Interstate 5: Tumwater to Mounts Road
Mid- to Long-Term Strategies
Nisqually River Council
December 20th, 2019
Dennis Engel Matthew Pahs
Olympic Region Multimodal Planning Manager Principal Senior Planner
2
Funding legislation
$550,000 in state and local funds to identify potential improvements
between exit 116 and exit 99 of Interstate 5. The study should
• further develop mid- and long-term strategies,
• identify potential US101/I-5 interchange improvements,
• a strategic plan for the Nisqually River bridges,
• regional congestion relief options, and
• ecosystem benefits to the Nisqually River estuary for salmon
productivity and flood control
-Engrossed Senate Substitute Bill 6106 Session Law, 2018 Regular Session
3
Study area limits
• Southern end point:
Exit 99 – SR 121/93rd Ave
• Northern end point:
Exit 116 – Mounts Road
• Included I-5 between
Mounts Road and Main
Gate at JBLM in travel time
measures
• Included all of Thurston
County and parts of Pierce
County for regional
measures such as VMT
4
Study purpose and goals
I-5 and major connecting routes between Tumwater and Mounts Road affect our region’s
economic vitality, accessibility and mobility, defense operations, and the environment. This
segment of I-5 is experiencing increasing congestion. Performance-based strategies are needed
to satisfy the following goals (not listed in order of priority):
• Improve travel times and reliability
• Increase the ability to safely, efficiently, and equitably move all people (multimodal) and
goods, and manage corridor capacity as an asset
• Improve accessibility to industrial areas, commercial areas, and job sites
• Protect and enhance the environment including reducing the transportation and
estuarine habitat constraints related to the Nisqually River Bridges and the river’s
delta.
• Improve network redundancy and resiliency
5
Modeling Scenarios
Scenarios Examples of modeled strategies
Operations • Extra lane at Nisqually Interchange
• Roundabouts on SR 507 near Yelm
Land Use • Sustainable Thurston – growth concentrated in urban centers and
corridors
Travel demand management • Increased parking rates in urban core
• Increased telework and schedule shifts
Transit • Full implementation of Intercity Transit’s long-range strategic plan
Hard shoulder running • Peak period general purpose shoulder use on I-5 between Sleater-
Kinney and Henderson
HOV conversion • Convert one existing general purpose lane to HOV from US 101 through
38th in Tacoma
Interchange improvements • Braided ramp at US 101 and I-5
• Martin Way interchange reconfiguration
Capacity expansion – HOV • Add 4th lane through study area as an HOV lane
Capacity Expansion – General purpose • Add 4th lane through study area as a general purpose lane
6
Performance measures
Study goal areas Performance measures
Travel times and reliability  Corridor travel times
 Maximum Throughput Travel Time Index (all traffic, HOV)
Multimodal efficiency & equity  Corridor person throughput (all traffic, HOV)
 County-wide mode split
 County-wide vehicle miles traveled
 Traffic Balance on I-5 (percent through traffic)
 Access for Environmental Justice populations (poverty,
minority, disability, no vehicle access)
Accessibility  County-wide access (SOV, HOV, & Transit) to
o Jobs
o Commercial services
 Travel times on selected freight access routes
Environment  Greenhouse gas emissions
Resiliency  Qualitative comparison “Improves availability and/or capacity of
alternate routes”
 Travel times on alternate routes through study area
7
Modeling
Used a practical solutions approach
• Modeled lower cost strategies first such as
operations and TDM
Included all improvements from
previous scenarios
• Exception – Widening scenarios did not include
Hard Shoulder Running
• Did this to see cumulative effect of lower cost
strategies
8
Modeling – 2040 baseline scenario Mounts Road
9
Modeling – 2040 baseline scenario – US 101/Plum
10
Draft strategy recommendations
Scenario Priority Draft recommendations
Land Use 1 Recommended short-term/mid-term/ongoing
Transit 2 Recommended short-term/mid-term/ongoing
Travel Demand Management 3 Recommended short-term/mid-term/ongoing
Operations 4 Recommended short- and mid-term
Hard Shoulder Running 5 Recommended mid-term
Interchange Improvements 6 Recommended mid-term/long-term
HOV Conversion 7 Recommended mid-term
Capacity Expansion I-5 - HOV1,2 8 Consider long-term
Capacity Expansion I-5 All GP2 - Not recommended
Short-term (0-4 years), mid-term (5-9 years), long-term (10-20 years)
Unless otherwise noted, scenarios included all improvements from previous scenarios
1 The benefits of HOV lanes are accounted for in the HOV conversion scenario, the Capacity Expansion I-5 – Add GP Lane, Retain HOV Lane adds general purpose
capacity not an HOV lane
2 Does not include Hard Shoulder Running, instead has permanent auxiliary lanes
11
Hydrologic Study
WSDOT and the Nisqually Indian Tribe fully
funded this study ($150,000 each)
Nisqually Tribe working with USGS
• Updating & validating modeling
• Analyzing historic water levels, storm surge, wave heights,
and extreme flood events
Draft results expected in November
12
Next steps
Next steps for this study
• Public engagement in late November/early December
• Report review in December
Planning Environmental Linkages Study
• WSDOT has advertised a Request for Qualifications
• Expect consultant selection in January
• PEL study will further refine solutions in cooperation with resource agencies
Project webpage: https://www.wsdot.wa.gov/planning/studies/i5/tumwater-mounts-road/home

