SlideShare una empresa de Scribd logo
1 de 14
1
Circular solutions for
Water
#7 Gotland
Sweden
Relevant data
Relevant sectors
Tourist
industry
Municipal
sector
Water
sector
Lead partners
Storsudred testbed area: 14 000 ha
Habitants during winter: 900
Habitants during summer : 1800
Tourists per year: 300 000
2
1. Objectives of the NextGen solutions
• Rainwater harvesting using automatic
floodgates to replenish aquifers and
monitoring of aquifer levels
• Decentralized membrane treatment of raw
wastewater to reduce volumes treated at the
central WWTP
• Climate efficient wastewater reuse
powered by solar energy to overcome
carbon footprint drawbacks
• Optimized membrane filtration for
producing drinkable water from challenging
surface water
• Storage of water in subsurface dams
Water
3
Technology Evidence Base (TEB)
Gotland
1. Objectives of the NextGen solutions
Positioning of demo case within the CE
4
T 1.2.1. Decentralised membrane treatment
powered by solar energy
2. New NextGen solutions
PRE-FILTRATION
COAGULATION AND
ULTRAFILTRATION
UV
SEDIMENTATION
SCREEN
DISC FILTER
ULTRAFILTRATION
REVERSE OSMOSIS
UASB
Annamox
PRECIPITATION
CHLORINATION
UV
PRECIPITATION
Treatment in the WTP  drinking water
Decentralised membrane treatment  regenerated water
Sewage
water
Recovered
water
Sewage
concentrate
to external
WWTP
Solar energy
Circular
water
systems
5
T 1.2.1. Drainage ditches with IoT for flow and water levels control
2. New NextGen solutions
6
T 1.2.1. Controlled nautral ponds dams for storage
2. New NextGen solutions
Keep the surface level during the summer
by an autmatic flood gate
Inflow, ditch, hatch
Burgsvik village
Lake
Reclaimed
waste
water
25 000 m3
Damed lake will store
100 000 m3
To pilot WTP for production of
60 000 m3 drinking water
quality
Water balance established but
the automatic floodgate is
foreseen to have delays of 9 –
12 months before testing the
system (summer 2021).
7
T 1.2.1. Groundwater dams for subsurface water storage
2. New NextGen solutions
8
3. Specific KPIs (actual vs expected)
Case
study
Topic Objectives
Specific Key Performance Indicator
(KPI)
Starting
value
Expected
value
#7
Gotland
(SE)
Wastewater
treatment
and reuse
To treat the wastewater by a
decentralized membrane treatment
to obtain regenerated water for being
stored in the controlled neutral ponds
dams and, after another treatment, to
be used as potable water
Water yield of Water yield of the system [%
of regenerated water produced] water
produced]
0
10 %
80, 95, 75
Water quality - Removal yield [%] of the
following parameters (outlet vs inlet):
conductivity, COD, ammonia,
Rainwater
harvesting
Rainwater harvesting and storage in
surface dams & lake.
Collection capacity [m3/year] 100 000
Drainage
ditches with
IoT
Flow and water levels measuring and
control
Flow and water levels measured and
controlled
Every 10-30 min
Aquifer
storage
Rainwater and lake water used in the
water treatment plant for obtaining
drinking water
Pilot capacity [m3/year]
100 000
80, 10, 50, 80,
10, 99
Water quality - Removal yield [%] of the
following parameters (outlet vs inlet):
metals, conductivity, color, COD, some
anions and E.coli.
Energy
Use of solar panels to minimize
electricity consumption during
wastewater reuse (summer)
Electricity consumption [kWh/m3
regenerated water]
3
9
4. Results
T 1.2.1. Decentralised membrane treatment of sewage powered by
solar energy
Off-site tests
Water quality Water recovery yield
Energy consumption
Parameter Removal (%)
NH4
+ 90%
COD 88%
Conductivity 99%
TSS (No filter) 0%
TSS (20 𝜇-filter) 40%
TSS (30 𝜇-filter) 23%
TSS (150 𝜇-filter) 6%
Parameter Value
Concentration Factor (CF) for the UF 10-25
Concentration Factor (CF) for the RO 7.3
Global CF 4.5 – 5.8
Water recovery 78 – 83%
Off-site tests finalized. Pilot under construction. Pilot operation: March 2021
10
4. Results
T 1.2.1. Drainage ditches with IoT for flow and water levels control
1 300 000 m3 / year
flows out to the sea
Rain per day
Ground water level
IoT for establishment of water balance since 2019.
11
4. Results
T 1.2.1. Controlled neutral ponds dams for storage
Water quality
Inflow and outflow of water to lake Mjölhatteträsk plotted with precipitation data. IoT-sensors
installed at MY3 and MY1.
Water quantity
Automatic floodgate and membrane filtration spring 2021
12
4. Results
T 1.2.1. Groundwater dams for subsurface water storage
• Detailed investigation will finalized in
November 2020
• If positive: Large scale capacity test in
January 2021
2
2
13
5. Lessons learned
• When it comes to on-site evaluation at an far-away island of a number parameters,
including communication with land-owners, pandemic out-breaks is a hinder for rapid
achievements
• Even by use of novel technologies and innovative methods, it is hard to predict
overburdens (e.g. clay versus sand).
• Unforeseen challengers is time-consuming but will result in new ideas and solutions
that are interesting, fun and pushes the development forward .
(Maybe not a very new lesson learned but confirms your experiences).
14
Thank you!
staffan.filipsson@ivl.se
www.ivl.se
xtGen - Community of Practice
14
anna.serra@eurecat.org
sandra.cases@eurecat.org

