1. REPUBLIC OF GHANA
MEDIUM TERM EXPENDITURE
FRAMEWORK (MTEF)
FOR 2014-2016
PROGRAMME BASED BUDGET ESTIMATES
FOR 2014
MINISTRY OF ROADS AND
HIGHWAYS (MRH)
2. Ministry of Roads and Highways Page ii
For copies of the MRH MTEF PBB Estimates, please contact the Public Relations Office of the
Ministry:
Ministry of Finance
Public Relations Office – (New Building, Ground Floor,
Room 002 or 004)
P. O. Box MB 40,
Accra – Ghana
The MRH MTEF PBB Estimate for 2014 is also available on the internet at: www.mofep.gov.gh
3. Ministry of Roads and Highways Page iii
TABLE OF CONTENTS
PART A: STRATEGIC OVERVIEW OF THE MINISTRY OF ROADS AND HIGHWAYS
(MRH)....................................................................................................................................................1
1. NMTDPF Strategic Policy Objectives......................................................................................................... 1
2. Mission (Goal) ........................................................................................................................................... 1
3. Core Functions .......................................................................................................................................... 1
4. Policy Outcome Indicators and Targets .................................................................................................... 2
5. 2013 Performance..................................................................................................................................... 3
6. MDA Summary – Expenditure Estimates by Budget Programme, Economic Classification and Projects 6
PART B: BUDGET PROGRAMME SUMMARY............................................................................7
PROGRAMME 1: Management and Administration ............................................................................................ 7
PROGRAMME 2: Road Construction...................................................................................................................26
PROGRAMME 3: Road Rehabilitation and Maintenance....................................................................................30
PROGRAMME 4: Road Safety and Environment.................................................................................................41
PART C: FINANCIAL INFORMATION ...................................................................................................................44
Annex 1: Summary of Expenditure by Programme, Economic Classification and Funding Source....................44
Annex 2: Expenditure by Programme and Sub Programme...............................................................................44
Annex 3: Expenditure by Project and Programme .............................................................................................44
Annex 4: Expenditure by Funding and Programme............................................................................................44
Annex 5: Expenditure by Programme/Sub-Programme and Economic Classification .......................................44
4. Ministry of Roads and Highways Page 1
PART A: STRATEGIC OVERVIEW OF THE MINISTRY OF
ROADS AND HIGHWAYS (MRH)
1. NMTDPF Strategic Policy Objectives
The MDA has adopted the following strategic policy objectives to guide its
efforts to fulfill the national policy objectives:
Establish Ghana as a Transportation Hub;
Create a sustainable, accessible, affordable, reliable, effective and efficient transport system
that meets user needs;
Integrate land use, transport planning, development planning and service provision;
Create a vibrant investment and performance based management environment that maximizes
benefits for public and private sector investors;
Develop and implement comprehensive and integrated Policy, Governance and Institutional
Frameworks;
Ensure Sustainable Development in the Transport Sector;
Develop adequate Human Resources and apply new Technology.
2. Mission
MRH exists to provide an integrated, efficient, cost-effective and sustainable road transport
system responsive to the needs of society, supporting growth and poverty reduction and capable
of establishing and maintaining Ghana as a transportation hub of West Africa.
3. Core Functions
The core functions of the Ministry of Roads and Highways are:
Policy formulation, monitoring, evaluation and coordination with regard to the Road
Infrastructure sector
Development and Maintenance of Road Infrastructure
Improving Road Safety and Environment
Financing of Road Maintenance
Training of professionals (Engineers,Contractors, etc)
5. Ministry of Roads and Highways Page 2
4. Policy Outcome Indicators and Targets
Outcome Indicator
Description
Unit of
Measurement
Baseline Latest status Target
Year Value Year Value Year Value
Road condition mix
The road
condition mix
shows the
proportion of
the entire
national road
network which
are good, fair,
poor
National:
Trunk Roads
Urban Roads
Feeder Roads
2010
40% Good
29% Fair
31% Poor
67,450km
12,840km
12,400 km
42,210 km
2012
43% Good
25% Fair
32% Poor
68,124km
13,344km
12,600 km
42,210 km
2014
45% Good
25% Fair
30% Poor
68,124km
13,344km
12,600 km
42,210 km
Proportion of roads
maintained/rehabilitated
Percentage 2010 50 2013 65 2014 68
Proportion of transit
corridor highway that
are in good condition
Good (%) 2010 38 2013 42 2014 45
6. Ministry of Roads and Highways Page 3
5. 2013 Performance
The Ministry and its Agencies pursued the following interventions to improve on its operations:
a. Maintenance of Road Asset:
As at end of June 2013, routine maintenance had been undertaken on 5,819km of the trunk
road network; 3,250km on the feeder road network; and on the urban road network 1,815km
of grading works and 27,848m2
/km of pothole patching. Additionally, periodic maintenance
activities, comprising re-gravelling/spot improvement and resealing works had been carried
out on 21km, 374km and 6,586km on the trunk, feeder and urban road networks respectively.
