Difference in clause
ISO 9001 : 2008 Vs. 2015
ISO 9001: 2008 ISO 9001:2015
• 0.Introduction
• 1.Scope
• 2.Normative reference
• 3.Terms and definitions
• 4.Quality Management System
• 5.Management Responsibility
• 6. Resource management
• 7. Product realization
• 8. Measurement, analysis and
improvement
• 0.Introduction
• 1.Scope
• 2.Normative reference
• 3.Terms and definitions
• 4.Context of the organization
• 5.Leadership
• 6.Planning
• 7.Support
• 8.Operation
• 9.Performance evolution
• 10.Improvement
2
Prasenjit Puri, Ph No. 8906636953
PDCA CYCLE FOR CLAUSES
• 9.Performance
evolution
• 10.Improvement
• 8.Operation
•4.Context of the
organization
•5.Leadership
•6.Planning
•7.Support
PLAN DO
CHECKACT
With this new
arrangement, the new
ISO 9001 strives to
give an additional
momentum to the
continuous and
systemic improvement
of processes within
organizations.
3
Prasenjit Puri, Ph No. 8906636953
DIFFERENT TERMINOLOGY IN ISO
9001:2008 AND ISO 9001:2015
ISO 9001: 2008
• Products
• Documentation, quality
manual, documented
procedures, records, instruction
• Work environment
• Monitoring and measuring
equipment
• Purchased product
• Supplier
ISO 9001:2015
• Products & services
• Documented information
• Environment for the operation
of processes
• Monitoring and measuring
resources
• Externally provided products
and services
4
Prasenjit Puri, Ph No. 8906636953
KEY ASPECTS- 7 QM PRINCIPLES
ISO 9001: 2015
Seven Quality Management
Principles
• 1.Customer Focus
• 2. Leadership
• 3.Engagement of people
• 4. Process Approach
• 5.Improvement
• 6. Evidence-based decision
making
• 7.Relationship management
ISO 9001:2008
Eight Quality Management
Principles
• 1.Customer Focused organization
• 2. Leadership
• 3.Involvement of people
• 4. Process Approach
• 5.System approach to
management
• 6. Factual approach to decision
making
• 7.Continual improvement
• 8. Mutually beneficial supplier
relationship.
5
Prasenjit Puri, Ph No. 8906636953
APPROACH OF ISO 9001
Process
Approach
P-D-C-A
Approach
Risk based
thinking
Key is to engage all 3 gears
6
Prasenjit Puri, Ph No. 8906636953
RISKED BASED THINKING
Risk:
• Effect of uncertainty on an expected
result
- ISO 9001:2015
7
Prasenjit Puri, Ph No. 8906636953
PROCESS APPROACH
PROCESS
Implementation
Identification
Management
Improvement
8
Prasenjit Puri, Ph No. 8906636953
PROCESS APPROACH
• Right Recourses:
• Qualified people
• Right Facilities/equipment
• Correct material
• Proven method
INPUT
• Process
ACTIVITY • Desired results:
• Quality products
• Quality services
• Customer satisfaction
OUTPUT
How is process measured?
Efficient
(No waste)
Effective
(Desired Results achieved)
9
Prasenjit Puri, Ph No. 8906636953
ISO 9001 REQUIREMENTS
REQUIREMENT
• “Shall” mandatory
• “Should” recommendation
• “Note” Guidance or clarification
• “Such as” Guidance only
10
Prasenjit Puri, Ph No. 8906636953
4.0 CONTEXT OF THE ORGANIZATION
4.1
• Understanding the organization and its context
4.2
• Understanding the needs & expectations of the
interested parties
4.3
• Determining the scope of the quality management
system
4.4
• Quality Management System and its process
11
Prasenjit Puri, Ph No. 8906636953
4.1Understanding the
organization and its context
Organization shall have determine
EXTERNAL
INTERNAL
Issues that are relevant to its
PURPOSE
&
STRATEGIC
DIRECTION
New
12
Prasenjit Puri, Ph No. 8906636953
4.1Understanding the
organization and its context
Organization shall MONITOR &
REVIEW
Information related to internal & external issues
New
13
Prasenjit Puri, Ph No. 8906636953
4.1Understanding the
organization and its context
INTERNAL ISSUES
• Values
• Culture
• Knowledge and
• Performance of the
organization
EXTERNAL ISSUES
It can be identified by using
the tool PESTLE
P - Political
E - Economical
S - Social
T - Technological
L - Legal
E – Ethical/Environmental
New
14
Prasenjit Puri, Ph No. 8906636953
4.1Understanding the organization and
its context
Now this is new in ISO
9001 and we really
need to understand the
context of the business
/ organization by
examine what are
internal & external
issues that are
currently effecting
business or issues that
may have potential
impact on
organization.
The SWOT analysis is
useful tool for this process.
15
Prasenjit Puri, Ph No. 8906636953
4.2 Understanding the needs &
expectations of the interested parties
Determine
• Relevant interested parties
• Relevant requirements of
interested parties
• Monitor and review the
information
Monitor and review
• Information and these interested
parties and
• Their relevant requirements
 Management
 Business Partner/Investor
 Staff
 Worker
 Union
 Distributor
 Channel Partner
 External Service Providers
 End users
 Contract workers
 Corporate shared service providers
 Statutory bodies
 Income tax department
 Judiciary
 Particular communities
 Particular state
 System certification bodies
 Consultants/Trainers
 Mediators
 Any Individual
List of potential interested
parties
New
16
Prasenjit Puri, Ph No. 8906636953
4.3 Determining the scope of the quality
management system
Determine the scope
• Boundaries and applicability of
the QMS
On the basis of
(ISO 9001:2015)
 The external and internal
clauses(4.1)
 The requirements (4.2)
 Product & services
provided
17
Prasenjit Puri, Ph No. 8906636953
5.0 LEADERSHIP
5.1
• Leadership & commitment
5.2
• Policy
5.3
• Organizational
roles,responsibilities and authority
18
Prasenjit Puri, Ph No. 8906636953
5.1 Leadership & commitment
Top
management
to ensure
Communication
for quality
management
principle
That system
achive its intended
results
Engaging,directing
and supporting
persons
Promotion of
improvements
Supporting for
other relevant
management roles
Availability of
resources for QMS
implementation
19
Prasenjit Puri, Ph No. 8906636953
5.2 POLICY
5.2.1/5.2.2 Quality Policy
• Quality Policy to support Strategic Direction
•Policy to be made available to the relevant
Interested Parties
20
Prasenjit Puri, Ph No. 8906636953
5.3 ORGANISATIONAL ROLES ,
RESPONSIBILITIES AND AUTHORITIES
Top management should ensure that the responsibilities &
authorities for relevant role are assigned, communicate &
understood with in organization.
Top management shall assigned responsibilities and authority for:
• Ensuring that the QMS System conforms to the requirements of the
international standard.
• Ensuring that the processes are delivering their intended output.
• Reporting to the performance of the Quality Management System
and on opportunity for improvement in a particular to top
management.
• Ensuring the promotion of customer focus throughout the
organization.
• Ensuring the integrity of the QMS is maintained when change to the
QMS are planned & implemented.
21
Prasenjit Puri, Ph No. 8906636953
6.0 PLANNING
6.1
• Action to address risk &
opportunities
6.2
• Quality objectives an planning to
achieve them
6.3
• Planning for changes
22
Prasenjit Puri, Ph No. 8906636953
6.1 Action to address risk &
opportunities
6.1.1 & 6.1.2 When planning for the QMS
• To consider
- The issue (Referred to in 4.1) and the requirements (Referred to
in 4.2) and
• To determine the risk & opportunities that need to be addressed.
• To plan action
- To address these risk & opportunities.
- How to integrate & implement the actions into QMS. (See 4.4)
- Evaluate the effectiveness of these action.
Intent: To give assurance that the quality management system
can achieve its intended result, enhance desirable effects, prevent
or reduce, undesired effects ; achieve improvement
23
Prasenjit Puri, Ph No. 8906636953
6.2 Quality objectives an
planning to achieve them
6.2.1 The organization shall establish quality objectives at relevant function,
levels and processes needed for the quality management system.
The quality objectives shall :
a) Be consistent with the quality policy;
b) Be measurable;
c) Take into account applicable requirement
d) Be relevant to conformity of products and services and to enhancement
of customer satisfaction.
e) Be monitored
f) Be communicated
g) Be update as appropriate
The organization shall maintain documented information on the quality
objectives.
24
Prasenjit Puri, Ph No. 8906636953
6.2 Quality objectives an
planning to achieve them
6.2.1 When planning how to achieve its quality objectives,
the organization shall determine:
a) What will be done.
b) What resources will be required ;
c) Who will be responsible;
d) When it will be completed ;
e) How the result will be evaluated
25
Prasenjit Puri, Ph No. 8906636953
6.3 Planning for changes
•In a planned manner
•To consider
-The purpose of changes and potential
consequences
-Availability of resources and,
-Allocation/reallocation of responsibility and
authority
26
Prasenjit Puri, Ph No. 8906636953
PLANNING
7.3 Awareness
7.4
Communication
7.5 Documented
Information
7.2 Competence
7.1 Resources
Earlier the Title was:
•Resource Management Clause-6
•Control of Monitoring & Measuring Device 7.6
27
Prasenjit Puri, Ph No. 8906636953
7.0 SUPPORT
7.1
• Resources
7.2
• Competence
7.3
• Awareness
7.4
• Communication
7.5
• Documented Information
28
Prasenjit Puri, Ph No. 8906636953
7.1 RESOURCES
7.1.1 General
a) To assess capability and constraints on existing internal
resources.
b) What needs to be obtained from external providers
7.1.2 People
Determine and provide the persons necessary for the
effective implementation of its quality management
system and for the operation and control of its processes.
7.1.3 Infrastructure
29
Prasenjit Puri, Ph No. 8906636953
7.1.4 ENVIRONMENT FOR THE
OPERATION OF PROCESSES
Human and physical factors also to be included now
Social(e.g. stress-reducing, burn proof prevention,
emotionally protective.)
Physical (e.g. airflow, hygiene)
Note: Where third- party certification to ISO 45001 (or
equivalent) is recognized. It may be used to demonstrate the
organization’s conformity to the personnel safety aspects of this
requirement (IATF Requirement)
30
Prasenjit Puri, Ph No. 8906636953
7.1.6 Organizational Knowledge –
New Heading
Determine the
knowledge
Maintain Knowledge
Make knowledge
available
Acquire or access
#any necessary
additional knowledge
and required updates
31
Prasenjit Puri, Ph No. 8906636953
7.2 COMPETENCE – ON THE JOB
TRAINING (earlier 6.2.2.3)
The organization shall:
a) Determine the necessary competence of person(s) doing work under
its control that affects the performance and effectiveness of the
quality management system.
b) Ensure that these persons are competent on the basis of appropriate
education ,training or experience.
c) Where applicable , take actions to acquire the necessary competence
and evaluate the effectiveness of the action taken.
Note: Applicable actions can include, for example the provision of
training to the mentoring of , or the reassignment of currently
employed persons, or the hiring of contracting of competent persons.
32
Prasenjit Puri, Ph No. 8906636953
7.3 AWARENESS
Maintain documented information to demonstrate that
all employee are aware of
• Their impact on product quality
• Importance of their activities in achieving, maintaining,
and improving quality, customer requirements and
• The risk involved for the customer with non-conforming
product.
33
Prasenjit Puri, Ph No. 8906636953
7.4 COMUNICATION
The Organization shall determine the internal and
external communication relevant to the quality
management system, including:
a) On what it will communicate;
b) When to communicate
c) With whom to communicate
d) How to communicate
e) Who communicate
34
Prasenjit Puri, Ph No. 8906636953
7.5 DOCUMENTED INFORMATION
7.5.1 General
The Organization’s Quality management system shall include:
a) Document information required by this internal Standards;
b) Documented information Determined by the organization
as being necessary for the effectiveness of the Quality
Management System.
Note: The Extent of the documented information for a quality
management system can differ from one organization to
another due to:
- The size of the Organization and its type of activities ,
processes, products and services.
- The complexity of Processes and their interactions.
- The competence of persons.
35
Prasenjit Puri, Ph No. 8906636953
7.5 DOCUMENTED INFORMATION
• Creating and updating documented information
(earlier 4.2.3-Control of documents) New
heading7.5.2
• Control of document information (earlier 4.2.4 –
Control of Record) New Heading (adopted from
ISO 9001:2015)
7.5.3
Now both requirements are donated
