Nancy Yen-wen Cheng, University of Oregon
•  What is BIM?
•  Why do we need it?
•  How does it work?
Nancy Yen-wen Cheng




What is BIM?
What is BIM?                   Nancy Yen-wen Cheng
A Building Information
   Model is a virtual object
   database shared by AEC
   partners
-  connects 3D forms to
   non-graphic attributes
   (material properties,
   cost, scheduling and
   performance
   information, etc.)




                                    Image courtesy of Revit
Consistent Information   Nancy Yen-wen Cheng
Consistent information reduces miscommunication Nancy Yen-wen Cheng




                                                Slide courtesy of IAI North America
Benefits throughout the Building Lifecycle                Nancy Yen-wen Cheng




                                        Timo Hartmann & Martin Fischer, Stanford CIFE, 2008
Nancy Yen-wen Cheng




Why do we need BIM?
Why BIM? Downward Construction Productivity               Nancy Yen-wen Cheng




                                    2004   2008   2012   2014   2018   2022   2024 ….




                                                                                Paul Teicholtz
Benefits of BIM compared to previous 2D CAD or paper Yen-wen Cheng
                                                 Nancy
•     Better: Coordination and clash detection reduces errors
•     Cheaper: Efficiency saves money
•     Faster: Minimizes redrawing
--   Chuck Eastman, Georgia Tech




                                                                **
Benefits of BIM compared to previous 2D CAD or paper Yen-wen Cheng
                                                 Nancy
•     Better: Coordination and clash detection reduces errors
•     Cheaper: Efficiency saves money
•     Faster: Minimizes redrawing
--   Chuck Eastman, Georgia Tech




                                                                ArchiCad
Why BIM? Islands of Automation in Construction     Nancy Yen-wen Cheng




                                                 Slide courtesy of Matti Hannus, VTT
Traditional Design Decisions                           Nancy Yen-wen Cheng




                Abili
                 ty
 Effort




                                                                         Litigation
                                                                           Phase




           SD           DD     CDs       Construction
          Time
                                     Slide courtesy of Patrick MacLeamy, IAI International
Earlier Design Decisions with BIM / IP                     Nancy Yen-wen Cheng




                Abili
                 ty
 Effort




                                                                             Litigation
                                                                               Phase




           SD           DD     CDs           Construction
          Time
                                         Slide courtesy of Patrick MacLeamy, IAI International
Benefits for Sustainability                         Nancy Yen-wen Cheng
Facilitates
•  Integrated practice
•  More seamless performance modeling
•  Post-occupancy monitoring & responsiveness




                                                Image courtesy of Turner Construction
Sustainability requires integrated practice                     Nancy Yen-wen Cheng
•  More stakeholders involved in design earlier
•  Shared risk & rewards: Your success depends of success of others –Michael Hricak
•  Cultural Transformation needed. New tools don’t change thinking or processes
   — The Toyota Way by Jeffrey K. Liker




                                                        Image courtesy of Green Building Services
Integrated Practice                                             Nancy Yen-wen Cheng
•  One aspect affects all others. Adding mass for a thermal flywheel effect would
   have triggered a seismic upgrade. As soon as you did something to the
   flooring, suddenly it wasn't just that cost, but it was the next cost, the next
   cost. So that was the early design process: dead end, let's back up, let's go
   this way, try again."
- Mark Heizer, Interface Engineering




                                                                             Diana Fischetti
Nancy Yen-wen Cheng




How does BIM work?
Interoperability                                                       Nancy Yen-wen Cheng
•  Get the right kind of information to the right people.
   -- Michael Hricak, USC




                                                    Image courtesy of Victor Várkonyi, Graphisoft
Interoperability                                                              Nancy Yen-wen Cheng
•  Changes to Architectural design changes Structural view




•  Industry Foundation Classes provide a common exchange language
   (driven by the Building Smart Alliance, formerly International Alliance for Interoperability)

                                                           Image courtesy of Victor Várkonyi, Graphisoft
Level of Detail                                                Nancy Yen-wen Cheng
•  Model complexity should support each phase of development




