Assignment Model
Problems
A fast food chain wants to build four stores. In the past, the chain has
used six different construction companies and, having been satisfied
with each, has invited each to bid on each job. The final bids (in
thousands of rupees) are shown in the following table. Since the fast
food chain wants to have each of the new stores ready as quickly as
possible, it will award at most one job to a construction company. What
assignment results in minimum total cost to the fast food chain?
Construction Companies
1 2 3 4 5 6
Store 1 85.3 88 87.5 82.4 89.1 86.7
Store 2 78.9 77.4 77.4 76.5 79.3 78.3
Store 3 82 81.3 82.4 80.6 83.5 81.7
Store 4 84.3 84.6 86.2 83.3 84.4 85.5
Balancing the assignment
problem
Construction Companies
1 2 3 4 5 6
Store 1 85.3 88 87.5 82.4 89.1 86.7
Store 2 78.9 77.4 77.4 76.5 79.3 78.3
Store 3 82 81.3 82.4 80.6 83.5 81.7
Store 4 84.3 84.6 86.2 83.3 84.4 85.5
Dummy 1
Dummy 2
1 2 3 4 5 6
S1 85.3 88 87.5 82.4 89.1 86.7
S2 78.9 77.4 77.4 76.5 79.3 78.3
S3 82 81.3 82.4 80.6 83.5 81.7
S4 84.3 84.6 86.2 83.3 84.4 85.5
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
Applying the Hungarian method
1st Reduced Cost Matrix
SUB TR AC TI NG THE M INI M UM ELE MENT OF
E AC H R O W FR O M E AC H E LE M E NT O F THAT
ROW
1 2 3 4 5 6
S1 85.3–82.4 88–82.4 87.5–82.4 82.4–82.4 89.1–82.4 86.7–82.4
S2 78.9–76.5 77.4–76.5 77.4–76.5 76.5–76.5 79.3–76.5 78.3–76.5
S3 82–80.6 81.3–80.6 82.4–80.6 80.6–80.6 83.5–80.6 81.7–80.6
S4 84.3–83.3 84.6–83.3 86.2–83.3 83.3–83.3 84.4–83.3 85.5–83.3
D1 0–0 0–0 0–0 0–0 0–0 0–0
D2 0–0 0–0 0–0 0–0 0–0 0–0
1 2 3 4 5 6
S1 2.9 5.6 5.1 0 6.7 4.3
S2 2.4 0.9 0.9 0 2.8 1.8
S3 1.4 0.7 1.8 0 2.9 1.1
S4 1 1.3 2.9 0 1.1 2.2
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
2nd Reduced Cost Matrix
SUB TRACTI NG THE MINI MUM ELE MENT OF
EACH COLUM N FR OM EACH ELE MENT OF
THAT COLUM N
1 2 3 4 5 6
S1 2.9–0 5.6–0 5.1–0 0–0 6.7–0 4.3–0
S2 2.4–0 0.9–0 0.9–0 0–0 2.8–0 1.8–0
S3 1.4–0 0.7–0 1.8–0 0–0 2.9–0 1.1–0
S4 1–0 1.3–0 2.9–0 0–0 1.1–0 2.2–0
D1 0–0 0–0 0–0 0–0 0–0 0–0
D2 0–0 0–0 0–0 0–0 0–0 0–0
1 2 3 4 5 6
S1 2.9 5.6 5.1 0 6.7 4.3
S2 2.4 0.9 0.9 0 2.8 1.8
S3 1.4 0.7 1.8 0 2.9 1.1
S4 1 1.3 2.9 0 1.1 2.2
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
Striking off all 0’s using
minimum number of
vertical/horizontal lines
1 2 3 4 5 6
S1 2.9 5.6 5.1 0 6.7 4.3
S2 2.4 0.9 0.9 0 2.8 1.8
S3 1.4 0.7 1.8 0 2.9 1.1
S4 1 1.3 2.9 0 1.1 2.2
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
Subtracting the minimum uncut
element from other uncut elements,
and adding it to elements at the
intersections
SI NC E MINI MUM NUM BER OF LI NE S
REQUI RED IS LE SS THA N THE NUM BER OF
ROWS/ COLUMNS
1 2 3 4 5 6
