Monitoring red-throated
diver distribution in
Liverpool Bay
Allen Risby
DONG Energy
• Burbo Bank Extension Offshore Wind Farm
• Requirement for red throated diver monitoring
• Power analysis & objectives
• Survey method
• Modelling & reporting
• Conclusions
2
Agenda
Burbo Bank Extension Offshore Wind Farm
The site was awarded in May 2010 by The
Crown Estate
• Total Area: 40 km²
• Capacity: max 259 MW
• DCO September 2014
• Proposed 32 turbines with 8 MW capacity
• Construction due to commence 2016, with
commissioning Q1 2017.
Other offshore wind farm projects in or near
Liverpool Bay (with operational year)
• North Hoyle (2003)
• Barrow (2006)
• Burbo Bank (2007)
• Rhyl Flats (2009)
• Walney I+II (2011 / 2012)
• Ormonde (2012)
• West of Duddon Sands (2014)
• Gwynt y Mor (under construction)
• Walney Extension (planned)
3
Liverpool Bay Special Protection Area
• Burbo Bank Extension lies mostly within
Liverpool Bay SPA;
• Liverpool Bay SPA designated in 2010, for
red-throated diver Gavia stellata and
common scoter Melanitta nigra; and
• North Hoyle, Rhyl Flats, Burbo Bank and
Gwynt-y-Môr also contained within Liverpool
Bay SPA.
4
Burbo Bank Extension OWF - Examination
• Planning Inspectorate (PINS) Examination
September 2013 – March 2014
• Nationally significant infrastructure project
• Key ornithological issue is extent of
displacement of red-throated diver,
consequences of displacement and
implications for Liverpool Bay SPA
• Cumulative assessment with Burbo Bank,
Gwynt-y-Môr and Rhyl Flats wind farms
• Outline ornithological survey document agreed
during Examination with Natural England &
Natural Resources Wales
• PINS recommendation and DECC AA
• DCO granted, deemed Marine Licence with
monitoring condition
Agreed approach to RTD Monitoring
Two objectives:
1) Measure displacement effect of Burbo Bank Extension on RTD
• Digital video aerial surveys focussed on the Burbo Bank Extension site and a 4
km buffer at a suitable resolution to assess the displacement effect
2) Measure change in RTD density across the SPA following Burbo Bank
Extension construction
• Digital video aerial surveys covering Liverpool Bay SPA (full extent but not 100%
coverage) at a suitable resolution to assess the change in density across the
SPA
6
Scope for RTD Monitoring
• A series of high resolution digital video aerial surveys to compare pre-construction
and post-construction distribution of RTD, the post-construction monitoring to extend
to up to 3 years (which may be non-sequential upon agreement)
• Survey designed to allow comparison with existing Liverpool Bay SPA surveys (such
as Bradbury et al, 2011) and be of sufficient "power" to provide statistical confidence
in the results
• HiDef approach based on the survey intensity and frequency identified in the digital
video aerial surveys carried out in 2011 for JNCC
• Survey methodology for Burbo Extension agreed with MMO, NE and NRW
• Surveys are taking place between November and March, as this is the key time of
year for RTD in Liverpool Bay
7
Power analysis
• HiDef undertook a suite of digital aerial surveys in winter 2011 for JNCC to calculate
power to detect change in SPA
• This programme provides good basis for understanding how much survey is required to
detect change at Burbo Bank Extension
• This demonstrates that 2 surveys per winter with 17.5% coverage of the SPA will detect
33% decrease and 50% increase with sufficient power
Scenario
Coverage of
site
Number of
surveys
Decline to be
detected
Increase to be
detected
Power to detect
change
1 5.83% 2 33% 50% 58.4%
2 17.5% 2 33% 50% 81.0%
3 5.83% 2 50% 100% 96.4%
4 17.5% 2 50% 100% 99.8%
8
Objective 1
• To measure the displacement effect from
Burbo Bank and Burbo Bank Extension and
measure the displacement distance in 500 m
bands from boundary
• Eight transects at 2.75 km apart – this is
approximately 20.2% coverage
• Area surveyed five times per winter (monthly
in Nov, Dec, Jan, Feb & Mar)
• One survey season during pre-construction
(now completed) and up to three during post-
construction (2017/18 onwards)
9
Objective 2
• To determine displacement effects of Burbo
Bank Extension and other wind farms on
RTD populations in Liverpool Bay SPA
• 44 transects at 2.75km apart – this is
approximately 18.6% coverage
• Area surveyed twice per winter (monthly in
Jan & Feb)
• One survey season pre-construction (now
completed) and up to three years post-
construction
10
The survey method
• HiDef bespoke system designed for bird
and marine mammal surveys
• Uses a rig with four ultra high resolution
video cameras (~ 500MPx)
• Cameras always angled away from sun
glare to stop data loss
• Surveys flown at 550m (1800ft) to avoid
flushing RTD and common scoter
• Uses a resolution of 2cm GSD
• Total strip width of 500m along continuous
transects – avoids pseudo-replication of
plot based approach
11
Red-throated diver images from Liverpool Bay
12
Flock of 6 red-throated divers Red-throated diver flying south-west
Red-throated diver with fish
13
January 2015 SPA-wide survey
summary of observations (circa 20% coverage)
14
Data modelling
• Analysis based on constructing density surface models (DSM) for RTD
• Strip transects broken into 100s of ‘segments’
• Calculates abundance with upper and lower confidence intervals (CI) and coefficient of
variance (CV) in fine matrix of grid cells
• Modern modelling approach uses ‘Complex Regional Spatial Smoother’ (CReSS)
• CReSS well-adapted for birds with patchy distribution, such as seabirds
• This modelling approach has been used at one other UK offshore wind farm, as well as
for a recent series of bird and marine mammal surveys for Marine Scotland
Pre-construction survey report
• The DSM will use bathymetry as a co-
variate for diver distribution
• Combines recent digital and historical
visual aerial survey data going back to
2001
• Report on the ability of model to detect
changes in RTD abundance around
Burbo Bank and Burbo Bank Extension,
as well as within the SPA
• Report on the ability to detect
displacement in 500m or 1km bands from
Burbo Bank Extension
• This is an example output from another
wind farm site where this technique has
been recently used
16
Conclusions
• Post consent monitoring that moves
monitoring away from old FEPA-style
Before and After Control Impact (BACI)
licence conditions
• Monitoring at the scale of the Liverpool
Bay SPA is more meaningful for
displacement than wind farm + buffer
monitoring alone
• Ability to incorporate previous (visual)
aerial survey data into the baseline
model
• Digital aerial surveys allow the data to
be subsequently re-analysed for other
target species.
17
Thank-You.
Any Questions?
18
19

