TRANSPORTATION
SYSTEM IN
BUILDING

LIFTS
History of Lifts


Roman architect Vitruvius, reported
that Archimedes built his first elevator in
236 BC.[13] Elevators were mentioned as
cabs on a hemp rope and powered by
hand or by animals.
• In 1852, Elisha Otis introduced the
safety elevator, which prevented the
fall of the cab if the cable broke. The
design of the Otis safety elevator is
somewhat similar to one type still used
today.
• On March 23, 1857 the first Otis
passenger elevator was installed at 488
Broadway in New York City

• The Equitable Life Building completed
in 1870 in New York City was the first
office building to have passenger
elevators.[20]
Elisha Otis' elevator patent drawing, 15 January 1861.
1.1 Definition of Lifts


A vertical transport equipment that efficiently moves people
between floors (levels, deck) of a building, vessel or other
structure.



Generally powered by electric
motor that drive by traction cable and
counterweight systems like a hoist or
hydraulic pump.
Importance of Lifts


Rapid development : buildings design nowadays built vertically
/higher because of high land cost.



Basic needs : to bring building user from one level to higher level in
building



Comfort needs : working efficiency for office building or large
organization.



UBBL : building with more than 6 storey must provide lifts system.



Fire requirements : provide fire lift to be used during fire.
1.2 Lift Categories According to the
Function


Trade Lift
- Crucial to the good performance to clients of the
building.
- Between 6 – 23 people.
- Speed of elevator 200 – 2000 ft/ min.
- Examples : offices, shopping mall and hotels


Hospital Lift
- Used in hospital & treatment center
- Designed for transporting large carts or furniture.
- Speed of elevator 100 – 350 ft/ min.
- Two sides of front and back doors for loading and
unloading facilities.
- Door width between 900 – 1100mm


High Residential Lift
- For high rise residential buildings such as flat, apartment
or condominium.
- Needs regular maintenance
because high frequency
of its use everyday or possibility
of vandalism.


Institution Lift

- Used in library, office, classroom or lecture hall located
at high altitudes.



Store Lift
- Used to transport heavy goods but depends on types of
good transported.
- Elevator speed 50 – 150ft/min.
- 5000 lbs normal, load haul 20000 lbs.
- Usually used in shoppping complex, airports, hotels,
warehouse


Lift of Cars
- Used specifically to lift a car in
multi storey car park or
showroom.

NOTES :
• The six types of elevators had to be in the form of pull
(traction) and hydraulics.
• Form of traction is more commonly used for high velocity.
• Hydraulic type only used to transport goods where waiting
time is not concerned.
1.3 Characteristic of Lifts
1.
2.
3.

Lift needed for the building more than 6 storey.
Installation must be in accordance with the regulation in
UBBL.
Suitable speed 100 – 150ft/min. Too fast will result in a nervous
breakdown to the user. If too slow will cause lack of function.

USER REQUIREMENTS :






Good System – quiet equipment, smooth journey, good
condition and safe at every moment.
Waiting time – minimum waiting time at any level.
Aesthetics – Button panel clear and easily reached at
appropriate level. Complete instruction. Decorative lighting
and comfortable.
Movement of door – door movement is quiet and fast.
1.4 Components & Installation of Lifts
Lift sub-system






Control Motion – includes motor, gear, engines, brakes and power
supply.
Control System - to get control the movements of the lift.
Door Control – contained motor connecting lift car doors,
platforms gates and door safety devices.
Safety Control – contain the safety gear,
speed controller for the first balance, heat
and lack of power.
Typical traction lift design
Lift Components
LIFT CAR




Platform where passengers or goods is transported.
Constructed with steel or iron attached with steel frame.
Fire resistance

Elevator hoist ropes on
top of a lift car


Equipment to be provided – door, floor panel indicators, button of
request, phone, emergency button, lighting, ventilation and
enough emergency supplies.

