PRESENTATION ON 
POST TENSIONED FLAT SLAB
RCC > PRESTRESS? 
- Concrete structures were common by 1920’’s 
- Concretes strength in compression and lack in tension was known. 
In RCC reinforcement replaces tension. 
- Thus transformation is due to development of cracks - Visible 
- Not so visible 
- This leads to : 
- Loss of durability due to cracking 
- Substantial deformations due to loss in section properties 
This restricted the use to smaller spans
HISTORY OF PRESTRESSING 
Initial Research and Development in Europe 1928- 
1933. 
Pioneers : - Freyssinet - France 
Leonhardt - Germany 
Magnel - Belgium 
USA adopted this technology in 1949. 
Reason for Development : Inability to increase spans of RCC Bridges. 
First Bridge : - Choicy Le Ruy across Seine 
Paris 1935 span 40m.
Prestressing is a tested, knowledge based Technology which 
has withstood TEST OF TIME. 
Live Technology : - Continuous State of Development. 
Better, Stronger and improved 
Materials 
With matching Hardware. 
2000T Capacity single Systems with steel strands. 
1 T Capacity Carbon Fibre systems in Rehabilitation field
FROM BRIDGES TO PT SLABS 
Prestress Developed initially for long span bridges. 
First span was 40m. Now 1000m spans are planned 
using cable stay technique which has same basic 
principles, materials, hardware. 
Technology was adopted later for many long span 
structures like aircraft hangers. 
Initial developments were all in Post Tensioning. 
- i.e.. Concrete cast first and prestress applied later.
Later Pre Tensioning developed. 
- i.e.. Concrete is cast around wires/strands already 
tensioned . 
- initially applied for standardized bridge girders. 
- Then to precast building slabs and precast girders. 
Advantages of PreTensioning 
-- Product uniformity factory made. 
-- Quick turnover with fast curing techniques. 
Disadvantages 
-- Transport, handling, multiple joints. 
-- Profiling limitations hence span restrictions.
To Overcome above post tensioning of slab 
developed. 
Advantages 
-- Reduction in number of joints 
-- Mass pours 
-- Quick removal of shutter possible to achieve same 
speed
Developed initially in USA. 
Being in use for last 50 years in various countries. 
In Asian countries like Singapore, India in use for last 35 
years. 
In middle east last 15-18 years 
In Oman last 5-6 years 
Oman therefore is starting with 
-- 50 years of knowledge 
-- Benefits of all theoretical research and development. 
-- Benefits of hardware development during period.
WHEN & WHY PT SLABS? 
New buildings require 
Large span structures, with flexible plans 
Unobstructed space below sofit for services 
Building height regulations : optimisation of storey ht 
Possible only if 
Beam less system is developed. 1) rcc flat slab 
2) prestressed flat slab
It is also possible to have prestressed slabs in normal 
slab and beam system, also allowing larger slab 
spans. 
Special Hardware suitable for slabs has been 
developed 
Flat Sheathings 
20mm thk 45 to 70 mm wide for 12.7mm strand 
--Rigid 
--Flexible 
Flat Anchorages
12.7 mm HT Strand 
Flat GI Duct 
Flat Anchorage 
Grout Vent Tube
5 Strand Anchorage 
3 Strand Anchorage
FLAT ANCHORING SYSTEM
APPLICABLE CODES 
Design 
ACI : 318 
ACI : 423 For unbonded tendons 
CAN : A23.3 
BS : 8110 
Materials 
Prestressing strands 
ASTM : A416, A421 ,A776 
BS : 5896
MATERIALS USED IN PT 
Concrete : Minimum C30 generally C35-C40 
Reinforcing steel : Based on country wise availability 
In Oman : 460 n/mm2 
In India : 415 n/mm2 
: 500 n/mm2 
In Singapore : 500 n/mm2 
Prestressing steel : Normal relaxation steel or grade I : 
braking Load ~ 1750 n/mm2 
: Low relaxation steel or grade II or 
super grade ~ 1860 n/mm2