                                                                           Onuma Inc.
BIM works at all scales                                                 Nancy Yen-wen Cheng
Geographic Information Systems (GIS) coordinating with building
   scale models through GeoSpatial Consorium




                                      Image courtesy of Geospatial Consotium, Onuma, Inc., Portland Maps
BIM works at all scales                Nancy Yen-wen Cheng
Geographic Information Systems (GIS)
   coordinating with building scale
   through GeoSpatial Consorium




                                        Images courtesy of Onuma, Inc.
BIM & Energy Analysis                                                       Nancy Yen-wen Cheng




                        Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts   **
BIM & Analysis                                                      Nancy Yen-wen Cheng
•  From simplified zone analysis to room-based analysis




Perimeter



            Core




                                                 Image courtesy of Christine Clevenger, Stanford CIFE
Performance-based design                                      Nancy Yen-wen Cheng
•  Round trip from model to analysis to reshaping the model
BIM & Analysis software                  Nancy Yen-wen Cheng




Images by BuildingGreen.com & Autodesk
Form & Performance                    Nancy Yen-wen Cheng
•  Solar radiation mapped onto form
SOM’s Pearl River Tower uses PV and
   wind turbines




                                       Slide courtesy of SOM, Ecotect
Shadow Casting                                                                Nancy Yen-wen Cheng
•  Burt Hill Architects' Parkway 22 condominium complex in Philadelphia




                                  Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
Shadow Casting                                                                Nancy Yen-wen Cheng
•  Burt Hill Architects' Parkway 22 condominium complex in Philadelphia




                                  Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
Parametric                                          Nancy Yen-wen Cheng
•  Parameter = variable (i.e. dimension or count)
Parametric modeling                                       Nancy Yen-wen Cheng

•  Adjustable form with Bentley’s Generative Components




  Images by Wilson Chang, Simon Frazier University
Modeling to Fabrication                                   Nancy Yen-wen Cheng

•  Adjustable form with Bentley’s Generative Components




  Images by Wilson Chang, Simon Frazier University
Construction visualization                               Nancy Yen-wen Cheng
•  See Stanford CIFE’s Virtual Design and Construction




                                                         Slide courtesy of Washington DOT
BIM in the Construction Industry                Nancy Yen-wen Cheng




                                   Slide courtesy of Martin Fischer, Stanford CIFE
Form and Performance                                                  Nancy Yen-wen Cheng
•  Graphic feedback: Deviation map obtained by mapping laser scan
   data collected during construction onto 3D design model




                                           Slide courtesy of Dr. Burcu Akinci, Carnegie Mellon University
Facilities Management     Nancy Yen-wen Cheng
•  4D Modeling, GSA




                        Slide courtesy of Caroline Clevenger
Building Information Networks                 Nancy Yen-wen Cheng
•  Building dashboard by Lucid Design Group
Building Information Networks                                                  Nancy Yen-wen Cheng
•  Operations, Services via Online connections




                                   Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
What matters?               Nancy Yen-wen Cheng




     From McGrawHill The
   Business Value of BIM,
SmartMarket Report, 2009,
www.bim.construction.com
Benefits of BIM             Nancy Yen-wen Cheng




     From McGrawHill The
   Business Value of BIM,
SmartMarket Report, 2009,
www.bim.construction.com
Benefits of BIM                                              Nancy Yen-wen Cheng


Evidence
•  20-30% higher productivity in the field
•  reduction of Requests for Information (RFI) & Change
   Orders (CO) by a factor of ten or more,
•  higher engagement of all stakeholders (~70% positive in
   2007 survey)
•  consideration of more design options from more
   perspectives
--Martin Fischer, Stanford Center for Integrated Facility
   Engineering (CIFE)

BIM
•  Reduces redundancy & errors
•  Provides visual communication
•  Facilitates adjustable Form with Performance




                                                                         Onuma, Inc.
Summary                                                 Nancy Yen-wen Cheng


Caveat
•  Don’t mistake change for innovation.
•  With computers, bad design can happen really fast.