The Ministry continued with the implementation of the Programme Estimate to regulate
overloading to an optimal limit and improve and expand on Transport Sector indicators and
database for better management of investments in the sector.
b. Improving Road Maintenance Financing:
The Ministry improved revenue generation into the Road Fund for the maintenance of the
road network. The total Road Fund accrual from January to June 2013 is GH¢126,259,175.33.
This is an increase of about GH¢9,894,257.33 over the amount recorded during the same
reporting period in 2012. The increase in the revenue inflow was mostly as a result of the
regular field visits to ensure that funds are being collected in conformity to laid down
procedure and paid into designated bank accounts.
c. Development of key road corridors:
The Ministry continued to improve major road corridors to promote trade and economic
activities. Some of the projects that achieved significant progress were the Dodo-Pepesu
Nkwanta Road (commencement to 14%), Agona Junction to Elubo Road (mobilization to
11%), Accra East Corridor roads -Giffard and Burma Camp Roads (mobilization to 34%),
Kwafokrom – Apedwa (54%-68%), Buipe-Tamale (37%-62%).
The development activities undertaken include Rehabilitation, Reconstruction, Construction
and Upgrading. In all, a total of 103km of development works representing 138% of the 2013
7. Ministry of Roads and Highways Page 4
approved programme of 75km was executed. 13no. bridges out of the planned 30no. have
been completed as at June 2013.
d. Controlling Axle Load and Implementation of sub-regional programmes
Axle load Control and Management: The Ministry pursued the implementation of the Law on
Axle Load Limit as stipulated in the New Road Traffic Regulation. Intensive eduation and
sensitization on the new regulation has been undertaken. Key stakeholders such as Freight
Forwarders, Haulers, Truckers, Ports, Private Weighbridge Station Operators have been
involved in this sensitization programme. Durbars have also been organized at Aflao and
Nkwanta for transitors on the eastern corridor.
Trade and Transit facilitation: Two (2) workshops have been organized to build the capacity
of the Ghana Police Service (MTTU) during the year. The objective is to sensitize the police
MTTU to help reduce the number of roadblocks on road transit corridors. This is to improve
trade as stipulated in the ECOWAS protocol and Project Development Objectives for the
Abidjan –Lagos corridor project. The workshops have help reduced the number of
checkpoints from 28 to 13no on the Aflao to Elubo road corridor.
Joint Border Posts: Construction of a Joint Border Post (JBP) at Noepe for Ghana and Togo is
on-going and scheduled for completion in December 2013. The Ministry being a secretariat to
the National Road Transport and Transit Facilitation Committee organized a study tour for all
border agencies to the Neope JBP. This created the platform for discussions on the operational
manual and recommendations were formulated for a smooth operation.
e. Public Private Partnerships: The Ministry continued to engage the Private sector using the
Public Private Partnerships (PPP) schemes for the financing, construction and management of
road infrastructure.
The procurement of a consultant to undertake feasibility study on the dualisation of the
Accra-Takoradi road has been completed. This project which is part of the Ghana PPP
project is financed by the World Bank and it is expected that the IDA will contribute to the
implementation of the project.
8. Ministry of Roads and Highways Page 5
The contract for the financing, design, construction and maintenance of an Overpass on
the Motorway at Teshie Link has been signed with a Link Infrastructure Co. Ltd. The
concessionaire is currently at the design stage and physical works are planned to
commence in 2013.
The Ministry has registered the following PPP projects with the Ministry of Finance and
discussions are on-going with various private entities to finalise the concessions:
i. Accra-Tema Motorway
ii. Western Corridor roads Phase 1(Elubo-Sunyani)
f. Monitoring and Evaluation:
The Ministry has completed the monitoring of projects in four (4) regions as at June 2013.
A total of 86 road projects have been inspected.