S1 2.9–0.7 5.6–0.7 5.1–0.7 0 6.7–0.7 4.3–0.7
S2 2.4–0.7 0.9–0.7 0.9–0.7 0 2.8–0.7 1.8–0.7
S3 1.4–0.7 0.7–0.7 1.8–0.7 0 2.9–0.7 1.1–0.7
S4 1–0.7 1.3–0.7 2.9–0.7 0 1.1–0.7 2.2–0.7
D1 0 0 0 0+0.7 0 0
D2 0 0 0 0+0.7 0 0
1 2 3 4 5 6
S1 2.2 4.9 4.4 0 6 3.6
S2 1.7 0.2 0.2 0 2.1 1.1
S3 0.7 0 1.1 0 2.2 0.4
S4 0.3 0.6 2.2 0 0.4 1.5
D1 0 0 0 0.7 0 0
D2 0 0 0 0.7 0 0
Striking off all 0’s using
minimum number of
vertical/horizontal lines
1 2 3 4 5 6
S1 2.2 4.9 4.4 0 6 3.6
S2 1.7 0.2 0.2 0 2.1 1.1
S3 0.7 0 1.1 0 2.2 0.4
S4 0.3 0.6 2.2 0 0.4 1.5
D1 0 0 0 0.7 0 0
D2 0 0 0 0.7 0 0
Subtracting the minimum uncut
element from other uncut elements,
and adding it to elements at the
intersections
SI NC E MINI MUM NUM BER OF LI NE S
REQUI RED IS LE SS THA N THE NUM BER OF
ROWS/ COLUMNS
1 2 3 4 5 6
S1 2.2–0.2 4.9–0.2 4.4–0.2 0 6–0.2 3.6–0.2
S2 1.7–0.2 0.2–0.2 0.2–0.2 0 2.1–0.2 1.1–0.2
S3 0.7 0 1.1 0+0.2 2.2 0.4
S4 0.3–0.2 0.6–0.2 2.2–0.2 0 0.4–0.2 1.5–0.2
D1 0 0 0 0.7+0.2 0 0
D2 0 0 0 0.7+0.2 0 0
1 2 3 4 5 6
S1 2 4.7 4.2 0 5.8 3.4
S2 1.5 0 0 0 1.9 0.9
S3 0.7 0 1.1 0.2 2.2 0.4
S4 0.1 0.4 2 0 0.2 1.3
D1 0 0 0 0.9 0 0
D2 0 0 0 0.9 0 0
Striking off all 0’s using
minimum number of
vertical/horizontal lines
1 2 3 4 5 6
S1 2 4.7 4.2 0 5.8 3.4
S2 1.5 0 0 0 1.9 0.9
S3 0.7 0 1.1 2
0. 2.2 0.4
S4 0.1 0.4 2 0 0.2 1.3
D1 0 0 0 9
0. 0 0
D2 0 0 0 9
0. 0 0
Subtracting the minimum uncut
element from other uncut elements,
and adding it to elements at the
intersections
SI NC E MINI MUM NUM BER OF LI NE S
REQUI RED IS LE SS THA N THE NUM BER OF
ROWS/ COLUMNS
1 2 3 4 5 6
S1 2 4.7 4.2 0 5.8 3.4
S2 1.5 0 0 0 1.9 0.9
S3 0.7 0 1.1 2
0. 2.2 0.4
S4 0.1 0.4 2 0 0.2 1.3
D1 0 0 0 9
0. 0 0
D2 0 0 0 9
0. 0 0
1 2 3 4 5 6
S1 2–0.1 4.7–0.1 4.2–0.1 0 5.8–0.1 3.4–0.1
S2 1.5 0 0 0+0.1 1.9 0.9
S3 0.7 0 1.1 0.2+0.1 2.2 0.4
S4 0.1–0.1 0.4–0.1 2–0.1 0 0.2–0.1 1.3–0.1
D1 0 0 0 0.9+0.1 0 0
D2 0 0 0 0.9+0.1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 0 0.1 1.1
D1 0 0 0 1 0 0
D2 0 0 0 1 0 0
Striking off all 0’s using
minimum number of
vertical/horizontal lines
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 0 0 1
0. 1.9 0.9
S3 0.7 0 1.1 3
0. 2.2 0.4
S4 0 0.3 1.9 0 0.1 1.1
D1 0 0 0 1 0 0
D2 0 0 0 1 0 0
Making assignments
SI NC E MINI MUM NUM BER OF LI NE S
REQUI RED IS EQUAL TO THE NUM BER OF
ROWS/ COLUMNS
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 0 0.1 1.1
D1 0 0 0 1 0 0
D2 0 0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 0 0 0 1 0 0
D2 0 0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 0 0 0 1 0 0
D2 0 0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 0 ×
0 0 1 0 0
D2 0 ×
0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 0 ×
0 0 1 0 0
D2 0 ×