Más contenido relacionado

La actualidad más candente

4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineeringholegajendra
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont Commuter Express
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentIRJET Journal
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Pronob Ghosh
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_riverRavi Naid Gorle
 
IRJET- Effective Surface Drainage for Kurla Junction
IRJET- Effective Surface Drainage for Kurla JunctionIRJET- Effective Surface Drainage for Kurla Junction
IRJET- Effective Surface Drainage for Kurla JunctionIRJET Journal
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineeringholegajendra
 
Performance evaluation of santasi roundabout, kumasighana
Performance evaluation of santasi roundabout, kumasighanaPerformance evaluation of santasi roundabout, kumasighana
Performance evaluation of santasi roundabout, kumasighanaeSAT Publishing House
 
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...eSAT Journals
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Civil Zone
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Saksham Bhutani
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13jhayman09
 
Chapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaChapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaBashaFayissa1
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 

La actualidad más candente (20)

4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summary
 
Route surveying
Route surveyingRoute surveying
Route surveying
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
 
IRJET- Effective Surface Drainage for Kurla Junction
IRJET- Effective Surface Drainage for Kurla JunctionIRJET- Effective Surface Drainage for Kurla Junction
IRJET- Effective Surface Drainage for Kurla Junction
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineering
 
Performance evaluation of santasi roundabout, kumasighana
Performance evaluation of santasi roundabout, kumasighanaPerformance evaluation of santasi roundabout, kumasighana
Performance evaluation of santasi roundabout, kumasighana
 
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
Performance evaluation of santasi roundabout, kumasi ghana using micro simula...
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
Unit 5
Unit 5Unit 5
Unit 5
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
Unit 4
Unit 4Unit 4
Unit 4
 
4 bombay cete 24
4 bombay cete 244 bombay cete 24
4 bombay cete 24
 
Chapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaChapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaa
 
Kf3418331844
Kf3418331844Kf3418331844
Kf3418331844
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 

Similar a I5 Tumwater to Mounts Road Strategies Study

I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11absnakcac
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...Fairfax County
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
Refining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityRefining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityAshish Shah
 
Maintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsMaintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsJill Reeves
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planningMuhammadNomanAslam3
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentationdirectionsto2050
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updatedpyoungkyova
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3Priya Krishnan
 
Caltrain modernization program update 8 10-2012
Caltrain modernization program update 8 10-2012Caltrain modernization program update 8 10-2012
Caltrain modernization program update 8 10-2012Adina Levin
 
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009Ross King
 

Similar a I5 Tumwater to Mounts Road Strategies Study (20)

Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
 
dr. cal
dr. caldr. cal
dr. cal
 
Sustainable Urban Mobility Planning
Sustainable Urban Mobility PlanningSustainable Urban Mobility Planning
Sustainable Urban Mobility Planning
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
Una introducción a HDM-4
Una introducción a HDM-4Una introducción a HDM-4
Una introducción a HDM-4
 
Refining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainabilityRefining pavement management strategies to enhance financial sustainability
Refining pavement management strategies to enhance financial sustainability
 
Maintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsMaintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay Projects
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planning
 
hc-eeac-jun09
hc-eeac-jun09hc-eeac-jun09
hc-eeac-jun09
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updated
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3Thailand pavement-management-system-tpms-3
Thailand pavement-management-system-tpms-3
 
TMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility StudyTMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility Study
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
Caltrain modernization program update 8 10-2012
Caltrain modernization program update 8 10-2012Caltrain modernization program update 8 10-2012
Caltrain modernization program update 8 10-2012
 
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009
Terms of Reference - Manukau to Pokeno Transport Corridor Study - 18 Feb 2009
 

Más de Nisqually River Council

Nisqually Watershed Stewardship Report 8.16.19
Nisqually Watershed Stewardship Report 8.16.19Nisqually Watershed Stewardship Report 8.16.19
Nisqually Watershed Stewardship Report 8.16.19Nisqually River Council
 
Nisqually River Education Project - NOAA ELG Presentation 2019
Nisqually River Education Project - NOAA ELG Presentation 2019Nisqually River Education Project - NOAA ELG Presentation 2019
Nisqually River Education Project - NOAA ELG Presentation 2019Nisqually River Council
 
Dynamic Habitat Models for Estuary-Dependent Species
Dynamic Habitat Models for Estuary-Dependent SpeciesDynamic Habitat Models for Estuary-Dependent Species
Dynamic Habitat Models for Estuary-Dependent SpeciesNisqually River Council
 
Nisqually Watershed Management Plan 2019 Addendum - Appendices
Nisqually Watershed Management Plan 2019 Addendum - AppendicesNisqually Watershed Management Plan 2019 Addendum - Appendices
Nisqually Watershed Management Plan 2019 Addendum - AppendicesNisqually River Council
 
Nisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - FiguresNisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - FiguresNisqually River Council
 
Nisqually Watershed Management Plan 2019 Addendum
Nisqually Watershed Management Plan 2019 Addendum Nisqually Watershed Management Plan 2019 Addendum
Nisqually Watershed Management Plan 2019 Addendum Nisqually River Council
 
2018 Nisqually Water Planning Unit Working Agreement
2018 Nisqually Water Planning Unit Working Agreement2018 Nisqually Water Planning Unit Working Agreement
2018 Nisqually Water Planning Unit Working AgreementNisqually River Council
 
Evaluating Biodiversity in the Salish Sea at Two Levels
Evaluating Biodiversity in the Salish Sea at Two LevelsEvaluating Biodiversity in the Salish Sea at Two Levels
Evaluating Biodiversity in the Salish Sea at Two LevelsNisqually River Council
 
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft Presentation
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft PresentationNisqually Watershed Stewardship Plan: Status Report 2018 Draft Presentation
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft PresentationNisqually River Council
 
Nisqually Indian Tribe Food Sovereignty Assessment
Nisqually Indian Tribe Food Sovereignty AssessmentNisqually Indian Tribe Food Sovereignty Assessment
Nisqually Indian Tribe Food Sovereignty AssessmentNisqually River Council
 
Thurston County Nisqually Subarea Plan Update
Thurston County Nisqually Subarea Plan UpdateThurston County Nisqually Subarea Plan Update
Thurston County Nisqually Subarea Plan UpdateNisqually River Council
 

Más de Nisqually River Council (20)

Yil Me Hu Summer 2022
Yil Me Hu Summer 2022Yil Me Hu Summer 2022
Yil Me Hu Summer 2022
 
Yil Me Hu Winter 2021
Yil Me Hu Winter 2021Yil Me Hu Winter 2021
Yil Me Hu Winter 2021
 
Nisqually Watershed Stewardship Report 8.16.19
Nisqually Watershed Stewardship Report 8.16.19Nisqually Watershed Stewardship Report 8.16.19
Nisqually Watershed Stewardship Report 8.16.19
 
Nisqually River Education Project - NOAA ELG Presentation 2019
Nisqually River Education Project - NOAA ELG Presentation 2019Nisqually River Education Project - NOAA ELG Presentation 2019
Nisqually River Education Project - NOAA ELG Presentation 2019
 