Sheathing : Galvanised Iron 
Bright Metal 
HDPE (Common in bridges). 
Grout : Basic cement , water mixture with 
admixture to fill the space between 
sheathing and strands. 
Grade should be same as concrete 
slab
COMPARISON OF RCC AND PRESTRESSED 
FLAT SLAB 
RCC Flat Slab 
1. Cracked section under service. 
2. Excessive deformations or 
increased thickness to control 
deformations, due to cracked 
sections. 
3. Once cracked no closure of 
crack removal of load. 
4. Heavy reinforcement leads to 
conjustion and concretability 
parameters. 
Prestressed Flat Slab 
1. Uncracked section under service. 
2. Deflections very much under 
limit due to : 
a) Prestress gives opposite initial 
deformations 
b) Gross properties reduce 
deflections 
3. Due to positive force on section 
closure on removal of load. 
4. No conjustion of steel.
COMPARISON OF RCC AND PRESTRESSED 
FLAT SLAB 
RCC Flat Slab 
5 Excessive shrinkage cracks. 
6. Shear performance - 
Normal. 
Prestressed Flat Slab 
5. Early stressing of part of cables 
reduce these substantially. 
6. Since section is uncracked and 
compressed enhanced shear 
capacity by 30% or so.
COMPARISON OF RCC & PT FLAT SLAB 
ON REAL PARAMETERS 
Take typical 9m x 9m grid Live load 4kn/m2 SDL 3 kn/m2 
RCC flat slab 
1. Slab thickness 300mm 
2. HYSD 35 to 40 kg/m2 
depending on size of dropcap 
3. HTS Nil 
4. Likely long term deflection 
28-30mm 
Prestressed flat slab 
1. Slab thickness 220mm 
2. HYSD 8 –– 10 kg/m2 
depending 
on dropcap 
3. HTS ~ 4.5 kg/m2 
4. Likely long term deflection 
10-12mm
Cost Comparison 
Project :Sohar Pearl 
Office & Apparment Buildings City Mall 
Alternative 1 : RCC Flat Slab Alternative 1 : RCC Flat Slab 
For 8.5 x 8.3M Grid For 8.5 x 8.3M Grid 
Slab thickness 300 MM Slab thickness 300 MM 
Drop Cap 4000*4000*450MM Drop Cap 4000*4000*500MM 
Materials Quantity Unit Price Amount Materials Quantity Unit Price Amount 
Concrete 25.565 36.000 920.340 Concrete 24.365 36.000 877.140 
Reinforcemen 2556.5 0.380 971.470 Reinforcement 2436.5 0.380 925.870 
Shuttering 71.75 5.800 416.150 Shuttering 72.15 5.800 418.470 
Total RO : 2307.960 Total RO : 2221.480 
Alternative 2 : Post-tensioned Slab Alternative 2 : Post-tensioned Slab 
For 8.5 x 8.3M Grid For 8.5 x 8.3M Grid 
Slab thickness 200 Slab thickness 200 MM 
Drop Cap 2800*2800*350 MM Drop Cap 2800*2800*350 MM 
Materials Quantity Unit Price Amount Materials Quantity Unit Price Amount 
Concrete 15.2 36.000 547.200 Concrete 15.2 36.000 547.200 
Reinforcemen 634.95 0.380 241.281 Reinforcement 634.95 0.380 241.281 
Shuttering 71.39 5.800 414.062 Shuttering 71.39 5.800 414.062 
Post-tensionin 70.55 9.000 634.950 Post-tensionin 70.55 9.000 634.950 
Total RO : 1837.493 Total RO : 1837.493 
Savings 20.4% Savings 17.3%
Direct advantage Related further advantages 
••Floor to floor height reduction 
••Savings on total building height 1 floor can be gained for approx. each 
20 floors 
••Reduction of slab thickness leads to reduced energy needs 
••Savings in columns and foundations costs 
••Reduced formwork costs 
••Increase in column of free space 
••Flexible planning 
••Improvement in durability 
••Improvement in slab rigidity 
Reduction in slab thickness DESIGN 
Large spans 
Limitation on crack widths 
Reduction of steel ••Easier placing and handling of reinforcement 
reinforcement and 
arrangement simplification 
••Large floor area can be tackled at a time 
••Reduction in overall construction time 
Less concrete volume per 
pour 
••Early formwork release. 
••Reduction in total construction time. 
••Reduction of formworks sets. 
••Improvement in constructability. –– table forms. 
Quick rotation of formwork 
CONSTRUCTION 
High deflection control ••Improvement in serviceability for all non-structural elements.
CRITICAL ISSUES : AS DESIGNER 
 If drop cap not available : Punching shear 
problems. 
or inadequate Limitations on max. shear 
even with reinforcement. 
 RCC and PT Junctions. 
 Openings. 
 Shrinkage cracking. 
 Multi level propping. 
 Honeycombing near anchorages. 
 Breakage at passive anchors.
Examples of punching shear reinforcement for 
flat slab
CRITICAL ISSUES : AS CONSTRUCTOR 
Design of scaffolding system. 
When can shutter be released? 
Multilevel propping
SHARING OF DESIGN RESPONSIBILITIES 
Globally ,PT is operated through special Agencies who have to 
act in cooperation with main consultant and main contractor. 
Necessary to DEFINE Responsibilities. 
Framing Plan, Column Spacing - Main RCC consultant / 
Architect / Owner 
Global Analysis including 
Lateral load analysis 
Columns, footings, RCC areas -Main Consultant 
Load bearing beams 
Additions in slab for Global effects
SHARING OF DESIGN RESPONSIBILITIES 
Slab Analysis ( Vertical Loads Only)- PT Consultant 
Slab Drawings : 
PT Layout & Elevations - PT Consultant 
Reinforcement in slabs 
Overall stability of structure - Main Consultant
Procedures /Work Methodology 
Step-01: Tendon &Anchorage Installation 
Step-02:Concreting/Casting of Slab 
Step-03: Stressing of Cables 
Step-04: Grouting of Cables
Step -01 : Tendon & Anchorage Installation
Step-02: Concreting /Casting of Slab
Step-03: Stressing of Cable
Step-04: Grouting of Tendon
Ongoing and Completed Projects
Project: Al Rawaq Building 
Client: Suhail Bahwan Holdings 
Consultant: Cowi & Partners LLC 
Project: ASSAUD Business Centra 
Client: Alia Properties 
Consultant: Triad Oman Consultants
Project: 4 star Hotel Appartment at Al Qurum 
Client: Mustafa Sultan Enterprises 
Consultant: Al Hatmy Consultants 
Project: Proposed Hotel Development at Azaiba 
Client: Azaiba Hotel LLC 
Consultant: Kadri Consultants
Project: Knowledge Oasis Muscat-04 
Client: PIEI 
Consultant: NEO/EIDC
Project: Comm Bldg at MBD for Badrr Shipping 
Client: Badrr Shipping Agencies 
Consultant: EIDC 
Project: Facility Building at KOM 
Client: Oasis Development SAOC/PIEI 
Consultant: Leeyanah Engg Consultancy
Project: Headquarters for MOD-Pension Fund 
Client: MOD-Pension Fund 
Consultant: Gulf Engg Consultancy 
Project: Al Ruwad International School 
Client: Muscat Int School 
Consultant: Gulf Engg Consultancy
Project: Muscat International Airport-PkgIII 
Client: Ministry of Transport& Communication 
Consultant: Hill International 
Contractor: Bechtel Enka Bahwan Consortium 
Project: Comm Bldg at Bausher for Sk Salem Al 
Areimi 
Client: Sk Salem Al Areimi 
Consultant: TRIAD Oman
Project: Bait Al Zubair –Ph04 
Client: The Zubair Corporation 
Consultant: Image Design/TRIAD Oman
Project: Residential development at Ruwi 
Client: The Zubair Corporation 
Consultant: NEO 
Project: Residential development at Wadi Kabir 
Client: Sk Salem Al Areimi 
Consultant:TRIAD Oman
Project: Residential Building –Dar Al Maha-01 
Client: Sohar Investment & Development 
Consultant: EIDC 
Project: Comm Res Bldg for Mr Dawood Al Futaisi 
Client: Mr Dawood Al Futaisi 
Consultant: Dawood Consultancy
Project: The Sultan centre at Azaiba 
Client: The Sultan centre 
Consultant: Cowi & Partners 
Project: Al Maha Beach Restautant 
Client: Al Rotana Hotels & Developments 
Consultant: EIDC
PT Slab ready for Concreting
PT Slab & PT Beam 
PT Slab Before Concreting
Beamless Slab Soffit 
PT Slab with Column Heads/Drop Caps
THANK YOU …… 
Corporate Address 
Specialised Engineering LLC 
PO Box 1020,Ruwi-112 
Sultanate of Oman 
Tel: 24713494 
Fax:24713495 
E-mail-info@spl-eng.com 
Web:www.spl-eng.com

Más contenido relacionado

La actualidad más candente

Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
Nik M Farid
 
many projects shoring
many projects shoringmany projects shoring
many projects shoring
Samir Salman
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
hlksd
 

La actualidad más candente (20)

Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
 
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
 
Pt slabs
Pt slabsPt slabs
Pt slabs
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...
 
Column Analysis and Design
Column Analysis and Design Column Analysis and Design
Column Analysis and Design
 
Earthquake load as per UBC97
Earthquake load as per UBC97Earthquake load as per UBC97
Earthquake load as per UBC97
 
Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for Engineers
 
various connection of steel structure
various connection of steel structurevarious connection of steel structure
various connection of steel structure
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
 
Steel building detail
Steel building detailSteel building detail
Steel building detail
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
many projects shoring
many projects shoringmany projects shoring
many projects shoring
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beams
 
Influence line diagram for model arch bridge
Influence line diagram for model arch bridgeInfluence line diagram for model arch bridge
Influence line diagram for model arch bridge
 
T beam TYPES
T beam TYPEST beam TYPES
T beam TYPES
 
Mat or raft foundation
Mat or raft foundationMat or raft foundation
Mat or raft foundation
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
 

Destacado

Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)
Yeasir Gerrard
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
sarani_reza
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
CCL Concrete
 
Design of reinforced flat slabs to bs 8110 (ciria 110)
Design of reinforced flat slabs to bs 8110 (ciria 110)Design of reinforced flat slabs to bs 8110 (ciria 110)
Design of reinforced flat slabs to bs 8110 (ciria 110)
bmxforu
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3
Prasanth Dasu
 

Destacado (20)

Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Flat slab
Flat slabFlat slab
Flat slab
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Lec 3 design problem of flat plate slab
Lec 3 design problem of flat plate slabLec 3 design problem of flat plate slab
Lec 3 design problem of flat plate slab
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor System
 
design flat slab
design flat slabdesign flat slab
design flat slab
 
Sachpazis: Flat slab design to bs8110 part 1-1997
Sachpazis: Flat slab design to bs8110 part 1-1997Sachpazis: Flat slab design to bs8110 part 1-1997
Sachpazis: Flat slab design to bs8110 part 1-1997
 
Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)Flat plate slab design (10.01.03.052)
Flat plate slab design (10.01.03.052)
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
 
Progress report
Progress reportProgress report
Progress report
 
Design of reinforced flat slabs to bs 8110 (ciria 110)
Design of reinforced flat slabs to bs 8110 (ciria 110)Design of reinforced flat slabs to bs 8110 (ciria 110)
Design of reinforced flat slabs to bs 8110 (ciria 110)
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3
 
Post Tension Services India Pvt. Ltd.
Post Tension Services India Pvt. Ltd.Post Tension Services India Pvt. Ltd.
Post Tension Services India Pvt. Ltd.
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Aci
AciAci
Aci
 
Design of multi storey building resting on single column
Design of multi storey building resting on single columnDesign of multi storey building resting on single column
Design of multi storey building resting on single column
 

Similar a Pt slab design philosophy with slides and pictures showing benefit

Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training report
Rajendra Jhurawat
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
Raghavendra Raghu
 

Similar a Pt slab design philosophy with slides and pictures showing benefit (20)

RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Formwork
FormworkFormwork
Formwork
 
Speedy construction
Speedy constructionSpeedy construction
Speedy construction
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training report
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Types of pavement construction procedure
Types of pavement construction procedureTypes of pavement construction procedure
Types of pavement construction procedure
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End Treatments
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
 
IRJET- Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET-  	  Cost Analysis of Two-Way Slab and Post Tension SlabIRJET-  	  Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET- Cost Analysis of Two-Way Slab and Post Tension Slab
 
PHC-Pile-Brochure.pdf
PHC-Pile-Brochure.pdfPHC-Pile-Brochure.pdf
PHC-Pile-Brochure.pdf
 
Composite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAOComposite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAO
 
Practical aspects of PSC.ppt
Practical aspects of PSC.pptPractical aspects of PSC.ppt
Practical aspects of PSC.ppt
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Acm assignment
Acm assignmentAcm assignment
Acm assignment
 
Final distribution presentation
Final distribution presentationFinal distribution presentation
Final distribution presentation
 
Final distribution presentation
Final distribution presentationFinal distribution presentation
Final distribution presentation
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptx
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 

Pt slab design philosophy with slides and pictures showing benefit

  • 1.
  • 2. PRESENTATION ON POST TENSIONED FLAT SLAB
  • 3. RCC > PRESTRESS? - Concrete structures were common by 1920’’s - Concretes strength in compression and lack in tension was known. In RCC reinforcement replaces tension. - Thus transformation is due to development of cracks - Visible - Not so visible - This leads to : - Loss of durability due to cracking - Substantial deformations due to loss in section properties This restricted the use to smaller spans
  • 4. HISTORY OF PRESTRESSING Initial Research and Development in Europe 1928- 1933. Pioneers : - Freyssinet - France Leonhardt - Germany Magnel - Belgium USA adopted this technology in 1949. Reason for Development : Inability to increase spans of RCC Bridges. First Bridge : - Choicy Le Ruy across Seine Paris 1935 span 40m.
  • 5. Prestressing is a tested, knowledge based Technology which has withstood TEST OF TIME. Live Technology : - Continuous State of Development. Better, Stronger and improved Materials With matching Hardware. 2000T Capacity single Systems with steel strands. 1 T Capacity Carbon Fibre systems in Rehabilitation field
  • 6. FROM BRIDGES TO PT SLABS Prestress Developed initially for long span bridges. First span was 40m. Now 1000m spans are planned using cable stay technique which has same basic principles, materials, hardware. Technology was adopted later for many long span structures like aircraft hangers. Initial developments were all in Post Tensioning. - i.e.. Concrete cast first and prestress applied later.
  • 7. Later Pre Tensioning developed. - i.e.. Concrete is cast around wires/strands already tensioned . - initially applied for standardized bridge girders. - Then to precast building slabs and precast girders. Advantages of PreTensioning -- Product uniformity factory made. -- Quick turnover with fast curing techniques. Disadvantages -- Transport, handling, multiple joints. -- Profiling limitations hence span restrictions.
  • 8. To Overcome above post tensioning of slab developed. Advantages -- Reduction in number of joints -- Mass pours -- Quick removal of shutter possible to achieve same speed
  • 9. Developed initially in USA. Being in use for last 50 years in various countries. In Asian countries like Singapore, India in use for last 35 years. In middle east last 15-18 years In Oman last 5-6 years Oman therefore is starting with -- 50 years of knowledge -- Benefits of all theoretical research and development. -- Benefits of hardware development during period.
  • 10. WHEN & WHY PT SLABS? New buildings require Large span structures, with flexible plans Unobstructed space below sofit for services Building height regulations : optimisation of storey ht Possible only if Beam less system is developed. 1) rcc flat slab 2) prestressed flat slab
  • 11. It is also possible to have prestressed slabs in normal slab and beam system, also allowing larger slab spans. Special Hardware suitable for slabs has been developed Flat Sheathings 20mm thk 45 to 70 mm wide for 12.7mm strand --Rigid --Flexible Flat Anchorages
  • 12. 12.7 mm HT Strand Flat GI Duct Flat Anchorage Grout Vent Tube
  • 13. 5 Strand Anchorage 3 Strand Anchorage
  • 15. APPLICABLE CODES Design ACI : 318 ACI : 423 For unbonded tendons CAN : A23.3 BS : 8110 Materials Prestressing strands ASTM : A416, A421 ,A776 BS : 5896
  • 16. MATERIALS USED IN PT Concrete : Minimum C30 generally C35-C40 Reinforcing steel : Based on country wise availability In Oman : 460 n/mm2 In India : 415 n/mm2 : 500 n/mm2 In Singapore : 500 n/mm2 Prestressing steel : Normal relaxation steel or grade I : braking Load ~ 1750 n/mm2 : Low relaxation steel or grade II or super grade ~ 1860 n/mm2
  • 17. Sheathing : Galvanised Iron Bright Metal HDPE (Common in bridges). Grout : Basic cement , water mixture with admixture to fill the space between sheathing and strands. Grade should be same as concrete slab
  • 18. COMPARISON OF RCC AND PRESTRESSED FLAT SLAB RCC Flat Slab 1. Cracked section under service. 2. Excessive deformations or increased thickness to control deformations, due to cracked sections. 3. Once cracked no closure of crack removal of load. 4. Heavy reinforcement leads to conjustion and concretability parameters. Prestressed Flat Slab 1. Uncracked section under service. 2. Deflections very much under limit due to : a) Prestress gives opposite initial deformations b) Gross properties reduce deflections 3. Due to positive force on section closure on removal of load. 4. No conjustion of steel.
  • 19. COMPARISON OF RCC AND PRESTRESSED FLAT SLAB RCC Flat Slab 5 Excessive shrinkage cracks. 6. Shear performance - Normal. Prestressed Flat Slab 5. Early stressing of part of cables reduce these substantially. 6. Since section is uncracked and compressed enhanced shear capacity by 30% or so.
  • 20.
  • 21. COMPARISON OF RCC & PT FLAT SLAB ON REAL PARAMETERS Take typical 9m x 9m grid Live load 4kn/m2 SDL 3 kn/m2 RCC flat slab 1. Slab thickness 300mm 2. HYSD 35 to 40 kg/m2 depending on size of dropcap 3. HTS Nil 4. Likely long term deflection 28-30mm Prestressed flat slab 1. Slab thickness 220mm 2. HYSD 8 –– 10 kg/m2 depending on dropcap 3. HTS ~ 4.5 kg/m2 4. Likely long term deflection 10-12mm
  • 22. Cost Comparison Project :Sohar Pearl Office & Apparment Buildings City Mall Alternative 1 : RCC Flat Slab Alternative 1 : RCC Flat Slab For 8.5 x 8.3M Grid For 8.5 x 8.3M Grid Slab thickness 300 MM Slab thickness 300 MM Drop Cap 4000*4000*450MM Drop Cap 4000*4000*500MM Materials Quantity Unit Price Amount Materials Quantity Unit Price Amount Concrete 25.565 36.000 920.340 Concrete 24.365 36.000 877.140 Reinforcemen 2556.5 0.380 971.470 Reinforcement 2436.5 0.380 925.870 Shuttering 71.75 5.800 416.150 Shuttering 72.15 5.800 418.470 Total RO : 2307.960 Total RO : 2221.480 Alternative 2 : Post-tensioned Slab Alternative 2 : Post-tensioned Slab For 8.5 x 8.3M Grid For 8.5 x 8.3M Grid Slab thickness 200 Slab thickness 200 MM Drop Cap 2800*2800*350 MM Drop Cap 2800*2800*350 MM Materials Quantity Unit Price Amount Materials Quantity Unit Price Amount Concrete 15.2 36.000 547.200 Concrete 15.2 36.000 547.200 Reinforcemen 634.95 0.380 241.281 Reinforcement 634.95 0.380 241.281 Shuttering 71.39 5.800 414.062 Shuttering 71.39 5.800 414.062 Post-tensionin 70.55 9.000 634.950 Post-tensionin 70.55 9.000 634.950 Total RO : 1837.493 Total RO : 1837.493 Savings 20.4% Savings 17.3%
  • 23. Direct advantage Related further advantages ••Floor to floor height reduction ••Savings on total building height 1 floor can be gained for approx. each 20 floors ••Reduction of slab thickness leads to reduced energy needs ••Savings in columns and foundations costs ••Reduced formwork costs ••Increase in column of free space ••Flexible planning ••Improvement in durability ••Improvement in slab rigidity Reduction in slab thickness DESIGN Large spans Limitation on crack widths Reduction of steel ••Easier placing and handling of reinforcement reinforcement and arrangement simplification ••Large floor area can be tackled at a time ••Reduction in overall construction time Less concrete volume per pour ••Early formwork release. ••Reduction in total construction time. ••Reduction of formworks sets. ••Improvement in constructability. –– table forms. Quick rotation of formwork CONSTRUCTION High deflection control ••Improvement in serviceability for all non-structural elements.
  • 24. CRITICAL ISSUES : AS DESIGNER  If drop cap not available : Punching shear problems. or inadequate Limitations on max. shear even with reinforcement.  RCC and PT Junctions.  Openings.  Shrinkage cracking.  Multi level propping.  Honeycombing near anchorages.  Breakage at passive anchors.
  • 25. Examples of punching shear reinforcement for flat slab
  • 26. CRITICAL ISSUES : AS CONSTRUCTOR Design of scaffolding system. When can shutter be released? Multilevel propping
  • 27. SHARING OF DESIGN RESPONSIBILITIES Globally ,PT is operated through special Agencies who have to act in cooperation with main consultant and main contractor. Necessary to DEFINE Responsibilities. Framing Plan, Column Spacing - Main RCC consultant / Architect / Owner Global Analysis including Lateral load analysis Columns, footings, RCC areas -Main Consultant Load bearing beams Additions in slab for Global effects
  • 28. SHARING OF DESIGN RESPONSIBILITIES Slab Analysis ( Vertical Loads Only)- PT Consultant Slab Drawings : PT Layout & Elevations - PT Consultant Reinforcement in slabs Overall stability of structure - Main Consultant
  • 29. Procedures /Work Methodology Step-01: Tendon &Anchorage Installation Step-02:Concreting/Casting of Slab Step-03: Stressing of Cables Step-04: Grouting of Cables
  • 30. Step -01 : Tendon & Anchorage Installation
  • 35. Project: Al Rawaq Building Client: Suhail Bahwan Holdings Consultant: Cowi & Partners LLC Project: ASSAUD Business Centra Client: Alia Properties Consultant: Triad Oman Consultants
  • 36. Project: 4 star Hotel Appartment at Al Qurum Client: Mustafa Sultan Enterprises Consultant: Al Hatmy Consultants Project: Proposed Hotel Development at Azaiba Client: Azaiba Hotel LLC Consultant: Kadri Consultants
  • 37. Project: Knowledge Oasis Muscat-04 Client: PIEI Consultant: NEO/EIDC
  • 38. Project: Comm Bldg at MBD for Badrr Shipping Client: Badrr Shipping Agencies Consultant: EIDC Project: Facility Building at KOM Client: Oasis Development SAOC/PIEI Consultant: Leeyanah Engg Consultancy
  • 39. Project: Headquarters for MOD-Pension Fund Client: MOD-Pension Fund Consultant: Gulf Engg Consultancy Project: Al Ruwad International School Client: Muscat Int School Consultant: Gulf Engg Consultancy
  • 40. Project: Muscat International Airport-PkgIII Client: Ministry of Transport& Communication Consultant: Hill International Contractor: Bechtel Enka Bahwan Consortium Project: Comm Bldg at Bausher for Sk Salem Al Areimi Client: Sk Salem Al Areimi Consultant: TRIAD Oman
  • 41. Project: Bait Al Zubair –Ph04 Client: The Zubair Corporation Consultant: Image Design/TRIAD Oman
  • 42. Project: Residential development at Ruwi Client: The Zubair Corporation Consultant: NEO Project: Residential development at Wadi Kabir Client: Sk Salem Al Areimi Consultant:TRIAD Oman
  • 43. Project: Residential Building –Dar Al Maha-01 Client: Sohar Investment & Development Consultant: EIDC Project: Comm Res Bldg for Mr Dawood Al Futaisi Client: Mr Dawood Al Futaisi Consultant: Dawood Consultancy
  • 44. Project: The Sultan centre at Azaiba Client: The Sultan centre Consultant: Cowi & Partners Project: Al Maha Beach Restautant Client: Al Rotana Hotels & Developments Consultant: EIDC
  • 45. PT Slab ready for Concreting
  • 46. PT Slab & PT Beam PT Slab Before Concreting
  • 47. Beamless Slab Soffit PT Slab with Column Heads/Drop Caps