9. Ministry of Roads and Highways Page 6
6. MDA Summary – Expenditure Estimates by Budget Programme, Economic
Classification and Projects
Expenditure By Budget Program
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
BP 1:Management and
Administration
31,277,294 68,573,732 68,953,818
BP 2: Road and Bridge
Construction
596,189,672 596,153,163 602,073,860
BP 3: Roads Rehabilitation and
Maintenance
104,374,211 103,549,872 104,585,370
BP 4: Road Safety And
Environment
47,435,574 54,351,185 54,894,525
Total Expenditure 779,276,751 822,627,952 830,507,573
Expenditure by Economic
Classification
2010 2011 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 30,279,556 30,582,351 30,582,351
22 Use of Goods and Services 5,845,520 36,035,246 36,395,599
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 54,327 54,327 54,870
28 Other Expenses 80,895,853 80,879,492 81,688,288
Capital Expenditure
31 Non-Financial Assets 662,201,495 675,076,534 681,786,464
Total Expenditure 779,276,751 822,627,950 830,507,572
Expenditure by Program and
Projects
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Management and Administration 436,193 436,193 440,555
Road and Bridge Construction 570,793,591 570,793,591 576,460,692
Roads Rehabilitation and
Maintenance
83,835,157 83,035,157 83,865,508
Road Safety And Environment 7,136,554 6,928,954 6,998,244
Total Expenditure 662,201,495 661,193,895 667,764,999
10. Ministry of Roads and Highways Page 7
PART B: BUDGET PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
1. Budget Programme Objectives
To create a sustainable, accessible, affordable, reliable, effective and efficient transport
system that meets user needs;
To develop and implement comprehensive and integrated Policy, Governance and
Institutional Frameworks;
To develop adequate Human Resources and apply new Technology;
To create a vibrant investment and performance-based management environment that
maximizes benefits for public and private sector investors;
2. Budget Programme Description
The Management and Administration Programme covers the planning, development and
administration of the Road network. This entails policy formulation, coordination and oversight,
performance monitoring and evaluation of the sector in the following broad areas:
Road Infrastructure Development and Maintenance
Road Maintenance Financing
These functions are performed by the Road Infrastructure and Support Agencies as follows:
Ghana Highway Authority is charged with the responsibility for the administration, planning,
control, development and maintenance of trunk roads, ferries and related facilities in the
country;
Department of Feeder Roads (DFR) is charged with the responsibility for the
administration, planning, control, development and maintenance of feeder roads and related
facilities in the country;
Department of Urban Roads (DUR) is charged with the responsibility for the administration,
planning, control, development and maintenance of urban roads and related facilities in the
country;
Koforidua Training Centre is a center for the training of professionals (engineers,
contractors, consultants, administrative staff, etc.) in the transport sector;
11. Ministry of Roads and Highways Page 8
Road Fund Secretariat established by Act 536 (1997), is to finance the following activities:
o Routine and Periodic Maintenance of road and related facilities;
o Upgrading and Rehabilitation of Roads;
o Road Safety Activities;
o Selected Road Safety Projects and such other relevant matters as may be determined by
the Board
The main sources of funding for the Road sub-sector are as follows:
GoG - maintenance, development works, minor rehabilitation and upgrading
Donor Funds - maintenance and development works.
Road Fund - mainly for maintenance
12. Ministry of Roads and Highways Page 9
3. Budget Programme Summary : Expenditure by Sub-Programme, Economic
Classification and Projects
Programme 1: Management and Administration
Expenditure By Budget Sub-
Program
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
BSP 1.1 General Administration 24,832,868 52,358,751 52,641,500
BSP 1.2 Finance 26,439 26,657 26,704
BSP 1.3 Human Resource 6,117,001 7,571,883 7,585,922
BSP 1.4 Policy, Planning,
Monitoring and Evaluation 63,721 8,376,847 8,460,055
BSP 1.5 Statistics, Research,
Information and Public Relations 237,265 239,594 239,594
Total Expenditure 31,277,294 68,573,732 68,953,818
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 30,262,556 30,565,181 30,565,181
22 Use of Goods and Services 571,976 30,818,360 31,126,544
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 6,569 6,569 6,635
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets 436,193 7,183,622 7,255,458
Total Expenditure 31,277,294 68,573,732 68,953,818
Expenditure by Projects 2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Purchase of Office Furniture and
Other Equipment
34,487 34,487 34,832
Purchase of Vehicles & Other
Equipment
34,487 34,487 34,832
Construction of Bungalows 206,922 206,922 208,991
Rehabilitation of Office
Accommodation
77,528 77,528 78,303
Purchase of Plant Equipment 34,487 34,487 34,832
Other (Roads, Bridges & Signals) 48,282 48,282 48,765
Total Expenditure 436,193 7,183,622 7,255,458
13. Ministry of Roads and Highways Page 10
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
SUB-PROGRAMME SP 1.1: General Administration
1. Budget Sub-Programme Objective
To effectively coordinate the activities of the Ministry and its Agencies and ensure the provision
of adequate logistics
2. Budget Sub-Programme Description
This sub programme looks at the coordination of activities of the Ministry and its Agencies
through the office of the Chief Director.
