Termite Job Calculations

(I Shouldn’t Have Slept Through Math Class)




Andrew Greess        Our Equipment. Your Success.
NPMA SW Conference
Albuquerque, NM             www.QSpray.com
January 2011
3 Warnings!




              Our Equipment. Your Success.
                             www.QSpray.com
#1 - This Subject is VERY Boring!




                      Our Equipment. Your Success.
                                     www.QSpray.com
#1 - This Subject is VERY Boring!
Fortunately, I am not above pandering & bribes!




                             Our Equipment. Your Success.
                                            www.QSpray.com
#2 - Difficult to pick a level that
works for everyone




                       Our Equipment. Your Success.
                                      www.QSpray.com
#2 - Difficult to pick a level that
works for everyone
             -Too basic, lose the very experienced folks




                             Our Equipment. Your Success.
                                             www.QSpray.com
#2 - Difficult to pick a level that
works for everyone
             -Too basic, lose the very experienced folks

             -Too advanced, lose the beginners
                who really need help




                             Our Equipment. Your Success.
                                             www.QSpray.com
#2 - Difficult to pick a level that
works for everyone
             -Too basic, lose the very experienced folks

             -Too advanced, lose the beginners
                who really need help

             Solution: Go with very basic version,
                and ask the pro’s to help



                             Our Equipment. Your Success.
                                             www.QSpray.com
#3 NM Dept of Ag - Cracking Down!
 mess up your calculations & you WILL be fined!




                             Our Equipment. Your Success.
                                            www.QSpray.com
#3 NM Dept of Ag - Cracking Down!
 mess up your calculations & you WILL be fined!
                - Graph Paper

                - Accurate drawings & measurements

                - Accurately show & describe infestations

                - Calculated gallons must = actual gallons



                                Our Equipment. Your Success.
                                               www.QSpray.com
#3 NM Dept of Ag - Cracking Down!
 mess up your calculations & you WILL be fined!
                    - Graph Paper

                    - Accurate drawings & measurements

                    - Accurately show & describe infestations

                    - Calculated gallons must = actual gallons
Make it clear & easy for NMDA to understand what you did & why

                                    Our Equipment. Your Success.
                                                   www.QSpray.com
Before We Crunch the Numbers:
    - Share experiences

    - Ask Questions

    - Examples from Jack Root


                  Our Equipment. Your Success.
                                 www.QSpray.com
Not Talking about:
  - Equipment calibration

  - Mix Rates/Tank Mixes

  - Application techniques


                        Our Equipment. Your Success.
                                       www.QSpray.com
Before you start applying termiticide,
Be Prepared:
       - Graph Paper & Pencils
       - Measuring Wheel (Univar Booth)
       - Review sales quote
       - Review mix already in tank
       - Determine additional mix rate
       - Determine construction type
       - Read Label
                                 Our Equipment. Your Success.
                                                www.QSpray.com
Some Key Numbers:
- Horizontal Barrier
   1 gallon/10 square feet
    example: floor




                        Our Equipment. Your Success.
                                       www.QSpray.com
Some Key Numbers:
- Horizontal Barrier
   1 gallon/10 square feet
     example: floor


- Vertical Barrier
   4 gallons/10 linear feet (per foot of depth)
     examples: perimeters, control cracks, protrusions,
     grade changes, bath traps, abutting slabs

         (read your label)
                                  Our Equipment. Your Success.
                                                  www.QSpray.com
Example 1 - 2000 Sq Foot House
Monolithic Slab         40’


                  50’
  Pretreat                          Final Grade




                              Our Equipment. Your Success.
                                                  www.QSpray.com
Example 1 - 2000 Sq Foot House
Monolithic Slab                        40’


                                 50’
   Pretreat                                        Final Grade

40’ x 50’ = 2000 square feet

2000 square feet = 200 gallons
      10




                                             Our Equipment. Your Success.
                                                                 www.QSpray.com
Example 1 - 2000 Sq Foot House
Monolithic Slab                        40’


                                 50’
   Pretreat                                           Final Grade

40’ x 50’ = 2000 square feet                 40’ + 50’ + 40’ + 50’ = 180 lineal feet

2000 square feet = 200 gallons               180 lineal feet = 18 x 4 = 72 gallons
      10                                            10




                                             Our Equipment. Your Success.
                                                                    www.QSpray.com
Example 1 - 2000 Sq Foot House
Monolithic Slab                           40’


                                 50’
   Pretreat                                              Final Grade

40’ x 50’ = 2000 square feet                    40’ + 50’ + 40’ + 50’ = 180 lineal feet