0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 0 1 0 0
D2 ×
0 ×
0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 0 1 0 0
D2 ×
0 ×
0 0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 0
D2 ×
0 ×
0 ×
0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 0
D2 ×
0 ×
0 ×
0 1 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 ×
0
D2 ×
0 ×
0 ×
0 1 ×
0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 ×
0
D2 ×
0 ×
0 ×
0 1 ×
0 0
Computing total cost
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 ×
0
D2 ×
0 ×
0 ×
0 1 ×
0 0
1 2 3 4 5 6
S1 85.3 88 87.5 82.4 89.1 86.7
S2 78.9 77.4 77.4 76.5 79.3 78.3
S3 82 81.3 82.4 80.6 83.5 81.7
S4 84.3 84.6 86.2 83.3 84.4 85.5
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
1 2 3 4 5 6
S1 1.9 4.6 4.1 0 5.7 3.3
S2 1.5 ×
0 0 0.1 1.9 0.9
S3 0.7 0 1.1 0.3 2.2 0.4
S4 0 0.3 1.9 ×
0 0.1 1.1
D1 ×
0 ×
0 ×
0 1 0 ×
0
D2 ×
0 ×
0 ×
0 1 ×
0 0
1 2 3 4 5 6
S1 85.3 88 87.5 82.4 89.1 86.7
S2 78.9 77.4 77.4 76.5 79.3 78.3
S3 82 81.3 82.4 80.6 83.5 81.7
S4 84.3 84.6 86.2 83.3 84.4 85.5
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
1 2 3 4 5 6
S1 85.3 88 87.5 82.4 89.1 86.7
S2 78.9 77.4 77.4 76.5 79.3 78.3
S3 82 81.3 82.4 80.6 83.5 81.7
S4 84.3 84.6 86.2 83.3 84.4 85.5
D1 0 0 0 0 0 0
D2 0 0 0 0 0 0
Optimum Assignment and TotalCost
Construction Company Store Cost
1 4 Rs.84300
2 3 Rs.81300
3 2 Rs.77400
4 1 Rs.82400
5 - -
6 - -
Total Cost Rs.325400
Ans: Optimum Assignment & TotalCost
Construction Company Store Cost
1 4 Rs.84300
2 3 Rs.81300
3 2 Rs.77400
4 1 Rs.82400
5 - -
6 - -
Total Cost Rs.325400
A firm wants to purchase three different types of equipment and five
manufacturers have come forward to supply these machines. However,
the firm’s policy is not to accept more than one machine from any of the
manufacturers. The data relating to the price (in lakhs of rupees) quoted
by the different manufacturers are given below. Determine how best the
firm can purchase the three machines.
Machines
1 2 3
Manufacturers
A 2.99 3.11 2.68
B 2.78 2.87 2.57
C 2.92 3.05 2.80
D 2.82 3.10 2.74
E 3.11 2.90 2.64
A management consulting firm has a backlog of 4 contracts.
Work on these contracts must be started immediately. 3 project
leaders are available for assignment to the contracts. Because
of varying work experience of the project leaders the profit of
the consulting firm would vary based on the assignments as
shown below. The unassigned contract can be completed by
subcontracting it to an outside consultant. The profit from the
subcontract is zero. Determine the assignment of project
leaders to the contracts so as to maximise profits.
Contracts
1 2 3 4
Project
Leaders
A 13 10 9 11
B 15 17 13 20
C 6 8 11 7

