SlideShare una empresa de Scribd logo
1 de 6
Résumé
(Mr.) Paramjeet Singh
Email: paramjeet1953@yahoo.com Mobile Phone#: (+91)-9717947707
D-177, Anand Vihar,
Delhi-110 092. INDIA
Date of Birth: 4th
July 1953
Marital Status: Married
Language Known: English, Hindi & Punjabi
Passport # / Nationality: B 5032854 / Indian
Overseas Work Exposure: USA, United Kingdom, Australia, United Arab Emirates-UAE, Saudi Arabia & Republic of IRAN.
Academic Qualification:
• Higher Secondary – CBSE - New Delhi, India
Technical Qualification:
• Draughtsman (Mechanical Engineering) – Lucknow, UP India – 1974
Computer Competency:
• PDS (Plant Design System by Intergraph Inc.)
PDS - Piping Designer
PDS - Equipment Modeling
PDS – ISOGEN
PDS – Drawing Manager & Orthogen
PDS - Clash Check
• AutoCAD
• MicroStation
• 3D Modeling (A Software for 3D-Modeling of Piping and Plant Layout)
• Windows NT / 2000, MS Word, MS Excel, MS PowerPoint etc.
Operating systems e.g. DOS, Windows 95, Windows NT etc.
Career Summary:
Over 30 years of experience in Plant Layout & Piping Design
Fields of Experience:
Refineries, Petrochemical, Power Plants, Pharmaceutical, Fertilizers, offshore Piping and Pipeline,
cross country Pipeline, Mining & Metals, Fire Protection, Water / Effluent Treatment Plant Heating
ventilation and Air-conditioning (HVAC).
Professional Experience:
• Checking and supervision of designer’s work.
• Proficiency in generation of Piping Studies, Plant layouts and Piping layouts
• Plant Piping and Equipment Layout Preparation (2D / 3D)
• Piping Isometrics for various critical & non-critical systems
• Layout Design conceptualization and 3D-modeling
• Proficiency in pipe support and hanger selection/ detailing
• Review of P& I Diagrams & Vendor Documents / Drawings
• Very well conversant with American / NFPA / British / Australian codes & standards
• As-Built Piping Design and Drawings Preparations
• Preparation of Material Take-Off (MTO)
• Client/Vendor interactions and also with statutory authorities like IBR
 Overseas / Construction Job Site Assignment
1. Shajah Intercontinental Hotel : Sharjah, UAE
2. Dubai Airport : Dubai, UAE
3. Arab Monetary Fund HQ : Abu Dhabi, UAE
4. Trinidad LNG Train-1 : Houston, TX - USA
5. Equiva SRU : Houston, TX – USA
6. Comalco Alumina Refinery : Queensland, AUSTRALIA
7. Trinidad Lombago LNG feed : London, U.K.
Presently working with:
Valdel Engineers & Contractors (Since 3rd
March 2015)
 Working as Piping Consultant for SXL Mariner East 2 Project, Marcus Hook, PA, USA for their Propane
facility Unit.
 Worked as Lead Engineer, on Marathon Petroleum Company LLC’s Flare Gas Recovery Unit, From, 3rd
March2015 to January 2016.
Samsung Engineering Pvt. Ltd. DELHI (Since September08 to
February20015)
 Worked as Area Lead for RCTF (Riyadh Refinery Clean Transportation Fuels), Saudi Arabia.
 Worked as Area Lead for Samsung Total Petrochemical(STC) No.2 –Aromatic Plant
 Worked as Area Lead for LDPE, Rabigh Phase II, GPP (Phase I), Iraq,
 LDPE, Singapore Product warehouse, OPaL, Dahej.
 Worked as Area Lead for DFCU (Dual Feed Cracker Unit and associated Units) OPAL Dahej.
 Responsibilities include FEED ,conceptual design, supervision of Designers, for their 2D and 3D work , Checking of
Vendor Documents, MDS, controlling of man hours and planning the activities to meet the target. Planning and
executing the schedule to meet the targets. Interaction with clients and vendors, Model review and clearing the tags,
Interview people for fresh recruitment etc.
Foster Wheeler Energy Pvt. Ltd., U.K (Aug06 to June08)
 Worked as a Lead Designer for Ethylene plant in Thailand.