as documented information
36
Prasenjit Puri, Ph No. 8906636953
8.0 Operation
8.1
• Operational Planning & Control
8.2
• Requirements for products & services
8.3
• Design and development of products & services
8.4
• Control of externally provided processes, products & services
8.5
• Production & service provision
8.6 • Release of products & Services
8.7
• Control of Non conforming outputs
Note: Earlier the title was Product
Realization and was covered in
Clause 7.0 37
Prasenjit Puri, Ph No. 8906636953
8.2 Requirements for products &
services
8.2 Requirement
for products and
services
8.2.1 Customer
Communication
8.2.2Determining
the requirements
for products and
services
8.2.3 Review of
the requirements
for products &
services
8.2.4 Changes to
requirements for
products and
services
38
Prasenjit Puri, Ph No. 8906636953
8.4 Control of externally provided
processes, products & services
• Products and services are provided directly to the
customer(s) by externally providers on behalf of
the organization;
• A process or part of a process, is provided by an
external provider as a result of a decision by the
organization.
• To include all products and services
- subassembly, sequencing, sorting, rework and calibration
services etc.
39
Prasenjit Puri, Ph No. 8906636953
8.4.2 Types and extent of control
The Organization shall:
• Ensure that externally provided processes remain within
the control of its quality management system.
• Define both the controls
- On an external provider
- On an resulting output
40
Prasenjit Puri, Ph No. 8906636953
8.5.4 Preservation
The organization shall preserve the output during
production and service provision, to the extent
necessary to ensure conformity to the
requirements.
Note: Preservation on include identification,
handling, contamination control, packaging,
storage, transmission or transportation and
protection.
41
Prasenjit Puri, Ph No. 8906636953
8.5.5 Post –delivery activities
Determine the extent of post delivery activities
required, consider following:
• Statutory and regulatory requirement
• The potential undesired consequences associated
with its products and services
• The nature, use and intended lifetime of its
products and services
• Customer requirements
• Customer feedback
42
Prasenjit Puri, Ph No. 8906636953
8.5.6 Control of changes
• Review and control changes for production or
service provision, to the extent necessary;
• Retain documented information describing
- The result of the review changes
- The person authorizing the change
- Any necessary action arising from the review
43
Prasenjit Puri, Ph No. 8906636953
9.0 Performance Evaluation
9.1
• Monitoring measurement, analysis
and evolution
9.2
• Internal Audit
9.3
• Management Review
44
Prasenjit Puri, Ph No. 8906636953
9.0 Performance Evaluation
9.1 Monitoring measurement, analysis and evaluation
(earlier 8 measurement, analysis and improvement)
9.1.1 General(earlier 8.1)
• What needs to be monitored and measured
• The methods of monitoring, measurement, analysis and
evolution need to ensure valid result.
• When the monitoring and measuring shall be performed
• When monitoring and measurement shall be analyzed and
evaluated.
• Retain appropriate documented information as evidence
of the results.
45
Prasenjit Puri, Ph No. 8906636953
9.1.3 Analysis and evaluation
(earlier 8.4 analysis of data)
• Degree of customer satisfaction.
• The performance and effectiveness of the quality
management system
• If planning has been implemented effectively
• The effectiveness of action taken to address risks and
opportunities
• The need for improvements to the quality management
system
46
Prasenjit Puri, Ph No. 8906636953
9.2 Internal Audit
• 9.2.1 The organization shall conduct internal audit at
planned intervals to provide information on whether
the quality management system
a) Conform to:
1) The Organization's own requirements for it’s a
quality management system.
2) The requirements of this international standard.
b) It effectively implemented and maintained.
47
Prasenjit Puri, Ph No. 8906636953
9.3 Management Review
9.3.1 General
Top management shall review the
organization’s quality management
system, at planned intervals, to ensure
its continuing suitability, adequacy,
effectiveness and alignment with
strategic direction of the organization.
48
Prasenjit Puri, Ph No. 8906636953
9.3.2 Management Review Inputs
The management review shall be planned and carried out taking into
consideration:
a) The status of actions from previous management reviews;
b) Change in external and internal issues that are relevant to the quality
management system,;
c) Information on the performance & effectiveness of the quality management
system, including trends in:
1) The Customer satisfaction and feedback from relevant interested parties;
2) The extent to which quality objectives have been meet.
3) Process performance and conformity of products and services;
4) Non conformities and corrective actions
5) Monitoring & measurement results
6) Audit results;
7) The performance of eternal providers
d) The adequacy of resources;
e) The effectiveness of actions taken to address risks & opportunities (see 6.1)
f) Opportunities for improvement.
49
Prasenjit Puri, Ph No. 8906636953
10 IMPROVEMENT
10.1
• General
10.2
• Non conformity and corrective action
10.3
• Continual Improvement
50
Prasenjit Puri, Ph No. 8906636953
10.2 Non conformity and
corrective action
(Earlier 8.5.2 corrective action)
React to the conformity and as applicable:
• Take action to control and correct it.
• Deal with the consequence;
• Update risk and opportunities determined during
planning, if necessary;
• Corrective actions shall be appropriate to the effects of
the nonconformities encountered.
51
Prasenjit Puri, Ph No. 8906636953
10.3 CONTINUAL IMPROVEMENT
• The organization shall improve the suitability,
adequacy and effectiveness of the quality
management system.
• The organization shall consider the results of
analysis and evaluation, and outputs from
management review, to determine if there are needs
or opportunities that shall be addressed as part of
continual improvement.
52
Prasenjit Puri, Ph No. 8906636953
END OF SLIDE
Thank you
53
Prasenjit Puri, Ph No. 8906636953

