3. CPPC Port & Marine Assets
Port & Stockyard
• Conveyor system
• East & West Stackers
• Reclaimer
• Water System (Dust
Suppressant)
• Port Conveyor System
• Sample Station
• Barge Loader
Marine
• Transhipper's (Magdragon 1 &
Magdragon 2)
• Crew Boats
• Tug Boats (Coonan, Corunna,
Mag Trans 1 & Mag Trans 2)
• Barges
• Hire Fleet Multi Cat, Spare Tug
x 2 (Mermaid Storm, Resolute)
• Tzigna
6. Data Integration
AMS Machinery Manager
v5.61
• Vibration
• Lubrication
• Thermography
Equipment
CSI 2140
Laboratory Report
imported as a CSV file
FLIR T640
7. Effective Asset Management
Process Flow
• Establish the current
health and performance
of your assets
• Develop a baseline to
identify where to invest
future resources
• Review your current
maintenance plan
8. Reporting & Feedback
SAP Asset management program
• PMO 1
– Next scheduled week
– Future maintenance period
• PMO 3 Break Down
– Current scheduled week
On completion of the
corrective maintenance
tasks an ADHOC
requirement will be
raised to recommission
the equipment. This will
be used as the QA to
accept the machine
back into service.
10. Program Benefits & Why
Benefits
• Current Asset Health
• Production restrictions
• Rapid health analysis
• Maintenance
Optimisation
Return from investment
• Equipment availability
• Short / long term planning
• Meet dynamic logistic
requirements
• Inclusions & exclusion to
the main work list