SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
Increasetheawarenessandknowledgeofthecoiledtubingoperations
andfactorswhichaffectitsperformance
Petrosync Distinguished Instructor
CoiledTubingTechnologyCoiledTubingTechnology
Improveyour
techniquesand
learnfromthe
Expert!
Magdi Taha El Naggar
Managing Director
Oil Fields Global Consultants (OFGC)
Over 39 years dedicated outstanding service in oil and gas field with excellent HSE record
Officially certified & registered as Professional Petroleum Engineering Consultant (License
116/7)
Extensice training capabilities, currently joint venturing with several major professional
international training institutes and conduting several training at Singapore, Malaysia,
Vietnam, Indonesia, Egypt etc
5-9October2015,KualaLumpur,Malaysia
UNDERSTAND the fundamentals & concept of the coiled tubing unit
INCREASE the awareness and knowledge of the coiled tubing operations and factors which affect its performance.
LEARN an overview of coiled tubing operational techniques, technologies and equipment.
UNDERSTAND alternate deployment scenarios and multisensory applications for surveillance and optimization.
POSSESS the basic skills required to select and implement the various coiled tubing techniques as per operational
requirements.
ABLE to handle various coiled tubing emergency situations, plan its operations, monitor and analyze its performance.
LEARN strategies and best practices for field the coiled tubing operation optimization
Course Objectives
Specially Designed for
This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following
roles:
FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your
specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house
budget!
If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com
HYBRID TRAINING SOLUTIONS
Drilling Managers
Drilling Supervisors
Drilling Superintendents
Senior Drillers
Drilling Engineers
Operation Engineers
Project Engineers
Well Engineer
Production Engineer
Supported by
This course is designed to introduce an overview of the coiled tubing operations concept and its applications in oil fields. It
introduces variety of coiled tubing technologies with special attention on the unit as surface equipment and downhole tools.
Moreover, the course covers the main components, application envelope and the coiled tubing special applications and contingency
plan for all possible situations, which could be encountered throughout various operations.
Petrosync Distinguished Instructor
Course Overview
COILED TUBING TECHNOLOGY
5-9 October 2015, Kuala Lumpur, Malaysia
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This
excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred
locationandtime. Wewillmeetyouanywherearoundtheglobe.
Ifyouliketoknowmoreaboutthisexcellentprogram,pleasecontactuson+6564154502oremailgeneral@petrosync.com
IN-HOUSE SOLUTIONS
CLIENTLISTINCLUDES:
Murphy
Petrofac
Talisman
Sapura
Schlumberger
Total
UMW
Iraq Oil Company
OXY
Gulf of Suez Oil Company
Badredine Oil Company
WEPCO
OGS
Apex Dubai
GlobalPetroSolutions
Magdi is an independent consultant having more than 39 years of experience in Petroleum industry. He has
extensive experience in IWCF and IADC certification. He also has extensive professional experience in various
phase of petroleum, reservoir, production, drilling & workover engineering and field operations with several
multinational companies including ARAMCO (Saudi Arabia) and ADCO (UAE). Magdi is experienced
professional in all phases of well intervention operations utilizing coiled tubing and well emergency cases,
well control as well as extended reach operations. He also has experience in conducting training with several
major professional international training institutes at Singapore, Malaysia, Vietnam, Indonesia, China, Egypt,
Oman and so on. In additional, he has the extensive experience in full field development studies, reservoir
studies, production enhancement for oil fields as well as various types of wells.
Magdi Taha El Naggar
Managing Director
Oil Fields Global Consultants (OFGC)
Module (4) CoiledTubing Unit
Introduction
Coiled tubing description
Coiled tubing equipment design
Coiled tubing applications
Coiled tubing advantages
Coiled tubing disadvantages
Module (5) CoiledTubing Surface Equipment
Depth meter
Goose neck
Injector head
Coiled tubing reel
Prime movers
Power Pack
Stripper (conventional, side door)
BOP
Module (1)Well CompletionTypes
Definition of well completion
Well completion Classification
X-masTree
Wellhead
Casings
Liners
ProductionTubing String
Packers
Sub-Surface Control System (SC-SSSVs)
Wellhead Control System
Artificial lift completions (ESP, GL)
Smart Completions
Impact of well completion selection on future operations in
the well
COILED TUBING TECHNOLOGY
5-9 October 2015, Kuala Lumpur, Malaysia
Course Agenda
Day One - 5 October 2015
PROGRAM SCHEDULE
Registration (Day 1)
Session I
Refreshment & Networking Session I
Session II
Lunch
Session III
Refreshment & Networking Session II
Session IV
End of Day
08:00 - 09:00
09:00 - 11:00
11:00 - 11:15
11:15 - 13:00