A modern internal control panel. Notice the
buttons labeled 1 above G.

An external control panel
• Divided into 2 types :
1. Closed Lift (typical type)
2. Open Lift (bubble type)

Open Lift (bubble type)

Closed Lift (typical type)
LIFT SHAFT




Constructed with reinforced concrete.
To accommodate the loading and fire resistance.
Size of lift shaft space is determined by the number of user.

Looking down the lift shaft
of a hydraulic elevator. The
hydraulic ram is to the left
Gearless motor mounted on the wall in the lift shaft
GOVERNOR
 Usually

placed at the top of lift shaft.
 Placed in room equipped with a lifting
beam for maintenance purposes.
 Have electric motor, safety gear, guard rail,
diaphragm motion and gear.
LIFT DOOR
Lift car is equipped with its own door (sliding
type).
 Security measure – resist the movement as long
as the door is still open.
 Self closing within a certain time frame.
 2 types of sliding door :
1. Opened automatically when the lift stops at
every level.
2. Swing door – will open when the lift stopped
at the lobby.

GUARD RAIL




Work to keep the car and the counterweight.
Mounted on both sides of the lift shaft which is
attached to the wheel of the car.
A safety device to hold the lift from crashing
down if the rope break.

BUFFER



To absorb the impact of the lift car when it fell.
Placed in a room called the lift pit.
COUNTERWEIGHT
 Load

borne by the generator is balanced by
the counterweight.
 Connected with a wire rope of the elevator
car.
 Function of counterweight :
- To grip the lift car
- Reduce the power of generator
- Reduce the brake to stop the car lifts.
1.5 Selection Factor
GENERAL REQUIREMENTS
 Utility – The function must be identified whether for
commercial, office of hospital.
 Capacity & number of lifts – depends on the access building
pattern and building size.
 Speed – depends on the number of stops, numbers of user and
transport cost.
 Type & size of lift gate – depends on the use or function.
PHYSICAL REQUIREMENTS
 Size of lift shaft – depends on lift cargo capacity
 Depth of lift shaft – depends on the speed of elevator
 Area of space in lift – depends on speed of elevators.
 Mechanical room size – depends on type and size of the lift
equipment.
OTHER REQUIREMENTS






Electrical panels and power outlets.
Ventilation fan and lighting in engine room.
Steps down and power sockets in the wells lift (lift pit).
The structure for lifting the machinery room.
Maintanence works.
Building type

Waiting time (second)

Office building
- Central town
- Commercial

25 – 30
30 – 45

Residential building
- Luxury
- Medium type
- Low cost
- Hostel

50 – 70
60 – 80
80 – 120
60 – 80

Hotel
- Class A
- Class B

40 – 60
50 - 70
Function

Lif capacity
(lbs)

Min. Speed
(ft/min.)

Building height (ft)

Office Building
Small size

2500

Medium size

3000

High scale

3500

350 – 400
500 – 600
700
800
1000

0 – 125
126 – 225
226 – 275
276 – 375
> 375

Hotel

2500
3000

Same as above

Hospital

3000

150
200
250 – 300
350 – 400
500 – 600
700

0 – 60
61 – 100
101 – 125
126 – 175
176 – 250
> 250

100
200
250 – 300
350 - 400

0 – 75
76 – 125
126 – 200
> 200

200
250 – 300
350 – 400
500

0 – 100
101 – 150
151 – 200
> 200

3500
4000

Residential

2000
2500

Commercial

3500
4000

5000
1.6 Location & Lift Arrangement
LIFT ARRANGEMENT
 To ensure there is no interference between
passengers who wish to get into the lift.
 Should be carefully planned so can easily get into
lobby and travel distance is reasonable.
 Maximum travel distance 150 – 200ft
 System layout depends on the number of elevator
cars that use the elevator
 Normally the elevator is set in the layout or zoned.
BENEFIT
 If there is high traffic , the usage is at optimum level
 Waiting time will be shorten.
Lift Arrangement for 2 car lift