 Responsibilities include detailed engineering, PDS Modeling, Checking of Vendor Documents, MDS, controlling of
man hours and planning the activities to meet the targets. Assisting designers under my supervision and guiding
them for any PDS or Piping related problems. Getting the 60%model review through by removing all the tags and
then handing over to the overseas office for further obligations.
TECHNIP KT INDIA LTD. - DELHI (Sep05 to July06)
 Worked as a Lead Designer for Ethylene project for Ras Lafan Olefin Company-RLOC-State of Qatar.
 Responsibilities include FEED ,conceptual design, supervision of Designers , PDS Modeling , Checking of Vendor
Documents, MDS, controlling of man hours and planning the activities to meet the targets. Vedio conferencing with
Paris office and sorting out day to day obstacles faced by the designers under my supervision and guiding them for
any PDS or Piping related problems.
TECHNIP ABUDHABI (From Dec.03 to18th June 05)
 Worked as Lead Designer Piping. And handled various projects in the same position.
 Responsibilities included conceptual design, 1st
MTO, Supervision of Designers to model the piping and extracting
Isometrics, general arrangement drawings, checking, organizing and coordinating with the client and vendors. Site
inspections and trouble shooting during shut downs of Gas plants etc.
 BECHTEL INDIA PVT. LTD. (From Mar, 20001 to January 04)
A USA based EPC Multinational, an ISO 9001 Certified Company at Gurgaon, Haryana, India. Contributing in the growth
of company as s a Supervisor Piping Designer in Plant Layout and Piping Department.
Project Responsibility:
Comalco Alumina Refinery, Gladstone, Australia Office: Bechtel Brisbane, AUSTRALIA
Production of smelter grade Alumina using Weipa bauxite by the Bayer process. The first stage of CAR involves the
expenditure of US$750m to produce 1.4 million tonnes per annum (mtpa) of alumina, the material used in the smelting
process to produce aluminium.
• Deputed to AUSTRALIA Bechtel office at Brisbane, Australia.
• Responsible Checking and Design for White Side Area (Alumina Area) piping layout design & equipment
layout using
PDS- Piping Designer
PDS - Equipment Modeling
PDS – ISOGEN
PDS – Drawing Manager & Orthogen
PDS - Clash Check
• Preparation of Equipment layout design, Nozzle orientation and their modeling.
• Looked after Calcination unit, Hydrate Preparation/Classification: Preparing Material Take-off and Isometric
Generation for the same.
Equiva Project, Houston Office: Bechtel Houston USA
SRU (Sulpher Removal Units for Five Refineries)
• Deputed to USA, BECHTEL office located at Houston, USA.
• Performed as a Lead Engineer (Engineering Supervisor) and headed a Team of Engineers.
• Preparation of Equipment layout design, Nozzle orientation and their modeling.
• Checking and coordination on PDS
• Design Review Sessions.
Borouge Petrochemical Project, Abu Dhabi Office: Bechtel London, UK
• Preparation of Piping As-Built Drawings & Design on PDS and extracted piping isometrics using ISOGEN.
• Performed as a Project Coordinator for Piping, Electrical & Civil deliverables for Issuance including Man-
hours & Man-power tracking.
• Preparation of Equipment layout design, Nozzle orientation and their modeling.
 Lurgi India Co. Ltd.
(From Feb. 99 tofeb.2001)
Lurig India Ltd, an ISO 9001 Certified Engineering Unit from Germany, set up in India.
Contributed in the growth of company as Senior Engineer.
Project Responsibility:
Responsible for making conceptual studies, Piping Modelling , Equipment Modelling on PDS, Extracting Gas on
Drawing Manager, Extracting Isometrics on ISOGEN Supporting, Site supervision and interraction with clients
and Venders. Man hour controlling and scheduling. Meeting the set targets, Supervising and guiding the
designers aabout the design and PDS related problems.
NPCC, Abu Dhabi, U.A.E
(From Nov. 1997 to January 99)
NATIONAL PETROLEUM CONSTRUCTION CO.ABU DHABI, U.A.E, an ISO 9001 Certified Engineering Unit at Abu Dhabi
UAE. Contributed to The Growth Of Company As a Designer Piping.
Project Responsibility:
Team Leader for offshore and onshore piping and pipeline. Checking and supervision of Design and
Construction of various projects, Study Drawings and Piping general arrangements, supporting, fabrication
drawings for Piping and supports, Making Isometrics etc.