  — Michael Hricak




                                                          Slide courtesy of Onuma, Inc.
Summary                                           Nancy Yen-wen Cheng
                                                   nywc@uoregon.edu
Sustainable Design requires Integrated Practice
     –  Engage stakeholders early
     –  Share risks & rewards
BIM supports the full building life-cycle
BIM: Building Investigation Model
BAM: Building Assembly Model
BOOM: Building Operation Optimization Model
-- Patrick MacLeamy, HOK




                                                     Slide courtesy of CH2MHill

Más contenido relacionado

La actualidad más candente

Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1Stephen Au
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designA survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designAbdoul-Aziz Gansonre
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Autodesk Construction Cloud.pptx
Autodesk Construction Cloud.pptxAutodesk Construction Cloud.pptx
Autodesk Construction Cloud.pptxMustafa Ahmed
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)Franco Bontempi Org Didattica
 
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates WebinarISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates WebinarClive Jordan - fighter of Evil BIM
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)metalalp
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersMarc Goldman
 
BUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGBUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGSarthak Kaura
 

La actualidad más candente (20)

What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designA survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Autodesk Construction Cloud.pptx
Autodesk Construction Cloud.pptxAutodesk Construction Cloud.pptx
Autodesk Construction Cloud.pptx
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
BIM
BIMBIM
BIM
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates WebinarISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
 
OPEN BIM
OPEN BIMOPEN BIM
OPEN BIM
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and Owners
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGBUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLING
 
COBie
COBieCOBie
COBie
 

Similar a Building Information Modeling : What, Why, How

Nathan Wood DPR Lean BIM
Nathan Wood DPR Lean BIMNathan Wood DPR Lean BIM
Nathan Wood DPR Lean BIMMartin Brown
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBe2camp Admin
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011KarinSundberg
 
From email to BIM: 20 years of construction collaboration technologies
From email to BIM: 20 years of construction collaboration technologiesFrom email to BIM: 20 years of construction collaboration technologies
From email to BIM: 20 years of construction collaboration technologiespwcom.co.uk Ltd
 
Chicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki JauhiainenChicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki Jauhiainenjjauhiai
 
Auckland RUG - Building Digital Bridges
Auckland RUG - Building Digital BridgesAuckland RUG - Building Digital Bridges
Auckland RUG - Building Digital BridgesDavid Harrison
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202apartridge
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxcooperapleh
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxeubanksnefen
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxhelzerpatrina
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09rsalbin
 
“All the big problems happen on the first day"...
“All the big problems happen on the first day"...“All the big problems happen on the first day"...
“All the big problems happen on the first day"...Finith Jernigan, FAIA
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Virtual ULI
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)habibfathi
 
Building Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfBuilding Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfShaheRobinson
 
Campbell Resume with Timeline
Campbell Resume with TimelineCampbell Resume with Timeline
Campbell Resume with TimelineDace Campbell
 

Similar a Building Information Modeling : What, Why, How (20)

Nathan Wood DPR Lean BIM
Nathan Wood DPR Lean BIMNathan Wood DPR Lean BIM
Nathan Wood DPR Lean BIM
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011
 
From email to BIM: 20 years of construction collaboration technologies
From email to BIM: 20 years of construction collaboration technologiesFrom email to BIM: 20 years of construction collaboration technologies
From email to BIM: 20 years of construction collaboration technologies
 
Chicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki JauhiainenChicago2008 Jyrki Jauhiainen
Chicago2008 Jyrki Jauhiainen
 
Auckland RUG - Building Digital Bridges
Auckland RUG - Building Digital BridgesAuckland RUG - Building Digital Bridges
Auckland RUG - Building Digital Bridges
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202
 
Nw b im_hub_-_march2013
Nw b im_hub_-_march2013Nw b im_hub_-_march2013
Nw b im_hub_-_march2013
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Bim White Paper 11 9 09
Bim White Paper 11 9 09Bim White Paper 11 9 09
Bim White Paper 11 9 09
 
