GOLDEN GATE BRIDGE
BY: NOUMAN TAHIR
14-CE-128
LOCATION
The golden gate bridge is constructed on channel between san-
francisco bay and pacific ocean. This peninsula is 3 miles long
and 1mile wide. The structure links the U.S. city of San Francisco,
on the northern tip of the San Francisco Peninsula, to Marin
County, bridging both san-francisco and California State across
the strait.
Satellite view
GENERAL INFORMATION OF BRIDGE
Chief engineer
Joseph Strauss
Architecture
Irving Foster Morrow
Beginning of project
5 January 1933
Completion
28 May 1937
Cost
$ 35 million
Status
in use
Project type
 Structure
suspension bridge
It opened in 1937 and was, until 1964, the longest suspension main
bridge span in the world.
 function/usage
motorway bridge/ freeway bridge
 Material
steel bridge
 Color of bridge
international orange
Dimensions of bridge
main span 1 280 m
length of side spans 345 m
total length 2 737 m
Cables
number of cables 2
strands per cable 92
wires per strand 27 572
deck
deck depth 7.6 m
deck width 27 m
clearance/elevation 67 m
Tower
height 230 m
Dimensions
elevation
67m
Purpose of elevation
An elevation/clearance of 67m was given to allow the passage of massive and huge
ships under the bridge.
Material used in construction
cables
Cables are entirely made
up of steel.
Deck truss
Made up of steel using
rivets.
pylons
Made up of steels and sections are
joined together by using rivets.
Joining of sections by rivets
CONSTRUCTION OF BRIDGE
COMPONENTS
 The north pier, which supports the tower, was built easily on a bedrock ledge 6m
below the water.
 But on the southern San Francisco side, Strauss had to build his pier in the open
ocean, 30m below the surface.
 Steel frame and steel cables.
 weight-blocks which ballast the cable anchorage.
Provided for stabilization.
 Pier:
The pier, made up of 147,600 tons of concrete, was built in 37m of
open water. This was achieved by the concrete fender that in itself is a
marvel of construction; it is 108m long and 56m wide at the center line
of the bridge.
 Suspended cantilever construction.
Suspended cantilever construction
Construction challenges
 The bridge in this location should withstand brutal winds, tide, and fog.
 It is also located less than 13km from the epicenter of the most
catastrophic earthquake in history.
 There was high speed moving water at spot where south tower had to
be constructed. The construction of south side pier started from 30 m
below hard rock bed.
 Cable anchorage was a challenging task for engineers.
Fog and cable anchorage challenges
Loading on bridge
The most important types of loadings considered on the bridge construction are:
 Dead load,
 Super-imposed dead load,
 Live Traffic,
 Wind,
 Temperature
This bridge is designed constructed in a way that it can bear:
 90 mph of wind.
 8.0 intensity earthquake.
 Wage of workers
Every worker earned $4 to $11 per day.
 Workers died during construction
11 workers died during construction.
 Safety
A safety net was tied below elevations to avoid any loss of life. 19 lives were
saved by this net.
Visiting the bridge
The bridge is popular with
pedestrians and bicyclists, and was
built with walkways on either side of
the six vehicle traffic lanes. Initially,
they were separated from the traffic
lanes by only a metal curb, but
railings between the walkways and
the traffic lanes were added in 2003,
primarily as a measure to prevent
bicyclists from falling into the
roadway.
Suicides
The Golden Gate Bridge is the
second most used suicide
site/suicide bridge in the
world.
Brief glimpse of all aspects
THANK YOU

Más contenido relacionado

La actualidad más candente

Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5Sandhya Singh
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.Puneet Chhonker
 
Portal frame by Rhythm Murgai
Portal frame by Rhythm MurgaiPortal frame by Rhythm Murgai
Portal frame by Rhythm MurgaiRhythm Murgai
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge pptSourav Roy
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Rohit Arora
 
Taipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,TaiwanTaipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,Taiwansatish rai
 
Buoyant foundation
Buoyant foundationBuoyant foundation
Buoyant foundationParth Patil
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers pptSAI KIRAN
 
Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentationGabriela Soto Bazán
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise PresentationKaiserin Tania
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridgemrzislion
 

La actualidad más candente (20)

Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Portal frame by Rhythm Murgai
Portal frame by Rhythm MurgaiPortal frame by Rhythm Murgai
Portal frame by Rhythm Murgai
 
Highrise structure
Highrise structureHighrise structure
Highrise structure
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
Taipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,TaiwanTaipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,Taiwan
 
Buoyant foundation
Buoyant foundationBuoyant foundation
Buoyant foundation
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers ppt
 
Doors & windows
Doors & windowsDoors & windows
Doors & windows
 
Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentation
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridge
 

Destacado

Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its TypesZakaria Yahya
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)suraj kumar
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges David Collings
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Precast Bridges slides
Precast Bridges slidesPrecast Bridges slides
Precast Bridges slidesWaqas Javaid
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Bridge
Bridge Bridge
Bridge illpa
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpointguested929b
 

