013 found that:
• Variation in outcomes exists for patients admitted at the
weekend, seen in mortality rates, patient experience, length of
hospital stay and re-admission rates
• Our junior doctors often feel clinically exposed and
unsupported at weekends
• Lack of many seven day services has an adverse effect on
measurable outcomes in each of the five domains of the NHS
Outcomes Framework:
• mortality amenable to healthcare
• quality of care for people with long term conditions
• outcomes from acute episodes of care
• patient experience
• patient safety16
Developing national clinical standards
A Clinical Reference Group (CRG) was convened with
representation from patients, primary care, secondary care, social
care and colleagues from Colleges and professional bodies to
develop clinical standards on behalf of the Forum.
The CRG was asked to:
• Establish the clinical evidence base for providing NHS
Services, 7 days a week
• Defining standards of care that will help commissioners and
providers to deliver a consistently high quality acute care
service at all times of the week.
17
18
Consultant review within 12/14 hrs
Availability of core MDT
Rapid access to diagnostics
Only 16% of hospitals
review all emergency
medical admissions
within 14 hours of
arrival
Nearly 80% have
5 or more MDT
members during
the week. This is
just 30% at the
weekend
X-ray and CT availability is
consistently high but other services
vary considerably making informed
decision making difficult
Seven Day Services Forum: survey findings
Seven Day Services Forum: clinical standards
The CRG developed 10 clinical standards based on the evidence
and recommendations from Royal Colleges and expert bodies.
These follow the patient pathway, apply seven days a week and aim
to ensure:
• Prompt access to consultant review and multi-disciplinary
assessment
• Availability of diagnostics to support decision-making
• Timely treatment and interventions
• Planned, safe and appropriate timing of transfers from hospitals
All standards are based on existing recommendations from Royal
Colleges and expert bodies and will cover the seven days of the
week
19
Alignment with Academy of Medical Royal
Colleges
The clinical standards are deliberately aligned with the Academy of
Medical Royal Colleges work on consultant-delivered care:
• Consultant involvement: All hospital inpatients should be reviewed by
an on-site consultant at least once every 24 hours, seven days a week,
unless it has been determined that this would not affect the patient's care
pathway
• Consultant supervision: Consultant-supervised interventions and
investigations, and their reports should be provided, seven days per
week, if the results will change the outcome or status of the patient’s
care pathway before the next ‘normal’ working day – this should include
interventions and investigations which will enable immediate discharge
or a shortened length of hospital stay
• Support services, seven days a week: Support services both in
hospital and in the community and primary care setting should be
available seven days per week to ensure that the next steps in the
patient’s care pathway, as determined by the daily consultant review, can
be taken20
Clinical standard 1:
Patient experience
• Patients, and where appropriate families and
carers, must be actively involved in shared
decision making and supported by clear
information from health and social care
professionals to make fully informed choices
about investigations, treatment and on-going care
that reflect what is important to them. This should
happen consistently, seven days a week.
21
2: Time to first consultant review
• All emergency admissions must be seen and
have a thorough clinical assessment by a
suitable consultant as soon as possible but at
the latest within 14 hours of arrival at hospital
22
3: Multi-disciplinary team review
• All emergency inpatients must have prompt
assessment by a multi-professional team to
identify complex or on-going needs, unless
deemed unnecessary by the responsible
consultant. The multi-disciplinary assessment
should be overseen by a competent decision-
maker, be undertaken within 14 hours and an
integrated management plan with estimated
discharge date to be in place along with
