Step in project planning



Scope
A bounded description of the data and control, function,
performance, constraints, interfaces and reliability Sufficient to
determine project feasibility and create an initial plan.


Scheduling (penjadualan)
Must Manage
i. Parallelism (tasks can be undertaken simultaneously)
Keselarian (tugas boleh dilaksanakan serentak)

ii. Dependency (task has an effect on subsequent tasks)
Kebergantungan (tugas mempunyai kesan kepada tugas berikutnya)

iii. Bad Scheduling is a very destructive influence

(Penjadualan

buruk adalah pengaruh yang sangat merosakkan)

iv. Rule 90-90 : First 90% of a project is complete. (Peraturan
90-90 : Pertama 90% projek yang lengkap)

v. 90% of the scheduled time. The other 10% is also
completed in 90% of the time (90% daripada masa yang dijadualkan. Yang lain
10% juga siap dalam 90%)
i.
ii.
iii.
iv.

Critical Path (the chain of tasks that determine the
duration of the project)
Earliest Time that a task can begin if all preceding
tasks are completed in the shortest possible time
Latest Time for task initiation that will not delay the
project
Latest and Earliest Finish for the overall project
Total Float (the maximum slippage without
overall delay)
 ADVANTAGE


DISADVANTAGES
A Gantt chart is a type of bar chart, developed by Henry Gantt,
that illustrates a project schedule. Gantt charts illustrate the
start and finish dates of the terminal elements and summary
elements of a project.
 Terminal elements and summary elements comprise the work
breakdown structure of the project. Some Gantt charts also
show the dependency (i.e., precedence network) relationships
between activities. Gantt charts can be used to show current
schedule status using percent-complete shadings and a vertical.

Time estimates
Time estimates
Activity Predecessor
Activity Predecessor

Expected time
Expected time
Opt. (O) Normal (M) Pess. (P)
Opt. (O) Normal (M) Pess. (P)

A
A

—
—

2
2

4
4

6
6

4.00
4.00

B
B

—
—

3
3

5
5

9
9

5.33
5.33

C
C

A
A

4
4

5
5

7
7

5.17
5.17

D
D

A
A

4
4

6
6

10
10

6.33
6.33

E
E

B, C
B, C

4
4

5
5

7
7

5.17
5.17

F
F

D
D

3
3

4
4

8
8

4.50
4.50

G
G

E
E

3
3

5
5

8
8

5.17
5.17





The Critical Path Method (CPM) is a mathematically based
algorithm for scheduling set of project activities, Project
Scheduling.
The name CPM comes from the Critical Path of Activities that
determine a project’s minimum duration.
The main outputs of the Critical Path Method are the Arrow
Diagram, Activity Schedule, and Modified Bar Chart.
Resource Leveling and Crashing are two tools used to optimize
projects via scheduling
Activity

Prior Activity

A

None

B

A

Example
2

Activity

Prior Activity

A

None

B

A

C

A
Activity

Prior Activity

A

None

B

None

C

A, B

D

A, B

Más contenido relacionado

La actualidad más candente

pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
FiQahh AmiNn
 
Pembinaan
PembinaanPembinaan
Pembinaan
anis
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
Natalie Ulza
 
C3010 bab4
C3010 bab4C3010 bab4
C3010 bab4
pokjak80
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
alanchong88
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industri
cik Ena
 
Jenis kerosakan jalan raya
Jenis kerosakan jalan rayaJenis kerosakan jalan raya
Jenis kerosakan jalan raya
Suhailah Fauzi
 

La actualidad más candente (20)

pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
 
Modul 1 pengurusan projek
Modul 1 pengurusan projekModul 1 pengurusan projek
Modul 1 pengurusan projek
 
Jenis kontraktor
Jenis kontraktorJenis kontraktor
Jenis kontraktor
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
C3010 bab4
C3010 bab4C3010 bab4
C3010 bab4
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industri
 
Lukisan bangunan
Lukisan bangunanLukisan bangunan
Lukisan bangunan
 
Unit 1 tender 1.1
Unit 1 tender 1.1Unit 1 tender 1.1
Unit 1 tender 1.1
 
SPK JKR Malaysia: Terminologi
SPK JKR Malaysia: TerminologiSPK JKR Malaysia: Terminologi
SPK JKR Malaysia: Terminologi
 