Más contenido relacionado

La actualidad más candente

ISO 9001:2015
ISO 9001:2015   ISO 9001:2015
ISO 9001:2015 aristian
 
ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions Nirav Trivedi
 
ISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesshree
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationDQS Inc.
 
ISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamMotaharul Islam
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
 
Iso 9001 2015 Quality Transition ISO Consultant Implementation Certification...
Iso 9001 2015 Quality Transition  ISO Consultant Implementation Certification...Iso 9001 2015 Quality Transition  ISO Consultant Implementation Certification...
Iso 9001 2015 Quality Transition ISO Consultant Implementation Certification...Robert Jasper
 
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...himalya sharma
 
TUV Southwest Training Programs
TUV Southwest Training ProgramsTUV Southwest Training Programs
TUV Southwest Training ProgramsTUV Southwest
 
ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1DQS Inc.
 
Certification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQACertification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQANQA
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015Enrique Biton
 

La actualidad más candente (20)

Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
ISO 9001:2015
ISO 9001:2015   ISO 9001:2015
ISO 9001:2015
 
ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions
 
ISO 9001:2015
ISO 9001:2015ISO 9001:2015
ISO 9001:2015
 
ISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clauses
 
ISO 9001:2015 (QMS) Awareness Training
ISO 9001:2015 (QMS) Awareness TrainingISO 9001:2015 (QMS) Awareness Training
ISO 9001:2015 (QMS) Awareness Training
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training Presentation
 
ISO9001:2015 presentation
ISO9001:2015 presentationISO9001:2015 presentation
ISO9001:2015 presentation
 
ISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul Islam
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
ISO 9001/14001/45001 requirements comparison
ISO 9001/14001/45001 requirements comparisonISO 9001/14001/45001 requirements comparison
ISO 9001/14001/45001 requirements comparison
 
Internal auditor 9001 day 1
Internal auditor 9001 day 1Internal auditor 9001 day 1
Internal auditor 9001 day 1
 
Iso 9001 2015 Quality Transition ISO Consultant Implementation Certification...
Iso 9001 2015 Quality Transition  ISO Consultant Implementation Certification...Iso 9001 2015 Quality Transition  ISO Consultant Implementation Certification...
Iso 9001 2015 Quality Transition ISO Consultant Implementation Certification...
 