Side by side
arrangement –
width of corridor
= width of car lift

Opposite
arrangement of
corridor = width of
car lift
ment –
width of corridor
= width of car lift

Not good
arrangement
Lift Arrangement for 3 car lift

Opposite
arrangement –
width of corridor
= 1.5 – 2A, where
A is width of lift

Side by side
arrangement width of corridor =
1.5A, where A is
width of lift
Lift Arrangement for 4 car lift

Opposite
arrangement –
width of corridor
= 1.5 – 2A, where
A is width of lift

Side by side
arrangement width of corridor =
1.5A, where A is
width of lift
Lift Arrangement for 6 car lift

Opposite
arrangement –
width of corridor
= 1.75 – 2A,
where A is width
of lift

Side by side
arrangement width of corridor =
2A, where A is
width of lift
Lift Arrangement for 6 car lift

Weak
arrangement for
6 car lift
Lift Arrangement for 8 car lift

Opposite
arrangement –
width of corridor
= 2A, where A is
width of lift
1.7 Types of lift
ELECTRIC LIFT









Common type used today.
Use electric lift cable to lift the
elevator car with the weight and
movement is the catalyst action.
Use the traction with the motor.
Used in most building > 60ft.
Motor room on top of lift shaft will
increase the load of building structure.
Possibility of noise structure
Need a lift wells and maintenance
room near the engine room.

Traction elevator motor
HYDRAULIC LIFT









Use hydraulics principles – moves by the action
of steel plunger lift which installed under the car.
Not suitable for building > 60ft (low rise) –
insufficient space or roof rooms too small to put
the machinery.
Transport load not > 100,000 pound.
Speed – not > 200ft/min.
Installation does not increase the building
structures because lifting weight is not used.
Machinery room located at ground floor
Shaft area is smaller than electric lift.
Bottom view of a hydraulic elevator
HANDICAPPED LIFT




For people with disability who use wheelchair.
Or with disabilities who are unable to use ordinary
crowded lift of fast services.
Mounted on the stair parallel to the ladder

FIRE LIFT



Buildings over than 60ft high are required to provide fire
lift.
This lift controlled by a system back on in emergencies.
PATERNOSTER










A lift systems moves continuously in one
direction by providing the same car lifts.
Provides the movement up and down
continuously.
No doors and passengers are forced into
or out of the moving car lift
Speed – 80 min.
Suitable for 6 – 7 storey buildings
Not suitable to used by children or older people.
HIGH RISE LIFT






Service requirement for high rise building is
critical to balance the upper and lower level
services.
The concept of zone system and sky lobby can
be used.
Usually divided into zones where high level car
will not stop or pick passengers at lower level.
Zone which too low will takes passengers down
to lower levels such as 5 – 10 levels below.
DOUBLE DECKER LIFT










Carry passengers without raising double the lift shaft.
Have two platforms which are increased.
High transport capacity and reduce floor space
Number of stops can reduced to 50% - reducing
waiting time and shorter car lift trips.
Can be used in building which has a same height in
every level.
The main lobby has two levels.
Must have clear indication of the use in the main
lobby to avoid confusion.
1.8 : Lift Installation by zone system
ONE SYSTEM ZONE
 For building not > 15 levels.
 Elevators car stops at every level of the building.
 Used to save space.
TWO SYSTEM ZONE
 For buildings > 15 levels and < 40 levels.
 System brake into two zone of elevator
 The elevator of bottom and same for the top will not
stop at any lower zone.
 Not effective in the event of ‘off peak’ and interfloor
service.
SKY LOBBY ZONE





For building > 40 levels.
A group lift with high speed moving lift
without interruption from the floor to
the sky lobby.
The elevator will move with normal
velocity at the next level.
Lift