Más contenido relacionado

Similar a 3. ASSIGNMENT MODEL1.pptx

6cw95kf4spaybsbhz5na 140618171029-phpapp02
6cw95kf4spaybsbhz5na 140618171029-phpapp026cw95kf4spaybsbhz5na 140618171029-phpapp02
6cw95kf4spaybsbhz5na 140618171029-phpapp02
Huỳnh Thế
 
Unite steel tool joints mechanical property
Unite steel tool joints mechanical propertyUnite steel tool joints mechanical property
Unite steel tool joints mechanical property
Shanghai Unite Steel
 

Similar a 3. ASSIGNMENT MODEL1.pptx (20)

FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFERFINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
FINITE DIFFERENCE METHOD FOR 2D- HEAT TRANSFER
 
Centre console back
Centre console backCentre console back
Centre console back
 
Tamsa (prontuario) mc
Tamsa (prontuario) mcTamsa (prontuario) mc
Tamsa (prontuario) mc
 
Rev1.0
Rev1.0Rev1.0
Rev1.0
 
Accelerate performance
Accelerate performanceAccelerate performance
Accelerate performance
 
Indian Spectrum Auctions : Design Issues & Way Forward
Indian Spectrum Auctions : Design Issues & Way ForwardIndian Spectrum Auctions : Design Issues & Way Forward
Indian Spectrum Auctions : Design Issues & Way Forward
 
Harmonic hpgp specsheet
Harmonic hpgp specsheetHarmonic hpgp specsheet
Harmonic hpgp specsheet
 
Trigonotabel
TrigonotabelTrigonotabel
Trigonotabel
 
AIS Torque Cal, Torque Chart and Bolting Pattern.pdf
AIS Torque Cal, Torque Chart and Bolting Pattern.pdfAIS Torque Cal, Torque Chart and Bolting Pattern.pdf
AIS Torque Cal, Torque Chart and Bolting Pattern.pdf
 
Roll grinding Six Sigma project
Roll grinding Six Sigma projectRoll grinding Six Sigma project
Roll grinding Six Sigma project
 
Project 1
Project 1Project 1
Project 1
 
Harmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalogHarmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalog
 
6cw95kf4spaybsbhz5na 140618171029-phpapp02
6cw95kf4spaybsbhz5na 140618171029-phpapp026cw95kf4spaybsbhz5na 140618171029-phpapp02
6cw95kf4spaybsbhz5na 140618171029-phpapp02
 
bảng tra phân phối chuẩn
bảng tra phân phối chuẩnbảng tra phân phối chuẩn
bảng tra phân phối chuẩn
 
Flanges catalog
Flanges catalogFlanges catalog
Flanges catalog
 
Tablas de distribución normal.
Tablas de distribución normal.Tablas de distribución normal.
Tablas de distribución normal.
 
Tablas, estadistica
Tablas, estadisticaTablas, estadistica
Tablas, estadistica
 
Tablas de distribucion normal con la probabilidad definitiva - Con todos los ...
Tablas de distribucion normal con la probabilidad definitiva - Con todos los ...Tablas de distribucion normal con la probabilidad definitiva - Con todos los ...
Tablas de distribucion normal con la probabilidad definitiva - Con todos los ...
 
kupdf.net_indian-steel-table.pdf
kupdf.net_indian-steel-table.pdfkupdf.net_indian-steel-table.pdf
kupdf.net_indian-steel-table.pdf
 
Unite steel tool joints mechanical property
Unite steel tool joints mechanical propertyUnite steel tool joints mechanical property
Unite steel tool joints mechanical property
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Último (20)