The operations carried out include:
Providing general information and direction for the Ministry;
Establishment of standard procedures of operation for the effective and efficient running of
the Ministry;
Consolidating and incorporating the Ministry's needs for works, goods and services into a
master procurement plan, establishing and maintaining a fixed asset register;
Liaising with appropriate Heads of Agencies to plan for the acquisition, replacement and
disposal of equipment;
Management of assets; and
Communicating the strategies and programmes of the Ministry and its Agencies to the public
for feedback and follow-ups.
14. Ministry of Roads and Highways Page 11
3. Budget Sub-Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Response to
official
correspondence
Number of
working days
-
Within (7)
working
days
Within
seven (7)
working
days
Within
seven (7)
working
days
Within
seven (7)
working
days
Organisation of
management
meetings
Number of
management
meetings
-
Twice a
month
Twice a
month
Twice a
month
Twice a
month
Liaison between
sector Ministries
and development
partners
Number of sector
meetings
- Quarterly Quarterly Quarterly Quarterly
Dissemination of
information to the
public through
Policy Fairs and
Meet-the-Press
sessions, etc
Number of public
interactions
-
Three (3)
times a year
Three (3)
times a year
Three (3)
times a year
Three (3)
times a
year
Response to public
complaints
Number of
working days
-
Ten (10)
working
days after
receipt of
complaints
Ten (10)
working
days after
receipt of
complaints
Ten (10)
working
days after
receipt of
complaints
Ten (10)
working
days after
receipt of
complaints
Update of assets
register
assets register
updated
-
End of
quarter
End of
quarter
End of
quarter
End of
quarter
15. Ministry of Roads and Highways Page 12
4. Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the sub-
programme.
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
Budget Sub-Programme SP 1.1: General Administration
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 23,845,418 24,083,872 24,083,872
22 Use of Goods and Services 549,257 21,089,257 21,300,150
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 2,000 2,000 2,020
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets 436,193 7,183,622 7,255,458
Total Expenditure 24,832,868 52,358,751 52,641,500
Operations Projects
Provision of legal support Acquisition of lands and buildings
Procurement of works, goods and services Renovation of existing buildings
Management of assets (vehicles, buildings,
equipment, etc)
Acquisition of vehicles
Public relations Acquisition of Plant and Equipment
Acquisition of Office Equipment and supplies
16. Ministry of Roads and Highways Page 13
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
SUB-PROGRAMME SP 1.2: Finance
1. Budget Sub-Programme Objective
To improve resource mobilization, financial management and reporting
2. Budget Sub-Programme Description
This sub-programme considers the financial management practices of the Ministry. It establishes
and implements financial policies and procedures for planning and controlling financial
transactions of the Ministry consistent with prevailing financial and accounting policies,
objectives, rules, regulations and best practices. It also ensures the documentation and
controlling of cash flows as well as actual handling of cash.
The main operations undertaken include:
Maintaining proper accounting records;
Accounting and Reporting of financial statements;
Managing the conduct of financial audits;
Ensuring budgetary control, liabilities, revenue and expenditures;
Identifying other funding sources aside traditional funding sources; and
Strengthening revenue generation machinery
17. Ministry of Roads and Highways Page 14
3. Budget Sub-Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates the actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs
Output
Indicator
Past Years Projections
2012 2013
Budget Year
2014
Indicative
Year
2015
Indicative
Year
2016
Completion of
annual financial
reports
Financial
report
completed
-
3 months
after end
of the
financial
year
3 months after
end of the
financial year
3 months after
end of the
financial year
3 months after
end of the
financial year
Monthly
statements of
accounts
Monthly
statements of
accounts
completed
-
15 days
after end
of month
15 days after
end of month
15 days after
end of month
15 days after
end of month
Response to
audit
management
letters
completed by -
Thirty
days after
receipt of
manageme
nt letters
Thirty
days after
receipt of
management
letters
Thirty
days after
receipt of
management
letters
Thirty
days after
receipt of
management
letters
Processing of
Payment
certificates/
invoices
Processing of
Payment
certificates/
invoices made
within
-
Ten
working
days
Ten working
days
Ten working
days
Ten working
days
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the sub-
programme.
Operations Projects (Investment)
Keeping and maintaining proper books of accounts No projects
Preparation of monthly and annual financial reports
Processing of approved expenditures
Managing the conduct of financial audits
18. Ministry of Roads and Highways Page 15
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
Budget Sub-Programme SP 1.2: Finance
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 21,806 22,024 22,024
22 Use of Goods and Services 64 64 65
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 4,569 4,569 4,615
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets - - -
Total Expenditure 26,439 26,657 26,704
19. Ministry of Roads and Highways Page 16
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
SUB-PROGRAMME SP 1.3: Human Resource
1. Budget Sub-Programme Objective
To facilitate the recruitment, placement, retention and development of the capacity of staff in the
Road Sector
2. Budget Sub-Programme Description
This sub programme considers the human resource needs of the Ministry. It develops and
oversees the strategic planning of the human resource requirement of the Ministry. It is also
responsible for the recruitment/replacement, selection and continuous training of employees to
build capacity and efficiency across the sector.
