SlideShare una empresa de Scribd logo
1 de 12
 The system is designed to test the performance of
the Distributor valve.
 Distributor Valve works on Pressure difference in the
Brake Pipe.
 The system is consisting Brake Pipe, Auxiliary
Reservoir, Brake Cylinder and Control Reservoir.
 The System can be used to test the
Distributor Valve for Coach and Wagon
(Loaded or Empty)
 The stroke Length of the Brake Cylinder can
be adjustable manually from machine
according to the diameter of Brake Cylinder.
 The system works on a predefined Test
Sequence with an option to test the particular
test.
 Medium = Air
 Pressure Rating = 10 Kg/cm2
 Air supply Pressure Range = 8-10 Kg/cm2
 Flow Rate =2400 LPM
 Temperature Range = Ambient
Do’s:
 Read the User Manual fully before operating the System.
 Read the Pneumatic Circuit and understand which Valve/
Component on Panel do what.
 Check the proper closing of the Supply Valve of the system
when it is not in operation.
 Check the Source Pressure before operation.
Don’t:
 Never touch the sensors or their mountings.
 Touch any circuitry inside the panel.
 “ ON” the MCB before starting the computer.
 Adjust the cylinder Stroke under working
condition.
Working Of The System:
The System is consisting dual working mode i.e.
Automatic and A9 operated mode.
In Automatic mode the Test will be perform
according to the predefined sequence
automatically and also with an option for a
particular test according to the requirement.
In manual mode the test will be done with A9
(Drivers Brake) and Toggles Switch.
Mode Selection-
The mode selection can be done with the Mode
Selector with an option-
Automatic Mode.
A9 Operating Mode.
Automatic Mode-This mode is consist of two mode one
Automatic with the Computer and other Manual with the Toggle
Switches. These modes can be selected from the Manual
Control Panel Selector Switch.
 Auto-In this mode the Test will be perform
according to the predefined
◦ Sequence automatically.
 Manual-In this mode the Test will be
performing according to the requirement.
 A9 Operating Mode- In this mode all the Test
can be done with the A9 Drivers Brake.
THANK YOU

Más contenido relacionado

La actualidad más candente

Diesel Fire Pump Controllers
Diesel Fire Pump ControllersDiesel Fire Pump Controllers
Diesel Fire Pump Controllers
Danaher Specialty Products
 
Variable speed fire pump controllers
Variable speed fire pump controllersVariable speed fire pump controllers
Variable speed fire pump controllers
michaeljmack
 
Project Report - Spring 2014
Project Report - Spring 2014Project Report - Spring 2014
Project Report - Spring 2014
Garret Stec
 

La actualidad más candente (20)

SFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing ReportSFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing Report
 
AUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEMAUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEM
 
660 mw turbo governing & protection system
660 mw turbo  governing & protection system660 mw turbo  governing & protection system
660 mw turbo governing & protection system
 
Fire Pump System Pressure Control
Fire Pump System Pressure ControlFire Pump System Pressure Control
Fire Pump System Pressure Control
 
Diesel Fire Pump Controllers
Diesel Fire Pump ControllersDiesel Fire Pump Controllers
Diesel Fire Pump Controllers
 
Variable speed fire pump controllers
Variable speed fire pump controllersVariable speed fire pump controllers
Variable speed fire pump controllers
 
How to operate Fire Pump
How to operate Fire PumpHow to operate Fire Pump
How to operate Fire Pump
 
Fire pump controllers
Fire pump controllersFire pump controllers
Fire pump controllers
 
Turbinecontrolbasic
TurbinecontrolbasicTurbinecontrolbasic
Turbinecontrolbasic
 
Project Report - Spring 2014
Project Report - Spring 2014Project Report - Spring 2014
Project Report - Spring 2014
 
Centrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITTCentrifugal Pump Testing Standards - Presentation by ITT
Centrifugal Pump Testing Standards - Presentation by ITT
 
Trial 2 overview of oil handling operations mc cord pipeline
Trial 2 overview of oil handling operations mc cord pipelineTrial 2 overview of oil handling operations mc cord pipeline
Trial 2 overview of oil handling operations mc cord pipeline
 
Fire Pump Engines Overview
Fire Pump Engines OverviewFire Pump Engines Overview
Fire Pump Engines Overview
 
Fire pumps in brief
Fire pumps in briefFire pumps in brief
Fire pumps in brief
 
Automotive catalogue
Automotive catalogueAutomotive catalogue
Automotive catalogue
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010104980410 control-valve-calibration-procedure-fisher-hc6010
104980410 control-valve-calibration-procedure-fisher-hc6010
 
N2 and co2 filling system
N2 and co2 filling systemN2 and co2 filling system
N2 and co2 filling system
 