Más contenido relacionado

La actualidad más candente

Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalatorsKuNal MeHta
 
Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Arpit Vyas
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in buildingSelva Architect
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walkshamal das
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building MaterialsSorab Mishra
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
Fire regulations for buildings
Fire regulations for buildingsFire regulations for buildings
Fire regulations for buildingsDeepak KUMAR
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildingsHetvi Trada
 
14. Area of Refuge
14. Area of Refuge14. Area of Refuge
14. Area of RefugeSadiq Alam
 

La actualidad más candente (20)

Lifts
LiftsLifts
Lifts
 
Escalators
EscalatorsEscalators
Escalators
 
Escalators
EscalatorsEscalators
Escalators
 
Lifts
LiftsLifts
Lifts
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalators
 
Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in building
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walk
 
Lift Design
Lift  DesignLift  Design
Lift Design
 
Elevators and Escalators
 Elevators and Escalators Elevators and Escalators
Elevators and Escalators
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
 
Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
Fire regulations for buildings
Fire regulations for buildingsFire regulations for buildings
Fire regulations for buildings
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
14. Area of Refuge
14. Area of Refuge14. Area of Refuge
14. Area of Refuge
 
mechanical transportation
mechanical transportationmechanical transportation
mechanical transportation
 
Lifts or Elevators
Lifts or ElevatorsLifts or Elevators
Lifts or Elevators
 
Building services
Building servicesBuilding services
Building services
 

Destacado

Destacado (14)

Shopping mall.
Shopping mall.Shopping mall.
Shopping mall.
 
Arrangement of Escalators and Elevators
Arrangement of Escalators and ElevatorsArrangement of Escalators and Elevators
Arrangement of Escalators and Elevators
 
3 supply and demand
3 supply and demand3 supply and demand
3 supply and demand
 
Basic of Supply and Demand - Economic
Basic of Supply and Demand - EconomicBasic of Supply and Demand - Economic
Basic of Supply and Demand - Economic
 
MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1
 
Servicing large buildings
Servicing large buildingsServicing large buildings
Servicing large buildings
 
Elevator lift
Elevator lift Elevator lift
Elevator lift
 
Lif dan eskalator
Lif dan eskalatorLif dan eskalator
Lif dan eskalator
 
Topik 2 pengenalan lift
Topik 2 pengenalan liftTopik 2 pengenalan lift
Topik 2 pengenalan lift
 
Wk 4 modular_lecture
Wk 4 modular_lectureWk 4 modular_lecture
Wk 4 modular_lecture
 
Eskalator
EskalatorEskalator
Eskalator
 
Bab 3 Fungsi Perniagaan
Bab 3 Fungsi PerniagaanBab 3 Fungsi Perniagaan
Bab 3 Fungsi Perniagaan
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Demand and supply
Demand and supplyDemand and supply
Demand and supply
 

Similar a Lift

Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introductionwasim shaikh
 
Vertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdfVertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdfAbdulwalimusemohamed
 
BMC V - MODULE 02 - ELEVATORS (1).pptx
BMC V - MODULE 02 - ELEVATORS (1).pptxBMC V - MODULE 02 - ELEVATORS (1).pptx
BMC V - MODULE 02 - ELEVATORS (1).pptxAnoHossey
 
lifts-150324053755-conversion-gate01 (1).pdf
lifts-150324053755-conversion-gate01 (1).pdflifts-150324053755-conversion-gate01 (1).pdf
lifts-150324053755-conversion-gate01 (1).pdfParth697370
 
building service - lift and escalators
building service - lift and escalatorsbuilding service - lift and escalators
building service - lift and escalatorsrajitk97
 
dfnsf-170406142529.pdf
dfnsf-170406142529.pdfdfnsf-170406142529.pdf
dfnsf-170406142529.pdfRamazKanagala1
 
Elevators notes 1.pptx
Elevators notes 1.pptxElevators notes 1.pptx
Elevators notes 1.pptxAnoHossey
 