Jenis kerosakan jalan raya
Jenis kerosakan jalan rayaJenis kerosakan jalan raya
Jenis kerosakan jalan raya
 
Pengurusan Projek
Pengurusan ProjekPengurusan Projek
Pengurusan Projek
 
punca / kadar kemerosotan bangunan
punca / kadar kemerosotan bangunanpunca / kadar kemerosotan bangunan
punca / kadar kemerosotan bangunan
 
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
 
372968160-konkrit-bancuhan.ppt
372968160-konkrit-bancuhan.ppt372968160-konkrit-bancuhan.ppt
372968160-konkrit-bancuhan.ppt
 
Cube test report
Cube test reportCube test report
Cube test report
 
Bab 3
Bab 3Bab 3
Bab 3
 

Destacado

Ikan hiasan full
Ikan hiasan fullIkan hiasan full
Ikan hiasan full
Miza Wahit
 
Bidang pembelajaran 4.3 Tingkatan 5
Bidang pembelajaran  4.3 Tingkatan 5Bidang pembelajaran  4.3 Tingkatan 5
Bidang pembelajaran 4.3 Tingkatan 5
MOE
 

Destacado (15)

3. sisteminformasistrategis
3. sisteminformasistrategis3. sisteminformasistrategis
3. sisteminformasistrategis
 
Jurutera dan-masyaraka-t-slide
Jurutera dan-masyaraka-t-slideJurutera dan-masyaraka-t-slide
Jurutera dan-masyaraka-t-slide
 
Ikan hiasan full
Ikan hiasan fullIkan hiasan full
Ikan hiasan full
 
civil engineer / jurutera pembangunan (Dual Language)
civil engineer / jurutera pembangunan (Dual Language)civil engineer / jurutera pembangunan (Dual Language)
civil engineer / jurutera pembangunan (Dual Language)
 
Heat Exchanger
Heat ExchangerHeat Exchanger
Heat Exchanger
 
Troubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsTroubleshooting in Distillation Columns
Troubleshooting in Distillation Columns
 
Pengenalan sistem-operasi1
Pengenalan sistem-operasi1Pengenalan sistem-operasi1
Pengenalan sistem-operasi1
 
Maintenance of distillation column asmita
Maintenance of distillation column asmitaMaintenance of distillation column asmita
Maintenance of distillation column asmita
 
Fractional Distillation
Fractional DistillationFractional Distillation
Fractional Distillation
 
A training seminar on induction furnace by stead fast engineers pvt ltd
A  training seminar on induction furnace by stead fast engineers pvt ltdA  training seminar on induction furnace by stead fast engineers pvt ltd
A training seminar on induction furnace by stead fast engineers pvt ltd
 
FINAL REPORT PPT
FINAL REPORT PPTFINAL REPORT PPT
FINAL REPORT PPT
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - Maintainance
 
Sand replacement
Sand replacementSand replacement
Sand replacement
 
Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1
 
Bidang pembelajaran 4.3 Tingkatan 5
Bidang pembelajaran  4.3 Tingkatan 5Bidang pembelajaran  4.3 Tingkatan 5
Bidang pembelajaran 4.3 Tingkatan 5
 

Similar a 4.1 planning schedulling

PROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VISPROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VIS
tpvishnu1
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
WanBK Leo
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
yashchotaliyael21
 

Similar a 4.1 planning schedulling (20)

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Program Evaluation And Review Technique
Program Evaluation And Review TechniqueProgram Evaluation And Review Technique
Program Evaluation And Review Technique
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
PROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VISPROJECT MANAGEMENT _PPT_VIS
PROJECT MANAGEMENT _PPT_VIS
 
PertGanttchart
PertGanttchartPertGanttchart
PertGanttchart
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
An Overview Of Basic Planning & Scheduling Concepts
An Overview Of Basic Planning & Scheduling ConceptsAn Overview Of Basic Planning & Scheduling Concepts
An Overview Of Basic Planning & Scheduling Concepts
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt Chart
 
Project Management
Project Management Project Management
Project Management
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Assignment project scheduling
Assignment project schedulingAssignment project scheduling
Assignment project scheduling
 
CCP_SEC3_Planning and Scheduling
CCP_SEC3_Planning and SchedulingCCP_SEC3_Planning and Scheduling
CCP_SEC3_Planning and Scheduling
 