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

3. ASSIGNMENT MODEL1.pptx

  • 2. A fast food chain wants to build four stores. In the past, the chain has used six different construction companies and, having been satisfied with each, has invited each to bid on each job. The final bids (in thousands of rupees) are shown in the following table. Since the fast food chain wants to have each of the new stores ready as quickly as possible, it will award at most one job to a construction company. What assignment results in minimum total cost to the fast food chain? Construction Companies 1 2 3 4 5 6 Store 1 85.3 88 87.5 82.4 89.1 86.7 Store 2 78.9 77.4 77.4 76.5 79.3 78.3 Store 3 82 81.3 82.4 80.6 83.5 81.7 Store 4 84.3 84.6 86.2 83.3 84.4 85.5
  • 4. Construction Companies 1 2 3 4 5 6 Store 1 85.3 88 87.5 82.4 89.1 86.7 Store 2 78.9 77.4 77.4 76.5 79.3 78.3 Store 3 82 81.3 82.4 80.6 83.5 81.7 Store 4 84.3 84.6 86.2 83.3 84.4 85.5 Dummy 1 Dummy 2
  • 5. 1 2 3 4 5 6 S1 85.3 88 87.5 82.4 89.1 86.7 S2 78.9 77.4 77.4 76.5 79.3 78.3 S3 82 81.3 82.4 80.6 83.5 81.7 S4 84.3 84.6 86.2 83.3 84.4 85.5 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 7. 1st Reduced Cost Matrix SUB TR AC TI NG THE M INI M UM ELE MENT OF E AC H R O W FR O M E AC H E LE M E NT O F THAT ROW
  • 8. 1 2 3 4 5 6 S1 85.3–82.4 88–82.4 87.5–82.4 82.4–82.4 89.1–82.4 86.7–82.4 S2 78.9–76.5 77.4–76.5 77.4–76.5 76.5–76.5 79.3–76.5 78.3–76.5 S3 82–80.6 81.3–80.6 82.4–80.6 80.6–80.6 83.5–80.6 81.7–80.6 S4 84.3–83.3 84.6–83.3 86.2–83.3 83.3–83.3 84.4–83.3 85.5–83.3 D1 0–0 0–0 0–0 0–0 0–0 0–0 D2 0–0 0–0 0–0 0–0 0–0 0–0
  • 9. 1 2 3 4 5 6 S1 2.9 5.6 5.1 0 6.7 4.3 S2 2.4 0.9 0.9 0 2.8 1.8 S3 1.4 0.7 1.8 0 2.9 1.1 S4 1 1.3 2.9 0 1.1 2.2 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 10. 2nd Reduced Cost Matrix SUB TRACTI NG THE MINI MUM ELE MENT OF EACH COLUM N FR OM EACH ELE MENT OF THAT COLUM N
  • 11. 1 2 3 4 5 6 S1 2.9–0 5.6–0 5.1–0 0–0 6.7–0 4.3–0 S2 2.4–0 0.9–0 0.9–0 0–0 2.8–0 1.8–0 S3 1.4–0 0.7–0 1.8–0 0–0 2.9–0 1.1–0 S4 1–0 1.3–0 2.9–0 0–0 1.1–0 2.2–0 D1 0–0 0–0 0–0 0–0 0–0 0–0 D2 0–0 0–0 0–0 0–0 0–0 0–0
  • 12. 1 2 3 4 5 6 S1 2.9 5.6 5.1 0 6.7 4.3 S2 2.4 0.9 0.9 0 2.8 1.8 S3 1.4 0.7 1.8 0 2.9 1.1 S4 1 1.3 2.9 0 1.1 2.2 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 13. Striking off all 0’s using minimum number of vertical/horizontal lines
  • 14. 1 2 3 4 5 6 S1 2.9 5.6 5.1 0 6.7 4.3 S2 2.4 0.9 0.9 0 2.8 1.8 S3 1.4 0.7 1.8 0 2.9 1.1 S4 1 1.3 2.9 0 1.1 2.2 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 15. Subtracting the minimum uncut element from other uncut elements, and adding it to elements at the intersections SI NC E MINI MUM NUM BER OF LI NE S REQUI RED IS LE SS THA N THE NUM BER OF ROWS/ COLUMNS