LIFTS AND ESCALATORS.pptx and its basic pricples
LIFTS AND ESCALATORS.pptx and its basic pricplesLIFTS AND ESCALATORS.pptx and its basic pricples
LIFTS AND ESCALATORS.pptx and its basic pricplesMichael Intia
 
Elevators Definitions, Types and Applications
Elevators Definitions, Types and ApplicationsElevators Definitions, Types and Applications
Elevators Definitions, Types and ApplicationsProfSHananeel
 
Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)Hrishi Desai
 
3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptxJigsPatel37
 
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptxshamshaider10
 
lifts and escalators
lifts and escalatorslifts and escalators
lifts and escalatorsVir Ti
 

Similar a Lift (20)

Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introduction
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
ELEVATORS
ELEVATORSELEVATORS
ELEVATORS
 
Vertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdfVertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdf
 
Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
BMC V - MODULE 02 - ELEVATORS (1).pptx
BMC V - MODULE 02 - ELEVATORS (1).pptxBMC V - MODULE 02 - ELEVATORS (1).pptx
BMC V - MODULE 02 - ELEVATORS (1).pptx
 
lifts-150324053755-conversion-gate01 (1).pdf
lifts-150324053755-conversion-gate01 (1).pdflifts-150324053755-conversion-gate01 (1).pdf
lifts-150324053755-conversion-gate01 (1).pdf
 
Lifts & escalators
Lifts & escalators Lifts & escalators
Lifts & escalators
 
building service - lift and escalators
building service - lift and escalatorsbuilding service - lift and escalators
building service - lift and escalators
 
dfnsf-170406142529.pdf
dfnsf-170406142529.pdfdfnsf-170406142529.pdf
dfnsf-170406142529.pdf
 
Elevators notes 1.pptx
Elevators notes 1.pptxElevators notes 1.pptx
Elevators notes 1.pptx
 
Elevator system
Elevator systemElevator system
Elevator system
 
LIFTS AND ESCALATORS.pptx and its basic pricples
LIFTS AND ESCALATORS.pptx and its basic pricplesLIFTS AND ESCALATORS.pptx and its basic pricples
LIFTS AND ESCALATORS.pptx and its basic pricples
 
Elevators and excelarators
Elevators and excelaratorsElevators and excelarators
Elevators and excelarators
 
Elevators Definitions, Types and Applications
Elevators Definitions, Types and ApplicationsElevators Definitions, Types and Applications
Elevators Definitions, Types and Applications
 
Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)
 
3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx
 
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx
21AR013 FARHAN ULLAH LIFT PRESENTATION.pptx
 
ELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONSELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONS
 
lifts and escalators
lifts and escalatorslifts and escalators
lifts and escalators
 

Más de Natalie Ulza

miraculous discovery
miraculous discoverymiraculous discovery
miraculous discoveryNatalie Ulza
 
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)Natalie Ulza
 
amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5Natalie Ulza
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedullingNatalie Ulza
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policiesNatalie Ulza
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking struttingNatalie Ulza
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapakNatalie Ulza
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chartNatalie Ulza
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project managementNatalie Ulza
 
2.1 concept of leader ship
2.1 concept of leader ship2.1 concept of leader ship
2.1 concept of leader shipNatalie Ulza
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project managerNatalie Ulza
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of managementNatalie Ulza
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1Natalie Ulza
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1Natalie Ulza
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revNatalie Ulza
 

Más de Natalie Ulza (20)

miraculous discovery
miraculous discoverymiraculous discovery
miraculous discovery
 
PENEMUAN AJAIB
PENEMUAN AJAIBPENEMUAN AJAIB
PENEMUAN AJAIB
 
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
 
amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedulling
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
 
3.4 scaffolding
3.4 scaffolding3.4 scaffolding
3.4 scaffolding
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
 