20. Ministry of Roads and Highways Page 17
3. Budget Sub-Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget Year
2014
Indicative
Year
2015
Indicative
Year
2016
Recruitment/Replacement of staff:
Technical Staff
Number of technical staff
recruited
MRH - - 2 4 4
GHA - 28 62 44 41
DFR 35 - 15 - -
DUR - 50 - - -
Non- technical
staff
Number of non-technical
staff recruited
MRH - - 8 5 3
GHA - 3 108 86 89
DFR - - 20 - -
DUR - - - - -
Placement of Staff:
Technical Staff
Number of technical staff
placed
MRH - 1 2 - 2
GHA 15 10 - - 15
DFR 10 14 10 10 15
DUR 8 10 15 10 15
Non- technical
staff
Number of non-technical
staff placed
MRH 1 1 4 - 6
GHA - - - - -
DFR - - 20 10 10
DUR - - - - -
Training and Development:
Technical Staff
Number of technical staff
trained
MRH 12 7 18 20 24
21. Ministry of Roads and Highways Page 18
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget Year
2014
Indicative
Year
2015
Indicative
Year
2016
GHA 150 150 150
DFR 7 26 20 15 15
DUR 12 10 15 10 15
Non- technical
staff
Number of non-technical
trained
MRH 26 11 28 32 36
GHA 120 120 120
DFR 5 - 10 5 5
DUR 5 3 6 6 6
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the sub-
programme.
Operations Projects (Investment)
Retention, Recruitment/Replacement of staff No project
Capacity development of staff
Transfer, placement and posting of staff
22. Ministry of Roads and Highways Page 19
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
Budget Sub-Programme SP1.3: Human Resource
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 6,106,857 6,167,926 6,167,926
22 Use of Goods and Services 10,144 1,403,957 1,417,996
25 Subsidies - - -
26 Grants - - -
27 Social Benefits - - -
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets - - -
Total Expenditure 6,117,001 7,571,883 7,585,922
23. Ministry of Roads and Highways Page 20
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
SUB-PROGRAMME SP 1.4: Policy, Planning, Monitoring and Evaluation
(PPME)
1. Budget Sub-Programme Objective
To develop policies and improve Planning, Monitoring and Evaluation in the Roads sector
2. Budget Sub-Programme Description
The sub-programme facilitates key stakeholder consultations for the planning and development
of sector policies and legislation. It develops and undertakes periodic reviews of policy, plans
and programmes to facilitate the achievement of MRH’s vision and national priorities for the
Road Sector.The PP&ME Units design and administer monitoring and evaluation systems to
assess the effectiveness of policies, programmes and processes in the Sector. It also coordinates
the preparation of the annual budget.
24. Ministry of Roads and Highways Page 21
3. Budget Sub-Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Preparation of annual
estimates
Annual estimates
submitted by
-
31st
October
31st October 31st October 31st October
Development/review of
policies
Number of policies
developed
/reviewed
- 2 - 2 -
Development and
updates of sector plans
completed within -
30days
after
annual
budget
30days after
annual
budget
30days after
annual
budget
30days after
annual
budget
Development and
updates of annual
procurement plans
completed by -
31st
October
31st October 31st October
31st
October
Monitoring of projects Number of visits -
At least
One visit
per region
At least One
visit per
region
At least One
visit per
region
At least One
visit per
region
Preparation of project
management reports
completed by -
A month
after each
Quarter
A month
after each
Quarter
A month
after each
Quarter
A month
after each
Quarter
25. Ministry of Roads and Highways Page 22
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the sub- programme.
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
Budget Sub-Programme SP1.4: Policy, Planning, Monitoring and Evaluation
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 55,497 56,051 56,051
22 Use of Goods and Services 8,225 8,320,796 8,404,004
25 Subsidies - - -
26 Grants - - -
27 Social Benefits - - -
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets - - -
Total Expenditure 63,722 8,376,847 8,460,055
Operations Projects (Investment)
Preparation of annual budget estimates No projects
Policy planning and initiation
Monitoring and evaluation
Co-ordination of donor activities
26. Ministry of Roads and Highways Page 23
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 1: Management and Administration
SUB-PROGRAMME SP 1.5: Research, Statistics and Information
Management (RSIM)
1. Budget Sub-Programme Objective
To enhance the collection, analysis and management of data to assist in making informed
decisions in the Road Sector.