Pneumatic circuits
Pneumatic circuitsPneumatic circuits
Pneumatic circuits
 

Similar a Dv test rig

Chapter 45
Chapter 45Chapter 45
Chapter 45
mcfalltj
 
Test Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- NeometrixTest Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- Neometrix
Neometrix_Engineering_Pvt_Ltd
 
CONTROL SYSTEMS IN AUTOMOBILES
CONTROL SYSTEMS IN AUTOMOBILESCONTROL SYSTEMS IN AUTOMOBILES
CONTROL SYSTEMS IN AUTOMOBILES
Sharath S
 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
SATYANARAYANABODDULA
 

Similar a Dv test rig (20)

computerized-microprocessor-controlled-dv-test-bench.pptx
computerized-microprocessor-controlled-dv-test-bench.pptxcomputerized-microprocessor-controlled-dv-test-bench.pptx
computerized-microprocessor-controlled-dv-test-bench.pptx
 
Chapter 45
Chapter 45Chapter 45
Chapter 45
 
Hydraulic Hose Leak Testing (Test Rig is Pneumatic Hydraulic).pptx
Hydraulic Hose Leak Testing  (Test Rig is Pneumatic Hydraulic).pptxHydraulic Hose Leak Testing  (Test Rig is Pneumatic Hydraulic).pptx
Hydraulic Hose Leak Testing (Test Rig is Pneumatic Hydraulic).pptx
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
95ZJ_8H.PDF
95ZJ_8H.PDF95ZJ_8H.PDF
95ZJ_8H.PDF
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptx
 
Test Rig For IRAB Brake System
Test Rig For IRAB Brake SystemTest Rig For IRAB Brake System
Test Rig For IRAB Brake System
 
Test Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- NeometrixTest Rig for 130LPM Pump of LCA- Neometrix
Test Rig for 130LPM Pump of LCA- Neometrix
 
H60
H60H60
H60
 
Positioner valve
Positioner  valvePositioner  valve
Positioner valve
 
Microprocessor controlled injection molding machine
Microprocessor controlled injection molding machineMicroprocessor controlled injection molding machine
Microprocessor controlled injection molding machine
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systems
 
Hydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheetHydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheet
 
SIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.pptSIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.ppt
 
CONTROL SYSTEMS IN AUTOMOBILES
CONTROL SYSTEMS IN AUTOMOBILESCONTROL SYSTEMS IN AUTOMOBILES
CONTROL SYSTEMS IN AUTOMOBILES
 
UNIT 1 CSE NEW.PPTX
UNIT 1 CSE NEW.PPTXUNIT 1 CSE NEW.PPTX
UNIT 1 CSE NEW.PPTX
 
Operation of hydro power plants
Operation of hydro power plants Operation of hydro power plants
Operation of hydro power plants
 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
 
control-system-ppt.pptx
control-system-ppt.pptxcontrol-system-ppt.pptx
control-system-ppt.pptx
 
06 vat300 e_c3-1_rev_b
06 vat300 e_c3-1_rev_b06 vat300 e_c3-1_rev_b
06 vat300 e_c3-1_rev_b
 

Más de Neometrix_Engineering_Pvt_Ltd

Neometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptxNeometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptx
Neometrix_Engineering_Pvt_Ltd
 
Dynamometer Engine Test Rig for engines parameters RPM
Dynamometer Engine Test Rig  for engines parameters RPMDynamometer Engine Test Rig  for engines parameters RPM
Dynamometer Engine Test Rig for engines parameters RPM
Neometrix_Engineering_Pvt_Ltd
 
Portable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air forcePortable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air force
Neometrix_Engineering_Pvt_Ltd
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
Neometrix_Engineering_Pvt_Ltd
 
45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx
Neometrix_Engineering_Pvt_Ltd
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Neometrix_Engineering_Pvt_Ltd
 
Mobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix DefeneceMobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix Defenece
Neometrix_Engineering_Pvt_Ltd
 
universal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptxuniversal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptx
Neometrix_Engineering_Pvt_Ltd
 
hydraulic-snubber-test-bench.pptx
hydraulic-snubber-test-bench.pptxhydraulic-snubber-test-bench.pptx
hydraulic-snubber-test-bench.pptx
Neometrix_Engineering_Pvt_Ltd
 

Más de Neometrix_Engineering_Pvt_Ltd (20)

Neometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptxNeometrix Optical Balloon Theodolite.pptx
Neometrix Optical Balloon Theodolite.pptx
 
Dynamometer Engine Test Rig for engines parameters RPM
Dynamometer Engine Test Rig  for engines parameters RPMDynamometer Engine Test Rig  for engines parameters RPM
Dynamometer Engine Test Rig for engines parameters RPM
 
Portable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air forcePortable Digital Barometer for Indian Air force
Portable Digital Barometer for Indian Air force
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
 