 Engineers India Limited
(From Dec. 1993 to Oct. 1997)
Deputed thru Dalal Consultants. Contributed to The Growth Of Company As a Designer Piping.
Project Responsibility:
Design & Drafting of Layout and Piping Arrangements, Supporting Isometrics & Material Take Off for CDU,
VDU,BBU, Offsite etc., for Mangalore Refinery, Mathura Refinery & Digboi Refinery
 Bellelli Nuova Cimmimontubi, Republic of IRAN
(From Jan. 1992 to Oct. 1993)
Contributed to The Growth Of Company As a Designer Piping.
Project Responsibility:
Worked as In-charge at the Technical Office with M/s Belleli Nuova Cimmimontubi an Italian Organization
proficient in Refineries and Petrochemicals construction at Arak Refinery in Iran. Supervision of the Technical
Office Staff, checking of Drawings, making Isometrics for process Piping and utilities. Steam tracing,
supporting, Material Take-off, Fabrication and Erection Supervision.
Consultants: Japan Gas Company (JGC).
 Project & Development India Ltd. N.Delhi, India
(From June 1990 to Jan. 1992)
Contributed to the Growth of Company As a Draughtsman
Project Responsibility:
Plot plans, Key plans, P & I diagrams, Flow Sheets Equipment Layout, Piping Arrangement, Supporting
Isometrics & Material Take off for Ammonia Plant, Urea Plant, Yard, Multi Fuel oil & Dimineralised water
storage and Distribution.
Projects Handled: Chambal Fertilizers & Chemicals Ltd. Capacity 1350 T.P.D. Ammonia1100 x 2 T.P.D. –
Urea
Consultants: Snamprogetti (Italy)
 Spie-Capag / Nkk / Toyo Consortium
(From Dec. 1986 to Jun. 1990)
A Japanese and French Joint Venture. Contributed In The Growth Of Company As a Senior Draughtsman.
Project Responsibility:
Plot Plans, Grading plan, key plans, Piping arrangements for Intermediate Pigging Stations and Terminals,
Supports and Isometrics, Piping arrangements for gas metering stations, Piping for Compressor Stations,
Material Take Off. Site Supervision and as built rectification etc.
Projects Handled: HBJ gas pipeline, 1800 km long LPG transportation through underground pipe-line from
Hazira to Jagdishpur with supplies to various fertilizer units and power projects.
 Projects & Development India Ltd. New Delhi, India
(From Sep. 1985 to Dec. 1986)
Deputed thru ECA Consultants. Contributed In The Growth Of Company As a Design Draughtsman.
Project Responsibility:
Piping Design and Layouts. Isometrics drawings, under-ground, steam, fuel oil and utility Piping layout, Billing
of Materials, Plot Plans, Supporting arrangements, P&I diagrams.
Projects Handled: Indo Gulf Fertilizers and Chemicals Ltd., 1350 TPD – Ammonia, 1100 x 2 TPD - Urea
Consultants: Snamprogetti (Italy)
 Duvent Fans (P) Ltd.New Delhi, India
(From Nov. 1982 to Aug. 1985)
Contributed In The Growth Of Company As a Draughtsman.
Conforce Gulf Ltd., Sharjah, U.A.E.
(From Aug79 to april81)
Contributed In The Growth Of Company As a Draughtsman.
 Ghurair Crown Engg.Dubai, U.A.E.
(From Jun. 1981 to Oct. 1982)
Contributed In The Growth Of Company As a Draughtsman.
 Blue Star Ltd.New Delhi, India
(From June 1973 to Aug. 1979)
Contributed In The Growth Of Company As a Draughtsman.
Bharat Steel Tubes, New Delhi, India
(From Jun. 1973 to May 1979)
Contributed In The Growth Of Company As a Jr. Draughtsman.
(Paramjeet Singh)
Contributed In The Growth Of Company As a Draughtsman.
Bharat Steel Tubes, New Delhi, India
(From Jun. 1973 to May 1979)
Contributed In The Growth Of Company As a Jr. Draughtsman.