Kayak Nisqually
Kayak Nisqually Kayak Nisqually
Kayak Nisqually
 
Dynamic Habitat Models for Estuary-Dependent Species
Dynamic Habitat Models for Estuary-Dependent SpeciesDynamic Habitat Models for Estuary-Dependent Species
Dynamic Habitat Models for Estuary-Dependent Species
 
Tacoma Metro Parks Public Engagement
Tacoma Metro Parks Public EngagementTacoma Metro Parks Public Engagement
Tacoma Metro Parks Public Engagement
 
Nisqually Watershed Management Plan 2019 Addendum - Appendices
Nisqually Watershed Management Plan 2019 Addendum - AppendicesNisqually Watershed Management Plan 2019 Addendum - Appendices
Nisqually Watershed Management Plan 2019 Addendum - Appendices
 
Nisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - FiguresNisqually Watershed Management Plan 2019 Addendum - Figures
Nisqually Watershed Management Plan 2019 Addendum - Figures
 
Nisqually Watershed Management Plan 2019 Addendum
Nisqually Watershed Management Plan 2019 Addendum Nisqually Watershed Management Plan 2019 Addendum
Nisqually Watershed Management Plan 2019 Addendum
 
2018 Nisqually Water Planning Unit Working Agreement
2018 Nisqually Water Planning Unit Working Agreement2018 Nisqually Water Planning Unit Working Agreement
2018 Nisqually Water Planning Unit Working Agreement
 
Yil Me Hu Winter 2018-19
Yil Me Hu Winter 2018-19Yil Me Hu Winter 2018-19
Yil Me Hu Winter 2018-19
 
Remembering Medicine Creek
Remembering Medicine CreekRemembering Medicine Creek
Remembering Medicine Creek
 
Evaluating Biodiversity in the Salish Sea at Two Levels
Evaluating Biodiversity in the Salish Sea at Two LevelsEvaluating Biodiversity in the Salish Sea at Two Levels
Evaluating Biodiversity in the Salish Sea at Two Levels
 
Nisqually Stream Stewards Map 2018
Nisqually Stream Stewards Map 2018Nisqually Stream Stewards Map 2018
Nisqually Stream Stewards Map 2018
 
2018 SRFB PSAR Project Ranked List
2018 SRFB PSAR Project Ranked List2018 SRFB PSAR Project Ranked List
2018 SRFB PSAR Project Ranked List
 
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft Presentation
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft PresentationNisqually Watershed Stewardship Plan: Status Report 2018 Draft Presentation
Nisqually Watershed Stewardship Plan: Status Report 2018 Draft Presentation
 
2018 SRFB PSAR Project List for
2018 SRFB PSAR Project List for2018 SRFB PSAR Project List for
2018 SRFB PSAR Project List for
 
Nisqually Indian Tribe Food Sovereignty Assessment
Nisqually Indian Tribe Food Sovereignty AssessmentNisqually Indian Tribe Food Sovereignty Assessment
Nisqually Indian Tribe Food Sovereignty Assessment
 
Thurston County Nisqually Subarea Plan Update
Thurston County Nisqually Subarea Plan UpdateThurston County Nisqually Subarea Plan Update
Thurston County Nisqually Subarea Plan Update
 

Último

CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 

Último (20)

CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Green Banking
Green Banking Green Banking
Green Banking
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 