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
 
Iso 9001 2015
Iso 9001 2015 Iso 9001 2015
Iso 9001 2015
 
TUV Southwest Training Programs
TUV Southwest Training ProgramsTUV Southwest Training Programs
TUV Southwest Training Programs
 
Iso 9001
Iso 9001Iso 9001
Iso 9001
 
ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1
 
Certification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQACertification Body Approach to ISO 9001:2015 by NQA
Certification Body Approach to ISO 9001:2015 by NQA
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015
 

Similar a ISO 9001: 2015

30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptxibr1722011
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committeeHpm India
 
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008Engr. Syed Noor Mustafa Shah
 
Role of Top management
Role of Top managementRole of Top management
Role of Top managementHpm India
 
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptxQMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptxinfoqtc
 
QMS awareness 12th may 2015
QMS awareness 12th may 2015QMS awareness 12th may 2015
QMS awareness 12th may 2015Amr Eldakroury
 
39635837 iso-9001-2008-awarness
39635837 iso-9001-2008-awarness39635837 iso-9001-2008-awarness
39635837 iso-9001-2008-awarnesssride01
 
Quality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxPQuality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxPPauwels Consulting
 
Understanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesUnderstanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesPathKind Labs
 
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1SelvaBabu2
 
Management responsibility
Management responsibilityManagement responsibility
Management responsibilityAhmed Said
 
Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Carlin Jannine
 
QMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxQMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxButchEnalpe
 
ISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues WebinarISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues WebinarColin Gray
 
QMS from a Regulatory Perspective
QMS from a Regulatory PerspectiveQMS from a Regulatory Perspective
QMS from a Regulatory PerspectiveGreenlight Guru
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality managementDomenika Calvopiña
 
Aweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxAweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxKuldeepChauhan370926
 
Futureofthequalitymanagementprinciples 1
Futureofthequalitymanagementprinciples 1Futureofthequalitymanagementprinciples 1
Futureofthequalitymanagementprinciples 1Paul Robere
 

Similar a ISO 9001: 2015 (20)

30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
 
Role of Top management
Role of Top managementRole of Top management
Role of Top management
 
ISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptxISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptx
 
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptxQMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
 
QMS awareness 12th may 2015
QMS awareness 12th may 2015QMS awareness 12th may 2015
QMS awareness 12th may 2015
 
39635837 iso-9001-2008-awarness
39635837 iso-9001-2008-awarness39635837 iso-9001-2008-awarness
39635837 iso-9001-2008-awarness
 
9001 2008 details
9001 2008 details9001 2008 details
9001 2008 details
 
Quality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxPQuality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxP
 
Understanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesUnderstanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratories
 
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
 
Management responsibility
Management responsibilityManagement responsibility
Management responsibility
 
Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015
 
QMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxQMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptx
 
ISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues WebinarISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues Webinar
 
QMS from a Regulatory Perspective
QMS from a Regulatory PerspectiveQMS from a Regulatory Perspective
QMS from a Regulatory Perspective
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality management
 
Aweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxAweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptx
 
Futureofthequalitymanagementprinciples 1
Futureofthequalitymanagementprinciples 1Futureofthequalitymanagementprinciples 1
Futureofthequalitymanagementprinciples 1
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Último (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