2. Budget Sub-Programme Description
This sub-programme conducts research activities for the Ministry, through consultation and
collaboration with other MDAs and relevant public and private institutions. To support this,
RSIM conducts sample statistical surveys and other statistical enquiries, maintains records,
library and archives of publicity materials generated by the Ministry.
The RSIM also analyses all data collected for use by the Mnistry and its Agencies. It also
prepares periodic bulletins for the transport sector and other areas of operational interest to
improve performance of the sector.
27. Ministry of Roads and Highways Page 24
3. Budget Sub-Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs
Output
Indicator
Past Years Projections
2012 2013
Budget Year
2014
Indicative
Year
2015
Indicative
Year
2016
Development and
updates of
transport
performance
indicators
Updates
Completed by
-
30th
June for
2011&2012
indicators
30th
June for
2013
indicators
30th
June
for 2014
indicators
30th
June
for 2015
indicators
Dissemination of
transport
performance
indicators to the
public
Dissemination
completed by
-
30th Sept. for
2011 indicators
30th Sept. for
2012
indicators
30th Sept.
for 2013
indicators
30th Sept.
for 2014
indicators
feedback from
the public within
-
Seven (7)
working days
Seven (7)
working
days
Seven (7)
working
days
Seven (7)
working
days
Development and
publication of
monthly
construction cost
indices
Completed by -
30 days after
the end of
every month
30 days after
the end of
every month
30 days
after the
end of
every
month
30 days
after the
end of
every
month
28. Ministry of Roads and Highways Page 25
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the sub- programme.
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
Budget Sub-Programme SP1.5: Research, Statistics & Infomation Managment
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 232,978 235,308 235,308
22 Use of Goods and Services 4,286 4,286 4,329
25 Subsidies - - -
26 Grants - - -
27 Social Benefits - - -
28 Other Expenses - - -
Capital Expenditure
31 Non-Financial Assets - - -
Total Expenditure 237,264 239,594 239,637
Operations Projects (Investment)
Collection and management of data No projects
Development of IT systems and procedures
Analysis and Management of database
Research, statistics and information management
29. Ministry of Roads and Highways Page 26
BUDGET PROGRAMME SUMMARY
PROGRAMME 2: Road Construction
1. Budget Programme Objectives
To open up new areas for accessibility and socio-economic growth;
To facilitate efficient movement of people, goods and services;
To reduce vehicle operating cost and travel time.
2. Budget Programme Description
This programme involves feasibility studies, design, the right of way acquisition and
construction of roads to improve accessibility and mobility of people, goods and services. The
following road networks are constructed:
Trunk Roads
The trunk road network provides a smooth, economic, efficient, safe and reliable trunk road
network that will minimise road accidents and save lives as well as link the national, regional,
district capitals and other major towns, cities and neighbouring countries at optimal cost to
support socio-economic development in Ghana.
Feeder Roads
The feeder road network involves the provision of safe and all weather accessible feeder roads at
optimum cost which facilitate the movements of people, goods and services to promote socio-
economic development, in particular agriculture. .
Urban Roads
The urban road network is to provide safe reliable all weather accessible roads at optimum cost
to reduce travel time of people, goods and services to promote socio-economic development in
Metropolitan and Municipal Assemblies.
Operations under this programmeinclude major improvement and development works.
Improvements include:
Major Rehabilitation
Upgrading
Development Works:
Reconstruction
Construction
Interchanges
Bridges
30. Ministry of Roads and Highways Page 27
Consultancy
Right of way acquisition
Compensation to project affected persons
3. Budget ProgrammeResults Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this programme. The past data indicates actual performance whilst
the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Construction of roads:
- Trunk Roads (GHA)
Equivalent Km of road
constructed
247 103 300 300 300
- Feeder Roads (DFR) 42 20 45 50 60
- Urban Roads (DUR) 160 80 150 160 200
Construction of bridges/interchanges:
- Trunk Roads
Number of
Bridges/Interchanges
constructed
- 15 12 5 12
- Feeder Roads
Number of Bridges
constructed
16 13 20 20 20
- Urban Roads
Number of
Bridges/Interchanges
constructed
- 2 2 2 -
Engineering Studies:
- Trunk Roads
Number of
engineering studies
completed
6 3 5 5 2
- Feeder Roads
Number of
engineering studies
completed
3 2 3 3 3
- Urban Roads
Number of
engineering studies
completed
1 1 1 1 1
31. Ministry of Roads and Highways Page 28
4. Budget ProgrammeOperations and Projects
The table lists the main Operations and Projects to be undertaken by the programme.