2.1 concept of leader ship
2.1 concept of leader ship2.1 concept of leader ship
2.1 concept of leader ship
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project manager
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
 
BOD TEST
BOD TESTBOD TEST
BOD TEST
 
TURBIDITY TEST
TURBIDITY TESTTURBIDITY TEST
TURBIDITY TEST
 

Último

Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfDerekIwanaka1
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 

Último (20)

Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 

Lift

  • 2. History of Lifts  Roman architect Vitruvius, reported that Archimedes built his first elevator in 236 BC.[13] Elevators were mentioned as cabs on a hemp rope and powered by hand or by animals.
  • 3. • In 1852, Elisha Otis introduced the safety elevator, which prevented the fall of the cab if the cable broke. The design of the Otis safety elevator is somewhat similar to one type still used today. • On March 23, 1857 the first Otis passenger elevator was installed at 488 Broadway in New York City • The Equitable Life Building completed in 1870 in New York City was the first office building to have passenger elevators.[20]
  • 4. Elisha Otis' elevator patent drawing, 15 January 1861.
  • 5. 1.1 Definition of Lifts  A vertical transport equipment that efficiently moves people between floors (levels, deck) of a building, vessel or other structure.  Generally powered by electric motor that drive by traction cable and counterweight systems like a hoist or hydraulic pump.
  • 6. Importance of Lifts  Rapid development : buildings design nowadays built vertically /higher because of high land cost.  Basic needs : to bring building user from one level to higher level in building  Comfort needs : working efficiency for office building or large organization.  UBBL : building with more than 6 storey must provide lifts system.  Fire requirements : provide fire lift to be used during fire.
  • 7. 1.2 Lift Categories According to the Function  Trade Lift - Crucial to the good performance to clients of the building. - Between 6 – 23 people. - Speed of elevator 200 – 2000 ft/ min. - Examples : offices, shopping mall and hotels
  • 8.  Hospital Lift - Used in hospital & treatment center - Designed for transporting large carts or furniture. - Speed of elevator 100 – 350 ft/ min. - Two sides of front and back doors for loading and unloading facilities. - Door width between 900 – 1100mm
  • 9.  High Residential Lift - For high rise residential buildings such as flat, apartment or condominium. - Needs regular maintenance because high frequency of its use everyday or possibility of vandalism.
  • 10.  Institution Lift - Used in library, office, classroom or lecture hall located at high altitudes.  Store Lift - Used to transport heavy goods but depends on types of good transported. - Elevator speed 50 – 150ft/min. - 5000 lbs normal, load haul 20000 lbs. - Usually used in shoppping complex, airports, hotels, warehouse
  • 11.  Lift of Cars - Used specifically to lift a car in multi storey car park or showroom. NOTES : • The six types of elevators had to be in the form of pull (traction) and hydraulics. • Form of traction is more commonly used for high velocity. • Hydraulic type only used to transport goods where waiting time is not concerned.
  • 12. 1.3 Characteristic of Lifts 1. 2. 3. Lift needed for the building more than 6 storey. Installation must be in accordance with the regulation in UBBL. Suitable speed 100 – 150ft/min. Too fast will result in a nervous breakdown to the user. If too slow will cause lack of function. USER REQUIREMENTS :     Good System – quiet equipment, smooth journey, good condition and safe at every moment. Waiting time – minimum waiting time at any level. Aesthetics – Button panel clear and easily reached at appropriate level. Complete instruction. Decorative lighting and comfortable. Movement of door – door movement is quiet and fast.
  • 13. 1.4 Components & Installation of Lifts Lift sub-system     Control Motion – includes motor, gear, engines, brakes and power supply. Control System - to get control the movements of the lift. Door Control – contained motor connecting lift car doors, platforms gates and door safety devices. Safety Control – contain the safety gear, speed controller for the first balance, heat and lack of power.