completed medicines reconciliation within 24
hours
23
4: Shift handovers
• Handovers must be led by a competent senior
decision maker and take place at a designated
time and place, with multi-professional
participation from the relevant in-coming and out-
going shifts. Handover processes, including
communication and documentation, must be
reflected in hospital policy and standardised
across seven days of the week
24
5: Diagnostics
Hospital inpatients must have scheduled seven-day
access to diagnostic services such as x-ray,
ultrasound, computerised tomography (CT),
magnetic resonance imaging (MRI),
echocardiography, endoscopy, bronchoscopy and
pathology. Consultant-directed diagnostic tests
and their reporting will be available seven days a
week:
• within 1 hour for critical patients
• within 12 hours for urgent patients
• within 24 hours for non-urgent patients
25
6: Interventions
Hospital inpatients must have timely 24 hour
access, seven days a week, to consultant-
directed interventions that meet the relevant
specialty guidelines, either on-site or through
formally agreed networked arrangements with
clear protocols, such as:
• critical care
• interventional radiology
• interventional endoscopy
• emergency general surgery
26
7: Mental health
Where a mental health need is identified following
an acute admission the patient must be assessed
by psychiatric liaison within the appropriate
timescales 24 hours a day, seven days a week:
• Within 1 hour for emergency care needs
• Within 14 hours for urgent care needs
27
8: Ongoing review
• All patients on the AMU, SAU, ICU and other high
dependency areas must be seen and reviewed by
a consultant twice daily, including all acutely ill
patients directly transferred, or others who
deteriorate. To maximise continuity of care
consultants should be working multiple day blocks
• Once transferred from the acute area of the
hospital to a general ward patients should be
reviewed during a consultant-delivered ward
round at least once every 24 hours, seven days
a week, unless it has been determined that this
would not affect the patient’s care pathway
28
9: Transfer to community, primary
and social care
• Support services, both in the hospital and in
primary, community and mental health settings
must be available seven days a week to ensure
that the next steps in the patient’s care pathway,
as determined by the daily consultant-led review,
can be taken
29
10: Quality Improvement
• All those involved in the delivery of acute care
must participate in the review of patient outcomes
to drive care quality improvement. The duties,
working hours and supervision of trainees in all
healthcare professions must be consistent with
the delivery of high-quality, safe patient care,
seven days a week
30
Seven Day Services: Implementation
• Year 1 (2014/15) – local contracts should include an Action
Plan to deliver the clinical standards within the Service
Development and Improvement Plan Section
• Year 2 (2015/16) – those clinical standards which will have
the greatest impact should move into the national
requirements section of the NHS Standard Contract
• Year 3 (2016/17) – all clinical standards should be
incorporated into the national requirements section of the
NHS Standard Contract with appropriate contractual
sanctions for non-compliance.
31
Enablers for implementation
• NHS England Implementation Board and delivery sub-group
• Development of metrics to support the standards
• Clinical Senates support
• NHS IQ to introduce a large-scale transformational change
programme to support the spread of seven day services
• CRG continues to provide expert advice
• In London – ongoing audit of implementation of Quality
Standards, and lessons shared
• Inspection and assurance – CQC hospital inspections to
include assessment of seven day services implementation
32
The wider context
Recognising relationships with other work including:
• Primary Care Transformation
• Urgent and Emergency Care Review
• Integrated care programme
• Reconfiguration proposals and service change plans
• Productive elective care
33
Patient perspective
• “I was lucky. Shouldn’t every one of us
have the best chance possible no
matter what time of day or day of the
week it is?”
• Rodney Partington, Patient representative
34