Operations Projects (Investment)
Inventory, design, estimation and project packaging
Preparation of Tender and Contract Documents
Invitation for bids and Expression of Interests
Evaluation of bids
Award of contracts
Supervision/monitoring and evaluation of
projects/contracts
Preparation and certification of payment certificates
Preparation of monthly, quarterly and annual reports
Post audit/project completion reporting.
Negotiating of claims
Disputes resolution
32. Ministry of Roads and Highways Page 29
5. Budget ProgrammeSummary : Expenditure by Economic Classification and
Projects
Programme 2: Road Construction
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees - - -
22 Use of Goods and Services 4,928,380 4,900,051 4,949,051
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 21,491 21,491 21,706
28 Other Expenses 20,446,210 20,438,030 20,642,411
Capital Expenditure
31 Non-Financial Assets 570,793,591 570,793,591 576,460,692
Total Expenditure 596,189,672 596,153,163 602,073,860
Expenditure by Projects 2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Undertake major improvement and
development works
315,297,833 315,297,833 318,450,811
Supervision and Consultancy of
works
40,421,784 40,421,784 40,826,002
Compensation of Crops and
Buildings
3,100,000 3,100,000 3,131,000
Upgrading works 2014 6,048,529 6,048,529 6,109,015
Road Reconstruction works 2014 1,696,703 1,696,703 1,713,670
Road Construction Works 2014 486,677 486,677 491,543
Bridge Construction Works 2014 505 505 510
Undertake Major Rehabilitation
work in 2014
7,336,155 7,336,155 7,368,682
Road Construction works Donor
Support 2014
141,315,061 141,315,061 142,728,212
IGF from Road Construction works
2014
4,043 4,043 4,083
Pay Compensation to Property
Owners on all Road Projects
306,198 306,198 309,260
Undertake Road and Bridge
Construction
54,780,103 54,780,103 55,327,904
Total Expenditure 570,793,591 570,793,591 576,460,692
33. Ministry of Roads and Highways Page 30
BUDGET PROGRAMMESUMMARY
PROGRAMME 3: Road Rehabilitation and Maintenance
1. Budget ProgrammeObjectives
To preserve initial investment on the roads;
To reduce the cost of future interventions;
To reduce vehicle operating cost and travel time;
To improve riding comfort.
2. Budget ProgrammeDescription
Maintenance is an essential component in the operation and management of a road network
and is done through routine and periodic maintenance of the different road networks.
Routine Maintenance involves the following operations:
Shoulder Maintenance
Rehabilitation of Drainage Structures
Vegetation control
Pothole patching
Grading
Desilting
Periodic Maintenance involves the following operations:
Spot Improvement;
Re-gravelling;
Resealing;
Asphaltic Overlay.
Partial Reconstruction
Maintenance of bridges,
Minor Rehabilitation and Upgrading consist of:
Minor Upgrading;
Construction of culverts and other structures
34. Ministry of Roads and Highways Page 31
3. Budget ProgrammeSummary : Expenditure by Economic Classification and
Projects
PROGRAMME 3: Road Rehabilitation and Maintenance
Expenditure By Budget Sub-
Program
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
BSP 3.1 Routine Maintenance 49,330,418 49,310,947 49,804,056
BSP 3.2 Periodic Maintenance 20,038,935 20,035,284 20,235,637
BSP 3.3 Minor Rehabilitation 35,004,858 34,203,641 34,545,678
Total Expenditure 104,374,211 103,549,872 104,585,370
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees - - -
22 Use of Goods and Services 247,217 228,331 230,615
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 19,103 19,103 19,294
28 Other Expenses 20,272,734 20,267,280 20,469,953
Capital Expenditure
31 Non-Financial Assets 83,835,157 83,035,157 83,865,508
Total Expenditure 104,374,211 103,549,872 104,585,370
Expenditure by Projects 2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Undertake periodic maintenance of
roads and bridges
25,371,344 25,371,344 25,625,057
IGF from road maintenance works 4,043 4,043 4,083
Routine Maintenance 3,194,053 3,194,053 3,225,993
Periodic Maintenance 19,379,863 19,379,863 19,573,662
Minor Rehailitation and
Maintenance
16,834,854 16,834,854 17,003,202
Undertake Road Rehabilitation and
Maintenance
3,428,000 3,428,000 3,462,280
Undertake Road Rehabilitation and
Maintenance
6,430,500 6,430,500 6,494,805
Undertake Road Rehabilitation and
Maintenance
9,192,500 8,392,500 8,476,425
Total Expenditure 83,835,157 83,035,157 83,865,508
35. Ministry of Roads and Highways Page 32
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 3: Road Rehabilitation and Maintenance
SUB-PROGRAMME SP 3.1: Routine Maintenance
1. Budget Sub-ProgrammeObjectives
To preserve initial investment on the roads;
To reduce the cost of future interventions;
To reduce vehicle operating cost and travel time;
To improve riding comfort.
