2. 2
COOPERATION POTENTIAL
Revised PDP VII generation
Resource (MW) Year 2020 Year 2025 Year 2030
Hydro 18,060 20,362 21,886
Coal 25,620 47,575 55,167
Gas 8,940 15,054 23,699
RE (wind, solar, small hydro, biomas) 5,940 12,063
27,195
Solar: 12,000
Wind: 6,000
Other: ~10,000
Imports 1,440 1,448 1,554
Sum 60,000 96,500 129,500
3. 3
SWITCHING TO LNG
- For Phu My, O Mon, Tan Phuoc Power Plant Complex
CAPEX – INVESTMENT STRATEGY
From 2020 - 2030, EVN needs a total of about 15 billion USD of capex of power plants, the
electricity industry needs about 90 billion USD for the overall development of the electricity industry
(power, transmission, distribution, retail, electricity market, ...)
EVN’s credit rating
BB+, positive outlook, equal to Vietnam sovereign rating.
COOPERATION OPPORTUNITIES
Strategic shareholders – Capital investment
4. 4
OMON COMPLEX
LOCATION: CAN THO PROVINCE
BAC AI PSPP
LOCATION: NINH THUAN PROVINCE
IALY HPP EXTENSION
LOCATION: KONTUM PROVINCE
TAN PHUOC COMPLEX
LOCAITON: TIEN GIANG PROVINCE
TRI AN HPP EXTENSION
LOCATION: DONG NAI PROVINCE
RENEWABLE ENERGY PROJECTS (SOLAR)
1. On-site SESAN 4 HPP (Gia Lai & Kon Tum Province)
2. PHUOC THAI (Ninh Phuoc Disctrict, Ninh Thuan
Province)
HOA BINH HPP EXTENSION
LOCATION: HOA BINH PROVINCE
POWER DEVELOPMENT PROJECTS
5. 4. EVN NEW POWER PROJECT
5
HOA BINH HPP EXTENSION
EXISTING CAPACITY: 8x240MW (COD: 1988 - 1994)
EXTENSION CAPACITY: 2x240MW (planned COD: 2021 - 2022)
CURRENT STATUS: FS approved
PRE COST ESTIMATION : $318M
TRI AN HPP EXTENSION
EXISTING CAPACITY: 4x100MW (COD: 1988 - 1989)
EXTENSION CAPACITY: 2x100MW (planned COD: 2025, EVN proposal COD: 2021
- 2022)
CURRENT STATUS: PRE-PROJECT STAGE
PRE COST ESTIMATION: $137M
IALY HPP EXTENSION
EXISTING CAPACITY: 4x180MW (COD: 2000 - 2002)
EXTENSION CAPACITY: 2x180MW (planned COD: 2020)
CURRENT STATUS: FS approved
PRE COST ESTIMATION : $252M
TRI AN HPP
IALY
HPP
HOA BINH
HPP
POWER DEVELOPMENT PROJECTS
HPP EXTENSION PROJECTS
6. 6
BAC AI PSPP
INSTALLED CAPACITY: 4x300MW
CURRENT STATUS: TECHINICAL DESIGN STAGE
ESTIMATED COST: $980M
COD (planned):
Bac Ai #1, 2: 2023
Bac Ai #3, 4: 2025
BAC AI PSPP
POWER DEVELOPMENT PROJECTS
PUMP STORAGE PROJECTS
7. 7
SESAN 4 HPP SITE
INSTALLED CAPACITY: 47MW
(Photovoltaic)
CURRENT STATUS: PRE-PROJECT
STAGE
COD (planned): 2020
PHUOC THAI SITE
INSTALLED CAPACITY:
PHUOC THAI 1 (50MW)
PHUOC THAI 2( 100MW)
PHUOC THAI 3 (50MW)
TECHNOLOGY: Photovoltaic
CURRENT STATUS: on-going
COD (planned): 2020
PHUOC THAI
SITE
SESAN 4 HPP
SITE
POWER DEVELOPMENT PROJECTS
SOLAR ENERGY PROJECTS
8. 8
O MON
CAN THO
OMON I POWER PLANT
CAPACITY: 2x330 (CONVENTIONAL TPP)
FUEL: CURRENT: FO; TO BE CONVERTED TO
NARTURAL GAS
COD: UNIT 1: 2009, UNIT 2: 2015
OMON IV POWER PLANT
CAPACITY: >750MW (CCGT)
FUEL: NARTURAL GAS SUPPLIED FROM
LOT B (SOUTH-WEST AREA )
CURRENT STATUS: PRE-PROJECT STAGE;
PLANNED COD: 2024
SOURCE OF FUNDING: COMMERCIAL
LOAN AND ECA
OMON III POWER PLANT
CAPACITY: >750MW (CCGT)
FUEL: NARTURAL GAS SUPPLIED FROM
LOT B (SOUTH-WEST AREA )
CURRENT STATUS: PRE-PROJECT STAGE;
PLANNED COD: 2024
SOURCE OF FUNDING: JAPAN
INTERNATIONAL COOPERATION AGENCY
OMON IOMON IIIOMON IV
500kV
SWITCHYARD
POWER DEVELOPMENT PROJECTS
OMON CCGT POWER PLANT PROJECTS
9. 9
PLANNED IN THE REVISED PDP 7
o CAPACITY: 4x600MW
o FUEL: IMPORTED COAL
o OWNER: EVN
o COD:
TAN PHUOC 1 #1: 2027
TAN PHUOC 1 #2: 2028
TAN PHUOC 2 #1: 2028
TAN PHUOC 2 #2: 2029
EVN PROPOSAL
o CAPACITY: CCGT PLANTS: 4X1000MW
o FUEL: IMPORTED LNG
o OWNER: EVN
o SOURCE OF FUNDING: TO BE DEFINED.
ESTIMATED: COMMERCIAL LOANS
AND/OR ECA
o COD (intended):
TAN PHUOC 1: 2023 - 2024
TAN PHUOC 2: 2024 - 2025
TAN PHUOC 3: 2025 - 2026
TAN PHUOC 4: 2026 - 2027
TAN PHUOC
1
TAN PHUOC
LNG
TAN PHUOC
4
TAN PHUOC
3
TAN PHUOC
2
TAN PHUOC
TIỀN GIANG
POWER DEVELOPMENT PROJECTS
TAN PHUOC CCGT POWER PLANT PROJECTS
10. 10
PLANNED IN THE REVISED PDP 7
o CAPACITY: 2x750MW
o FUEL: NATURE GAS FROM BLUE WHALE
o OWNER: SEMBCORP
o COD:
DUNG QUAT 1: 2023
DUNG QUAT 2: 2024
CURRENT SITUATION
o CAPACITY: CCGT PLANTS: 2X750MW
o FUEL: NATURE GAS FROM BLUE WHALE
o OWNER: EVN, SEMBCORP
o SOURCE OF FUNDING: TO BE DEFINED.
ESTIMATED: COMMERCIAL LOANS
AND/OR ECA
o COD (intended):
DUNG QUAT 1: 2023
DUNG QUAT 2: 2024
DUNG QUAT 3: 2025
DUNG QUAT
3
DUNG QUAT
2
DUNG QUAT
QUANG NGAI
DUNG QUAT
1
POWER DEVELOPMENT PROJECTS
DUNG QUAT CCGT POWER PLANT PROJECTS