“All the big problems happen on the first day"...
“All the big problems happen on the first day"...“All the big problems happen on the first day"...
“All the big problems happen on the first day"...
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)
 
General dqi for web
General dqi for webGeneral dqi for web
General dqi for web
 
Building Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfBuilding Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdf
 
Campbell Resume with Timeline
Campbell Resume with TimelineCampbell Resume with Timeline
Campbell Resume with Timeline
 

Más de Nancy Cheng

University of Oregon Portland Architecture Program
University of Oregon Portland Architecture ProgramUniversity of Oregon Portland Architecture Program
University of Oregon Portland Architecture ProgramNancy Cheng
 
Meagan dickemann shanghai talk
Meagan dickemann shanghai talkMeagan dickemann shanghai talk
Meagan dickemann shanghai talkNancy Cheng
 
Univ. of Oregon Architecture Curriculum
Univ. of Oregon Architecture CurriculumUniv. of Oregon Architecture Curriculum
Univ. of Oregon Architecture CurriculumNancy Cheng
 
Alice Kimm, AIA of JFAK Architects
Alice Kimm, AIA of JFAK ArchitectsAlice Kimm, AIA of JFAK Architects
Alice Kimm, AIA of JFAK ArchitectsNancy Cheng
 
"Skin, Frame and Sustainability" by Works Partnership Architecture
"Skin, Frame and Sustainability" by Works Partnership Architecture"Skin, Frame and Sustainability" by Works Partnership Architecture
"Skin, Frame and Sustainability" by Works Partnership ArchitectureNancy Cheng
 
Nancy Cheng's Interests & Context
Nancy Cheng's Interests & ContextNancy Cheng's Interests & Context
Nancy Cheng's Interests & ContextNancy Cheng
 
Depicting Daylight: Types of Multiple Image Display
Depicting Daylight: Types of Multiple Image DisplayDepicting Daylight: Types of Multiple Image Display
Depicting Daylight: Types of Multiple Image DisplayNancy Cheng
 
Cultivating Collaboration: lessons from cohousing studios
Cultivating Collaboration: lessons from cohousing studiosCultivating Collaboration: lessons from cohousing studios
Cultivating Collaboration: lessons from cohousing studiosNancy Cheng
 

Más de Nancy Cheng (8)

University of Oregon Portland Architecture Program
University of Oregon Portland Architecture ProgramUniversity of Oregon Portland Architecture Program
University of Oregon Portland Architecture Program
 
Meagan dickemann shanghai talk
Meagan dickemann shanghai talkMeagan dickemann shanghai talk
Meagan dickemann shanghai talk
 
Univ. of Oregon Architecture Curriculum
Univ. of Oregon Architecture CurriculumUniv. of Oregon Architecture Curriculum
Univ. of Oregon Architecture Curriculum
 
Alice Kimm, AIA of JFAK Architects
Alice Kimm, AIA of JFAK ArchitectsAlice Kimm, AIA of JFAK Architects
Alice Kimm, AIA of JFAK Architects
 
"Skin, Frame and Sustainability" by Works Partnership Architecture
"Skin, Frame and Sustainability" by Works Partnership Architecture"Skin, Frame and Sustainability" by Works Partnership Architecture
"Skin, Frame and Sustainability" by Works Partnership Architecture
 
Nancy Cheng's Interests & Context
Nancy Cheng's Interests & ContextNancy Cheng's Interests & Context
Nancy Cheng's Interests & Context
 
Depicting Daylight: Types of Multiple Image Display
Depicting Daylight: Types of Multiple Image DisplayDepicting Daylight: Types of Multiple Image Display
Depicting Daylight: Types of Multiple Image Display
 
Cultivating Collaboration: lessons from cohousing studios
Cultivating Collaboration: lessons from cohousing studiosCultivating Collaboration: lessons from cohousing studios
Cultivating Collaboration: lessons from cohousing studios
 