13:00 - 14:00
14:00 - 15:30
15:30 - 15:45
15:45 - 17:00
Module (3)Well Intervention Operations
Conventional:
CoiledTubing Operations
Well kick-off operations
Stimulation
Scale Removal
Cement Squeeze
Fishing Operations
Well killing & securing for well routine maintenance
operations
Wireline (Slick, E-line)
Snubbing operations
WellTesting (PTS, MPFM)
Non-Conventional:
Well Control
Emergency
Impact of well completion and well intervention operations
Day Two - 6 October 2015
Module (2)Well Completion Operations
Definition of well completion concept
Perforation
Types
Guns
Bullets
Phasing
TCP
Stimulation operation
Basics and concept
Candidates selection
Reservoir lithology & impact on stimulation
methodology
Hydraulic Fracturing
ExerciseandCaseStudiesProvided
Module (6)Surface Equipment Handling &Testing Procedures
Depth meter
Injector head
Reel
Power pack
Control cabin
Pressure control equipment
BOP
Stripper (conventional, side door)
RTMS
Auxiliary surface equipment
ExerciseandCaseStudiesProvided
Day Three - 7 October 2015
COILED TUBING TECHNOLOGY
5-9 October 2015, Kuala Lumpur, Malaysia
Module (7) CoiledTubing DownholeTools
Standard threads
Grapper connectors
Connectors
Check valves
Nozzles & Jetting subs
Swivel joint
Release joints
PRV
Centralizers
Accelerators
Jars
Overshots
Module (8) Pre-Job Safety Procedures
General requirements
General HSE aspects
PTW
TBM
Coiled tubing well control drill
Module (9) High Pressure CoiledTubing
Module (10) CoiledTubing Applications
Matrix treatment
Logging operations (open hole, Cased hole)
Drilling contingencies
Squeeze cement
Day Four - 8 October 2015
Under reaming/milling
Inflatable packers and bridge plugs
Coiled tubing drilling
Coiled tubing completion
Well Kick-off
Fill Cleaning
Scale removal
Well control/killing
Excessive water/gas shut-off
Fishing operations
P & A
Artificial lift
Module (11) CoiledTubing Operation Procedures
Pre-Job requirements
Scaffolding
Pre-job equipment requirements
Coiled tubing rigging-up & function testing
Treating line rigging-up &testing
General running procedures
Operational procedures:
Well Control/Killing
Well Kick-off
Nitrogen properties & uses
Fill cleaning
Scale removal
Excessive water/gas shut-off
P & A
Well stimulation
Production logging pressure deployment procedures
Fishing operations
Rigging down and HSE requirements
Coiled tubing stability during mobilization
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all
delegates.
Certificate of Attendance
You will receive a Certificate of Attendance bearing the signatures of the Trainer upon
successful completion of the course. This certificate is proof of your continuing
professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and
practical experience through interactive sessions. This will provide you with a deeper
and more long-term understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course
and will be an invaluable source of reference for you and your colleagues afterward.
Petrosync Quality
Day Five - 9 October 2015
COILED TUBING TECHNOLOGY
5-9 October 2015, Kuala Lumpur, Malaysia
Module(12)CoiledTubingTechnicalData
Definitions
Coiledtubingoperatinglimits
Burstpressure
Collapsepressure
Coiledtubingovality
Fatigueandcorrosion
Stressandstrain
Forcesaffectingthecoiledtubingperformance
Buckling
Depthcorrectionandstuckpointcalculations
Helicallock-up
Catastrophicbuckling
Coiledtubingsizes,volumesanddisplacementvolumes
Coiledtubingcomponents(Dims&Wts)
Coiledtubingspeedlimits
Commonnipplesandlocksystemdata
Coiledtubingpressuredropcurves
Module (13) CoiledTubing Contingency Procedures
Module (14) CoiledTubing OperationalTroubleshooting & case History
Module (15) CoiledTubing Maintenance
Group Discount is based on Standard Price
* For 7 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
DELEGATESDETAILS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
By Direct Transfer : Please quote invoice number(s) on remittance advice
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Authorized Signature : ____________________________________________________________________________
Mrs Ms Dr OthersMr
DETAILS
PROGRAMMECONSULTANT
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
INVESTMENT PACKAGES
CourseDetails
AMEX
TERMSANDCONDITIONS
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea
bank charges.
- For credit card payment, there is additional
4% credit card processsing fee.
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
Confirmation
InvestmentPackage FULLMASTERCLASS
5-9 OCTOBER 2015
Standard Price 5OCT2015 SGD$ 5,995
Group Discount
(3 or more Delegates)
Early Bird Offer
Deadline
5OCT2015
4SEPT2015 SGD$ 5,795
Title : Coiled Tubing Technology
Date : 5-9 October 2015
Location : Kuala Lumpur, Malaysia
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
SGD$ 5,695
PetroSync Global Pte Ltd Bank details:
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 2889018980 • USD : 0288002682016
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd eceives the full invoiced amount.
CERTIFICATEOFATTENDANCE
70% attendance is required for PetroSync’s Certificate of Attendance