  • 15. Lift Components LIFT CAR    Platform where passengers or goods is transported. Constructed with steel or iron attached with steel frame. Fire resistance Elevator hoist ropes on top of a lift car
  • 16.  Equipment to be provided – door, floor panel indicators, button of request, phone, emergency button, lighting, ventilation and enough emergency supplies. A modern internal control panel. Notice the buttons labeled 1 above G. An external control panel
  • 17. • Divided into 2 types : 1. Closed Lift (typical type) 2. Open Lift (bubble type) Open Lift (bubble type) Closed Lift (typical type)
  • 18. LIFT SHAFT    Constructed with reinforced concrete. To accommodate the loading and fire resistance. Size of lift shaft space is determined by the number of user. Looking down the lift shaft of a hydraulic elevator. The hydraulic ram is to the left
  • 19. Gearless motor mounted on the wall in the lift shaft
  • 20. GOVERNOR  Usually placed at the top of lift shaft.  Placed in room equipped with a lifting beam for maintenance purposes.  Have electric motor, safety gear, guard rail, diaphragm motion and gear.
  • 21. LIFT DOOR Lift car is equipped with its own door (sliding type).  Security measure – resist the movement as long as the door is still open.  Self closing within a certain time frame.  2 types of sliding door : 1. Opened automatically when the lift stops at every level. 2. Swing door – will open when the lift stopped at the lobby. 
  • 22. GUARD RAIL    Work to keep the car and the counterweight. Mounted on both sides of the lift shaft which is attached to the wheel of the car. A safety device to hold the lift from crashing down if the rope break. BUFFER   To absorb the impact of the lift car when it fell. Placed in a room called the lift pit.
  • 23. COUNTERWEIGHT  Load borne by the generator is balanced by the counterweight.  Connected with a wire rope of the elevator car.  Function of counterweight : - To grip the lift car - Reduce the power of generator - Reduce the brake to stop the car lifts.
  • 24. 1.5 Selection Factor GENERAL REQUIREMENTS  Utility – The function must be identified whether for commercial, office of hospital.  Capacity & number of lifts – depends on the access building pattern and building size.  Speed – depends on the number of stops, numbers of user and transport cost.  Type & size of lift gate – depends on the use or function. PHYSICAL REQUIREMENTS  Size of lift shaft – depends on lift cargo capacity  Depth of lift shaft – depends on the speed of elevator  Area of space in lift – depends on speed of elevators.  Mechanical room size – depends on type and size of the lift equipment.
  • 25. OTHER REQUIREMENTS      Electrical panels and power outlets. Ventilation fan and lighting in engine room. Steps down and power sockets in the wells lift (lift pit). The structure for lifting the machinery room. Maintanence works.
  • 26. Building type Waiting time (second) Office building - Central town - Commercial 25 – 30 30 – 45 Residential building - Luxury - Medium type - Low cost - Hostel 50 – 70 60 – 80 80 – 120 60 – 80 Hotel - Class A - Class B 40 – 60 50 - 70
  • 27. Function Lif capacity (lbs) Min. Speed (ft/min.) Building height (ft) Office Building Small size 2500 Medium size 3000 High scale 3500 350 – 400 500 – 600 700 800 1000 0 – 125 126 – 225 226 – 275 276 – 375 > 375 Hotel 2500 3000 Same as above Hospital 3000 150 200 250 – 300 350 – 400 500 – 600 700 0 – 60 61 – 100 101 – 125 126 – 175 176 – 250 > 250 100 200 250 – 300 350 - 400 0 – 75 76 – 125 126 – 200 > 200 200 250 – 300 350 – 400 500 0 – 100 101 – 150 151 – 200 > 200 3500 4000 Residential 2000 2500 Commercial 3500 4000 5000
  • 28. 1.6 Location & Lift Arrangement LIFT ARRANGEMENT  To ensure there is no interference between passengers who wish to get into the lift.  Should be carefully planned so can easily get into lobby and travel distance is reasonable.  Maximum travel distance 150 – 200ft  System layout depends on the number of elevator cars that use the elevator  Normally the elevator is set in the layout or zoned. BENEFIT  If there is high traffic , the usage is at optimum level  Waiting time will be shorten.