  • 16. 1 2 3 4 5 6 S1 2.9–0.7 5.6–0.7 5.1–0.7 0 6.7–0.7 4.3–0.7 S2 2.4–0.7 0.9–0.7 0.9–0.7 0 2.8–0.7 1.8–0.7 S3 1.4–0.7 0.7–0.7 1.8–0.7 0 2.9–0.7 1.1–0.7 S4 1–0.7 1.3–0.7 2.9–0.7 0 1.1–0.7 2.2–0.7 D1 0 0 0 0+0.7 0 0 D2 0 0 0 0+0.7 0 0
  • 17. 1 2 3 4 5 6 S1 2.2 4.9 4.4 0 6 3.6 S2 1.7 0.2 0.2 0 2.1 1.1 S3 0.7 0 1.1 0 2.2 0.4 S4 0.3 0.6 2.2 0 0.4 1.5 D1 0 0 0 0.7 0 0 D2 0 0 0 0.7 0 0
  • 18. Striking off all 0’s using minimum number of vertical/horizontal lines
  • 19. 1 2 3 4 5 6 S1 2.2 4.9 4.4 0 6 3.6 S2 1.7 0.2 0.2 0 2.1 1.1 S3 0.7 0 1.1 0 2.2 0.4 S4 0.3 0.6 2.2 0 0.4 1.5 D1 0 0 0 0.7 0 0 D2 0 0 0 0.7 0 0
  • 20. Subtracting the minimum uncut element from other uncut elements, and adding it to elements at the intersections SI NC E MINI MUM NUM BER OF LI NE S REQUI RED IS LE SS THA N THE NUM BER OF ROWS/ COLUMNS
  • 21. 1 2 3 4 5 6 S1 2.2–0.2 4.9–0.2 4.4–0.2 0 6–0.2 3.6–0.2 S2 1.7–0.2 0.2–0.2 0.2–0.2 0 2.1–0.2 1.1–0.2 S3 0.7 0 1.1 0+0.2 2.2 0.4 S4 0.3–0.2 0.6–0.2 2.2–0.2 0 0.4–0.2 1.5–0.2 D1 0 0 0 0.7+0.2 0 0 D2 0 0 0 0.7+0.2 0 0
  • 22. 1 2 3 4 5 6 S1 2 4.7 4.2 0 5.8 3.4 S2 1.5 0 0 0 1.9 0.9 S3 0.7 0 1.1 0.2 2.2 0.4 S4 0.1 0.4 2 0 0.2 1.3 D1 0 0 0 0.9 0 0 D2 0 0 0 0.9 0 0
  • 23. Striking off all 0’s using minimum number of vertical/horizontal lines
  • 24. 1 2 3 4 5 6 S1 2 4.7 4.2 0 5.8 3.4 S2 1.5 0 0 0 1.9 0.9 S3 0.7 0 1.1 2 0. 2.2 0.4 S4 0.1 0.4 2 0 0.2 1.3 D1 0 0 0 9 0. 0 0 D2 0 0 0 9 0. 0 0
  • 25. Subtracting the minimum uncut element from other uncut elements, and adding it to elements at the intersections SI NC E MINI MUM NUM BER OF LI NE S REQUI RED IS LE SS THA N THE NUM BER OF ROWS/ COLUMNS
  • 26. 1 2 3 4 5 6 S1 2 4.7 4.2 0 5.8 3.4 S2 1.5 0 0 0 1.9 0.9 S3 0.7 0 1.1 2 0. 2.2 0.4 S4 0.1 0.4 2 0 0.2 1.3 D1 0 0 0 9 0. 0 0 D2 0 0 0 9 0. 0 0
  • 27. 1 2 3 4 5 6 S1 2–0.1 4.7–0.1 4.2–0.1 0 5.8–0.1 3.4–0.1 S2 1.5 0 0 0+0.1 1.9 0.9 S3 0.7 0 1.1 0.2+0.1 2.2 0.4 S4 0.1–0.1 0.4–0.1 2–0.1 0 0.2–0.1 1.3–0.1 D1 0 0 0 0.9+0.1 0 0 D2 0 0 0 0.9+0.1 0 0
  • 28. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 0 0.1 1.1 D1 0 0 0 1 0 0 D2 0 0 0 1 0 0
  • 29. Striking off all 0’s using minimum number of vertical/horizontal lines
  • 30. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 0 0 1 0. 1.9 0.9 S3 0.7 0 1.1 3 0. 2.2 0.4 S4 0 0.3 1.9 0 0.1 1.1 D1 0 0 0 1 0 0 D2 0 0 0 1 0 0
  • 31. Making assignments SI NC E MINI MUM NUM BER OF LI NE S REQUI RED IS EQUAL TO THE NUM BER OF ROWS/ COLUMNS
  • 32. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 0 0.1 1.1 D1 0 0 0 1 0 0 D2 0 0 0 1 0 0
  • 33. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 0 0 0 1 0 0 D2 0 0 0 1 0 0
  • 34. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 0 0 0 1 0 0 D2 0 0 0 1 0 0
  • 35. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 0 × 0 0 1 0 0 D2 0 × 0 0 1 0 0
  • 36. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 0 × 0 0 1 0 0 D2 0 × 0 0 1 0 0