Más contenido relacionado

La actualidad más candente

TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
grssieee
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Stephen Flood
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Engineers Australia
 
2014 04 emerald siggery
2014   04 emerald siggery2014   04 emerald siggery
2014 04 emerald siggery
SevernEstuary
 
Ian Grant_An improved satellite-based long record of Australian vegetation dy...
Ian Grant_An improved satellite-based long record of Australian vegetation dy...Ian Grant_An improved satellite-based long record of Australian vegetation dy...
Ian Grant_An improved satellite-based long record of Australian vegetation dy...
TERN Australia
 

La actualidad más candente (20)

CAMS General Assembly EUMETSAT
CAMS General Assembly EUMETSATCAMS General Assembly EUMETSAT
CAMS General Assembly EUMETSAT
 
AAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary DavisAAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary Davis
 
Use of Remote Sensing to Investigate Striking Challenges on W R in Lebanon, A...
Use of Remote Sensing to Investigate Striking Challenges on W R in Lebanon, A...Use of Remote Sensing to Investigate Striking Challenges on W R in Lebanon, A...
Use of Remote Sensing to Investigate Striking Challenges on W R in Lebanon, A...
 
Land Cover Map 2015
Land Cover Map 2015Land Cover Map 2015
Land Cover Map 2015
 
TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
TU3.L09 - SPACEBORNE FULLY POLARIMETRIC TIME-SERIES DATASETS FOR LAND COVER A...
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Nearshore Hardbottom Monitoring: Alternative Methods
Nearshore Hardbottom Monitoring: Alternative MethodsNearshore Hardbottom Monitoring: Alternative Methods
Nearshore Hardbottom Monitoring: Alternative Methods
 
Tete bayou openhousemeeting_021215
Tete bayou openhousemeeting_021215Tete bayou openhousemeeting_021215
Tete bayou openhousemeeting_021215
 
Theme 1: Main session outcomes and key messages
Theme 1: Main session outcomes and key messagesTheme 1: Main session outcomes and key messages
Theme 1: Main session outcomes and key messages
 
Indiana Harbor Illinois
Indiana Harbor IllinoisIndiana Harbor Illinois
Indiana Harbor Illinois
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 
20041217_OkeeposterKelly
20041217_OkeeposterKelly20041217_OkeeposterKelly
20041217_OkeeposterKelly
 
Base platform workshop_09_feb17
Base platform workshop_09_feb17Base platform workshop_09_feb17
Base platform workshop_09_feb17
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Modelling Development-related Changes in Concentrations and Deposition to Hab...
Modelling Development-related Changes in Concentrations and Deposition to Hab...Modelling Development-related Changes in Concentrations and Deposition to Hab...
Modelling Development-related Changes in Concentrations and Deposition to Hab...
 
DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...
DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...
DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Nisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - FiguresNisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - Figures
 
2014 04 emerald siggery
2014   04 emerald siggery2014   04 emerald siggery
2014 04 emerald siggery
 
Ian Grant_An improved satellite-based long record of Australian vegetation dy...
Ian Grant_An improved satellite-based long record of Australian vegetation dy...Ian Grant_An improved satellite-based long record of Australian vegetation dy...
Ian Grant_An improved satellite-based long record of Australian vegetation dy...
 

Similar a #4/9 Monitoring red throated diver distribution Liverpool Bay - DONG Energy

O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
andronikos1990
 
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Carl Greenstreet
 
Zebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint PresentationZebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint Presentation
ZEBRA Environmental
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
Ravi Naid Gorle
 
Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)
nm2allen
 
Offshore wind supply chain bilbao alan 28 feb 2012
Offshore wind supply chain bilbao   alan 28 feb 2012Offshore wind supply chain bilbao   alan 28 feb 2012
Offshore wind supply chain bilbao alan 28 feb 2012
British Embassy Madrid
 

Similar a #4/9 Monitoring red throated diver distribution Liverpool Bay - DONG Energy (20)

Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
O'Hara Murray & Gallego - Modelling Offshore Wind Farms off the East Coast of...
 
EOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERC
 
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Bell Creek, USA
Bell Creek, USABell Creek, USA
Bell Creek, USA
 
Mp ground water
Mp ground waterMp ground water
Mp ground water
 
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring
 
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation scheme
 
Zebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint PresentationZebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint Presentation
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
 
Water for Agriculture in Latin America and the Caribbean Under a Changing Cli...
Water for Agriculture in Latin America and the Caribbean Under a Changing Cli...Water for Agriculture in Latin America and the Caribbean Under a Changing Cli...
Water for Agriculture in Latin America and the Caribbean Under a Changing Cli...
 
Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)
 
TGS GPS- Eastern Canada Interpretation- Labrador
TGS GPS- Eastern Canada Interpretation- LabradorTGS GPS- Eastern Canada Interpretation- Labrador
TGS GPS- Eastern Canada Interpretation- Labrador
 
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modelling
 
2009 09 IMCORE - Rhoda Ballinger
2009 09 IMCORE - Rhoda Ballinger 2009 09 IMCORE - Rhoda Ballinger
2009 09 IMCORE - Rhoda Ballinger
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert Project
 
Offshore wind supply chain bilbao alan 28 feb 2012
Offshore wind supply chain bilbao   alan 28 feb 2012Offshore wind supply chain bilbao   alan 28 feb 2012
Offshore wind supply chain bilbao alan 28 feb 2012
 

Más de NaturalEngland

Más de NaturalEngland (15)

#1/9 Steve Bellew of GoBE consultants highlighting first principles for post ...
#1/9 Steve Bellew of GoBE consultants highlighting first principles for post ...#1/9 Steve Bellew of GoBE consultants highlighting first principles for post ...
#1/9 Steve Bellew of GoBE consultants highlighting first principles for post ...
 
#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response
 
#3/9 Ornithology monitoring on offshore windfarms
#3/9 Ornithology monitoring on offshore windfarms#3/9 Ornithology monitoring on offshore windfarms
#3/9 Ornithology monitoring on offshore windfarms
 
#5/9: A plea for survey precision
#5/9: A plea for survey precision#5/9: A plea for survey precision
#5/9: A plea for survey precision
 
#6/9 Marine ecological monitoring at UK OSWF
#6/9 Marine ecological monitoring at UK OSWF#6/9 Marine ecological monitoring at UK OSWF
#6/9 Marine ecological monitoring at UK OSWF
 
#7/9 Environmental Impact monitoring NL
#7/9 Environmental Impact monitoring NL#7/9 Environmental Impact monitoring NL
#7/9 Environmental Impact monitoring NL
 