Más contenido relacionado

La actualidad más candente

Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
Manuel Hidalgo
 
cement lock battelle poster final stern
cement lock battelle poster final sterncement lock battelle poster final stern
cement lock battelle poster final stern
Eric A. Stern
 
ARM Heathrow case study-LR
ARM Heathrow case study-LRARM Heathrow case study-LR
ARM Heathrow case study-LR
Neil McCarthy
 
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
Neil McCarthy
 

La actualidad más candente (20)

NextGen Braunschweig Germany
NextGen Braunschweig GermanyNextGen Braunschweig Germany
NextGen Braunschweig Germany
 
D1.2 operational demo cases
D1.2 operational demo casesD1.2 operational demo cases
D1.2 operational demo cases
 
Circular Economy Solutions in the Water Sector
Circular Economy Solutions in the Water SectorCircular Economy Solutions in the Water Sector
Circular Economy Solutions in the Water Sector
 
Anders Nätorpp Demo case - Switzerland, Altenrhein
Anders Nätorpp Demo case - Switzerland, AltenrheinAnders Nätorpp Demo case - Switzerland, Altenrhein
Anders Nätorpp Demo case - Switzerland, Altenrhein
 
Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...
 
Paul Adams
Paul AdamsPaul Adams
Paul Adams
 
Biogas portal article srinivas kasulla
Biogas portal  article srinivas kasullaBiogas portal  article srinivas kasulla
Biogas portal article srinivas kasulla
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Andreas Weger
Andreas WegerAndreas Weger
Andreas Weger
 
Robert Lovitt
Robert LovittRobert Lovitt
Robert Lovitt
 
Organics Recycling Through Residuals Treatment at MWRA’s Deer Island Treatmen...
Organics Recycling Through Residuals Treatment at MWRA’s Deer Island Treatmen...Organics Recycling Through Residuals Treatment at MWRA’s Deer Island Treatmen...
Organics Recycling Through Residuals Treatment at MWRA’s Deer Island Treatmen...
 
cement lock battelle poster final stern
cement lock battelle poster final sterncement lock battelle poster final stern
cement lock battelle poster final stern
 
An Experimental Study on Treatment of Dairy Waste Water using Microbial Fuel ...
An Experimental Study on Treatment of Dairy Waste Water using Microbial Fuel ...An Experimental Study on Treatment of Dairy Waste Water using Microbial Fuel ...
An Experimental Study on Treatment of Dairy Waste Water using Microbial Fuel ...
 
ARM Heathrow case study-LR
ARM Heathrow case study-LRARM Heathrow case study-LR
ARM Heathrow case study-LR
 
Bathing Water Services - Anders Chr. Erichsen (DHI)
Bathing Water Services - Anders Chr. Erichsen (DHI)Bathing Water Services - Anders Chr. Erichsen (DHI)
Bathing Water Services - Anders Chr. Erichsen (DHI)
 
Integrated Modelling to Support Integrated Management: Real-time Catchment Ap...
Integrated Modelling to Support Integrated Management: Real-time Catchment Ap...Integrated Modelling to Support Integrated Management: Real-time Catchment Ap...
Integrated Modelling to Support Integrated Management: Real-time Catchment Ap...
 