ISO 9001: 2015

  • 1. ISO 9001 : 2015 Latest Quality Management System 1 Prasenjit Puri, Ph No. 8906636953
  • 2. Difference in clause ISO 9001 : 2008 Vs. 2015 ISO 9001: 2008 ISO 9001:2015 • 0.Introduction • 1.Scope • 2.Normative reference • 3.Terms and definitions • 4.Quality Management System • 5.Management Responsibility • 6. Resource management • 7. Product realization • 8. Measurement, analysis and improvement • 0.Introduction • 1.Scope • 2.Normative reference • 3.Terms and definitions • 4.Context of the organization • 5.Leadership • 6.Planning • 7.Support • 8.Operation • 9.Performance evolution • 10.Improvement 2 Prasenjit Puri, Ph No. 8906636953
  • 3. PDCA CYCLE FOR CLAUSES • 9.Performance evolution • 10.Improvement • 8.Operation •4.Context of the organization •5.Leadership •6.Planning •7.Support PLAN DO CHECKACT With this new arrangement, the new ISO 9001 strives to give an additional momentum to the continuous and systemic improvement of processes within organizations. 3 Prasenjit Puri, Ph No. 8906636953
  • 4. DIFFERENT TERMINOLOGY IN ISO 9001:2008 AND ISO 9001:2015 ISO 9001: 2008 • Products • Documentation, quality manual, documented procedures, records, instruction • Work environment • Monitoring and measuring equipment • Purchased product • Supplier ISO 9001:2015 • Products & services • Documented information • Environment for the operation of processes • Monitoring and measuring resources • Externally provided products and services 4 Prasenjit Puri, Ph No. 8906636953
  • 5. KEY ASPECTS- 7 QM PRINCIPLES ISO 9001: 2015 Seven Quality Management Principles • 1.Customer Focus • 2. Leadership • 3.Engagement of people • 4. Process Approach • 5.Improvement • 6. Evidence-based decision making • 7.Relationship management ISO 9001:2008 Eight Quality Management Principles • 1.Customer Focused organization • 2. Leadership • 3.Involvement of people • 4. Process Approach • 5.System approach to management • 6. Factual approach to decision making • 7.Continual improvement • 8. Mutually beneficial supplier relationship. 5 Prasenjit Puri, Ph No. 8906636953
  • 6. APPROACH OF ISO 9001 Process Approach P-D-C-A Approach Risk based thinking Key is to engage all 3 gears 6 Prasenjit Puri, Ph No. 8906636953
  • 7. RISKED BASED THINKING Risk: • Effect of uncertainty on an expected result - ISO 9001:2015 7 Prasenjit Puri, Ph No. 8906636953
  • 9. PROCESS APPROACH • Right Recourses: • Qualified people • Right Facilities/equipment • Correct material • Proven method INPUT • Process ACTIVITY • Desired results: • Quality products • Quality services • Customer satisfaction OUTPUT How is process measured? Efficient (No waste) Effective (Desired Results achieved) 9 Prasenjit Puri, Ph No. 8906636953
  • 10. ISO 9001 REQUIREMENTS REQUIREMENT • “Shall” mandatory • “Should” recommendation • “Note” Guidance or clarification • “Such as” Guidance only 10 Prasenjit Puri, Ph No. 8906636953
  • 11. 4.0 CONTEXT OF THE ORGANIZATION 4.1 • Understanding the organization and its context 4.2 • Understanding the needs & expectations of the interested parties 4.3 • Determining the scope of the quality management system 4.4 • Quality Management System and its process 11 Prasenjit Puri, Ph No. 8906636953
  • 12. 4.1Understanding the organization and its context Organization shall have determine EXTERNAL INTERNAL Issues that are relevant to its PURPOSE & STRATEGIC DIRECTION New 12 Prasenjit Puri, Ph No. 8906636953
  • 13. 4.1Understanding the organization and its context Organization shall MONITOR & REVIEW Information related to internal & external issues New 13 Prasenjit Puri, Ph No. 8906636953
  • 14. 4.1Understanding the organization and its context INTERNAL ISSUES • Values • Culture • Knowledge and • Performance of the organization EXTERNAL ISSUES It can be identified by using the tool PESTLE P - Political E - Economical S - Social T - Technological L - Legal E – Ethical/Environmental New 14 Prasenjit Puri, Ph No. 8906636953
  • 15. 4.1Understanding the organization and its context Now this is new in ISO 9001 and we really need to understand the context of the business / organization by examine what are internal & external issues that are currently effecting business or issues that may have potential impact on organization. The SWOT analysis is useful tool for this process. 15 Prasenjit Puri, Ph No. 8906636953
  • 16. 4.2 Understanding the needs & expectations of the interested parties Determine • Relevant interested parties • Relevant requirements of interested parties • Monitor and review the information Monitor and review • Information and these interested parties and • Their relevant requirements  Management  Business Partner/Investor  Staff  Worker  Union  Distributor  Channel Partner  External Service Providers  End users  Contract workers  Corporate shared service providers  Statutory bodies  Income tax department  Judiciary  Particular communities  Particular state  System certification bodies  Consultants/Trainers  Mediators  Any Individual List of potential interested parties New 16 Prasenjit Puri, Ph No. 8906636953
  • 17. 4.3 Determining the scope of the quality management system Determine the scope • Boundaries and applicability of the QMS On the basis of (ISO 9001:2015)  The external and internal clauses(4.1)  The requirements (4.2)  Product & services provided 17 Prasenjit Puri, Ph No. 8906636953
  • 18. 5.0 LEADERSHIP 5.1 • Leadership & commitment 5.2 • Policy 5.3 • Organizational roles,responsibilities and authority 18 Prasenjit Puri, Ph No. 8906636953
  • 19. 5.1 Leadership & commitment Top management to ensure Communication for quality management principle That system achive its intended results Engaging,directing and supporting persons Promotion of improvements Supporting for other relevant management roles Availability of resources for QMS implementation 19 Prasenjit Puri, Ph No. 8906636953
  • 20. 5.2 POLICY 5.2.1/5.2.2 Quality Policy • Quality Policy to support Strategic Direction •Policy to be made available to the relevant Interested Parties 20 Prasenjit Puri, Ph No. 8906636953