I5 Tumwater to Mounts Road Strategies Study

  • 1. Interstate 5: Tumwater to Mounts Road Mid- to Long-Term Strategies Nisqually River Council December 20th, 2019 Dennis Engel Matthew Pahs Olympic Region Multimodal Planning Manager Principal Senior Planner
  • 2. 2 Funding legislation $550,000 in state and local funds to identify potential improvements between exit 116 and exit 99 of Interstate 5. The study should • further develop mid- and long-term strategies, • identify potential US101/I-5 interchange improvements, • a strategic plan for the Nisqually River bridges, • regional congestion relief options, and • ecosystem benefits to the Nisqually River estuary for salmon productivity and flood control -Engrossed Senate Substitute Bill 6106 Session Law, 2018 Regular Session
  • 3. 3 Study area limits • Southern end point: Exit 99 – SR 121/93rd Ave • Northern end point: Exit 116 – Mounts Road • Included I-5 between Mounts Road and Main Gate at JBLM in travel time measures • Included all of Thurston County and parts of Pierce County for regional measures such as VMT
  • 4. 4 Study purpose and goals I-5 and major connecting routes between Tumwater and Mounts Road affect our region’s economic vitality, accessibility and mobility, defense operations, and the environment. This segment of I-5 is experiencing increasing congestion. Performance-based strategies are needed to satisfy the following goals (not listed in order of priority): • Improve travel times and reliability • Increase the ability to safely, efficiently, and equitably move all people (multimodal) and goods, and manage corridor capacity as an asset • Improve accessibility to industrial areas, commercial areas, and job sites • Protect and enhance the environment including reducing the transportation and estuarine habitat constraints related to the Nisqually River Bridges and the river’s delta. • Improve network redundancy and resiliency
  • 5. 5 Modeling Scenarios Scenarios Examples of modeled strategies Operations • Extra lane at Nisqually Interchange • Roundabouts on SR 507 near Yelm Land Use • Sustainable Thurston – growth concentrated in urban centers and corridors Travel demand management • Increased parking rates in urban core • Increased telework and schedule shifts Transit • Full implementation of Intercity Transit’s long-range strategic plan Hard shoulder running • Peak period general purpose shoulder use on I-5 between Sleater- Kinney and Henderson HOV conversion • Convert one existing general purpose lane to HOV from US 101 through 38th in Tacoma Interchange improvements • Braided ramp at US 101 and I-5 • Martin Way interchange reconfiguration Capacity expansion – HOV • Add 4th lane through study area as an HOV lane Capacity Expansion – General purpose • Add 4th lane through study area as a general purpose lane
  • 6. 6 Performance measures Study goal areas Performance measures Travel times and reliability  Corridor travel times  Maximum Throughput Travel Time Index (all traffic, HOV) Multimodal efficiency & equity  Corridor person throughput (all traffic, HOV)  County-wide mode split  County-wide vehicle miles traveled  Traffic Balance on I-5 (percent through traffic)  Access for Environmental Justice populations (poverty, minority, disability, no vehicle access) Accessibility  County-wide access (SOV, HOV, & Transit) to o Jobs o Commercial services  Travel times on selected freight access routes Environment  Greenhouse gas emissions Resiliency  Qualitative comparison “Improves availability and/or capacity of alternate routes”  Travel times on alternate routes through study area
  • 7. 7 Modeling Used a practical solutions approach • Modeled lower cost strategies first such as operations and TDM Included all improvements from previous scenarios • Exception – Widening scenarios did not include Hard Shoulder Running • Did this to see cumulative effect of lower cost strategies
  • 8. 8 Modeling – 2040 baseline scenario Mounts Road
  • 9. 9 Modeling – 2040 baseline scenario – US 101/Plum
  • 10. 10 Draft strategy recommendations Scenario Priority Draft recommendations Land Use 1 Recommended short-term/mid-term/ongoing Transit 2 Recommended short-term/mid-term/ongoing Travel Demand Management 3 Recommended short-term/mid-term/ongoing Operations 4 Recommended short- and mid-term Hard Shoulder Running 5 Recommended mid-term Interchange Improvements 6 Recommended mid-term/long-term HOV Conversion 7 Recommended mid-term Capacity Expansion I-5 - HOV1,2 8 Consider long-term Capacity Expansion I-5 All GP2 - Not recommended Short-term (0-4 years), mid-term (5-9 years), long-term (10-20 years) Unless otherwise noted, scenarios included all improvements from previous scenarios 1 The benefits of HOV lanes are accounted for in the HOV conversion scenario, the Capacity Expansion I-5 – Add GP Lane, Retain HOV Lane adds general purpose capacity not an HOV lane 2 Does not include Hard Shoulder Running, instead has permanent auxiliary lanes
  • 11. 11 Hydrologic Study WSDOT and the Nisqually Indian Tribe fully funded this study ($150,000 each) Nisqually Tribe working with USGS • Updating & validating modeling • Analyzing historic water levels, storm surge, wave heights, and extreme flood events Draft results expected in November
  • 12. 12 Next steps Next steps for this study • Public engagement in late November/early December • Report review in December Planning Environmental Linkages Study • WSDOT has advertised a Request for Qualifications • Expect consultant selection in January • PEL study will further refine solutions in cooperation with resource agencies Project webpage: https://www.wsdot.wa.gov/planning/studies/i5/tumwater-mounts-road/home