Más contenido relacionado

La actualidad más candente

Pediatric Nephrology Program Outline 2015
Pediatric Nephrology Program Outline 2015Pediatric Nephrology Program Outline 2015
Pediatric Nephrology Program Outline 2015
Beatrice Goilav
 
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
healthcareisi
 
Ian Blunt: PARR-30: a predictive model for readmission within 30 days
Ian Blunt: PARR-30: a predictive model for readmission within 30 daysIan Blunt: PARR-30: a predictive model for readmission within 30 days
Ian Blunt: PARR-30: a predictive model for readmission within 30 days
Nuffield Trust
 

La actualidad más candente (20)

Nephrology leadership program 2 setting a renal transplant program june 2019
Nephrology leadership program  2 setting a renal transplant program june 2019Nephrology leadership program  2 setting a renal transplant program june 2019
Nephrology leadership program 2 setting a renal transplant program june 2019
 
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
 
The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...
 
Nephrology leadership program 4 patient safety in dialysis and nephrology au...
Nephrology leadership program  4 patient safety in dialysis and nephrology au...Nephrology leadership program  4 patient safety in dialysis and nephrology au...
Nephrology leadership program 4 patient safety in dialysis and nephrology au...
 
Richard Fluck AKI Frontiers Slide Set
Richard Fluck AKI Frontiers Slide SetRichard Fluck AKI Frontiers Slide Set
Richard Fluck AKI Frontiers Slide Set
 
Consultant Connect : Ron Cook
Consultant Connect : Ron CookConsultant Connect : Ron Cook
Consultant Connect : Ron Cook
 
Respiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness projectRespiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness project
 
Presentation 223 rebecca brittain als tele health_ a patient centered approa...
Presentation 223  rebecca brittain als tele health_ a patient centered approa...Presentation 223  rebecca brittain als tele health_ a patient centered approa...
Presentation 223 rebecca brittain als tele health_ a patient centered approa...
 
Opening Keynote “Population Management: The CareMore Experience" David Ramire...
Opening Keynote “Population Management: The CareMore Experience" David Ramire...Opening Keynote “Population Management: The CareMore Experience" David Ramire...
Opening Keynote “Population Management: The CareMore Experience" David Ramire...
 
Delivering Healthcare (Part 2) Lecture C
Delivering Healthcare (Part 2) Lecture CDelivering Healthcare (Part 2) Lecture C
Delivering Healthcare (Part 2) Lecture C
 
Alisa Hoffarth, RN_ resume
Alisa Hoffarth, RN_ resumeAlisa Hoffarth, RN_ resume
Alisa Hoffarth, RN_ resume
 
Pediatric Nephrology Program Outline 2015
Pediatric Nephrology Program Outline 2015Pediatric Nephrology Program Outline 2015
Pediatric Nephrology Program Outline 2015
 
Dr. Messina CHF Poster
Dr. Messina CHF PosterDr. Messina CHF Poster
Dr. Messina CHF Poster
 
Hpe live talk 10112016
Hpe live talk 10112016Hpe live talk 10112016
Hpe live talk 10112016
 
Think kidneys in primary and secondary care
Think kidneys in primary and secondary careThink kidneys in primary and secondary care
Think kidneys in primary and secondary care
 
Value of secondary prevention in cardiac rehabilitation
Value of secondary prevention in cardiac rehabilitationValue of secondary prevention in cardiac rehabilitation
Value of secondary prevention in cardiac rehabilitation
 
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
Improving Quality And Reducing Cost In Healthcare The Role Of Information And...
 
2015 GA Partnership Telehealth Ebberwein
2015 GA Partnership Telehealth Ebberwein2015 GA Partnership Telehealth Ebberwein
2015 GA Partnership Telehealth Ebberwein
 
Ian Blunt: PARR-30: a predictive model for readmission within 30 days
Ian Blunt: PARR-30: a predictive model for readmission within 30 daysIan Blunt: PARR-30: a predictive model for readmission within 30 days
Ian Blunt: PARR-30: a predictive model for readmission within 30 days
 
An update on the SNP and AMSC programmes
An update on the SNP and AMSC programmesAn update on the SNP and AMSC programmes
An update on the SNP and AMSC programmes
 

Similar a Developing and implementing clinical standards for seven day services

Implementing_Edoscopy Timed_OG_Pathway.pptx
Implementing_Edoscopy Timed_OG_Pathway.pptxImplementing_Edoscopy Timed_OG_Pathway.pptx
Implementing_Edoscopy Timed_OG_Pathway.pptx
radu75ro1
 

Similar a Developing and implementing clinical standards for seven day services (20)

Seven Day services - Healthcare Science presentation (Blower)
Seven Day services - Healthcare Science presentation (Blower)Seven Day services - Healthcare Science presentation (Blower)
Seven Day services - Healthcare Science presentation (Blower)
 
Linda Patterson: wrong bed, wrong ward
Linda Patterson: wrong bed, wrong wardLinda Patterson: wrong bed, wrong ward
Linda Patterson: wrong bed, wrong ward
 
NHS Standard Contract Presentation
NHS Standard Contract PresentationNHS Standard Contract Presentation
NHS Standard Contract Presentation
 
Making Seven Day Services a reality, pop up uni, 2 pm, 3 september 2015
Making Seven Day Services a reality, pop up uni, 2 pm, 3 september 2015Making Seven Day Services a reality, pop up uni, 2 pm, 3 september 2015
Making Seven Day Services a reality, pop up uni, 2 pm, 3 september 2015
 