  • 21. 5.3 ORGANISATIONAL ROLES , RESPONSIBILITIES AND AUTHORITIES Top management should ensure that the responsibilities & authorities for relevant role are assigned, communicate & understood with in organization. Top management shall assigned responsibilities and authority for: • Ensuring that the QMS System conforms to the requirements of the international standard. • Ensuring that the processes are delivering their intended output. • Reporting to the performance of the Quality Management System and on opportunity for improvement in a particular to top management. • Ensuring the promotion of customer focus throughout the organization. • Ensuring the integrity of the QMS is maintained when change to the QMS are planned & implemented. 21 Prasenjit Puri, Ph No. 8906636953
  • 22. 6.0 PLANNING 6.1 • Action to address risk & opportunities 6.2 • Quality objectives an planning to achieve them 6.3 • Planning for changes 22 Prasenjit Puri, Ph No. 8906636953
  • 23. 6.1 Action to address risk & opportunities 6.1.1 & 6.1.2 When planning for the QMS • To consider - The issue (Referred to in 4.1) and the requirements (Referred to in 4.2) and • To determine the risk & opportunities that need to be addressed. • To plan action - To address these risk & opportunities. - How to integrate & implement the actions into QMS. (See 4.4) - Evaluate the effectiveness of these action. Intent: To give assurance that the quality management system can achieve its intended result, enhance desirable effects, prevent or reduce, undesired effects ; achieve improvement 23 Prasenjit Puri, Ph No. 8906636953
  • 24. 6.2 Quality objectives an planning to achieve them 6.2.1 The organization shall establish quality objectives at relevant function, levels and processes needed for the quality management system. The quality objectives shall : a) Be consistent with the quality policy; b) Be measurable; c) Take into account applicable requirement d) Be relevant to conformity of products and services and to enhancement of customer satisfaction. e) Be monitored f) Be communicated g) Be update as appropriate The organization shall maintain documented information on the quality objectives. 24 Prasenjit Puri, Ph No. 8906636953
  • 25. 6.2 Quality objectives an planning to achieve them 6.2.1 When planning how to achieve its quality objectives, the organization shall determine: a) What will be done. b) What resources will be required ; c) Who will be responsible; d) When it will be completed ; e) How the result will be evaluated 25 Prasenjit Puri, Ph No. 8906636953
  • 26. 6.3 Planning for changes •In a planned manner •To consider -The purpose of changes and potential consequences -Availability of resources and, -Allocation/reallocation of responsibility and authority 26 Prasenjit Puri, Ph No. 8906636953
  • 27. PLANNING 7.3 Awareness 7.4 Communication 7.5 Documented Information 7.2 Competence 7.1 Resources Earlier the Title was: •Resource Management Clause-6 •Control of Monitoring & Measuring Device 7.6 27 Prasenjit Puri, Ph No. 8906636953
  • 28. 7.0 SUPPORT 7.1 • Resources 7.2 • Competence 7.3 • Awareness 7.4 • Communication 7.5 • Documented Information 28 Prasenjit Puri, Ph No. 8906636953
  • 29. 7.1 RESOURCES 7.1.1 General a) To assess capability and constraints on existing internal resources. b) What needs to be obtained from external providers 7.1.2 People Determine and provide the persons necessary for the effective implementation of its quality management system and for the operation and control of its processes. 7.1.3 Infrastructure 29 Prasenjit Puri, Ph No. 8906636953
  • 30. 7.1.4 ENVIRONMENT FOR THE OPERATION OF PROCESSES Human and physical factors also to be included now Social(e.g. stress-reducing, burn proof prevention, emotionally protective.) Physical (e.g. airflow, hygiene) Note: Where third- party certification to ISO 45001 (or equivalent) is recognized. It may be used to demonstrate the organization’s conformity to the personnel safety aspects of this requirement (IATF Requirement) 30 Prasenjit Puri, Ph No. 8906636953
  • 31. 7.1.6 Organizational Knowledge – New Heading Determine the knowledge Maintain Knowledge Make knowledge available Acquire or access #any necessary additional knowledge and required updates 31 Prasenjit Puri, Ph No. 8906636953
  • 32. 7.2 COMPETENCE – ON THE JOB TRAINING (earlier 6.2.2.3) The organization shall: a) Determine the necessary competence of person(s) doing work under its control that affects the performance and effectiveness of the quality management system. b) Ensure that these persons are competent on the basis of appropriate education ,training or experience. c) Where applicable , take actions to acquire the necessary competence and evaluate the effectiveness of the action taken. Note: Applicable actions can include, for example the provision of training to the mentoring of , or the reassignment of currently employed persons, or the hiring of contracting of competent persons. 32 Prasenjit Puri, Ph No. 8906636953
  • 33. 7.3 AWARENESS Maintain documented information to demonstrate that all employee are aware of • Their impact on product quality • Importance of their activities in achieving, maintaining, and improving quality, customer requirements and • The risk involved for the customer with non-conforming product. 33 Prasenjit Puri, Ph No. 8906636953
  • 34. 7.4 COMUNICATION The Organization shall determine the internal and external communication relevant to the quality management system, including: a) On what it will communicate; b) When to communicate c) With whom to communicate d) How to communicate e) Who communicate 34 Prasenjit Puri, Ph No. 8906636953
  • 35. 7.5 DOCUMENTED INFORMATION 7.5.1 General The Organization’s Quality management system shall include: a) Document information required by this internal Standards; b) Documented information Determined by the organization as being necessary for the effectiveness of the Quality Management System. Note: The Extent of the documented information for a quality management system can differ from one organization to another due to: - The size of the Organization and its type of activities , processes, products and services. - The complexity of Processes and their interactions. - The competence of persons. 35 Prasenjit Puri, Ph No. 8906636953
  • 36. 7.5 DOCUMENTED INFORMATION • Creating and updating documented information (earlier 4.2.3-Control of documents) New heading7.5.2 • Control of document information (earlier 4.2.4 – Control of Record) New Heading (adopted from ISO 9001:2015) 7.5.3 Now both requirements are donated as documented information 36 Prasenjit Puri, Ph No. 8906636953