Building Information Modeling : What, Why, How

  • 1. Nancy Yen-wen Cheng Building Information Modeling Nancy Yen-wen Cheng, University of Oregon •  What is BIM? •  Why do we need it? •  How does it work?
  • 3. What is BIM? Nancy Yen-wen Cheng A Building Information Model is a virtual object database shared by AEC partners -  connects 3D forms to non-graphic attributes (material properties, cost, scheduling and performance information, etc.) Image courtesy of Revit
  • 4. Consistent Information Nancy Yen-wen Cheng
  • 5. Consistent information reduces miscommunication Nancy Yen-wen Cheng Slide courtesy of IAI North America
  • 6. Benefits throughout the Building Lifecycle Nancy Yen-wen Cheng Timo Hartmann & Martin Fischer, Stanford CIFE, 2008
  • 7. Nancy Yen-wen Cheng Why do we need BIM?
  • 8. Why BIM? Downward Construction Productivity Nancy Yen-wen Cheng 2004 2008 2012 2014 2018 2022 2024 …. Paul Teicholtz
  • 9. Benefits of BIM compared to previous 2D CAD or paper Yen-wen Cheng Nancy •  Better: Coordination and clash detection reduces errors •  Cheaper: Efficiency saves money •  Faster: Minimizes redrawing -- Chuck Eastman, Georgia Tech **
  • 10. Benefits of BIM compared to previous 2D CAD or paper Yen-wen Cheng Nancy •  Better: Coordination and clash detection reduces errors •  Cheaper: Efficiency saves money •  Faster: Minimizes redrawing -- Chuck Eastman, Georgia Tech ArchiCad
  • 11. Why BIM? Islands of Automation in Construction Nancy Yen-wen Cheng Slide courtesy of Matti Hannus, VTT
  • 12. Traditional Design Decisions Nancy Yen-wen Cheng Abili ty Effort Litigation Phase SD DD CDs Construction Time Slide courtesy of Patrick MacLeamy, IAI International
  • 13. Earlier Design Decisions with BIM / IP Nancy Yen-wen Cheng Abili ty Effort Litigation Phase SD DD CDs Construction Time Slide courtesy of Patrick MacLeamy, IAI International
  • 14. Benefits for Sustainability Nancy Yen-wen Cheng Facilitates •  Integrated practice •  More seamless performance modeling •  Post-occupancy monitoring & responsiveness Image courtesy of Turner Construction
  • 15. Sustainability requires integrated practice Nancy Yen-wen Cheng •  More stakeholders involved in design earlier •  Shared risk & rewards: Your success depends of success of others –Michael Hricak •  Cultural Transformation needed. New tools don’t change thinking or processes — The Toyota Way by Jeffrey K. Liker Image courtesy of Green Building Services
  • 16. Integrated Practice Nancy Yen-wen Cheng •  One aspect affects all others. Adding mass for a thermal flywheel effect would have triggered a seismic upgrade. As soon as you did something to the flooring, suddenly it wasn't just that cost, but it was the next cost, the next cost. So that was the early design process: dead end, let's back up, let's go this way, try again." - Mark Heizer, Interface Engineering Diana Fischetti
  • 17. Nancy Yen-wen Cheng How does BIM work?
  • 18. Interoperability Nancy Yen-wen Cheng •  Get the right kind of information to the right people. -- Michael Hricak, USC Image courtesy of Victor Várkonyi, Graphisoft
  • 19. Interoperability Nancy Yen-wen Cheng •  Changes to Architectural design changes Structural view •  Industry Foundation Classes provide a common exchange language (driven by the Building Smart Alliance, formerly International Alliance for Interoperability) Image courtesy of Victor Várkonyi, Graphisoft
  • 20. Level of Detail Nancy Yen-wen Cheng •  Model complexity should support each phase of development Onuma Inc.
  • 21. BIM works at all scales Nancy Yen-wen Cheng Geographic Information Systems (GIS) coordinating with building scale models through GeoSpatial Consorium Image courtesy of Geospatial Consotium, Onuma, Inc., Portland Maps