Delivering the Five Year Forward View: Working collaboratively to prevent stroke
Delivering the Five Year Forward View: Working collaboratively to prevent strokeDelivering the Five Year Forward View: Working collaboratively to prevent stroke
Delivering the Five Year Forward View: Working collaboratively to prevent stroke
 
Seven day consultant present care
Seven day consultant present careSeven day consultant present care
Seven day consultant present care
 
Seven Day Services - Crawley event
Seven Day Services - Crawley event Seven Day Services - Crawley event
Seven Day Services - Crawley event
 
TYA and Adult Late Effects Service at UCLH
TYA and Adult Late Effects Service at UCLHTYA and Adult Late Effects Service at UCLH
TYA and Adult Late Effects Service at UCLH
 
Population Health Planning for Chronic Disease
Population Health Planning for Chronic DiseasePopulation Health Planning for Chronic Disease
Population Health Planning for Chronic Disease
 
Cheshire and Wirral Best Practice event - 8 November
Cheshire and Wirral Best Practice event - 8 NovemberCheshire and Wirral Best Practice event - 8 November
Cheshire and Wirral Best Practice event - 8 November
 
Implementing_Edoscopy Timed_OG_Pathway.pptx
Implementing_Edoscopy Timed_OG_Pathway.pptxImplementing_Edoscopy Timed_OG_Pathway.pptx
Implementing_Edoscopy Timed_OG_Pathway.pptx
 
Telehealth for the Underserved & Medicaid Population
Telehealth for the Underserved & Medicaid PopulationTelehealth for the Underserved & Medicaid Population
Telehealth for the Underserved & Medicaid Population
 
Testing Telehealth Solutions for Post Acute Care
Testing Telehealth Solutions for Post Acute CareTesting Telehealth Solutions for Post Acute Care
Testing Telehealth Solutions for Post Acute Care
 
7 day services practical tips for achieving consultant review of patients wit...
7 day services practical tips for achieving consultant review of patients wit...7 day services practical tips for achieving consultant review of patients wit...
7 day services practical tips for achieving consultant review of patients wit...
 
HIE-Enabled Data Sharing Between Hospital and Home Care Providers to Improve ...
HIE-Enabled Data Sharing Between Hospital and Home Care Providers to Improve ...HIE-Enabled Data Sharing Between Hospital and Home Care Providers to Improve ...
HIE-Enabled Data Sharing Between Hospital and Home Care Providers to Improve ...
 
Jayne Cooper
Jayne CooperJayne Cooper
Jayne Cooper
 
Seven Day Hospital Services Workshop: South West
Seven Day Hospital Services Workshop: South West Seven Day Hospital Services Workshop: South West
Seven Day Hospital Services Workshop: South West
 
Dr David Maltz: The challenge of length of stay
 Dr David Maltz: The challenge of length of stay Dr David Maltz: The challenge of length of stay
Dr David Maltz: The challenge of length of stay
 
Health Navigator lunch and learn – 15 January 2016
Health Navigator lunch and learn – 15 January 2016Health Navigator lunch and learn – 15 January 2016
Health Navigator lunch and learn – 15 January 2016
 
Health Navigator lunch and learn – 15 January 2016
Health Navigator lunch and learn – 15 January 2016Health Navigator lunch and learn – 15 January 2016
Health Navigator lunch and learn – 15 January 2016
 

Más de NHS Improving Quality

Más de NHS Improving Quality (20)

OUSR
OUSROUSR
OUSR
 
Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016
 
Changing behaviours: the power of social & platforms
Changing behaviours: the power of social & platformsChanging behaviours: the power of social & platforms
Changing behaviours: the power of social & platforms
 
How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...
 
Building the future: perspectives on large scale change
Building the future: perspectives on large scale changeBuilding the future: perspectives on large scale change
Building the future: perspectives on large scale change
 
Leading in a complex world:
Leading in a complex world: Leading in a complex world:
Leading in a complex world:
 
Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)
 
Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...
 
Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016
 
Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...
 
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
 
Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
We need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCCWe need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCC
 
Commissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slidesCommissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slides
 
Integrated data to support service redesign decision making 19 01 2016 final
Integrated data to support service redesign decision making 19 01 2016 finalIntegrated data to support service redesign decision making 19 01 2016 final
Integrated data to support service redesign decision making 19 01 2016 final
 
Health coaching for lay professionals
Health coaching for lay professionalsHealth coaching for lay professionals
Health coaching for lay professionals
 
Person centred care final Poll
Person centred care final PollPerson centred care final Poll
Person centred care final Poll
 

Último

VIP Call Girl Sector 10 Noida Call Me: 9711199171
VIP Call Girl Sector 10 Noida Call Me: 9711199171VIP Call Girl Sector 10 Noida Call Me: 9711199171
VIP Call Girl Sector 10 Noida Call Me: 9711199171
Call Girls Service Gurgaon
 
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real MeetCall Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
priyashah722354
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near MeVIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
mriyagarg453
 
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetbhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetErnakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Chandigarh
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMuzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetJalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In FaridabadCall Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
gragmanisha42
 
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
Sheetaleventcompany
 
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetOzhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Call Girls Service
 

Último (20)

VIP Call Girl Sector 10 Noida Call Me: 9711199171
VIP Call Girl Sector 10 Noida Call Me: 9711199171VIP Call Girl Sector 10 Noida Call Me: 9711199171
VIP Call Girl Sector 10 Noida Call Me: 9711199171
 
Call Girl Raipur 📲 9999965857 whatsapp live cam sex service available
Call Girl Raipur 📲 9999965857 whatsapp live cam sex service availableCall Girl Raipur 📲 9999965857 whatsapp live cam sex service available
Call Girl Raipur 📲 9999965857 whatsapp live cam sex service available
 
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real MeetCall Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
Call Girls Chandigarh 👙 7001035870 👙 Genuine WhatsApp Number for Real Meet
 
❤️♀️@ Jaipur Call Girls ❤️♀️@ Jaispreet Call Girl Services in Jaipur QRYPCF ...
❤️♀️@ Jaipur Call Girls ❤️♀️@ Jaispreet Call Girl Services in Jaipur QRYPCF  ...❤️♀️@ Jaipur Call Girls ❤️♀️@ Jaispreet Call Girl Services in Jaipur QRYPCF  ...
❤️♀️@ Jaipur Call Girls ❤️♀️@ Jaispreet Call Girl Services in Jaipur QRYPCF ...
 
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near MeVIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
VIP Call Girls Noida Sia 9711199171 High Class Call Girl Near Me
 
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetBareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Bareilly Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetbhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510
 
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetErnakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ernakulam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMuzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Muzaffarpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetJalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Jalna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In FaridabadCall Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
Call Girls Service Faridabad 📲 9999965857 ヅ10k NiGhT Call Girls In Faridabad
 
(Sonam Bajaj) Call Girl in Jaipur- 09257276172 Escorts Service 50% Off with C...
(Sonam Bajaj) Call Girl in Jaipur- 09257276172 Escorts Service 50% Off with C...(Sonam Bajaj) Call Girl in Jaipur- 09257276172 Escorts Service 50% Off with C...
(Sonam Bajaj) Call Girl in Jaipur- 09257276172 Escorts Service 50% Off with C...
 
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
Call Girl Amritsar ❤️♀️@ 8725944379 Amritsar Call Girls Near Me ❤️♀️@ Sexy Ca...
 
❤️♀️@ Jaipur Call Girl Agency ❤️♀️@ Manjeet Russian Call Girls Service in Jai...
❤️♀️@ Jaipur Call Girl Agency ❤️♀️@ Manjeet Russian Call Girls Service in Jai...❤️♀️@ Jaipur Call Girl Agency ❤️♀️@ Manjeet Russian Call Girls Service in Jai...
❤️♀️@ Jaipur Call Girl Agency ❤️♀️@ Manjeet Russian Call Girls Service in Jai...
 
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetOzhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Ozhukarai Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Russian Call Girls Kota * 8250192130 Service starts from just ₹9999 ✅
Russian Call Girls Kota * 8250192130 Service starts from just ₹9999 ✅Russian Call Girls Kota * 8250192130 Service starts from just ₹9999 ✅
Russian Call Girls Kota * 8250192130 Service starts from just ₹9999 ✅
 

Developing and implementing clinical standards for seven day services

  • 1. Developing and implementing clinical standards for seven day services Celia Ingham Clark National Director: Reducing Premature Mortality 11/12 June 2014
  • 2. National seven day services Forum • The national Seven Day Services Forum led by Bruce Keogh is leading the approach to deliver seven day health care services • It initially focussed on the acute inpatient pathway, although there is recognition of the need for whole-system change. • As such, there is alignment with other national work including the Urgent and Emergency Care review, primary care transformation and the integrated care programme. • A clinical reference group reviewed the evidence base and developed clinical standards for acute inpatients, based on recommendations from professional bodies. • The NHS England Board has agreed to the inclusion of these clinical standards in the standard contract over the next three years 2
  • 3. Seven day services: Why? • Illness happens seven days a week • Currently outcomes differ at weekends • Trainee feedback suggests variable consultant involvement in acute care out of hours • Hypothesis that patients admitted at weekends are sicker due to limited access to primary care • Importance of “failure to rescue” in defining the difference between hospitals with high and low mortality rates • Acute illness can occur at any time and patient expectations are rising as other sectors (e.g. banking and retail) have moved to offer seven day services 3
  • 4. Key themes • There is often inadequate involvement of senior medical personnel in the assessment and subsequent management of many acutely ill patients, particularly at the weekend • Limited access to diagnostic services and allied health professionals at weekends to establish multi-disciplinary management plans and facilitate transfer out of hospital • Poor weekend emergency service provision is associated with an increased variation in outcomes such as: • Mortality rates • Patient experience • Length of stay 4
  • 5. Cause of the weekend effect - multifactorial • Variable staffing levels in hospitals at the weekend • Fewer senior decision makers of consultant level skill and experience on site at the weekend • A lack of consistent support services, such as diagnostic and scientific services at weekends • A lack of community, primary and social care services which could prevent some unnecessary admissions and support timely discharge 5
  • 6. In London data shows higher mortality rates for weekend emergency admissions than weekdays Total emergency admissions In hospital mortality following emergency admission In hospital mortality following emergency admission (%) Weekday 521,868 16,377 3.14 +0.32 Weekend 159,676 5,531 3.46 The 0.32% difference between weekday and weekend mortality equates to 520 potentially avoidable deaths London’s heart attack centres already operate a consultant delivered service seven days per week and no observed difference is found in mortality rates in the week and at the weekend, suggesting where systems are in place to respond seven days a week, there is a direct effect on mortality rates 6
  • 7. Similarly elective surgical mortality is higher for weekend admissions Day of week of procedure and 30 day mortality for elective surgery: retrospective analysis of hospital episode statistics BMJ 2013;346:f2424 (Published 28 May 2013) 7
  • 8. Seven Day Services – What? • What we mean by Seven Day Services • Emergency care Must Do • Urgent care Should Do • Elective care Could Do • ? All of the above 8
  • 9. Seven day services: What? 9 True emergencies – where minutes delay can affect risk of death • Cardiac arrest • Ruptured aortic aneurysm • Acute MI • Extra-dural haematoma Services provided promptly • Emergency laparotomy • Fractured NOF (DH 2011 BPT to improve care) • “hot” cholecystectomy Routine services • Endoscopy • MRI scans Services not commonly provided at weekends now • Routine elective surgery • Routine GP consultations • Contact with specialist nurses • Routine outpatient appointments Similar spectrum applies to diagnostics and their reports: FBC, U&E, ECG, CXR, CT, USS and cardiac echo, spirometry, histopathology Spectrumofcare
  • 10. Seven day services: Not ‘should we’ but ‘how far should we go’? 10 • Care and services need to shift towards seven day services to abolish differentials in: • Patient safety • Patient experience • Clinical effectiveness • Discussions underway: should this also address patient convenience?
  • 11. 11 Review of literature and College reports Develop case for change Develop standards Commission standards Audit acute hospitals against standards Follow up with acute hospitals Engagementwithkeystakeholders Development of the London acute care quality standards
  • 12. London quality standards – overview • Addressing the variations in service arrangements and patient outcomes between weekdays and weekends was identified by the NHS in London as a key priority in 2012/13 and has remained as such. • Scope of the standards: 12 Adult emergency services (AES) Paediatric emergency services (PES) Maternity services Emergency departments Acute medicine Emergency general surgery Critical care Fractured neck of femur Emergency departments Emergency inpatient medicine Emergency general surgery Specific parts of the pathway requiring specialist acute care: - Labour - Birth - Immediate postnatal care
  • 13. London quality standards: Key themes • Admissions seen by consultant <12 hours • Twice daily ward rounds for all acute patients • MDT plan within 24 hours including EDD • Timely access to diagnostics and reports • Timely access to interventions including theatre • Good information for patients and their carers • Timely transfer to next place of care 13
  • 14. London quality standards: consultant-delivered care • All patients seen and assessed by a consultant within 12 hours of admission • Emergency admissions to be managed in MAU, SAU or Critical Care Unit • Rotas constructed to maximise continuity of patient care • Access to all key diagnostic services in a timely manner 24 hours a day, seven days a week to support clinical decision making • Access to Interventional Radiology 24 hours a day, seven days a week within 1 hour for critical patients • Access to comprehensive endoscopy 24 hours a day, seven days a week 14
  • 15. London quality standards: consultant-delivered care • All health professionals use unitary document for medical record • EDD set within 24 hours of admission • All patients on MAU/SAU seen and reviewed by a consultant during twice daily ward rounds • All referrals to intensive care should have consultant involvement • Structured handovers should take place twice a day and at every handover between consultant teams Patient experience • Consultant-led communications and information to patients, including patient information leaflets • Patient experience data recorded, analysed and acted on 15
  • 16. National approach The National Seven Day Services Forum established by Professor Sir Bruce Keogh in 2013 found that: • Variation in outcomes exists for patients admitted at the weekend, seen in mortality rates, patient experience, length of hospital stay and re-admission rates • Our junior doctors often feel clinically exposed and unsupported at weekends • Lack of many seven day services has an adverse effect on measurable outcomes in each of the five domains of the NHS Outcomes Framework: • mortality amenable to healthcare • quality of care for people with long term conditions • outcomes from acute episodes of care • patient experience • patient safety16
  • 17. Developing national clinical standards A Clinical Reference Group (CRG) was convened with representation from patients, primary care, secondary care, social care and colleagues from Colleges and professional bodies to develop clinical standards on behalf of the Forum. The CRG was asked to: • Establish the clinical evidence base for providing NHS Services, 7 days a week • Defining standards of care that will help commissioners and providers to deliver a consistently high quality acute care service at all times of the week. 17
  • 18. 18 Consultant review within 12/14 hrs Availability of core MDT Rapid access to diagnostics Only 16% of hospitals review all emergency medical admissions within 14 hours of arrival Nearly 80% have 5 or more MDT members during the week. This is just 30% at the weekend X-ray and CT availability is consistently high but other services vary considerably making informed decision making difficult Seven Day Services Forum: survey findings
  • 19. Seven Day Services Forum: clinical standards The CRG developed 10 clinical standards based on the evidence and recommendations from Royal Colleges and expert bodies. These follow the patient pathway, apply seven days a week and aim to ensure: • Prompt access to consultant review and multi-disciplinary assessment • Availability of diagnostics to support decision-making • Timely treatment and interventions • Planned, safe and appropriate timing of transfers from hospitals All standards are based on existing recommendations from Royal Colleges and expert bodies and will cover the seven days of the week 19
  • 20. Alignment with Academy of Medical Royal Colleges The clinical standards are deliberately aligned with the Academy of Medical Royal Colleges work on consultant-delivered care: • Consultant involvement: All hospital inpatients should be reviewed by an on-site consultant at least once every 24 hours, seven days a week, unless it has been determined that this would not affect the patient's care pathway • Consultant supervision: Consultant-supervised interventions and investigations, and their reports should be provided, seven days per week, if the results will change the outcome or status of the patient’s care pathway before the next ‘normal’ working day – this should include interventions and investigations which will enable immediate discharge or a shortened length of hospital stay • Support services, seven days a week: Support services both in hospital and in the community and primary care setting should be available seven days per week to ensure that the next steps in the patient’s care pathway, as determined by the daily consultant review, can be taken20