  • 37. 8.0 Operation 8.1 • Operational Planning & Control 8.2 • Requirements for products & services 8.3 • Design and development of products & services 8.4 • Control of externally provided processes, products & services 8.5 • Production & service provision 8.6 • Release of products & Services 8.7 • Control of Non conforming outputs Note: Earlier the title was Product Realization and was covered in Clause 7.0 37 Prasenjit Puri, Ph No. 8906636953
  • 38. 8.2 Requirements for products & services 8.2 Requirement for products and services 8.2.1 Customer Communication 8.2.2Determining the requirements for products and services 8.2.3 Review of the requirements for products & services 8.2.4 Changes to requirements for products and services 38 Prasenjit Puri, Ph No. 8906636953
  • 39. 8.4 Control of externally provided processes, products & services • Products and services are provided directly to the customer(s) by externally providers on behalf of the organization; • A process or part of a process, is provided by an external provider as a result of a decision by the organization. • To include all products and services - subassembly, sequencing, sorting, rework and calibration services etc. 39 Prasenjit Puri, Ph No. 8906636953
  • 40. 8.4.2 Types and extent of control The Organization shall: • Ensure that externally provided processes remain within the control of its quality management system. • Define both the controls - On an external provider - On an resulting output 40 Prasenjit Puri, Ph No. 8906636953
  • 41. 8.5.4 Preservation The organization shall preserve the output during production and service provision, to the extent necessary to ensure conformity to the requirements. Note: Preservation on include identification, handling, contamination control, packaging, storage, transmission or transportation and protection. 41 Prasenjit Puri, Ph No. 8906636953
  • 42. 8.5.5 Post –delivery activities Determine the extent of post delivery activities required, consider following: • Statutory and regulatory requirement • The potential undesired consequences associated with its products and services • The nature, use and intended lifetime of its products and services • Customer requirements • Customer feedback 42 Prasenjit Puri, Ph No. 8906636953
  • 43. 8.5.6 Control of changes • Review and control changes for production or service provision, to the extent necessary; • Retain documented information describing - The result of the review changes - The person authorizing the change - Any necessary action arising from the review 43 Prasenjit Puri, Ph No. 8906636953
  • 44. 9.0 Performance Evaluation 9.1 • Monitoring measurement, analysis and evolution 9.2 • Internal Audit 9.3 • Management Review 44 Prasenjit Puri, Ph No. 8906636953
  • 45. 9.0 Performance Evaluation 9.1 Monitoring measurement, analysis and evaluation (earlier 8 measurement, analysis and improvement) 9.1.1 General(earlier 8.1) • What needs to be monitored and measured • The methods of monitoring, measurement, analysis and evolution need to ensure valid result. • When the monitoring and measuring shall be performed • When monitoring and measurement shall be analyzed and evaluated. • Retain appropriate documented information as evidence of the results. 45 Prasenjit Puri, Ph No. 8906636953
  • 46. 9.1.3 Analysis and evaluation (earlier 8.4 analysis of data) • Degree of customer satisfaction. • The performance and effectiveness of the quality management system • If planning has been implemented effectively • The effectiveness of action taken to address risks and opportunities • The need for improvements to the quality management system 46 Prasenjit Puri, Ph No. 8906636953
  • 47. 9.2 Internal Audit • 9.2.1 The organization shall conduct internal audit at planned intervals to provide information on whether the quality management system a) Conform to: 1) The Organization's own requirements for it’s a quality management system. 2) The requirements of this international standard. b) It effectively implemented and maintained. 47 Prasenjit Puri, Ph No. 8906636953
  • 48. 9.3 Management Review 9.3.1 General Top management shall review the organization’s quality management system, at planned intervals, to ensure its continuing suitability, adequacy, effectiveness and alignment with strategic direction of the organization. 48 Prasenjit Puri, Ph No. 8906636953
  • 49. 9.3.2 Management Review Inputs The management review shall be planned and carried out taking into consideration: a) The status of actions from previous management reviews; b) Change in external and internal issues that are relevant to the quality management system,; c) Information on the performance & effectiveness of the quality management system, including trends in: 1) The Customer satisfaction and feedback from relevant interested parties; 2) The extent to which quality objectives have been meet. 3) Process performance and conformity of products and services; 4) Non conformities and corrective actions 5) Monitoring & measurement results 6) Audit results; 7) The performance of eternal providers d) The adequacy of resources; e) The effectiveness of actions taken to address risks & opportunities (see 6.1) f) Opportunities for improvement. 49 Prasenjit Puri, Ph No. 8906636953
  • 50. 10 IMPROVEMENT 10.1 • General 10.2 • Non conformity and corrective action 10.3 • Continual Improvement 50 Prasenjit Puri, Ph No. 8906636953
  • 51. 10.2 Non conformity and corrective action (Earlier 8.5.2 corrective action) React to the conformity and as applicable: • Take action to control and correct it. • Deal with the consequence; • Update risk and opportunities determined during planning, if necessary; • Corrective actions shall be appropriate to the effects of the nonconformities encountered. 51 Prasenjit Puri, Ph No. 8906636953
  • 52. 10.3 CONTINUAL IMPROVEMENT • The organization shall improve the suitability, adequacy and effectiveness of the quality management system. • The organization shall consider the results of analysis and evaluation, and outputs from management review, to determine if there are needs or opportunities that shall be addressed as part of continual improvement. 52 Prasenjit Puri, Ph No. 8906636953
  • 53. END OF SLIDE Thank you 53 Prasenjit Puri, Ph No. 8906636953