#8/9 Bird monitoring at Dugeon offshore windfarm
#8/9 Bird monitoring at Dugeon offshore windfarm#8/9 Bird monitoring at Dugeon offshore windfarm
#8/9 Bird monitoring at Dugeon offshore windfarm
 
NE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green cityNE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green city
 
NE Mosaic approach: Managing habitats for species - introduction
NE Mosaic approach: Managing habitats for species - introductionNE Mosaic approach: Managing habitats for species - introduction
NE Mosaic approach: Managing habitats for species - introduction
 
8 Steve Bellew GoBe offshore wind seminar 18 19 march 2014
8 Steve Bellew GoBe offshore wind seminar 18 19 march 20148 Steve Bellew GoBe offshore wind seminar 18 19 march 2014
8 Steve Bellew GoBe offshore wind seminar 18 19 march 2014
 
6 Crown Estate's Jessica Orr Developing an offshore windfarm into the future
6 Crown Estate's Jessica Orr Developing an offshore windfarm into the future6 Crown Estate's Jessica Orr Developing an offshore windfarm into the future
6 Crown Estate's Jessica Orr Developing an offshore windfarm into the future
 
5 Chris Gibson Natural England offshore wind seminar 18 19 march 2014 Why are...
5 Chris Gibson Natural England offshore wind seminar 18 19 march 2014 Why are...5 Chris Gibson Natural England offshore wind seminar 18 19 march 2014 Why are...
5 Chris Gibson Natural England offshore wind seminar 18 19 march 2014 Why are...
 
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
4 sarah nightingale decc offshore wind seminar 18 19  march 20144 sarah nightingale decc offshore wind seminar 18 19  march 2014
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
 
Offshore renewables in the UK: Funding and developing offshore wind projects
Offshore renewables in the UK: Funding and developing offshore wind projectsOffshore renewables in the UK: Funding and developing offshore wind projects
Offshore renewables in the UK: Funding and developing offshore wind projects
 
Healthy Ecosystems, Healthy People
Healthy Ecosystems, Healthy PeopleHealthy Ecosystems, Healthy People
Healthy Ecosystems, Healthy People
 

Último

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
rajputriyana310
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 

Último (20)