Más contenido relacionado

La actualidad más candente

LSES eBrochure
LSES eBrochureLSES eBrochure
LSES eBrochureAlex Itty
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design petroEDGE
 
Qualitas Laboratory
Qualitas LaboratoryQualitas Laboratory
Qualitas LaboratoryVivin Vijay
 
Vertech Mining & Minerals Capability Statement
Vertech Mining & Minerals Capability StatementVertech Mining & Minerals Capability Statement
Vertech Mining & Minerals Capability StatementOwen Johnstone
 
Corrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRCorrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRAndrea Fernandes
 
PetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync
 
Sorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSerena Fu
 
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...Michael Siswaraharja
 
Sourcing_QCP_HOT Mining质量管理
Sourcing_QCP_HOT Mining质量管理Sourcing_QCP_HOT Mining质量管理
Sourcing_QCP_HOT Mining质量管理Lolita Liao
 
CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015hsechouhan
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenanceLawrence Kwende
 
Global Energy Group Capability Profile
Global Energy Group Capability ProfileGlobal Energy Group Capability Profile
Global Energy Group Capability Profileandrewmatheson
 
9th offshore lng brochure
9th offshore lng brochure9th offshore lng brochure
9th offshore lng brochureAsia IQPC
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
UGL Corporate presentation
UGL Corporate presentationUGL Corporate presentation
UGL Corporate presentationSatyendra_parmar
 
Leenz feature article nov 11
Leenz feature article nov 11Leenz feature article nov 11
Leenz feature article nov 11chasnz12
 
Rakesh Singh, Snr. HSE Proffessional, Resume
Rakesh Singh, Snr. HSE Proffessional, ResumeRakesh Singh, Snr. HSE Proffessional, Resume
Rakesh Singh, Snr. HSE Proffessional, Resumetiger318
 

La actualidad más candente (20)

LSES eBrochure
LSES eBrochureLSES eBrochure
LSES eBrochure
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design
 
Level 1 Certificate
Level 1 CertificateLevel 1 Certificate
Level 1 Certificate
 
Qualitas Laboratory
Qualitas LaboratoryQualitas Laboratory
Qualitas Laboratory
 
Vertech Mining & Minerals Capability Statement
Vertech Mining & Minerals Capability StatementVertech Mining & Minerals Capability Statement
Vertech Mining & Minerals Capability Statement
 
Corrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRCorrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LR
 
PetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector course
 
Sorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSorucing_QCP_HOT Mining
Sorucing_QCP_HOT Mining
 
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
 
Sourcing_QCP_HOT Mining质量管理
Sourcing_QCP_HOT Mining质量管理Sourcing_QCP_HOT Mining质量管理
Sourcing_QCP_HOT Mining质量管理
 
ACD, Mia
ACD, MiaACD, Mia
ACD, Mia
 
CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenance
 
Global Energy Group Capability Profile
Global Energy Group Capability ProfileGlobal Energy Group Capability Profile
Global Energy Group Capability Profile
 