2000 square feet = 200 gallons                  180 lineal feet = 18 x 4 = 72 gallons
      10                                               10


                      Total = 200 + 72 = 272 gallons


                                                Our Equipment. Your Success.
                                                                       www.QSpray.com
Example 1 - 2000 Sq Foot House
Floating Slab
                      40’

                50’
  Pretreat                  Final Grade
Example 1 - 2000 Sq Foot House
  Floating Slab
                                       40’

                                50’
      Pretreat                               Final Grade

40’ x 50’ = 2000 square feet

2000 square feet = 200 gallons, PLUS
      10
Example 1 - 2000 Sq Foot House
    Floating Slab
                                                40’

                                          50’
        Pretreat                                      Final Grade

 40’ x 50’ = 2000 square feet

 2000 square feet = 200 gallons, PLUS
       10

40’ + 50’ + 40’ + 50’ = 180 lineal feet

180 lineal feet = 18 x 4 = 72 gallons
       10
Example 1 - 2000 Sq Foot House
    Floating Slab
                                                40’

                                          50’
        Pretreat                                             Final Grade

 40’ x 50’ = 2000 square feet                    40’ + 50’ + 40’ + 50’ = 180 lineal feet

 2000 square feet = 200 gallons, PLUS           180 lineal feet = 18 x 4 = 72 gallons
       10                                             10

40’ + 50’ + 40’ + 50’ = 180 lineal feet

180 lineal feet = 18 x 4 = 72 gallons
       10
Example 1 - 2000 Sq Foot House
    Floating Slab
                                                40’

                                          50’
        Pretreat                                             Final Grade

 40’ x 50’ = 2000 square feet                    40’ + 50’ + 40’ + 50’ = 180 lineal feet

 2000 square feet = 200 gallons, PLUS           180 lineal feet = 18 x 4 = 72 gallons
       10                                             10

40’ + 50’ + 40’ + 50’ = 180 lineal feet

180 lineal feet = 18 x 4 = 72 gallons
       10

                           Total = ( 200 + 72 ) + 72 = 344 gallons
Example 1- 2000 Sq Foot House

                                 40’
                      50’

Monolithic Slab                              Floating Slab

    200 gallons   Horizontal Barrier         200 gallons
      0           Interior Perimeter          72
     72           Exterior Perimeter          72

   272 gallons           Total               344 gallons



                                       Our Equipment. Your Success.
                                                           www.QSpray.com
Example 2 - 2000 Sq Foot House
Protrusions
            1’                               2’


     1’            1’                                   1’
                                  1’


           1’                               2’

  1 + 1 + 1 + 1 = 4 Lineal feet   1 + 2 + 1 + 2 = 6 lineal feet
         (bath)                            (kitchen)



                                             Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 2 - 2000 Sq Foot House
Protrusions
            1’                               2’


     1’            1’                                     1’
                                  1’


           1’                               2’

  1 + 1 + 1 + 1 = 4 Lineal feet   1 + 2 + 1 + 2 = 6 lineal feet

      4 x 4 = 1.6 gallons                  6 x 4 = 2.4 gallons
     10                                   10


                                             Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 2- 2000 Sq Foot House
                                        K = 6 lineal feet
Protrusions         K         B
                                        B = 4 lineal x 2 = 8 lineal feet
                              B
                                  40’
                        50’

  Monolithic Slab                         Floating Slab




                                    Our Equipment. Your Success.
                                                       www.QSpray.com
Example 2- 2000 Sq Foot House
                                                 K = 6 lineal feet
Protrusions         K             B
                                                 B = 4 lineal x 2 = 8 lineal feet
                                  B
                                        40’
                            50’

  Monolithic Slab                                  Floating Slab

      200 gallons       Horizontal Barrier         200 gallons




                                             Our Equipment. Your Success.
                                                                 www.QSpray.com
Example 2- 2000 Sq Foot House
                                             K = 6 lineal feet
Protrusions         K         B
                                             B = 4 lineal x 2 = 8 lineal feet
                              B
                                    40’
                        50’

  Monolithic Slab                              Floating Slab

      200 gallons   Horizontal Barrier         200 gallons
        0           Interior Perimeter          72




                                         Our Equipment. Your Success.
                                                             www.QSpray.com
Example 2- 2000 Sq Foot House
                                             K = 6 lineal feet
Protrusions         K         B
                                             B = 4 lineal x 2 = 8 lineal feet
                              B
                                   40’
                        50’