02-Key Definitions .pdf
02-Key Definitions .pdf02-Key Definitions .pdf
02-Key Definitions .pdf
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.ppt
 
Schedule_Module_V.10.ppt
Schedule_Module_V.10.pptSchedule_Module_V.10.ppt
Schedule_Module_V.10.ppt
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 
Ii. pert cpm
Ii. pert cpmIi. pert cpm
Ii. pert cpm
 
Critical path presentation for timely project completion
Critical path presentation for timely project completionCritical path presentation for timely project completion
Critical path presentation for timely project completion
 

Más de Natalie Ulza

PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
Natalie Ulza
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
Natalie Ulza
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
Natalie Ulza
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
Natalie Ulza
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
Natalie Ulza
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
Natalie Ulza
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
Natalie Ulza
 

Más de Natalie Ulza (20)

miraculous discovery
miraculous discoverymiraculous discovery
miraculous discovery
 
PENEMUAN AJAIB
PENEMUAN AJAIBPENEMUAN AJAIB
PENEMUAN AJAIB
 
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
 
amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
 
3.4 scaffolding
3.4 scaffolding3.4 scaffolding
3.4 scaffolding
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
 
BOD TEST
BOD TESTBOD TEST
BOD TEST
 
TURBIDITY TEST
TURBIDITY TESTTURBIDITY TEST
TURBIDITY TEST
 
Mangan test
Mangan testMangan test
Mangan test
 
JET JAR TEST
JET JAR TESTJET JAR TEST
JET JAR TEST
 
FERUM TEST
FERUM TESTFERUM TEST
FERUM TEST
 
environment pollution topic 2-water pollution 2
environment pollution topic 2-water pollution 2environment pollution topic 2-water pollution 2
environment pollution topic 2-water pollution 2
 
environment pollution topic 1-public health
environment pollution topic 1-public healthenvironment pollution topic 1-public health
environment pollution topic 1-public health
 

Último

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 

4.1 planning schedulling

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.  Step in project planning  Scope A bounded description of the data and control, function, performance, constraints, interfaces and reliability Sufficient to determine project feasibility and create an initial plan. 
  • 6. Scheduling (penjadualan) Must Manage i. Parallelism (tasks can be undertaken simultaneously) Keselarian (tugas boleh dilaksanakan serentak) ii. Dependency (task has an effect on subsequent tasks) Kebergantungan (tugas mempunyai kesan kepada tugas berikutnya) iii. Bad Scheduling is a very destructive influence (Penjadualan buruk adalah pengaruh yang sangat merosakkan) iv. Rule 90-90 : First 90% of a project is complete. (Peraturan 90-90 : Pertama 90% projek yang lengkap) v. 90% of the scheduled time. The other 10% is also completed in 90% of the time (90% daripada masa yang dijadualkan. Yang lain 10% juga siap dalam 90%)
  • 7. i. ii. iii. iv. Critical Path (the chain of tasks that determine the duration of the project) Earliest Time that a task can begin if all preceding tasks are completed in the shortest possible time Latest Time for task initiation that will not delay the project Latest and Earliest Finish for the overall project Total Float (the maximum slippage without overall delay)
  • 8.
  • 11. A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.  Terminal elements and summary elements comprise the work breakdown structure of the project. Some Gantt charts also show the dependency (i.e., precedence network) relationships between activities. Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical. 
  • 12. Time estimates Time estimates Activity Predecessor Activity Predecessor Expected time Expected time Opt. (O) Normal (M) Pess. (P) Opt. (O) Normal (M) Pess. (P) A A — — 2 2 4 4 6 6 4.00 4.00 B B — — 3 3 5 5 9 9 5.33 5.33 C C A A 4 4 5 5 7 7 5.17 5.17 D D A A 4 4 6 6 10 10 6.33 6.33 E E B, C B, C 4 4 5 5 7 7 5.17 5.17 F F D D 3 3 4 4 8 8 4.50 4.50 G G E E 3 3 5 5 8 8 5.17 5.17
  • 13.
  • 14.    The Critical Path Method (CPM) is a mathematically based algorithm for scheduling set of project activities, Project Scheduling. The name CPM comes from the Critical Path of Activities that determine a project’s minimum duration. The main outputs of the Critical Path Method are the Arrow Diagram, Activity Schedule, and Modified Bar Chart. Resource Leveling and Crashing are two tools used to optimize projects via scheduling
  • 15.