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 

#4/9 Monitoring red throated diver distribution Liverpool Bay - DONG Energy

  • 1. Monitoring red-throated diver distribution in Liverpool Bay Allen Risby DONG Energy
  • 2. • Burbo Bank Extension Offshore Wind Farm • Requirement for red throated diver monitoring • Power analysis & objectives • Survey method • Modelling & reporting • Conclusions 2 Agenda
  • 3. Burbo Bank Extension Offshore Wind Farm The site was awarded in May 2010 by The Crown Estate • Total Area: 40 km² • Capacity: max 259 MW • DCO September 2014 • Proposed 32 turbines with 8 MW capacity • Construction due to commence 2016, with commissioning Q1 2017. Other offshore wind farm projects in or near Liverpool Bay (with operational year) • North Hoyle (2003) • Barrow (2006) • Burbo Bank (2007) • Rhyl Flats (2009) • Walney I+II (2011 / 2012) • Ormonde (2012) • West of Duddon Sands (2014) • Gwynt y Mor (under construction) • Walney Extension (planned) 3
  • 4. Liverpool Bay Special Protection Area • Burbo Bank Extension lies mostly within Liverpool Bay SPA; • Liverpool Bay SPA designated in 2010, for red-throated diver Gavia stellata and common scoter Melanitta nigra; and • North Hoyle, Rhyl Flats, Burbo Bank and Gwynt-y-Môr also contained within Liverpool Bay SPA. 4
  • 5. Burbo Bank Extension OWF - Examination • Planning Inspectorate (PINS) Examination September 2013 – March 2014 • Nationally significant infrastructure project • Key ornithological issue is extent of displacement of red-throated diver, consequences of displacement and implications for Liverpool Bay SPA • Cumulative assessment with Burbo Bank, Gwynt-y-Môr and Rhyl Flats wind farms • Outline ornithological survey document agreed during Examination with Natural England & Natural Resources Wales • PINS recommendation and DECC AA • DCO granted, deemed Marine Licence with monitoring condition
  • 6. Agreed approach to RTD Monitoring Two objectives: 1) Measure displacement effect of Burbo Bank Extension on RTD • Digital video aerial surveys focussed on the Burbo Bank Extension site and a 4 km buffer at a suitable resolution to assess the displacement effect 2) Measure change in RTD density across the SPA following Burbo Bank Extension construction • Digital video aerial surveys covering Liverpool Bay SPA (full extent but not 100% coverage) at a suitable resolution to assess the change in density across the SPA 6
  • 7. Scope for RTD Monitoring • A series of high resolution digital video aerial surveys to compare pre-construction and post-construction distribution of RTD, the post-construction monitoring to extend to up to 3 years (which may be non-sequential upon agreement) • Survey designed to allow comparison with existing Liverpool Bay SPA surveys (such as Bradbury et al, 2011) and be of sufficient "power" to provide statistical confidence in the results • HiDef approach based on the survey intensity and frequency identified in the digital video aerial surveys carried out in 2011 for JNCC • Survey methodology for Burbo Extension agreed with MMO, NE and NRW • Surveys are taking place between November and March, as this is the key time of year for RTD in Liverpool Bay 7
  • 8. Power analysis • HiDef undertook a suite of digital aerial surveys in winter 2011 for JNCC to calculate power to detect change in SPA • This programme provides good basis for understanding how much survey is required to detect change at Burbo Bank Extension • This demonstrates that 2 surveys per winter with 17.5% coverage of the SPA will detect 33% decrease and 50% increase with sufficient power Scenario Coverage of site Number of surveys Decline to be detected Increase to be detected Power to detect change 1 5.83% 2 33% 50% 58.4% 2 17.5% 2 33% 50% 81.0% 3 5.83% 2 50% 100% 96.4% 4 17.5% 2 50% 100% 99.8% 8
  • 9. Objective 1 • To measure the displacement effect from Burbo Bank and Burbo Bank Extension and measure the displacement distance in 500 m bands from boundary • Eight transects at 2.75 km apart – this is approximately 20.2% coverage • Area surveyed five times per winter (monthly in Nov, Dec, Jan, Feb & Mar) • One survey season during pre-construction (now completed) and up to three during post- construction (2017/18 onwards) 9
  • 10. Objective 2 • To determine displacement effects of Burbo Bank Extension and other wind farms on RTD populations in Liverpool Bay SPA • 44 transects at 2.75km apart – this is approximately 18.6% coverage • Area surveyed twice per winter (monthly in Jan & Feb) • One survey season pre-construction (now completed) and up to three years post- construction 10
  • 11. The survey method • HiDef bespoke system designed for bird and marine mammal surveys • Uses a rig with four ultra high resolution video cameras (~ 500MPx) • Cameras always angled away from sun glare to stop data loss • Surveys flown at 550m (1800ft) to avoid flushing RTD and common scoter • Uses a resolution of 2cm GSD • Total strip width of 500m along continuous transects – avoids pseudo-replication of plot based approach 11
  • 12. Red-throated diver images from Liverpool Bay 12 Flock of 6 red-throated divers Red-throated diver flying south-west Red-throated diver with fish
  • 13. 13
  • 14. January 2015 SPA-wide survey summary of observations (circa 20% coverage) 14
  • 15. Data modelling • Analysis based on constructing density surface models (DSM) for RTD • Strip transects broken into 100s of ‘segments’ • Calculates abundance with upper and lower confidence intervals (CI) and coefficient of variance (CV) in fine matrix of grid cells • Modern modelling approach uses ‘Complex Regional Spatial Smoother’ (CReSS) • CReSS well-adapted for birds with patchy distribution, such as seabirds • This modelling approach has been used at one other UK offshore wind farm, as well as for a recent series of bird and marine mammal surveys for Marine Scotland
  • 16. Pre-construction survey report • The DSM will use bathymetry as a co- variate for diver distribution • Combines recent digital and historical visual aerial survey data going back to 2001 • Report on the ability of model to detect changes in RTD abundance around Burbo Bank and Burbo Bank Extension, as well as within the SPA • Report on the ability to detect displacement in 500m or 1km bands from Burbo Bank Extension • This is an example output from another wind farm site where this technique has been recently used 16
  • 17. Conclusions • Post consent monitoring that moves monitoring away from old FEPA-style Before and After Control Impact (BACI) licence conditions • Monitoring at the scale of the Liverpool Bay SPA is more meaningful for displacement than wind farm + buffer monitoring alone • Ability to incorporate previous (visual) aerial survey data into the baseline model • Digital aerial surveys allow the data to be subsequently re-analysed for other target species. 17
  • 19. 19