  • 22. BIM works at all scales Nancy Yen-wen Cheng Geographic Information Systems (GIS) coordinating with building scale through GeoSpatial Consorium Images courtesy of Onuma, Inc.
  • 23. BIM & Energy Analysis Nancy Yen-wen Cheng Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts **
  • 24. BIM & Analysis Nancy Yen-wen Cheng •  From simplified zone analysis to room-based analysis Perimeter Core Image courtesy of Christine Clevenger, Stanford CIFE
  • 25. Performance-based design Nancy Yen-wen Cheng •  Round trip from model to analysis to reshaping the model
  • 26. BIM & Analysis software Nancy Yen-wen Cheng Images by BuildingGreen.com & Autodesk
  • 27. Form & Performance Nancy Yen-wen Cheng •  Solar radiation mapped onto form SOM’s Pearl River Tower uses PV and wind turbines Slide courtesy of SOM, Ecotect
  • 28. Shadow Casting Nancy Yen-wen Cheng •  Burt Hill Architects' Parkway 22 condominium complex in Philadelphia Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
  • 29. Shadow Casting Nancy Yen-wen Cheng •  Burt Hill Architects' Parkway 22 condominium complex in Philadelphia Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
  • 30. Parametric Nancy Yen-wen Cheng •  Parameter = variable (i.e. dimension or count)
  • 31. Parametric modeling Nancy Yen-wen Cheng •  Adjustable form with Bentley’s Generative Components Images by Wilson Chang, Simon Frazier University
  • 32. Modeling to Fabrication Nancy Yen-wen Cheng •  Adjustable form with Bentley’s Generative Components Images by Wilson Chang, Simon Frazier University
  • 33. Construction visualization Nancy Yen-wen Cheng •  See Stanford CIFE’s Virtual Design and Construction Slide courtesy of Washington DOT
  • 34. BIM in the Construction Industry Nancy Yen-wen Cheng Slide courtesy of Martin Fischer, Stanford CIFE
  • 35. Form and Performance Nancy Yen-wen Cheng •  Graphic feedback: Deviation map obtained by mapping laser scan data collected during construction onto 3D design model Slide courtesy of Dr. Burcu Akinci, Carnegie Mellon University
  • 36. Facilities Management Nancy Yen-wen Cheng •  4D Modeling, GSA Slide courtesy of Caroline Clevenger
  • 37. Building Information Networks Nancy Yen-wen Cheng •  Building dashboard by Lucid Design Group
  • 38. Building Information Networks Nancy Yen-wen Cheng •  Operations, Services via Online connections Slide courtesy of Phil Bernstein, Steven Brittan, Mark Dietrick, Rick Huibregts
  • 39. What matters? Nancy Yen-wen Cheng From McGrawHill The Business Value of BIM, SmartMarket Report, 2009, www.bim.construction.com
  • 40. Benefits of BIM Nancy Yen-wen Cheng From McGrawHill The Business Value of BIM, SmartMarket Report, 2009, www.bim.construction.com
  • 41. Benefits of BIM Nancy Yen-wen Cheng Evidence •  20-30% higher productivity in the field •  reduction of Requests for Information (RFI) & Change Orders (CO) by a factor of ten or more, •  higher engagement of all stakeholders (~70% positive in 2007 survey) •  consideration of more design options from more perspectives --Martin Fischer, Stanford Center for Integrated Facility Engineering (CIFE) BIM •  Reduces redundancy & errors •  Provides visual communication •  Facilitates adjustable Form with Performance Onuma, Inc.
  • 42. Summary Nancy Yen-wen Cheng Caveat •  Don’t mistake change for innovation. •  With computers, bad design can happen really fast. — Michael Hricak Slide courtesy of Onuma, Inc.
  • 43. Summary Nancy Yen-wen Cheng nywc@uoregon.edu Sustainable Design requires Integrated Practice –  Engage stakeholders early –  Share risks & rewards BIM supports the full building life-cycle BIM: Building Investigation Model BAM: Building Assembly Model BOOM: Building Operation Optimization Model -- Patrick MacLeamy, HOK Slide courtesy of CH2MHill