Chemical Engineer
Chemical EngineerChemical Engineer
Chemical Engineer
 
9th offshore lng brochure
9th offshore lng brochure9th offshore lng brochure
9th offshore lng brochure
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
UGL Corporate presentation
UGL Corporate presentationUGL Corporate presentation
UGL Corporate presentation
 
Leenz feature article nov 11
Leenz feature article nov 11Leenz feature article nov 11
Leenz feature article nov 11
 
Rakesh Singh, Snr. HSE Proffessional, Resume
Rakesh Singh, Snr. HSE Proffessional, ResumeRakesh Singh, Snr. HSE Proffessional, Resume
Rakesh Singh, Snr. HSE Proffessional, Resume
 

Destacado

TARIQ ISSA DAWOOD ALRAIS1
TARIQ ISSA DAWOOD ALRAIS1TARIQ ISSA DAWOOD ALRAIS1
TARIQ ISSA DAWOOD ALRAIS1Tariq Al Raisi
 
george chacko cv - Copy
george chacko cv - Copygeorge chacko cv - Copy
george chacko cv - CopyGeorge Chacko
 
PetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync
 
PetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync
 
PetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync
 
PetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync
 
PetroSync - Advanced Seismic Data Acquisition and Processing
PetroSync - Advanced Seismic Data Acquisition and ProcessingPetroSync - Advanced Seismic Data Acquisition and Processing
PetroSync - Advanced Seismic Data Acquisition and ProcessingPetroSync
 
PetroSync Advanced Logging Tool Physics
PetroSync Advanced Logging Tool PhysicsPetroSync Advanced Logging Tool Physics
PetroSync Advanced Logging Tool PhysicsPetroSync
 
PetroSync - Oil and Gas Contract Management
PetroSync - Oil and Gas Contract ManagementPetroSync - Oil and Gas Contract Management
PetroSync - Oil and Gas Contract ManagementPetroSync
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync
 
PetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync
 
PetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync
 
Rig Chief Mechanic
Rig Chief MechanicRig Chief Mechanic
Rig Chief MechanicShukla Alok
 
Imran Hussain Chief Mechanic (2)
Imran Hussain Chief Mechanic (2)Imran Hussain Chief Mechanic (2)
Imran Hussain Chief Mechanic (2)Imran Hussain
 
Francis Wong Kee Lik - CV
Francis Wong Kee Lik - CVFrancis Wong Kee Lik - CV
Francis Wong Kee Lik - CVKee Lik Wong
 

Destacado (20)

TARIQ ISSA DAWOOD ALRAIS1
TARIQ ISSA DAWOOD ALRAIS1TARIQ ISSA DAWOOD ALRAIS1
TARIQ ISSA DAWOOD ALRAIS1
 
george chacko cv - Copy
george chacko cv - Copygeorge chacko cv - Copy
george chacko cv - Copy
 
PetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work Performance
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production System
 
PetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and Treatments
 
PetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync - Advanced Contract Negotiation and Post-Contract Management
PetroSync - Advanced Contract Negotiation and Post-Contract Management
 
PetroSync - Post-Contract Management
PetroSync - Post-Contract ManagementPetroSync - Post-Contract Management
PetroSync - Post-Contract Management
 
PetroSync - Advanced Seismic Data Acquisition and Processing
PetroSync - Advanced Seismic Data Acquisition and ProcessingPetroSync - Advanced Seismic Data Acquisition and Processing
PetroSync - Advanced Seismic Data Acquisition and Processing
 
PetroSync Advanced Logging Tool Physics
PetroSync Advanced Logging Tool PhysicsPetroSync Advanced Logging Tool Physics
PetroSync Advanced Logging Tool Physics
 
PetroSync - Oil and Gas Contract Management
PetroSync - Oil and Gas Contract ManagementPetroSync - Oil and Gas Contract Management
PetroSync - Oil and Gas Contract Management
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced Fishing
 
PetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync - Special Core Analysis
PetroSync - Special Core Analysis
 
PetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe Prevention
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion Practices
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic Interpretation
 