(Paramjeet Singh)

Más contenido relacionado

Destacado

Destacado (10)

PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
CV-Shipyard
CV-ShipyardCV-Shipyard
CV-Shipyard
 
RESUME-01
RESUME-01RESUME-01
RESUME-01
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & material
 
Pratiksha Jadhav_ Resume
Pratiksha Jadhav_ ResumePratiksha Jadhav_ Resume
Pratiksha Jadhav_ Resume
 
Akhil_CV
Akhil_CVAkhil_CV
Akhil_CV
 
Naveen_Resume (2)
Naveen_Resume (2)Naveen_Resume (2)
Naveen_Resume (2)
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 

Paramjeet_CV_2016

  • 1. Résumé (Mr.) Paramjeet Singh Email: paramjeet1953@yahoo.com Mobile Phone#: (+91)-9717947707 D-177, Anand Vihar, Delhi-110 092. INDIA Date of Birth: 4th July 1953 Marital Status: Married Language Known: English, Hindi & Punjabi Passport # / Nationality: B 5032854 / Indian Overseas Work Exposure: USA, United Kingdom, Australia, United Arab Emirates-UAE, Saudi Arabia & Republic of IRAN. Academic Qualification: • Higher Secondary – CBSE - New Delhi, India Technical Qualification: • Draughtsman (Mechanical Engineering) – Lucknow, UP India – 1974 Computer Competency: • PDS (Plant Design System by Intergraph Inc.) PDS - Piping Designer PDS - Equipment Modeling PDS – ISOGEN PDS – Drawing Manager & Orthogen PDS - Clash Check • AutoCAD • MicroStation • 3D Modeling (A Software for 3D-Modeling of Piping and Plant Layout) • Windows NT / 2000, MS Word, MS Excel, MS PowerPoint etc. Operating systems e.g. DOS, Windows 95, Windows NT etc. Career Summary: Over 30 years of experience in Plant Layout & Piping Design Fields of Experience: Refineries, Petrochemical, Power Plants, Pharmaceutical, Fertilizers, offshore Piping and Pipeline, cross country Pipeline, Mining & Metals, Fire Protection, Water / Effluent Treatment Plant Heating ventilation and Air-conditioning (HVAC). Professional Experience: • Checking and supervision of designer’s work. • Proficiency in generation of Piping Studies, Plant layouts and Piping layouts • Plant Piping and Equipment Layout Preparation (2D / 3D) • Piping Isometrics for various critical & non-critical systems • Layout Design conceptualization and 3D-modeling • Proficiency in pipe support and hanger selection/ detailing • Review of P& I Diagrams & Vendor Documents / Drawings • Very well conversant with American / NFPA / British / Australian codes & standards • As-Built Piping Design and Drawings Preparations • Preparation of Material Take-Off (MTO) • Client/Vendor interactions and also with statutory authorities like IBR  Overseas / Construction Job Site Assignment 1. Shajah Intercontinental Hotel : Sharjah, UAE 2. Dubai Airport : Dubai, UAE 3. Arab Monetary Fund HQ : Abu Dhabi, UAE 4. Trinidad LNG Train-1 : Houston, TX - USA 5. Equiva SRU : Houston, TX – USA 6. Comalco Alumina Refinery : Queensland, AUSTRALIA
  • 2. 7. Trinidad Lombago LNG feed : London, U.K. Presently working with: Valdel Engineers & Contractors (Since 3rd March 2015)  Working as Piping Consultant for SXL Mariner East 2 Project, Marcus Hook, PA, USA for their Propane facility Unit.  Worked as Lead Engineer, on Marathon Petroleum Company LLC’s Flare Gas Recovery Unit, From, 3rd March2015 to January 2016. Samsung Engineering Pvt. Ltd. DELHI (Since September08 to February20015)  Worked as Area Lead for RCTF (Riyadh Refinery Clean Transportation Fuels), Saudi Arabia.  Worked as Area Lead for Samsung Total Petrochemical(STC) No.2 –Aromatic Plant  Worked as Area Lead for LDPE, Rabigh Phase II, GPP (Phase I), Iraq,  LDPE, Singapore Product warehouse, OPaL, Dahej.  Worked as Area Lead for DFCU (Dual Feed Cracker Unit and associated Units) OPAL Dahej.  Responsibilities include FEED ,conceptual design, supervision of Designers, for their 2D and 3D work , Checking of Vendor Documents, MDS, controlling of man hours and planning the activities to meet the target. Planning and executing the schedule to meet the targets. Interaction with clients and vendors, Model review and clearing the tags, Interview people for fresh recruitment etc. Foster Wheeler Energy Pvt. Ltd., U.K (Aug06 to June08)  Worked as a Lead Designer for Ethylene plant in Thailand.  