Destacado (13)

Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its Types
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Fundamentals of-psc-bridge
Fundamentals of-psc-bridgeFundamentals of-psc-bridge
Fundamentals of-psc-bridge
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Precast Bridges slides
Precast Bridges slidesPrecast Bridges slides
Precast Bridges slides
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Bridge
Bridge Bridge
Bridge
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpoint
 

Similar a Golden gate bridge construction

Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Seven modern wonders of the world
Seven modern wonders of the worldSeven modern wonders of the world
Seven modern wonders of the worldvvelasco
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationAmir Amdani
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setuRatulDas36
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the worldAsifKhan17884
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the worldAnishaJalathota
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuVishweshwar Rao Narla
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfPramodLimbore
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxsimonithomas47935
 
2009 civil engineering modern date
2009 civil engineering modern date2009 civil engineering modern date
2009 civil engineering modern date信瑜 單信瑜
 
Presentation
PresentationPresentation
PresentationMZaheeb
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 

Similar a Golden gate bridge construction (20)

Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Golden gate.pdf
Golden gate.pdfGolden gate.pdf
Golden gate.pdf
 
Seven modern wonders of the world
Seven modern wonders of the worldSeven modern wonders of the world
Seven modern wonders of the world
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the world
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the world
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docx
 
2009 civil engineering modern date
2009 civil engineering modern date2009 civil engineering modern date
2009 civil engineering modern date
 
Presentation
PresentationPresentation
Presentation
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Howrah bridge
Howrah bridgeHowrah bridge
Howrah bridge
 

Último

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Último (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Golden gate bridge construction

  • 1. GOLDEN GATE BRIDGE BY: NOUMAN TAHIR 14-CE-128
  • 2. LOCATION The golden gate bridge is constructed on channel between san- francisco bay and pacific ocean. This peninsula is 3 miles long and 1mile wide. The structure links the U.S. city of San Francisco, on the northern tip of the San Francisco Peninsula, to Marin County, bridging both san-francisco and California State across the strait.
  • 4. GENERAL INFORMATION OF BRIDGE Chief engineer Joseph Strauss Architecture Irving Foster Morrow Beginning of project 5 January 1933 Completion 28 May 1937 Cost $ 35 million Status in use
  • 5. Project type  Structure suspension bridge It opened in 1937 and was, until 1964, the longest suspension main bridge span in the world.  function/usage motorway bridge/ freeway bridge  Material steel bridge  Color of bridge international orange
  • 6. Dimensions of bridge main span 1 280 m length of side spans 345 m total length 2 737 m Cables number of cables 2 strands per cable 92 wires per strand 27 572 deck deck depth 7.6 m deck width 27 m clearance/elevation 67 m Tower height 230 m
  • 8. Purpose of elevation An elevation/clearance of 67m was given to allow the passage of massive and huge ships under the bridge.
  • 9. Material used in construction cables Cables are entirely made up of steel. Deck truss Made up of steel using rivets. pylons Made up of steels and sections are joined together by using rivets.
  • 10. Joining of sections by rivets
  • 12. COMPONENTS  The north pier, which supports the tower, was built easily on a bedrock ledge 6m below the water.  But on the southern San Francisco side, Strauss had to build his pier in the open ocean, 30m below the surface.
  • 13.  Steel frame and steel cables.  weight-blocks which ballast the cable anchorage. Provided for stabilization.  Pier: The pier, made up of 147,600 tons of concrete, was built in 37m of open water. This was achieved by the concrete fender that in itself is a marvel of construction; it is 108m long and 56m wide at the center line of the bridge.  Suspended cantilever construction.
  • 15. Construction challenges  The bridge in this location should withstand brutal winds, tide, and fog.  It is also located less than 13km from the epicenter of the most catastrophic earthquake in history.  There was high speed moving water at spot where south tower had to be constructed. The construction of south side pier started from 30 m below hard rock bed.  Cable anchorage was a challenging task for engineers.
  • 16. Fog and cable anchorage challenges
  • 17. Loading on bridge The most important types of loadings considered on the bridge construction are:  Dead load,  Super-imposed dead load,  Live Traffic,  Wind,  Temperature This bridge is designed constructed in a way that it can bear:  90 mph of wind.  8.0 intensity earthquake.
  • 18.  Wage of workers Every worker earned $4 to $11 per day.  Workers died during construction 11 workers died during construction.  Safety A safety net was tied below elevations to avoid any loss of life. 19 lives were saved by this net.
  • 19. Visiting the bridge The bridge is popular with pedestrians and bicyclists, and was built with walkways on either side of the six vehicle traffic lanes. Initially, they were separated from the traffic lanes by only a metal curb, but railings between the walkways and the traffic lanes were added in 2003, primarily as a measure to prevent bicyclists from falling into the roadway.
  • 20. Suicides The Golden Gate Bridge is the second most used suicide site/suicide bridge in the world.
  • 21. Brief glimpse of all aspects