Hydraulic Loading System - Neometrix Defence
Hydraulic Loading System - Neometrix DefenceHydraulic Loading System - Neometrix Defence
Hydraulic Loading System - Neometrix Defence
 
Lock Loading Test Rig (ERU119 & ERU120) .pptx
Lock Loading Test Rig (ERU119 & ERU120) .pptxLock Loading Test Rig (ERU119 & ERU120) .pptx
Lock Loading Test Rig (ERU119 & ERU120) .pptx
 
starter-generator-test-bench-Catalog.pptx
starter-generator-test-bench-Catalog.pptxstarter-generator-test-bench-Catalog.pptx
starter-generator-test-bench-Catalog.pptx
 
45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx45 KVA Ground Power Unit for Raphael .pptx
45 KVA Ground Power Unit for Raphael .pptx
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
 
Optical-test-bench-for-pcb-and-optic-testing.pptx
Optical-test-bench-for-pcb-and-optic-testing.pptxOptical-test-bench-for-pcb-and-optic-testing.pptx
Optical-test-bench-for-pcb-and-optic-testing.pptx
 
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptxPrinted circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
Printed circuit board (PCB) FUNCATIONAL TEST BENCH.pptx
 
Mobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix DefeneceMobile Test Facility (MTF) - Neometrix Defenece
Mobile Test Facility (MTF) - Neometrix Defenece
 
modern-universal-automatic-test-equipment.pptx
modern-universal-automatic-test-equipment.pptxmodern-universal-automatic-test-equipment.pptx
modern-universal-automatic-test-equipment.pptx
 
drive-and-control-automation-system.pptx
drive-and-control-automation-system.pptxdrive-and-control-automation-system.pptx
drive-and-control-automation-system.pptx
 
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCEHYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
HYDRAULIC REFILLING TROLLEY - NEOMETRIX DEFENCE
 
universal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptxuniversal-hydraulic-test-bench-aircrafts .pptx
universal-hydraulic-test-bench-aircrafts .pptx
 
Six Clamp Perfect Binding Machine
Six Clamp Perfect Binding MachineSix Clamp Perfect Binding Machine
Six Clamp Perfect Binding Machine
 
hydraulic-test-pac-with-chart-recorder.pptx
hydraulic-test-pac-with-chart-recorder.pptxhydraulic-test-pac-with-chart-recorder.pptx
hydraulic-test-pac-with-chart-recorder.pptx
 
oil-flooded-screw-compressor-test-rig.pptx
oil-flooded-screw-compressor-test-rig.pptxoil-flooded-screw-compressor-test-rig.pptx
oil-flooded-screw-compressor-test-rig.pptx
 
hydraulic-snubber-test-bench.pptx
hydraulic-snubber-test-bench.pptxhydraulic-snubber-test-bench.pptx
hydraulic-snubber-test-bench.pptx
 

Último

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Dv test rig

  • 1.
  • 2.
  • 3.  The system is designed to test the performance of the Distributor valve.  Distributor Valve works on Pressure difference in the Brake Pipe.  The system is consisting Brake Pipe, Auxiliary Reservoir, Brake Cylinder and Control Reservoir.
  • 4.  The System can be used to test the Distributor Valve for Coach and Wagon (Loaded or Empty)  The stroke Length of the Brake Cylinder can be adjustable manually from machine according to the diameter of Brake Cylinder.  The system works on a predefined Test Sequence with an option to test the particular test.
  • 5.  Medium = Air  Pressure Rating = 10 Kg/cm2  Air supply Pressure Range = 8-10 Kg/cm2  Flow Rate =2400 LPM  Temperature Range = Ambient
  • 6. Do’s:  Read the User Manual fully before operating the System.  Read the Pneumatic Circuit and understand which Valve/ Component on Panel do what.  Check the proper closing of the Supply Valve of the system when it is not in operation.  Check the Source Pressure before operation.
  • 7. Don’t:  Never touch the sensors or their mountings.  Touch any circuitry inside the panel.  “ ON” the MCB before starting the computer.  Adjust the cylinder Stroke under working condition.
  • 8. Working Of The System: The System is consisting dual working mode i.e. Automatic and A9 operated mode. In Automatic mode the Test will be perform according to the predefined sequence automatically and also with an option for a particular test according to the requirement. In manual mode the test will be done with A9 (Drivers Brake) and Toggles Switch.
  • 9. Mode Selection- The mode selection can be done with the Mode Selector with an option- Automatic Mode. A9 Operating Mode. Automatic Mode-This mode is consist of two mode one Automatic with the Computer and other Manual with the Toggle Switches. These modes can be selected from the Manual Control Panel Selector Switch.
  • 10.  Auto-In this mode the Test will be perform according to the predefined ◦ Sequence automatically.  Manual-In this mode the Test will be performing according to the requirement.
  • 11.  A9 Operating Mode- In this mode all the Test can be done with the A9 Drivers Brake.