Rig Chief Mechanic
Rig Chief MechanicRig Chief Mechanic
Rig Chief Mechanic
 
Imran Hussain Chief Mechanic (2)
Imran Hussain Chief Mechanic (2)Imran Hussain Chief Mechanic (2)
Imran Hussain Chief Mechanic (2)
 
CV
CVCV
CV
 
Francis Wong Kee Lik - CV
Francis Wong Kee Lik - CVFrancis Wong Kee Lik - CV
Francis Wong Kee Lik - CV
 

Similar a PetroSync - Coiled Tubing Technology

PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiPetro Nomics
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiPetro Nomics
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions OperationspetroEDGE
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTpetroEDGE
 
FAIZAL HUSSIN Full Resume - REV 1
FAIZAL HUSSIN Full Resume - REV 1FAIZAL HUSSIN Full Resume - REV 1
FAIZAL HUSSIN Full Resume - REV 1Faizal Hussin
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionWalter Lee
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...petroEDGE
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal OperationspetroEDGE
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalspetroEDGE
 
Small scale LNG operations
Small scale LNG operationsSmall scale LNG operations
Small scale LNG operationsEaswaran Kanason
 
Production Supervisor CV for Albert Switcher
Production Supervisor  CV for Albert SwitcherProduction Supervisor  CV for Albert Switcher
Production Supervisor CV for Albert SwitcherAlbert Switcher Gnana
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016Neto Manuel
 
Optimizing Gas Turbines and Life Management
Optimizing Gas Turbines and Life ManagementOptimizing Gas Turbines and Life Management
Optimizing Gas Turbines and Life ManagementWalter Lee
 

Similar a PetroSync - Coiled Tubing Technology (20)

PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
 
Belal abd Elhady CV
Belal abd Elhady  CVBelal abd Elhady  CV
Belal abd Elhady CV
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
FAIZAL HUSSIN Full Resume - REV 1
FAIZAL HUSSIN Full Resume - REV 1FAIZAL HUSSIN Full Resume - REV 1
FAIZAL HUSSIN Full Resume - REV 1
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling Engineers
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String Design
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal Operations
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
 
Small scale LNG operations
Small scale LNG operationsSmall scale LNG operations
Small scale LNG operations
 
Production Supervisor CV for Albert Switcher
Production Supervisor  CV for Albert SwitcherProduction Supervisor  CV for Albert Switcher
Production Supervisor CV for Albert Switcher
 
wellin2015
wellin2015wellin2015
wellin2015
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016
 
Optimizing Gas Turbines and Life Management
Optimizing Gas Turbines and Life ManagementOptimizing Gas Turbines and Life Management
Optimizing Gas Turbines and Life Management
 

Más de PetroSync

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 

Más de PetroSync (20)

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 

Último

TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 

Último (20)

POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 

PetroSync - Coiled Tubing Technology

  • 1. Increasetheawarenessandknowledgeofthecoiledtubingoperations andfactorswhichaffectitsperformance Petrosync Distinguished Instructor CoiledTubingTechnologyCoiledTubingTechnology Improveyour techniquesand learnfromthe Expert! Magdi Taha El Naggar Managing Director Oil Fields Global Consultants (OFGC) Over 39 years dedicated outstanding service in oil and gas field with excellent HSE record Officially certified & registered as Professional Petroleum Engineering Consultant (License 116/7) Extensice training capabilities, currently joint venturing with several major professional international training institutes and conduting several training at Singapore, Malaysia, Vietnam, Indonesia, Egypt etc 5-9October2015,KualaLumpur,Malaysia UNDERSTAND the fundamentals & concept of the coiled tubing unit INCREASE the awareness and knowledge of the coiled tubing operations and factors which affect its performance. LEARN an overview of coiled tubing operational techniques, technologies and equipment. UNDERSTAND alternate deployment scenarios and multisensory applications for surveillance and optimization. POSSESS the basic skills required to select and implement the various coiled tubing techniques as per operational requirements. ABLE to handle various coiled tubing emergency situations, plan its operations, monitor and analyze its performance. LEARN strategies and best practices for field the coiled tubing operation optimization Course Objectives Specially Designed for This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following roles: FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house budget! If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com HYBRID TRAINING SOLUTIONS Drilling Managers Drilling Supervisors Drilling Superintendents Senior Drillers Drilling Engineers Operation Engineers Project Engineers Well Engineer Production Engineer Supported by
  • 2. This course is designed to introduce an overview of the coiled tubing operations concept and its applications in oil fields. It introduces variety of coiled tubing technologies with special attention on the unit as surface equipment and downhole tools. Moreover, the course covers the main components, application envelope and the coiled tubing special applications and contingency plan for all possible situations, which could be encountered throughout various operations. Petrosync Distinguished Instructor Course Overview COILED TUBING TECHNOLOGY 5-9 October 2015, Kuala Lumpur, Malaysia SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred locationandtime. Wewillmeetyouanywherearoundtheglobe. Ifyouliketoknowmoreaboutthisexcellentprogram,pleasecontactuson+6564154502oremailgeneral@petrosync.com IN-HOUSE SOLUTIONS CLIENTLISTINCLUDES: Murphy Petrofac Talisman Sapura Schlumberger Total UMW Iraq Oil Company OXY Gulf of Suez Oil Company Badredine Oil Company WEPCO OGS Apex Dubai GlobalPetroSolutions Magdi is an independent consultant having more than 39 years of experience in Petroleum industry. He has extensive experience in IWCF and IADC certification. He also has extensive professional experience in various phase of petroleum, reservoir, production, drilling & workover engineering and field operations with several multinational companies including ARAMCO (Saudi Arabia) and ADCO (UAE). Magdi is experienced professional in all phases of well intervention operations utilizing coiled tubing and well emergency cases, well control as well as extended reach operations. He also has experience in conducting training with several major professional international training institutes at Singapore, Malaysia, Vietnam, Indonesia, China, Egypt, Oman and so on. In additional, he has the extensive experience in full field development studies, reservoir studies, production enhancement for oil fields as well as various types of wells. Magdi Taha El Naggar Managing Director Oil Fields Global Consultants (OFGC)
  • 3. Module (4) CoiledTubing Unit Introduction Coiled tubing description Coiled tubing equipment design Coiled tubing applications Coiled tubing advantages Coiled tubing disadvantages Module (5) CoiledTubing Surface Equipment Depth meter Goose neck Injector head Coiled tubing reel Prime movers Power Pack Stripper (conventional, side door) BOP Module (1)Well CompletionTypes Definition of well completion Well completion Classification X-masTree Wellhead Casings Liners ProductionTubing String Packers Sub-Surface Control System (SC-SSSVs) Wellhead Control System Artificial lift completions (ESP, GL) Smart Completions Impact of well completion selection on future operations in the well COILED TUBING TECHNOLOGY 5-9 October 2015, Kuala Lumpur, Malaysia Course Agenda Day One - 5 October 2015 PROGRAM SCHEDULE Registration (Day 1) Session I Refreshment & Networking Session I Session II Lunch Session III Refreshment & Networking Session II Session IV End of Day 08:00 - 09:00 09:00 - 11:00 11:00 - 11:15 11:15 - 13:00 13:00 - 14:00 14:00 - 15:30 15:30 - 15:45 15:45 - 17:00 Module (3)Well Intervention Operations Conventional: CoiledTubing Operations Well kick-off operations Stimulation Scale Removal Cement Squeeze Fishing Operations Well killing & securing for well routine maintenance operations Wireline (Slick, E-line) Snubbing operations WellTesting (PTS, MPFM) Non-Conventional: Well Control Emergency Impact of well completion and well intervention operations Day Two - 6 October 2015 Module (2)Well Completion Operations Definition of well completion concept Perforation Types Guns Bullets Phasing TCP Stimulation operation Basics and concept Candidates selection Reservoir lithology & impact on stimulation methodology Hydraulic Fracturing ExerciseandCaseStudiesProvided