  • 37. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 0 1 0 0 D2 × 0 × 0 0 1 0 0
  • 38. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 0 1 0 0 D2 × 0 × 0 0 1 0 0
  • 39. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 0 D2 × 0 × 0 × 0 1 0 0
  • 40. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 0 D2 × 0 × 0 × 0 1 0 0
  • 41. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 × 0 D2 × 0 × 0 × 0 1 × 0 0
  • 42. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 × 0 D2 × 0 × 0 × 0 1 × 0 0
  • 44. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 × 0 D2 × 0 × 0 × 0 1 × 0 0 1 2 3 4 5 6 S1 85.3 88 87.5 82.4 89.1 86.7 S2 78.9 77.4 77.4 76.5 79.3 78.3 S3 82 81.3 82.4 80.6 83.5 81.7 S4 84.3 84.6 86.2 83.3 84.4 85.5 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 45. 1 2 3 4 5 6 S1 1.9 4.6 4.1 0 5.7 3.3 S2 1.5 × 0 0 0.1 1.9 0.9 S3 0.7 0 1.1 0.3 2.2 0.4 S4 0 0.3 1.9 × 0 0.1 1.1 D1 × 0 × 0 × 0 1 0 × 0 D2 × 0 × 0 × 0 1 × 0 0 1 2 3 4 5 6 S1 85.3 88 87.5 82.4 89.1 86.7 S2 78.9 77.4 77.4 76.5 79.3 78.3 S3 82 81.3 82.4 80.6 83.5 81.7 S4 84.3 84.6 86.2 83.3 84.4 85.5 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0
  • 46. 1 2 3 4 5 6 S1 85.3 88 87.5 82.4 89.1 86.7 S2 78.9 77.4 77.4 76.5 79.3 78.3 S3 82 81.3 82.4 80.6 83.5 81.7 S4 84.3 84.6 86.2 83.3 84.4 85.5 D1 0 0 0 0 0 0 D2 0 0 0 0 0 0 Optimum Assignment and TotalCost Construction Company Store Cost 1 4 Rs.84300 2 3 Rs.81300 3 2 Rs.77400 4 1 Rs.82400 5 - - 6 - - Total Cost Rs.325400
  • 47. Ans: Optimum Assignment & TotalCost Construction Company Store Cost 1 4 Rs.84300 2 3 Rs.81300 3 2 Rs.77400 4 1 Rs.82400 5 - - 6 - - Total Cost Rs.325400
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57. A firm wants to purchase three different types of equipment and five manufacturers have come forward to supply these machines. However, the firm’s policy is not to accept more than one machine from any of the manufacturers. The data relating to the price (in lakhs of rupees) quoted by the different manufacturers are given below. Determine how best the firm can purchase the three machines. Machines 1 2 3 Manufacturers A 2.99 3.11 2.68 B 2.78 2.87 2.57 C 2.92 3.05 2.80 D 2.82 3.10 2.74 E 3.11 2.90 2.64
  • 58. A management consulting firm has a backlog of 4 contracts. Work on these contracts must be started immediately. 3 project leaders are available for assignment to the contracts. Because of varying work experience of the project leaders the profit of the consulting firm would vary based on the assignments as shown below. The unassigned contract can be completed by subcontracting it to an outside consultant. The profit from the subcontract is zero. Determine the assignment of project leaders to the contracts so as to maximise profits. Contracts 1 2 3 4 Project Leaders A 13 10 9 11 B 15 17 13 20 C 6 8 11 7