  Monolithic Slab                              Floating Slab

      200 gallons   Horizontal Barrier         200 gallons
        0           Interior Perimeter          72
       72           Exterior Perimeter          72




                                         Our Equipment. Your Success.
                                                             www.QSpray.com
Example 2- 2000 Sq Foot House
                                             K = 6 lineal feet
Protrusions         K         B
                                             B = 4 lineal x 2 = 8 lineal feet
                              B
                                   40’
                        50’

  Monolithic Slab                              Floating Slab

      200 gallons   Horizontal Barrier         200 gallons
        0           Interior Perimeter          72
       72           Exterior Perimeter          72
        2.4         Kitchen                      2.4




                                         Our Equipment. Your Success.
                                                             www.QSpray.com
Example 2- 2000 Sq Foot House
                                             K = 6 lineal feet
Protrusions         K         B
                                             B = 4 lineal x 2 = 8 lineal feet
                              B
                                   40’
                        50’

  Monolithic Slab                              Floating Slab

      200 gallons   Horizontal Barrier         200 gallons
        0           Interior Perimeter          72
       72           Exterior Perimeter          72
        2.4         Kitchen                      2.4
        3.2         2 Baths                      3.2



                                         Our Equipment. Your Success.
                                                             www.QSpray.com
Example 2- 2000 Sq Foot House
                                              K = 6 lineal feet
Protrusions          K         B
                                              B = 4 lineal x 2 = 8 lineal feet
                               B
                                    40’
                         50’

  Monolithic Slab                               Floating Slab

     200 gallons     Horizontal Barrier         200 gallons
        0            Interior Perimeter          72
       72            Exterior Perimeter          72
        2.4          Kitchen                      2.4
        3.2          2 Baths                      3.2
     277.6 gallons   Total                      349.6 gallons


                                          Our Equipment. Your Success.
                                                             www.QSpray.com
Example 3- House & Garage
Protrusions &      K         B
Control Cracks                         40’
                             B


                  50’


                                   20’

            Control Cracks
                                 20’




                                        Our Equipment. Your Success.
                                                       www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Square Footage:
                       K
                                           40’
                                 B               House 50’ x 40’ = 2000 sq. ft.
                                                 Garage 20’ x 20’ = 400 sq. ft.

                      50’


                                       20’

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Horizontal Barrier:
                       K
                                           40’
                                 B               House 50’ x 40’ = 2000 sq. ft.
                                                 Garage 20’ x 20’ = 400 sq. ft.

                      50’                        2400 sq ft = 240 gallons
                                                    10

                                       20’

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Interior Perimeter:
                       K
                                           40’
                                 B               House 40 + 40 + 50 + 30 = 160
                                                 Garage 20 + 20 + 20 = 60

                      50’                        220 ft x 4 = 88 gallons
                                                  10

                                       20’

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Interior Perimeter:
                       K
                                           40’
                                 B               House 40 + 40 + 50 + 30 = 160
                                                 Garage 20 + 20 + 20 = 60

                      50’                        220 ft x 4 = 88 gallons
                                                  10

                                       20’       Exterior Perimeter = 88 Gallons
                                                 (final grade)
                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Penetrations:
                       K
                                           40’
                                 B               Kitchen 2 + 2 + 1 + 1 = 6
                                                 Bath 1 + 1 + 1 + 1 = 4 x 2 =8

                      50’                        14 ft x 4 = 5.6 gallons
                                                 10

                                       20’

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                  www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Control Cracks:
                       K
                                           40’
                                 B               House 40 lineal feet
                                                 Garage 20 lineal feet

                      50’                        40 + 20 ft x 4 = 24 gallons
                                                    10

                                       20’

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                   www.QSpray.com
Example 3- House & Garage
Floating Slab                    B               Recap:
                       K
                                           40’
                                 B               Horizontal Barrier   240 gallons
                                                 Interior Perimeter    88
                                                 Exterior Perimeter    88
                      50’                        Plumbing               5.6
                                                 Control Cracks        24

                                       20’       Total:               445.6 gal

                Control Cracks
                                     20’




                                            Our Equipment. Your Success.
                                                                 www.QSpray.com
Example 4 - Geometric Shapes

-Not every house is a perfect square

- We need to calculate areas & perimeters




                       Our Equipment. Your Success.
                                      www.QSpray.com
Example 4 - Geometric Shapes
           Area = L x W
W
           Perimeter = L + L + W + W


    L




                             Our Equipment. Your Success.
                                            www.QSpray.com
Example 4 - Geometric Shapes


     Area = 3.14 x r x r   (π * r2)
r
     Circumference – 3.14 x r x 2 (π * d)




                                 Our Equipment. Your Success.
                                                www.QSpray.com
Example 4 - Geometric Shapes




     Area = ½ B x H

H    Perimeter = S1 + S2 + S3


B                           Our Equipment. Your Success.
                                           www.QSpray.com
Example 4 - Geometric Shapes
                      T       Area = (T + B)/2 x H

          S   H               Perimeter = S + S + T + B


                  B




                      Our Equipment. Your Success.
                                       www.QSpray.com
Example 4 - Geometric Shapes
                                  T   Area = (T + B)/2 x H

                          S   H       Perimeter = S + S + T + B
                                  B


Trapezoid

Rectangle + 2 triangles
Example 4 - Geometric Shapes



                        Area = (A x B) x 3.14
                A
            B
                        Circumference – calculus

                        (fuggedaboutit)




                Our Equipment. Your Success.
                                 www.QSpray.com
Example 4 - Geometric Shapes




               Our Equipment. Your Success.
                              www.QSpray.com
Example 4 - Geometric Shapes




Break complex shapes down
into smaller, bite-size chunks!

                                  Our Equipment. Your Success.
                                                 www.QSpray.com
Example 5 - Sloping Grade
                                                   5’ depth to footer
3’ depth to footer



                              .



                     30 lineal feet




                                      Our Equipment. Your Success.
                                                     www.QSpray.com
Example 5 - Sloping Grade
                                                                  5’ depth to footer
3’ depth to footer



                                              .



                                    30 lineal feet


   Average depth to footer = High end + Low end/2

   (3’ + 5’)/2 = 4’ average depth to footer

                                                     Our Equipment. Your Success.
                                                                    www.QSpray.com
Example 5 - Sloping Grade
                                                                     5’ depth to footer
3’ depth to footer



                                            .



                                   30 lineal feet
   4’ average depth to footer


   30 lineal feet x 4 = 12 gallons x 4’ average depth = 48 gallons
          10
                                                    Our Equipment. Your Success.
                                                                       www.QSpray.com
Example 5 - Sloping Grade
                                                                    5’ depth to footer
3’ depth to footer


                     Course aggregates may also require more termiticide
                                             .



                                      30 lineal feet




                                                       Our Equipment. Your Success.
                                                                      www.QSpray.com
Remember, Preparation is Key
 - Graph Paper & Pencils
 - Measuring Wheel
 - Review sales quote
 - Cheat Sheets
 - Know construction style, label
 - Ask for Help (no guessing)



                                    Our Equipment. Your Success.
                                                   www.QSpray.com
More Info on Spray Equipment:
Cheat Sheets: www.Qspray.com/termites
Pest Management Magazine articles
 www.SprayEquipmentBlog.com
 follow on Twitter & FB: Andrew Greess
 Contact: info @ qspray.com or (800) 675-7485
Call us when you need sprayers/parts/advice

                          Our Equipment. Your Success.
                                          www.QSpray.com
It is now safe to wake up!




                Our Equipment. Your Success.
                               www.QSpray.com

Más contenido relacionado

La actualidad más candente

MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptxMAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
LukeOxford2
 
Plant pathology by muhammad asif pak
Plant pathology by muhammad asif pakPlant pathology by muhammad asif pak
Plant pathology by muhammad asif pak
Muhmmad Asif
 
Minggu V Vii
Minggu V ViiMinggu V Vii
Minggu V Vii
sudiono
 
Principles of Weed Management
Principles of Weed ManagementPrinciples of Weed Management
Principles of Weed Management
Sean Bush
 

La actualidad más candente (20)

Chemical approach for weed management in kharif crops
Chemical approach for weed management in kharif crops Chemical approach for weed management in kharif crops
Chemical approach for weed management in kharif crops
 
Importance of mushroom cultivation A Lecture By Mr Allah Dad Khan Former DG...
Importance of mushroom cultivation   A Lecture By Mr Allah Dad Khan Former DG...Importance of mushroom cultivation   A Lecture By Mr Allah Dad Khan Former DG...
Importance of mushroom cultivation A Lecture By Mr Allah Dad Khan Former DG...
 
Introduction to ipm
Introduction to ipmIntroduction to ipm
Introduction to ipm
 
MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptxMAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
MAJOR CROPS OF THE PHILIPPINES AND THEIR GEOGRAPHIC.pptx
 
Pest risk analysis
Pest risk analysisPest risk analysis
Pest risk analysis
 
Plant pathology by muhammad asif pak
Plant pathology by muhammad asif pakPlant pathology by muhammad asif pak
Plant pathology by muhammad asif pak
 
Minggu V Vii
Minggu V ViiMinggu V Vii
Minggu V Vii
 
Bagrada Bug Integrated Pest Management
Bagrada Bug Integrated Pest ManagementBagrada Bug Integrated Pest Management
Bagrada Bug Integrated Pest Management
 
Integrated disease management (IDM)
Integrated disease management (IDM)Integrated disease management (IDM)
Integrated disease management (IDM)
 
Production technology of Palmorosa
Production technology of PalmorosaProduction technology of Palmorosa
Production technology of Palmorosa
 
Tree Fruits: Organic Production
Tree Fruits: Organic Production Tree Fruits: Organic Production
Tree Fruits: Organic Production
 
Rubber Tree Cultivation and Improvement in Malaysia: Anatomical and Morpholog...
Rubber Tree Cultivation and Improvement in Malaysia: Anatomical and Morpholog...Rubber Tree Cultivation and Improvement in Malaysia: Anatomical and Morpholog...
Rubber Tree Cultivation and Improvement in Malaysia: Anatomical and Morpholog...
 
CRP002 - IPM.pdf
CRP002 - IPM.pdfCRP002 - IPM.pdf
CRP002 - IPM.pdf
 
chili
chilichili
chili
 
Vegetable Production under Changing Climate Scenario; Gardening Guidebook
Vegetable Production under Changing Climate Scenario; Gardening Guidebook Vegetable Production under Changing Climate Scenario; Gardening Guidebook
Vegetable Production under Changing Climate Scenario; Gardening Guidebook
 
carrot.pptx
carrot.pptxcarrot.pptx
carrot.pptx
 
Selecting and Planting Fruit and Nut Trees
Selecting and Planting Fruit and Nut TreesSelecting and Planting Fruit and Nut Trees
Selecting and Planting Fruit and Nut Trees
 
Diseases of Mango
Diseases of MangoDiseases of Mango
Diseases of Mango
 
Production technology of stevia
Production technology of steviaProduction technology of stevia
Production technology of stevia
 
Principles of Weed Management
Principles of Weed ManagementPrinciples of Weed Management
Principles of Weed Management
 

Más de Quality Equipment & Spray

Weed Sprayers - You're Not Going to Believe This
Weed Sprayers - You're Not Going to Believe ThisWeed Sprayers - You're Not Going to Believe This
Weed Sprayers - You're Not Going to Believe This
Quality Equipment & Spray
 

Más de Quality Equipment & Spray (15)

Learn The Top 10 Avoidable Spray Equipment Problems from Spray Equipment Expe...
Learn The Top 10 Avoidable Spray Equipment Problems from Spray Equipment Expe...Learn The Top 10 Avoidable Spray Equipment Problems from Spray Equipment Expe...
Learn The Top 10 Avoidable Spray Equipment Problems from Spray Equipment Expe...
 
Spray Equipment Safety Seminar By Andrew Greess
Spray Equipment Safety Seminar By Andrew GreessSpray Equipment Safety Seminar By Andrew Greess
Spray Equipment Safety Seminar By Andrew Greess
 
Termite control tools equipment strategy
Termite control tools equipment strategyTermite control tools equipment strategy
Termite control tools equipment strategy
 
Backpacks sprayers selection use maintenance calibration
Backpacks sprayers selection use maintenance calibrationBackpacks sprayers selection use maintenance calibration
Backpacks sprayers selection use maintenance calibration
 
Spray equipment safety protect yourself
Spray equipment safety protect yourselfSpray equipment safety protect yourself
Spray equipment safety protect yourself
 
Spray Equipment Safety Presentation
Spray Equipment Safety PresentationSpray Equipment Safety Presentation
Spray Equipment Safety Presentation
 
Spray Equipment Safety
Spray Equipment SafetySpray Equipment Safety
Spray Equipment Safety
 
Spray equipment calibration pest & weed
Spray equipment calibration pest & weedSpray equipment calibration pest & weed
Spray equipment calibration pest & weed
 
Weed Sprayers - You're Not Going to Believe This
Weed Sprayers - You're Not Going to Believe ThisWeed Sprayers - You're Not Going to Believe This
Weed Sprayers - You're Not Going to Believe This
 
Landscape & Weed Sprayers = Boost Productivity
Landscape & Weed Sprayers = Boost ProductivityLandscape & Weed Sprayers = Boost Productivity
Landscape & Weed Sprayers = Boost Productivity
 