  • 29. Lift Arrangement for 2 car lift Side by side arrangement – width of corridor = width of car lift Opposite arrangement of corridor = width of car lift ment – width of corridor = width of car lift Not good arrangement
  • 30. Lift Arrangement for 3 car lift Opposite arrangement – width of corridor = 1.5 – 2A, where A is width of lift Side by side arrangement width of corridor = 1.5A, where A is width of lift
  • 31. Lift Arrangement for 4 car lift Opposite arrangement – width of corridor = 1.5 – 2A, where A is width of lift Side by side arrangement width of corridor = 1.5A, where A is width of lift
  • 32. Lift Arrangement for 6 car lift Opposite arrangement – width of corridor = 1.75 – 2A, where A is width of lift Side by side arrangement width of corridor = 2A, where A is width of lift
  • 33. Lift Arrangement for 6 car lift Weak arrangement for 6 car lift
  • 34. Lift Arrangement for 8 car lift Opposite arrangement – width of corridor = 2A, where A is width of lift
  • 35. 1.7 Types of lift ELECTRIC LIFT        Common type used today. Use electric lift cable to lift the elevator car with the weight and movement is the catalyst action. Use the traction with the motor. Used in most building > 60ft. Motor room on top of lift shaft will increase the load of building structure. Possibility of noise structure Need a lift wells and maintenance room near the engine room. Traction elevator motor
  • 36. HYDRAULIC LIFT        Use hydraulics principles – moves by the action of steel plunger lift which installed under the car. Not suitable for building > 60ft (low rise) – insufficient space or roof rooms too small to put the machinery. Transport load not > 100,000 pound. Speed – not > 200ft/min. Installation does not increase the building structures because lifting weight is not used. Machinery room located at ground floor Shaft area is smaller than electric lift.
  • 37. Bottom view of a hydraulic elevator
  • 38. HANDICAPPED LIFT    For people with disability who use wheelchair. Or with disabilities who are unable to use ordinary crowded lift of fast services. Mounted on the stair parallel to the ladder FIRE LIFT   Buildings over than 60ft high are required to provide fire lift. This lift controlled by a system back on in emergencies.
  • 39. PATERNOSTER       A lift systems moves continuously in one direction by providing the same car lifts. Provides the movement up and down continuously. No doors and passengers are forced into or out of the moving car lift Speed – 80 min. Suitable for 6 – 7 storey buildings Not suitable to used by children or older people.
  • 40. HIGH RISE LIFT     Service requirement for high rise building is critical to balance the upper and lower level services. The concept of zone system and sky lobby can be used. Usually divided into zones where high level car will not stop or pick passengers at lower level. Zone which too low will takes passengers down to lower levels such as 5 – 10 levels below.
  • 41. DOUBLE DECKER LIFT        Carry passengers without raising double the lift shaft. Have two platforms which are increased. High transport capacity and reduce floor space Number of stops can reduced to 50% - reducing waiting time and shorter car lift trips. Can be used in building which has a same height in every level. The main lobby has two levels. Must have clear indication of the use in the main lobby to avoid confusion.
  • 42. 1.8 : Lift Installation by zone system ONE SYSTEM ZONE  For building not > 15 levels.  Elevators car stops at every level of the building.  Used to save space. TWO SYSTEM ZONE  For buildings > 15 levels and < 40 levels.  System brake into two zone of elevator  The elevator of bottom and same for the top will not stop at any lower zone.  Not effective in the event of ‘off peak’ and interfloor service.
  • 43. SKY LOBBY ZONE    For building > 40 levels. A group lift with high speed moving lift without interruption from the floor to the sky lobby. The elevator will move with normal velocity at the next level.