  • 4. Module (6)Surface Equipment Handling &Testing Procedures Depth meter Injector head Reel Power pack Control cabin Pressure control equipment BOP Stripper (conventional, side door) RTMS Auxiliary surface equipment ExerciseandCaseStudiesProvided Day Three - 7 October 2015 COILED TUBING TECHNOLOGY 5-9 October 2015, Kuala Lumpur, Malaysia Module (7) CoiledTubing DownholeTools Standard threads Grapper connectors Connectors Check valves Nozzles & Jetting subs Swivel joint Release joints PRV Centralizers Accelerators Jars Overshots Module (8) Pre-Job Safety Procedures General requirements General HSE aspects PTW TBM Coiled tubing well control drill Module (9) High Pressure CoiledTubing Module (10) CoiledTubing Applications Matrix treatment Logging operations (open hole, Cased hole) Drilling contingencies Squeeze cement Day Four - 8 October 2015 Under reaming/milling Inflatable packers and bridge plugs Coiled tubing drilling Coiled tubing completion Well Kick-off Fill Cleaning Scale removal Well control/killing Excessive water/gas shut-off Fishing operations P & A Artificial lift Module (11) CoiledTubing Operation Procedures Pre-Job requirements Scaffolding Pre-job equipment requirements Coiled tubing rigging-up & function testing Treating line rigging-up &testing General running procedures Operational procedures: Well Control/Killing Well Kick-off Nitrogen properties & uses Fill cleaning Scale removal Excessive water/gas shut-off P & A Well stimulation Production logging pressure deployment procedures Fishing operations Rigging down and HSE requirements Coiled tubing stability during mobilization
  • 5. Limited Attendees The course has limited seats to ensure maximum learning and experience for all delegates. Certificate of Attendance You will receive a Certificate of Attendance bearing the signatures of the Trainer upon successful completion of the course. This certificate is proof of your continuing professional development. Interactive Training You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide you with a deeper and more long-term understanding of your current issues. High Quality Course Materials Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your colleagues afterward. Petrosync Quality Day Five - 9 October 2015 COILED TUBING TECHNOLOGY 5-9 October 2015, Kuala Lumpur, Malaysia Module(12)CoiledTubingTechnicalData Definitions Coiledtubingoperatinglimits Burstpressure Collapsepressure Coiledtubingovality Fatigueandcorrosion Stressandstrain Forcesaffectingthecoiledtubingperformance Buckling Depthcorrectionandstuckpointcalculations Helicallock-up Catastrophicbuckling Coiledtubingsizes,volumesanddisplacementvolumes Coiledtubingcomponents(Dims&Wts) Coiledtubingspeedlimits Commonnipplesandlocksystemdata Coiledtubingpressuredropcurves Module (13) CoiledTubing Contingency Procedures Module (14) CoiledTubing OperationalTroubleshooting & case History Module (15) CoiledTubing Maintenance
  • 6. Group Discount is based on Standard Price * For 7 or more delegates, please inquire for more attractive package. * Important: Please note that registration without payment will incur a SGD 200 administration fee. 1st Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________ Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ PAYMENTMETHODS DELEGATESDETAILS Please note: - Indicate if you have already registered by Phone Fax Email Web I agree to PetroSync’s terms & conditions,payment terms and cancellation policy. By Direct Transfer : Please quote invoice number(s) on remittance advice By Credit Card : Please debit my credit card: Visa MasterCard Card Number: Name printed on card: _____________________________________________________________________ Expiry Date: Security Code: INVOICEDETAILS Authorized Signature : ____________________________________________________________________________ Mrs Ms Dr OthersMr DETAILS PROGRAMMECONSULTANT PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. 2nd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr 3rd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr INVESTMENT PACKAGES CourseDetails AMEX TERMSANDCONDITIONS CHARGES&FEE(s) - For Payment by Direct TelegraphicTransfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processsing fee. DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published programme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATAPROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATIONPOLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. * To enjoy the promotion & discount offer, payment must be made before deadline * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. - If you have not received an acknowledgement before the training, please call us to confirm your booking. Confirmation InvestmentPackage FULLMASTERCLASS 5-9 OCTOBER 2015 Standard Price 5OCT2015 SGD$ 5,995 Group Discount (3 or more Delegates) Early Bird Offer Deadline 5OCT2015 4SEPT2015 SGD$ 5,795 Title : Coiled Tubing Technology Date : 5-9 October 2015 Location : Kuala Lumpur, Malaysia Name : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6826 4322 SGD$ 5,695 PetroSync Global Pte Ltd Bank details: Account Name: PetroSync Global Pte Ltd Bank Name : DBS Bank Ltd Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288 Account No : • SGD : 2889018980 • USD : 0288002682016 Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982 All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd eceives the full invoiced amount. CERTIFICATEOFATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance