SlideShare una empresa de Scribd logo
1 de 29
První brněnská strojírna
Reliable partner for your projects
200 years of První brněnská strojírna
History
One of the oldest machineries in the world
1814
Johannes Reiff
founded machinery company at Šlapanice
1872
První brněnská strojírna
Erste Brünner Maschinen- Fabriks-Gesselschaft
1929
Trademark registred
1993
Sale 67% part to ABB (next ALSTOM, SIEMENS, …)
PBS GROUP
PBS GROUP - Company Profile
BOILER TURBINE
EPC & TURNKEY DELIVERY
AEROSPACE PRECISION
CASTING
INDUSTRY QUALITY &
DEVELOPMENT
PBS Velká Bíteš – Main fields of activities
 AEROSPACE
 POWER INDUSTRY
 TRANSPORT
 ECOLOGY
 CRYOGENICS
 GLASS FIBRES
 MEDICAL
 FOOD INDUSTRY
 ELECTRICAL AND GAS INDUSTRY
PBS Velká Bíteš – aircfaft technologies
PBS ENERGO
PBS Brno - Profile
PBS Brno - Profile
• Engineering company
• Complex services in heating plants and power
engineering
• Own boiler technologies for different fuels
• Focus on ecologic burning
• Maintenance services
• ISO 9001 certification
PBS Brno - Products
PBS Brno - Products
Own boiler technology
• Biomass feed boilers
• Fossil fuel feed boilers
• Hot water boilers
• Separated communal waste feed boilers
• HRSG boilers
Biomass feed boilers
• Own boiler construction
• Load range of 10 – 60 tons of steam per hour (tph)
• Two membrane walls passes and one uncooled pass
conception
• Grate burning
• High efficiency
• Traveling or vibrating grate
• Low emissions
• Cleaning of heating surfaces
• Corrosion protection
Fossil fuel feed boilers
• Own boiler construction
• Load range 10 – 80 tph
• Two membrane walls passes and one uncooled pass
conception
• Grate or fluidized bed type
burning
• High efficiency
• Low emissions
• Corrosion Prevention
• Cleaning of heating surfaces
Hot water boilers
• Horizontal construction with forced circulation of water
• Combustion chamber with membrane walls
• Convective surfaces after the combustion chamber
• Delivered in pre-assembled blocks
• Automatic operation
• 10 – 100 MWt loads
• Superior tightness allows
pressure combustion
Treated communal waste feed boilers
• Own construction based on
previous research
• Load range 40 – 80 tph
• Precision burning
• Chlorine corrosion
protection
• RDF (Refuse Derived Fuel)
as a fuel
• Use of SNCR for low NOx
HRSG boilers
• Boilers for waste heat from
combustion turbines, engines
and other appliances
• Load range 5 – 80 MWt
• Water tube horizontal
boilers
• One to three pressure levels
• Fresh air firing option
Blocks for biomass or fossil fuel burning
• Typed solution with steam load range 10 – 60 tph
• Fuel handling
• Boilers and auxiliaries
• Steam turbine with auxiliaries
• Flue gas cleaning
• Electricity output
Blocks with gas engines
• Cooperation with engine manufacturers
• Use of flue gas heat exchangers
• Modular solution with modules of 4 – 10 Mwe
• Total load range
10 – 50 Mwe
Boiler retrofits
• Solution for lowering the
emissions of existing boilers
• Primary measurements –
burners, optimization of
combustion air
• Secondary measurements –
SNCR or SCR methods
• Installation of fabric filters
or ESP
Maintenance services
• Erection and start-up
projects
• Guarantee tests projects
• Conservation of boilers
• Technical assistance
• Chemical cleaning
• Staff training
PBS Brno - Power engineering projects
PBS Brno
PBS Brno offers EPC and Turnkey deliveries of power units for combustion of biomass and
co-generation of power and heat.
Fuel » biomass (straw, pellets, wood chips, power crops, etc.)
» gaseous fuel (natural gas, biogas, coke gas, etc.)
» liquid fuel (diesel, petrol, kerosene oil, burning oil, etc.)
Power units » 700 kW – 3 MW with the use of CSTG condensing extraction turbines
» 3 MW – 30 MW with the use of TG condensing extraction turbines
PBS Brno - References
PBS Brno - References
• Pilsen, gas fired boiler 25t/h
• Krnov, 35/40 t/h,wood chips fired boiler
• Domoradice, 35/40th, wood chips fired boiler
• Žarnovica Slovakia 40 t/h, wood chips and straw pelets
• Kutná Hora 30/33 t/h, straw fired boiler
• Wicker Germany 52 t/h, old wood fired boiler
• Pforzheim Germany 55 t/h, old wood fired boiler
• Mariánské Lázně 12 t/h, wood chips fired boiler
PBS Brno - References
• Štětí, 160 t/h oil fired boiler - reconstruction
• Žiar n.H. Slovakia, HRSG 10/30 t/h, fresh air firing
• Krompachy Slovakia, HRSG 12t/h
• Krško Slovenien, HRSG 60 t/h, fresh air firing
•
První brněnská strojírna, a. s.
Olomoucká 3419/9
618 00 Brno
Czech Republic
Phone: +420 532 295 111
Fax: +420 543 211 222
E-mail: pbs@pbs.cz
http://www.pbs.cz

Más contenido relacionado

Similar a PBS_Prezentace_HR_BiH_2015_06_AJ.pptx

OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSharshavardhan sivadi
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in miningMartin Preene
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
A critical review of recent technological developments in electric arc furnaces
A critical review of recent technological developments in electric arc furnacesA critical review of recent technological developments in electric arc furnaces
A critical review of recent technological developments in electric arc furnacesJorge Madias
 
Biomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierBiomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierRado Irgl
 
A presentation on Vizag Steel Plant. ppt
A presentation on Vizag Steel Plant. pptA presentation on Vizag Steel Plant. ppt
A presentation on Vizag Steel Plant. pptMukeshpanigrahy1
 
ISISAN Engineering Presentation
ISISAN Engineering PresentationISISAN Engineering Presentation
ISISAN Engineering PresentationMartin Velayudhan
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Fortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceFortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceSandra Nagdasova
 
Power Engineering II Lecture 1.pptx
Power Engineering II Lecture 1.pptxPower Engineering II Lecture 1.pptx
Power Engineering II Lecture 1.pptxAminuAliyuJibrin
 
2 Thermal Power Plants.pptx
2 Thermal Power Plants.pptx2 Thermal Power Plants.pptx
2 Thermal Power Plants.pptxTalhaKhanzada3
 
Straight Chamber Continuous Furnaces
Straight Chamber Continuous FurnacesStraight Chamber Continuous Furnaces
Straight Chamber Continuous FurnacesTalha Nafees
 

Similar a PBS_Prezentace_HR_BiH_2015_06_AJ.pptx (20)

sail bokaro
sail bokarosail bokaro
sail bokaro
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Geothermal energy in mining
Geothermal energy in miningGeothermal energy in mining
Geothermal energy in mining
 
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an In...
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an In...Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an In...
Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an In...
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
A critical review of recent technological developments in electric arc furnaces
A critical review of recent technological developments in electric arc furnacesA critical review of recent technological developments in electric arc furnaces
A critical review of recent technological developments in electric arc furnaces
 
02 simtec 2011 caldeiras
02 simtec 2011  caldeiras02 simtec 2011  caldeiras
02 simtec 2011 caldeiras
 
Biomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierBiomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifier
 
Unit 2
Unit 2Unit 2
Unit 2
 
CII Presentation
CII PresentationCII Presentation
CII Presentation
 
A presentation on Vizag Steel Plant. ppt
A presentation on Vizag Steel Plant. pptA presentation on Vizag Steel Plant. ppt
A presentation on Vizag Steel Plant. ppt
 
ISISAN Engineering Presentation
ISISAN Engineering PresentationISISAN Engineering Presentation
ISISAN Engineering Presentation
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
P1
P1P1
P1
 
Fortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independenceFortum Klaipėda: huge step towards independence
Fortum Klaipėda: huge step towards independence
 
Power Engineering II Lecture 1.pptx
Power Engineering II Lecture 1.pptxPower Engineering II Lecture 1.pptx
Power Engineering II Lecture 1.pptx
 
2 Thermal Power Plants.pptx
2 Thermal Power Plants.pptx2 Thermal Power Plants.pptx
2 Thermal Power Plants.pptx
 
Straight Chamber Continuous Furnaces
Straight Chamber Continuous FurnacesStraight Chamber Continuous Furnaces
Straight Chamber Continuous Furnaces
 
Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
Jonathan Lee (Newcastle University) - Intensification of Solvent Based Carbon...
 

Más de NamikHadziibrahimovi2

HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..pptHSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..pptNamikHadziibrahimovi2
 
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptxPresentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptxNamikHadziibrahimovi2
 
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptxPresentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptxNamikHadziibrahimovi2
 
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptxPresentation s HPP Vršuma-IDEAL ENERGY DOO.pptx
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptxNamikHadziibrahimovi2
 

Más de NamikHadziibrahimovi2 (6)

TRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.pptTRETMAN OTPADNE VODE MILANOVIC.ppt
TRETMAN OTPADNE VODE MILANOVIC.ppt
 
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..pptHSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
HSehovic-ES BiH i FBiH-Prezentacija.fin..ppt
 
Hidroelektrane.ppt
Hidroelektrane.pptHidroelektrane.ppt
Hidroelektrane.ppt
 
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptxPresentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
Presentation Construction of TPP Kakanj- Unit 8-JP Elektroprivreda biH d.d.pptx
 
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptxPresentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
Presentation Construction of HPP Ustikolina- JP Elektroprivreda BiH d.d.pptx
 
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptxPresentation s HPP Vršuma-IDEAL ENERGY DOO.pptx
Presentation s HPP Vršuma-IDEAL ENERGY DOO.pptx
 

Último

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 

Último (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 

PBS_Prezentace_HR_BiH_2015_06_AJ.pptx

  • 1. První brněnská strojírna Reliable partner for your projects 200 years of První brněnská strojírna
  • 3. One of the oldest machineries in the world 1814 Johannes Reiff founded machinery company at Šlapanice 1872 První brněnská strojírna Erste Brünner Maschinen- Fabriks-Gesselschaft 1929 Trademark registred 1993 Sale 67% part to ABB (next ALSTOM, SIEMENS, …)
  • 5. PBS GROUP - Company Profile BOILER TURBINE EPC & TURNKEY DELIVERY AEROSPACE PRECISION CASTING INDUSTRY QUALITY & DEVELOPMENT
  • 6. PBS Velká Bíteš – Main fields of activities  AEROSPACE  POWER INDUSTRY  TRANSPORT  ECOLOGY  CRYOGENICS  GLASS FIBRES  MEDICAL  FOOD INDUSTRY  ELECTRICAL AND GAS INDUSTRY
  • 7. PBS Velká Bíteš – aircfaft technologies
  • 9. PBS Brno - Profile
  • 10. PBS Brno - Profile • Engineering company • Complex services in heating plants and power engineering • Own boiler technologies for different fuels • Focus on ecologic burning • Maintenance services • ISO 9001 certification
  • 11. PBS Brno - Products
  • 12. PBS Brno - Products Own boiler technology • Biomass feed boilers • Fossil fuel feed boilers • Hot water boilers • Separated communal waste feed boilers • HRSG boilers
  • 13. Biomass feed boilers • Own boiler construction • Load range of 10 – 60 tons of steam per hour (tph) • Two membrane walls passes and one uncooled pass conception • Grate burning • High efficiency • Traveling or vibrating grate • Low emissions • Cleaning of heating surfaces • Corrosion protection
  • 14. Fossil fuel feed boilers • Own boiler construction • Load range 10 – 80 tph • Two membrane walls passes and one uncooled pass conception • Grate or fluidized bed type burning • High efficiency • Low emissions • Corrosion Prevention • Cleaning of heating surfaces
  • 15. Hot water boilers • Horizontal construction with forced circulation of water • Combustion chamber with membrane walls • Convective surfaces after the combustion chamber • Delivered in pre-assembled blocks • Automatic operation • 10 – 100 MWt loads • Superior tightness allows pressure combustion
  • 16. Treated communal waste feed boilers • Own construction based on previous research • Load range 40 – 80 tph • Precision burning • Chlorine corrosion protection • RDF (Refuse Derived Fuel) as a fuel • Use of SNCR for low NOx
  • 17. HRSG boilers • Boilers for waste heat from combustion turbines, engines and other appliances • Load range 5 – 80 MWt • Water tube horizontal boilers • One to three pressure levels • Fresh air firing option
  • 18. Blocks for biomass or fossil fuel burning • Typed solution with steam load range 10 – 60 tph • Fuel handling • Boilers and auxiliaries • Steam turbine with auxiliaries • Flue gas cleaning • Electricity output
  • 19. Blocks with gas engines • Cooperation with engine manufacturers • Use of flue gas heat exchangers • Modular solution with modules of 4 – 10 Mwe • Total load range 10 – 50 Mwe
  • 20. Boiler retrofits • Solution for lowering the emissions of existing boilers • Primary measurements – burners, optimization of combustion air • Secondary measurements – SNCR or SCR methods • Installation of fabric filters or ESP
  • 21. Maintenance services • Erection and start-up projects • Guarantee tests projects • Conservation of boilers • Technical assistance • Chemical cleaning • Staff training
  • 22. PBS Brno - Power engineering projects
  • 23. PBS Brno PBS Brno offers EPC and Turnkey deliveries of power units for combustion of biomass and co-generation of power and heat. Fuel » biomass (straw, pellets, wood chips, power crops, etc.) » gaseous fuel (natural gas, biogas, coke gas, etc.) » liquid fuel (diesel, petrol, kerosene oil, burning oil, etc.) Power units » 700 kW – 3 MW with the use of CSTG condensing extraction turbines » 3 MW – 30 MW with the use of TG condensing extraction turbines
  • 24. PBS Brno - References
  • 25. PBS Brno - References • Pilsen, gas fired boiler 25t/h • Krnov, 35/40 t/h,wood chips fired boiler • Domoradice, 35/40th, wood chips fired boiler • Žarnovica Slovakia 40 t/h, wood chips and straw pelets • Kutná Hora 30/33 t/h, straw fired boiler • Wicker Germany 52 t/h, old wood fired boiler • Pforzheim Germany 55 t/h, old wood fired boiler • Mariánské Lázně 12 t/h, wood chips fired boiler
  • 26. PBS Brno - References • Štětí, 160 t/h oil fired boiler - reconstruction • Žiar n.H. Slovakia, HRSG 10/30 t/h, fresh air firing • Krompachy Slovakia, HRSG 12t/h • Krško Slovenien, HRSG 60 t/h, fresh air firing •
  • 27.
  • 28.
  • 29. První brněnská strojírna, a. s. Olomoucká 3419/9 618 00 Brno Czech Republic Phone: +420 532 295 111 Fax: +420 543 211 222 E-mail: pbs@pbs.cz http://www.pbs.cz