Responsibilities include detailed engineering, PDS Modeling, Checking of Vendor Documents, MDS, controlling of man hours and planning the activities to meet the targets. Assisting designers under my supervision and guiding them for any PDS or Piping related problems. Getting the 60%model review through by removing all the tags and then handing over to the overseas office for further obligations. TECHNIP KT INDIA LTD. - DELHI (Sep05 to July06)  Worked as a Lead Designer for Ethylene project for Ras Lafan Olefin Company-RLOC-State of Qatar.  Responsibilities include FEED ,conceptual design, supervision of Designers , PDS Modeling , Checking of Vendor Documents, MDS, controlling of man hours and planning the activities to meet the targets. Vedio conferencing with Paris office and sorting out day to day obstacles faced by the designers under my supervision and guiding them for any PDS or Piping related problems. TECHNIP ABUDHABI (From Dec.03 to18th June 05)  Worked as Lead Designer Piping. And handled various projects in the same position.  Responsibilities included conceptual design, 1st MTO, Supervision of Designers to model the piping and extracting Isometrics, general arrangement drawings, checking, organizing and coordinating with the client and vendors. Site inspections and trouble shooting during shut downs of Gas plants etc.  BECHTEL INDIA PVT. LTD. (From Mar, 20001 to January 04) A USA based EPC Multinational, an ISO 9001 Certified Company at Gurgaon, Haryana, India. Contributing in the growth of company as s a Supervisor Piping Designer in Plant Layout and Piping Department. Project Responsibility: Comalco Alumina Refinery, Gladstone, Australia Office: Bechtel Brisbane, AUSTRALIA Production of smelter grade Alumina using Weipa bauxite by the Bayer process. The first stage of CAR involves the expenditure of US$750m to produce 1.4 million tonnes per annum (mtpa) of alumina, the material used in the smelting process to produce aluminium. • Deputed to AUSTRALIA Bechtel office at Brisbane, Australia.
  • 3. • Responsible Checking and Design for White Side Area (Alumina Area) piping layout design & equipment layout using PDS- Piping Designer PDS - Equipment Modeling PDS – ISOGEN PDS – Drawing Manager & Orthogen PDS - Clash Check • Preparation of Equipment layout design, Nozzle orientation and their modeling. • Looked after Calcination unit, Hydrate Preparation/Classification: Preparing Material Take-off and Isometric Generation for the same. Equiva Project, Houston Office: Bechtel Houston USA SRU (Sulpher Removal Units for Five Refineries) • Deputed to USA, BECHTEL office located at Houston, USA. • Performed as a Lead Engineer (Engineering Supervisor) and headed a Team of Engineers. • Preparation of Equipment layout design, Nozzle orientation and their modeling. • Checking and coordination on PDS • Design Review Sessions. Borouge Petrochemical Project, Abu Dhabi Office: Bechtel London, UK • Preparation of Piping As-Built Drawings & Design on PDS and extracted piping isometrics using ISOGEN. • Performed as a Project Coordinator for Piping, Electrical & Civil deliverables for Issuance including Man- hours & Man-power tracking. • Preparation of Equipment layout design, Nozzle orientation and their modeling.  Lurgi India Co. Ltd. (From Feb. 99 tofeb.2001) Lurig India Ltd, an ISO 9001 Certified Engineering Unit from Germany, set up in India. Contributed in the growth of company as Senior Engineer. Project Responsibility: Responsible for making conceptual studies, Piping Modelling , Equipment Modelling on PDS, Extracting Gas on Drawing Manager, Extracting Isometrics on ISOGEN Supporting, Site supervision and interraction with clients and Venders. Man hour controlling and scheduling. Meeting the set targets, Supervising and guiding the designers aabout the design and PDS related problems. NPCC, Abu Dhabi, U.A.E (From Nov. 1997 to January 99) NATIONAL PETROLEUM CONSTRUCTION CO.ABU DHABI, U.A.E, an ISO 9001 Certified Engineering Unit at Abu Dhabi UAE. Contributed to The Growth Of Company As a Designer Piping. Project Responsibility: Team Leader for offshore and onshore piping and pipeline. Checking and supervision of Design and Construction of various projects, Study Drawings and Piping general arrangements, supporting, fabrication drawings for Piping and supports, Making Isometrics etc.  Engineers India Limited (From Dec. 1993 to Oct. 1997) Deputed thru Dalal Consultants. Contributed to The Growth Of Company As a Designer Piping. Project Responsibility: Design & Drafting of Layout and Piping Arrangements, Supporting Isometrics & Material Take Off for CDU, VDU,BBU, Offsite etc., for Mangalore Refinery, Mathura Refinery & Digboi Refinery
  • 4.  Bellelli Nuova Cimmimontubi, Republic of IRAN (From Jan. 1992 to Oct. 1993) Contributed to The Growth Of Company As a Designer Piping. Project Responsibility: Worked as In-charge at the Technical Office with M/s Belleli Nuova Cimmimontubi an Italian Organization proficient in Refineries and Petrochemicals construction at Arak Refinery in Iran. Supervision of the Technical Office Staff, checking of Drawings, making Isometrics for process Piping and utilities. Steam tracing, supporting, Material Take-off, Fabrication and Erection Supervision. Consultants: Japan Gas Company (JGC).  Project & Development India Ltd. N.Delhi, India (From June 1990 to Jan. 1992) Contributed to the Growth of Company As a Draughtsman Project Responsibility: Plot plans, Key plans, P & I diagrams, Flow Sheets Equipment Layout, Piping Arrangement, Supporting Isometrics & Material Take off for Ammonia Plant, Urea Plant, Yard, Multi Fuel oil & Dimineralised water storage and Distribution. Projects Handled: Chambal Fertilizers & Chemicals Ltd. Capacity 1350 T.P.D. Ammonia1100 x 2 T.P.D. – Urea Consultants: Snamprogetti (Italy)  Spie-Capag / Nkk / Toyo Consortium (From Dec. 1986 to Jun. 1990) A Japanese and French Joint Venture. Contributed In The Growth Of Company As a Senior Draughtsman. Project Responsibility: Plot Plans, Grading plan, key plans, Piping arrangements for Intermediate Pigging Stations and Terminals, Supports and Isometrics, Piping arrangements for gas metering stations, Piping for Compressor Stations, Material Take Off. Site Supervision and as built rectification etc. Projects Handled: HBJ gas pipeline, 1800 km long LPG transportation through underground pipe-line from Hazira to Jagdishpur with supplies to various fertilizer units and power projects.  Projects & Development India Ltd. New Delhi, India (From Sep. 1985 to Dec. 1986) Deputed thru ECA Consultants. Contributed In The Growth Of Company As a Design Draughtsman. Project Responsibility: Piping Design and Layouts. Isometrics drawings, under-ground, steam, fuel oil and utility Piping layout, Billing of Materials, Plot Plans, Supporting arrangements, P&I diagrams. Projects Handled: Indo Gulf Fertilizers and Chemicals Ltd., 1350 TPD – Ammonia, 1100 x 2 TPD - Urea Consultants: Snamprogetti (Italy)  Duvent Fans (P) Ltd.New Delhi, India (From Nov. 1982 to Aug. 1985) Contributed In The Growth Of Company As a Draughtsman. Conforce Gulf Ltd., Sharjah, U.A.E. (From Aug79 to april81) Contributed In The Growth Of Company As a Draughtsman.  Ghurair Crown Engg.Dubai, U.A.E. (From Jun. 1981 to Oct. 1982) Contributed In The Growth Of Company As a Draughtsman.  Blue Star Ltd.New Delhi, India (From June 1973 to Aug. 1979)
  • 5. Contributed In The Growth Of Company As a Draughtsman. Bharat Steel Tubes, New Delhi, India (From Jun. 1973 to May 1979) Contributed In The Growth Of Company As a Jr. Draughtsman. (Paramjeet Singh)
  • 6. Contributed In The Growth Of Company As a Draughtsman. Bharat Steel Tubes, New Delhi, India (From Jun. 1973 to May 1979) Contributed In The Growth Of Company As a Jr. Draughtsman. (Paramjeet Singh)