Pest Control Equipment Safety
Pest Control Equipment SafetyPest Control Equipment Safety
Pest Control Equipment Safety
 
IPM Professional Tool Belt
IPM Professional Tool BeltIPM Professional Tool Belt
IPM Professional Tool Belt
 
Herbicide Sprayer - Design Considerations
Herbicide Sprayer - Design ConsiderationsHerbicide Sprayer - Design Considerations
Herbicide Sprayer - Design Considerations
 
Spray Equipment - Pre-Flight Check list
Spray Equipment - Pre-Flight Check listSpray Equipment - Pre-Flight Check list
Spray Equipment - Pre-Flight Check list
 
Backpack Sprayers - Use, Maintenance & Calibration
Backpack Sprayers - Use, Maintenance & CalibrationBackpack Sprayers - Use, Maintenance & Calibration
Backpack Sprayers - Use, Maintenance & Calibration
 

Último

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Último (20)

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Termite job calculations

  • 1. Termite Job Calculations (I Shouldn’t Have Slept Through Math Class) Andrew Greess Our Equipment. Your Success. NPMA SW Conference Albuquerque, NM www.QSpray.com January 2011
  • 2. 3 Warnings! Our Equipment. Your Success. www.QSpray.com
  • 3. #1 - This Subject is VERY Boring! Our Equipment. Your Success. www.QSpray.com
  • 4. #1 - This Subject is VERY Boring! Fortunately, I am not above pandering & bribes! Our Equipment. Your Success. www.QSpray.com
  • 5. #2 - Difficult to pick a level that works for everyone Our Equipment. Your Success. www.QSpray.com
  • 6. #2 - Difficult to pick a level that works for everyone -Too basic, lose the very experienced folks Our Equipment. Your Success. www.QSpray.com
  • 7. #2 - Difficult to pick a level that works for everyone -Too basic, lose the very experienced folks -Too advanced, lose the beginners who really need help Our Equipment. Your Success. www.QSpray.com
  • 8. #2 - Difficult to pick a level that works for everyone -Too basic, lose the very experienced folks -Too advanced, lose the beginners who really need help Solution: Go with very basic version, and ask the pro’s to help Our Equipment. Your Success. www.QSpray.com
  • 9. #3 NM Dept of Ag - Cracking Down! mess up your calculations & you WILL be fined! Our Equipment. Your Success. www.QSpray.com
  • 10. #3 NM Dept of Ag - Cracking Down! mess up your calculations & you WILL be fined! - Graph Paper - Accurate drawings & measurements - Accurately show & describe infestations - Calculated gallons must = actual gallons Our Equipment. Your Success. www.QSpray.com
  • 11. #3 NM Dept of Ag - Cracking Down! mess up your calculations & you WILL be fined! - Graph Paper - Accurate drawings & measurements - Accurately show & describe infestations - Calculated gallons must = actual gallons Make it clear & easy for NMDA to understand what you did & why Our Equipment. Your Success. www.QSpray.com
  • 12. Before We Crunch the Numbers: - Share experiences - Ask Questions - Examples from Jack Root Our Equipment. Your Success. www.QSpray.com
  • 13. Not Talking about: - Equipment calibration - Mix Rates/Tank Mixes - Application techniques Our Equipment. Your Success. www.QSpray.com
  • 14. Before you start applying termiticide, Be Prepared: - Graph Paper & Pencils - Measuring Wheel (Univar Booth) - Review sales quote - Review mix already in tank - Determine additional mix rate - Determine construction type - Read Label Our Equipment. Your Success. www.QSpray.com
  • 15. Some Key Numbers: - Horizontal Barrier 1 gallon/10 square feet example: floor Our Equipment. Your Success. www.QSpray.com
  • 16. Some Key Numbers: - Horizontal Barrier 1 gallon/10 square feet example: floor - Vertical Barrier 4 gallons/10 linear feet (per foot of depth) examples: perimeters, control cracks, protrusions, grade changes, bath traps, abutting slabs (read your label) Our Equipment. Your Success. www.QSpray.com
  • 17. Example 1 - 2000 Sq Foot House Monolithic Slab 40’ 50’ Pretreat Final Grade Our Equipment. Your Success. www.QSpray.com