  • 21. Clinical standard 1: Patient experience • Patients, and where appropriate families and carers, must be actively involved in shared decision making and supported by clear information from health and social care professionals to make fully informed choices about investigations, treatment and on-going care that reflect what is important to them. This should happen consistently, seven days a week. 21
  • 22. 2: Time to first consultant review • All emergency admissions must be seen and have a thorough clinical assessment by a suitable consultant as soon as possible but at the latest within 14 hours of arrival at hospital 22
  • 23. 3: Multi-disciplinary team review • All emergency inpatients must have prompt assessment by a multi-professional team to identify complex or on-going needs, unless deemed unnecessary by the responsible consultant. The multi-disciplinary assessment should be overseen by a competent decision- maker, be undertaken within 14 hours and an integrated management plan with estimated discharge date to be in place along with completed medicines reconciliation within 24 hours 23
  • 24. 4: Shift handovers • Handovers must be led by a competent senior decision maker and take place at a designated time and place, with multi-professional participation from the relevant in-coming and out- going shifts. Handover processes, including communication and documentation, must be reflected in hospital policy and standardised across seven days of the week 24
  • 25. 5: Diagnostics Hospital inpatients must have scheduled seven-day access to diagnostic services such as x-ray, ultrasound, computerised tomography (CT), magnetic resonance imaging (MRI), echocardiography, endoscopy, bronchoscopy and pathology. Consultant-directed diagnostic tests and their reporting will be available seven days a week: • within 1 hour for critical patients • within 12 hours for urgent patients • within 24 hours for non-urgent patients 25
  • 26. 6: Interventions Hospital inpatients must have timely 24 hour access, seven days a week, to consultant- directed interventions that meet the relevant specialty guidelines, either on-site or through formally agreed networked arrangements with clear protocols, such as: • critical care • interventional radiology • interventional endoscopy • emergency general surgery 26
  • 27. 7: Mental health Where a mental health need is identified following an acute admission the patient must be assessed by psychiatric liaison within the appropriate timescales 24 hours a day, seven days a week: • Within 1 hour for emergency care needs • Within 14 hours for urgent care needs 27
  • 28. 8: Ongoing review • All patients on the AMU, SAU, ICU and other high dependency areas must be seen and reviewed by a consultant twice daily, including all acutely ill patients directly transferred, or others who deteriorate. To maximise continuity of care consultants should be working multiple day blocks • Once transferred from the acute area of the hospital to a general ward patients should be reviewed during a consultant-delivered ward round at least once every 24 hours, seven days a week, unless it has been determined that this would not affect the patient’s care pathway 28
  • 29. 9: Transfer to community, primary and social care • Support services, both in the hospital and in primary, community and mental health settings must be available seven days a week to ensure that the next steps in the patient’s care pathway, as determined by the daily consultant-led review, can be taken 29
  • 30. 10: Quality Improvement • All those involved in the delivery of acute care must participate in the review of patient outcomes to drive care quality improvement. The duties, working hours and supervision of trainees in all healthcare professions must be consistent with the delivery of high-quality, safe patient care, seven days a week 30
  • 31. Seven Day Services: Implementation • Year 1 (2014/15) – local contracts should include an Action Plan to deliver the clinical standards within the Service Development and Improvement Plan Section • Year 2 (2015/16) – those clinical standards which will have the greatest impact should move into the national requirements section of the NHS Standard Contract • Year 3 (2016/17) – all clinical standards should be incorporated into the national requirements section of the NHS Standard Contract with appropriate contractual sanctions for non-compliance. 31
  • 32. Enablers for implementation • NHS England Implementation Board and delivery sub-group • Development of metrics to support the standards • Clinical Senates support • NHS IQ to introduce a large-scale transformational change programme to support the spread of seven day services • CRG continues to provide expert advice • In London – ongoing audit of implementation of Quality Standards, and lessons shared • Inspection and assurance – CQC hospital inspections to include assessment of seven day services implementation 32
  • 33. The wider context Recognising relationships with other work including: • Primary Care Transformation • Urgent and Emergency Care Review • Integrated care programme • Reconfiguration proposals and service change plans • Productive elective care 33
  • 34. Patient perspective • “I was lucky. Shouldn’t every one of us have the best chance possible no matter what time of day or day of the week it is?” • Rodney Partington, Patient representative 34