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
 
Advanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case StoryAdvanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case Story
 
Island Water Treatment Plant Capacity Expansion - Project File Report
Island Water Treatment Plant Capacity Expansion - Project File ReportIsland Water Treatment Plant Capacity Expansion - Project File Report
Island Water Treatment Plant Capacity Expansion - Project File Report
 
18. rainwater recharge
18. rainwater recharge18. rainwater recharge
18. rainwater recharge
 

Similar a NextGen Gotland Sweden

Integrated urban water management experiences from ethekweni municipality s...
Integrated urban water management   experiences from ethekweni municipality s...Integrated urban water management   experiences from ethekweni municipality s...
Integrated urban water management experiences from ethekweni municipality s...
Global Water Partnership
 

Similar a NextGen Gotland Sweden (20)

Rainwater Harvesting.ppt
Rainwater Harvesting.pptRainwater Harvesting.ppt
Rainwater Harvesting.ppt
 
PANDEY 2012 Rainwater Harvesting present.ppt
PANDEY 2012 Rainwater Harvesting present.pptPANDEY 2012 Rainwater Harvesting present.ppt
PANDEY 2012 Rainwater Harvesting present.ppt
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
Snow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and IrrigationSnow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and Irrigation
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Mk2 quantifying water user trade offs at yali reservoir vietnam
Mk2 quantifying water user trade offs at yali reservoir vietnamMk2 quantifying water user trade offs at yali reservoir vietnam
Mk2 quantifying water user trade offs at yali reservoir vietnam
 
3 aguas residuales
3 aguas residuales3 aguas residuales
3 aguas residuales
 
Ph d presentation npc final
Ph d presentation npc finalPh d presentation npc final
Ph d presentation npc final
 
Anneli Ylimartimo
Anneli YlimartimoAnneli Ylimartimo
Anneli Ylimartimo
 
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
The Canary Islands: World Laboratory for Water and Energy Technologies by Gon...
 
Seminar aparna
Seminar aparnaSeminar aparna
Seminar aparna
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
 
The future of water in the mining industry
The future of water in the mining industryThe future of water in the mining industry
The future of water in the mining industry
 
Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...Uniting univeristies, research labs, local government and the private sector ...
Uniting univeristies, research labs, local government and the private sector ...
 
DSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - TonelliDSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
 
L’impronta idrica della produzione di idrogeno elettrolitico su larga scala -...
L’impronta idrica della produzione di idrogeno elettrolitico su larga scala -...L’impronta idrica della produzione di idrogeno elettrolitico su larga scala -...
L’impronta idrica della produzione di idrogeno elettrolitico su larga scala -...
 
Integrated urban water management experiences from ethekweni municipality s...
Integrated urban water management   experiences from ethekweni municipality s...Integrated urban water management   experiences from ethekweni municipality s...
Integrated urban water management experiences from ethekweni municipality s...
 
Master's course defense presentation in Water Resource Management and GIS
Master's course defense presentation in Water Resource Management and GIS  Master's course defense presentation in Water Resource Management and GIS
Master's course defense presentation in Water Resource Management and GIS
 
Thesis present voeng soavandara
Thesis  present  voeng soavandaraThesis  present  voeng soavandara
Thesis present voeng soavandara
 
IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
 

Último

E Waste Management
E Waste ManagementE Waste Management
E Waste Management
Dr. Salem Baidas
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
Dr. Salem Baidas
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
sexy call girls service in goa
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentation
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 