  • 18. Example 1 - 2000 Sq Foot House Monolithic Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 2000 square feet = 200 gallons 10 Our Equipment. Your Success. www.QSpray.com
  • 19. Example 1 - 2000 Sq Foot House Monolithic Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 40’ + 50’ + 40’ + 50’ = 180 lineal feet 2000 square feet = 200 gallons 180 lineal feet = 18 x 4 = 72 gallons 10 10 Our Equipment. Your Success. www.QSpray.com
  • 20. Example 1 - 2000 Sq Foot House Monolithic Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 40’ + 50’ + 40’ + 50’ = 180 lineal feet 2000 square feet = 200 gallons 180 lineal feet = 18 x 4 = 72 gallons 10 10 Total = 200 + 72 = 272 gallons Our Equipment. Your Success. www.QSpray.com
  • 21. Example 1 - 2000 Sq Foot House Floating Slab 40’ 50’ Pretreat Final Grade
  • 22. Example 1 - 2000 Sq Foot House Floating Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 2000 square feet = 200 gallons, PLUS 10
  • 23. Example 1 - 2000 Sq Foot House Floating Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 2000 square feet = 200 gallons, PLUS 10 40’ + 50’ + 40’ + 50’ = 180 lineal feet 180 lineal feet = 18 x 4 = 72 gallons 10
  • 24. Example 1 - 2000 Sq Foot House Floating Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 40’ + 50’ + 40’ + 50’ = 180 lineal feet 2000 square feet = 200 gallons, PLUS 180 lineal feet = 18 x 4 = 72 gallons 10 10 40’ + 50’ + 40’ + 50’ = 180 lineal feet 180 lineal feet = 18 x 4 = 72 gallons 10
  • 25. Example 1 - 2000 Sq Foot House Floating Slab 40’ 50’ Pretreat Final Grade 40’ x 50’ = 2000 square feet 40’ + 50’ + 40’ + 50’ = 180 lineal feet 2000 square feet = 200 gallons, PLUS 180 lineal feet = 18 x 4 = 72 gallons 10 10 40’ + 50’ + 40’ + 50’ = 180 lineal feet 180 lineal feet = 18 x 4 = 72 gallons 10 Total = ( 200 + 72 ) + 72 = 344 gallons
  • 26. Example 1- 2000 Sq Foot House 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 72 Exterior Perimeter 72 272 gallons Total 344 gallons Our Equipment. Your Success. www.QSpray.com
  • 27. Example 2 - 2000 Sq Foot House Protrusions 1’ 2’ 1’ 1’ 1’ 1’ 1’ 2’ 1 + 1 + 1 + 1 = 4 Lineal feet 1 + 2 + 1 + 2 = 6 lineal feet (bath) (kitchen) Our Equipment. Your Success. www.QSpray.com
  • 28. Example 2 - 2000 Sq Foot House Protrusions 1’ 2’ 1’ 1’ 1’ 1’ 1’ 2’ 1 + 1 + 1 + 1 = 4 Lineal feet 1 + 2 + 1 + 2 = 6 lineal feet 4 x 4 = 1.6 gallons 6 x 4 = 2.4 gallons 10 10 Our Equipment. Your Success. www.QSpray.com
  • 29. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab Our Equipment. Your Success. www.QSpray.com
  • 30. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons Our Equipment. Your Success. www.QSpray.com
  • 31. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 Our Equipment. Your Success. www.QSpray.com
  • 32. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 72 Exterior Perimeter 72 Our Equipment. Your Success. www.QSpray.com
  • 33. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 72 Exterior Perimeter 72 2.4 Kitchen 2.4 Our Equipment. Your Success. www.QSpray.com
  • 34. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 72 Exterior Perimeter 72 2.4 Kitchen 2.4 3.2 2 Baths 3.2 Our Equipment. Your Success. www.QSpray.com
  • 35. Example 2- 2000 Sq Foot House K = 6 lineal feet Protrusions K B B = 4 lineal x 2 = 8 lineal feet B 40’ 50’ Monolithic Slab Floating Slab 200 gallons Horizontal Barrier 200 gallons 0 Interior Perimeter 72 72 Exterior Perimeter 72 2.4 Kitchen 2.4 3.2 2 Baths 3.2 277.6 gallons Total 349.6 gallons Our Equipment. Your Success. www.QSpray.com
  • 36. Example 3- House & Garage Protrusions & K B Control Cracks 40’ B 50’ 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 37. Example 3- House & Garage Floating Slab B Square Footage: K 40’ B House 50’ x 40’ = 2000 sq. ft. Garage 20’ x 20’ = 400 sq. ft. 50’ 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 38. Example 3- House & Garage Floating Slab B Horizontal Barrier: K 40’ B House 50’ x 40’ = 2000 sq. ft. Garage 20’ x 20’ = 400 sq. ft. 50’ 2400 sq ft = 240 gallons 10 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 39. Example 3- House & Garage Floating Slab B Interior Perimeter: K 40’ B House 40 + 40 + 50 + 30 = 160 Garage 20 + 20 + 20 = 60 50’ 220 ft x 4 = 88 gallons 10 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 40. Example 3- House & Garage Floating Slab B Interior Perimeter: K 40’ B House 40 + 40 + 50 + 30 = 160 Garage 20 + 20 + 20 = 60 50’ 220 ft x 4 = 88 gallons 10 20’ Exterior Perimeter = 88 Gallons (final grade) Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 41. Example 3- House & Garage Floating Slab B Penetrations: K 40’ B Kitchen 2 + 2 + 1 + 1 = 6 Bath 1 + 1 + 1 + 1 = 4 x 2 =8 50’ 14 ft x 4 = 5.6 gallons 10 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 42. Example 3- House & Garage Floating Slab B Control Cracks: K 40’ B House 40 lineal feet Garage 20 lineal feet 50’ 40 + 20 ft x 4 = 24 gallons 10 20’ Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 43. Example 3- House & Garage Floating Slab B Recap: K 40’ B Horizontal Barrier 240 gallons Interior Perimeter 88 Exterior Perimeter 88 50’ Plumbing 5.6 Control Cracks 24 20’ Total: 445.6 gal Control Cracks 20’ Our Equipment. Your Success. www.QSpray.com
  • 44. Example 4 - Geometric Shapes -Not every house is a perfect square - We need to calculate areas & perimeters Our Equipment. Your Success. www.QSpray.com
  • 45. Example 4 - Geometric Shapes Area = L x W W Perimeter = L + L + W + W L Our Equipment. Your Success. www.QSpray.com
  • 46. Example 4 - Geometric Shapes Area = 3.14 x r x r (π * r2) r Circumference – 3.14 x r x 2 (π * d) Our Equipment. Your Success. www.QSpray.com
  • 47. Example 4 - Geometric Shapes Area = ½ B x H H Perimeter = S1 + S2 + S3 B Our Equipment. Your Success. www.QSpray.com
  • 48. Example 4 - Geometric Shapes T Area = (T + B)/2 x H S H Perimeter = S + S + T + B B Our Equipment. Your Success. www.QSpray.com
  • 49. Example 4 - Geometric Shapes T Area = (T + B)/2 x H S H Perimeter = S + S + T + B B Trapezoid Rectangle + 2 triangles
  • 50. Example 4 - Geometric Shapes Area = (A x B) x 3.14 A B Circumference – calculus (fuggedaboutit) Our Equipment. Your Success. www.QSpray.com
  • 51. Example 4 - Geometric Shapes Our Equipment. Your Success. www.QSpray.com
  • 52. Example 4 - Geometric Shapes Break complex shapes down into smaller, bite-size chunks! Our Equipment. Your Success. www.QSpray.com
  • 53. Example 5 - Sloping Grade 5’ depth to footer 3’ depth to footer . 30 lineal feet Our Equipment. Your Success. www.QSpray.com
  • 54. Example 5 - Sloping Grade 5’ depth to footer 3’ depth to footer . 30 lineal feet Average depth to footer = High end + Low end/2 (3’ + 5’)/2 = 4’ average depth to footer Our Equipment. Your Success. www.QSpray.com
  • 55. Example 5 - Sloping Grade 5’ depth to footer 3’ depth to footer . 30 lineal feet 4’ average depth to footer 30 lineal feet x 4 = 12 gallons x 4’ average depth = 48 gallons 10 Our Equipment. Your Success. www.QSpray.com
  • 56. Example 5 - Sloping Grade 5’ depth to footer 3’ depth to footer Course aggregates may also require more termiticide . 30 lineal feet Our Equipment. Your Success. www.QSpray.com
  • 57. Remember, Preparation is Key - Graph Paper & Pencils - Measuring Wheel - Review sales quote - Cheat Sheets - Know construction style, label - Ask for Help (no guessing) Our Equipment. Your Success. www.QSpray.com
  • 58. More Info on Spray Equipment: Cheat Sheets: www.Qspray.com/termites Pest Management Magazine articles  www.SprayEquipmentBlog.com  follow on Twitter & FB: Andrew Greess  Contact: info @ qspray.com or (800) 675-7485 Call us when you need sprayers/parts/advice Our Equipment. Your Success. www.QSpray.com
  • 59. It is now safe to wake up! Our Equipment. Your Success. www.QSpray.com