Notas del editor

  1. Thank you for the opportunity to update you all, on our study effort that involves all jurisdictions here and frankly all travelers on the I-5 corridor in this area.
  2. As a reminder, out of the 2018 legislative session, WSDOT was given a budget item and very specific language to find solutions for the corridor specifically between Tumwater and Mounts Road. We partnered with TRPC to: develop Mid & Long Term strategies ID potential improvements for US 101/I-5 Develop a strategic plan for the I-5/Nisqually River bridges Look at congestion relief options & look at ecosystem benefits to the estuary for salmon productivity and flood control
  3. Here’s our study limits….southern end is Exit 99 in Tumwater….northern end is Exit 116 at Mounts Road Our traffic model also includes the JBLM area, all of Thurston county and parts of Pierce county for measures such as travel times and Vehicle Miles Traveled
  4. The Executive Team made up of the Cities (Tumwater, Olympia, Lacey, Dupont) involved, TRPC, Intercity transit & Pierce Transit, WSDOT, FHWA, JBLM, SSMCP, Thurston & Pierce counties, Nisqually tribe, Port of Olympia Refined the Study purpose and developed the following 5 goals: Improve travel times & reliability Increase the ability to move all people and goods, as well as manage the corridor capacity as an asset Improve accessibility Protect and enhance the environment Improve redundancy/resiliency
  5. The improvement scenarios we were able to model are listed here along with some example strategies. For the scenario that enhances operations, an extra lane at the Nisqually I/C was included as well as RABs near Yelm (Vail Road & SR 702). (Nisqually NB on-ramp from Martin Way – 2 thru lanes rather than 1 currently there) Land Use – Sustainable Thurston is a Community plan centered around resiliency, quality of life, etc. TDM – increased parking rates and increased telework and shift schedules Transit scenario includes IT’s long range plan implementation (new routes, expanded hours) HSR – peak use for GP between Sleater Kinney and Henderson on SB I-5 in Lacey/Olympia The HOV conversion scenario converts 1 existing lane to HOV through the corridor (assumes beyond Mounts Road) Capacity expansion HOV – 3 GP lanes and 1 HOV lane (HOV already in the base model) Capacity expansion – GP – adds a 4 GP
  6. Here’s the Performance Measures the team applied to each goal area. For Travel times & reliability: corridor travel times and Max throughput were used. (Index = Actual speeds vs Max throughput; theory is that between 45-51 mph the corridor moves the most amount of vehicles) For goal area Multimodal efficiency & equity, performance for the scenarios was measured by: Corridor person throughput – how many made it through - measurement County-wide mode split – SOV vs HOV County-wide vehicle miles traveled Traffic Balance on I-5 (percent traveling through rather than entering & exiting) Accessibility for Environmental Justice populations (people experiencing poverty, minority status, disabilities, and those with no access to a vehicl) Accessibility – Thurston County wide Access to Jobs and Commercial services as well as Travel times on freight routes (SR 510, Plum Street, etc.) Environment – performance metric is Greenhouse gas emissions from vehicles Resiliency – we used qualitative analysis of availability & capacity of alternate routes from our Technical group, as well as travel times on alt. rtes. through the study area
  7. MARC Talking points We took a Practical Solutions approach to modeling, starting with smaller, less costly strategies Each subsequent scenario includes improvements from all previous scenarios except for the capacity expansion scenarios do not include hard shoulder running because they have permanent auxiliary lanes This is important to keep in mind when looking at modeling results and scenario scoring
  8. I-5/US 101 Interchange animation
  9. Mounts Road Interchange animation
  10. Regarding strategies that were not recommended Local Network strategy improvements are already part of Regional Transportation Plan The 30 local network projects included in this study did not provide significant benefit according to study performance measures. However, these projects are intended for multimodal safety and local traffic flow and are important for local transportation network functioning. Capacity Expansion – I-5: Add GP Lane, Convert HOV Lane to GP did not perform as well as expansion w/ HOV lane This study assumed continuous HOV lanes would be installed through the JBLM area up to Tacoma. Given that assumption, the expansion scenario with HOV lanes performed slightly better than a scenario with all GP lanes. Performance results may be different if reality does not match the assumption and HOV versus GP expansion should be reconsidered.