NextGen Gotland Sweden

  • 1. 1 Circular solutions for Water #7 Gotland Sweden Relevant data Relevant sectors Tourist industry Municipal sector Water sector Lead partners Storsudred testbed area: 14 000 ha Habitants during winter: 900 Habitants during summer : 1800 Tourists per year: 300 000
  • 2. 2 1. Objectives of the NextGen solutions • Rainwater harvesting using automatic floodgates to replenish aquifers and monitoring of aquifer levels • Decentralized membrane treatment of raw wastewater to reduce volumes treated at the central WWTP • Climate efficient wastewater reuse powered by solar energy to overcome carbon footprint drawbacks • Optimized membrane filtration for producing drinkable water from challenging surface water • Storage of water in subsurface dams Water
  • 3. 3 Technology Evidence Base (TEB) Gotland 1. Objectives of the NextGen solutions Positioning of demo case within the CE
  • 4. 4 T 1.2.1. Decentralised membrane treatment powered by solar energy 2. New NextGen solutions PRE-FILTRATION COAGULATION AND ULTRAFILTRATION UV SEDIMENTATION SCREEN DISC FILTER ULTRAFILTRATION REVERSE OSMOSIS UASB Annamox PRECIPITATION CHLORINATION UV PRECIPITATION Treatment in the WTP  drinking water Decentralised membrane treatment  regenerated water Sewage water Recovered water Sewage concentrate to external WWTP Solar energy Circular water systems
  • 5. 5 T 1.2.1. Drainage ditches with IoT for flow and water levels control 2. New NextGen solutions
  • 6. 6 T 1.2.1. Controlled nautral ponds dams for storage 2. New NextGen solutions Keep the surface level during the summer by an autmatic flood gate Inflow, ditch, hatch Burgsvik village Lake Reclaimed waste water 25 000 m3 Damed lake will store 100 000 m3 To pilot WTP for production of 60 000 m3 drinking water quality Water balance established but the automatic floodgate is foreseen to have delays of 9 – 12 months before testing the system (summer 2021).
  • 7. 7 T 1.2.1. Groundwater dams for subsurface water storage 2. New NextGen solutions
  • 8. 8 3. Specific KPIs (actual vs expected) Case study Topic Objectives Specific Key Performance Indicator (KPI) Starting value Expected value #7 Gotland (SE) Wastewater treatment and reuse To treat the wastewater by a decentralized membrane treatment to obtain regenerated water for being stored in the controlled neutral ponds dams and, after another treatment, to be used as potable water Water yield of Water yield of the system [% of regenerated water produced] water produced] 0 10 % 80, 95, 75 Water quality - Removal yield [%] of the following parameters (outlet vs inlet): conductivity, COD, ammonia, Rainwater harvesting Rainwater harvesting and storage in surface dams & lake. Collection capacity [m3/year] 100 000 Drainage ditches with IoT Flow and water levels measuring and control Flow and water levels measured and controlled Every 10-30 min Aquifer storage Rainwater and lake water used in the water treatment plant for obtaining drinking water Pilot capacity [m3/year] 100 000 80, 10, 50, 80, 10, 99 Water quality - Removal yield [%] of the following parameters (outlet vs inlet): metals, conductivity, color, COD, some anions and E.coli. Energy Use of solar panels to minimize electricity consumption during wastewater reuse (summer) Electricity consumption [kWh/m3 regenerated water] 3
  • 9. 9 4. Results T 1.2.1. Decentralised membrane treatment of sewage powered by solar energy Off-site tests Water quality Water recovery yield Energy consumption Parameter Removal (%) NH4 + 90% COD 88% Conductivity 99% TSS (No filter) 0% TSS (20 𝜇-filter) 40% TSS (30 𝜇-filter) 23% TSS (150 𝜇-filter) 6% Parameter Value Concentration Factor (CF) for the UF 10-25 Concentration Factor (CF) for the RO 7.3 Global CF 4.5 – 5.8 Water recovery 78 – 83% Off-site tests finalized. Pilot under construction. Pilot operation: March 2021
  • 10. 10 4. Results T 1.2.1. Drainage ditches with IoT for flow and water levels control 1 300 000 m3 / year flows out to the sea Rain per day Ground water level IoT for establishment of water balance since 2019.
  • 11. 11 4. Results T 1.2.1. Controlled neutral ponds dams for storage Water quality Inflow and outflow of water to lake Mjölhatteträsk plotted with precipitation data. IoT-sensors installed at MY3 and MY1. Water quantity Automatic floodgate and membrane filtration spring 2021
  • 12. 12 4. Results T 1.2.1. Groundwater dams for subsurface water storage • Detailed investigation will finalized in November 2020 • If positive: Large scale capacity test in January 2021 2 2
  • 13. 13 5. Lessons learned • When it comes to on-site evaluation at an far-away island of a number parameters, including communication with land-owners, pandemic out-breaks is a hinder for rapid achievements • Even by use of novel technologies and innovative methods, it is hard to predict overburdens (e.g. clay versus sand). • Unforeseen challengers is time-consuming but will result in new ideas and solutions that are interesting, fun and pushes the development forward . (Maybe not a very new lesson learned but confirms your experiences).
  • 14. 14 Thank you! staffan.filipsson@ivl.se www.ivl.se xtGen - Community of Practice 14 anna.serra@eurecat.org sandra.cases@eurecat.org