2. Budget Sub-Programme Description
Routine maintenance is an essential component in the operation and management of a road
network and is done more than once a year on the different road surface types.
Routine Maintenance involves the following operations:
Shoulder Maintenance
Rehabilitation of Drainage Structures
Vegetation control
Pothole patching
Grading
Desilting
36. Ministry of Roads and Highways Page 33
3. Budget Sub-ProgrammeResults Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Routine Maintenanceof
roads:
Km of road maintained
- Trunk Roads
(13,344km)
10,674 5,819 11,600 11,600 11,600
- Feeder Roads
(42,210km)
12,686 3,400 16,000 16,000 16,000
- Urban Roads
(12,400km 12,400 8,400 14,000 14,000 14,000
Funds required for routine
maintenance
Percentage of routine
maintenance needs
covered by road fund
- 62 65 65 65
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the programme.
Operations Projects (Investment)
Inventory, design, estimation and project packaging Refer to Road Fund Contract Database
Preparation of Tender and Contract Documents
Invitation for bids and Expression of Interests
Evaluation of bids
Award of contracts
Supervision/monitoring and evaluation of
projects/contracts
Preparation and certification of payment certificates
37. Ministry of Roads and Highways Page 34
Operations Projects (Investment)
Preparation of monthly, quarterly and annual reports
Post audit/project completion reporting.
Conduction of road condition survey
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
and Projects
Sub-Programme SP 3.1: Routine Maintenance
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees - - -
22 Use of Goods and Services 240,328 225,219 227,472
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 19,103 19,103 19,294
28 Other Expenses 20,271,643 20,267,280 20,469,953
Capital Expenditure
31 Non-Financial Assets 28,799,344 28,799,344 29,087,337
Total Expenditure 49,330,418 49,310,947 49,804,056
38. Ministry of Roads and Highways Page 35
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 3: Road Rehabilitation and Maintenance
SUB-PROGRAMME SP 3.2: Periodic Maintenance
1. Budget Sub-ProgrammeObjectives
To preserve initial investment on the roads;
To reduce the cost of future interventions;
To reduce vehicle operating cost and travel time;
To improve riding comfort.
2. Budget Sub-Programme Description
Periodic maintenance is an essential component in the operation and management of a road
network and this is done over a long period of time (usually a number of years).
Periodic Maintenance involves the following operations:
Spot Improvement
Re-gravelling
Resealing
Asphaltic Overlay
Partial Reconstruction
Maintenance of Bridges
39. Ministry of Roads and Highways Page 36
3. Budget Sub-ProgrammeResults Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Periodic Maintenance of
roads:
Km of road maintained
- Trunk Roads
(13,344km)
160 43 892 892 892
- Feeder Roads
(42,210km)
1,285 183 1,500 1,500 1,500
- Urban Roads
(12,400km)
1,676 4200 4,200 4,200 4,200
Funds required for periodic
maintenance
Percentage of periodic
maintenance needs
covered by road fund
- 65 65 65 65
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the programme.
Operations Projects (Investment)
Inventory, design, estimation and project packaging
Preparation of Tender and Contract Documents
Invitation for bids and Expression of Interests
Evaluation of bids
Award of contracts
Supervision/monitoring and evaluation of
projects/contracts
40. Ministry of Roads and Highways Page 37
Operations Projects (Investment)
Preparation and certification of payment certificates
Preparation of monthly, quarterly and annual reports
Post audit/project completion reporting.
Conduction of road condition survey
5. Budget Sub-Programme Summary: Expenditure by Economic Classification
and Projects
Sub-Programme SP 3.2: Periodic Maintenance
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Actual Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees - - -
22 Use of Goods and Services 5,167 2,334 2,357
25 Subsidies - - -
26 Grants - - -
27 Social Benefits - - -
28 Other Expenses 818 - -
Capital Expenditure
31 Non-Financial Assets 20,032,950 20,032,950 20,233,279
Total Expenditure 20,038,935 20,035,284 20,235,637
41. Ministry of Roads and Highways Page 38
BUDGET SUB-PROGRAMME SUMMARY
PROGRAMME 3: Road Rehabilitation and Maintenance
SUB-PROGRAMME SP 3.3: Minor Rehabilitation
1. Budget Sub-ProgrammeObjectives
To preserve initial investment on the roads;
To reduce the cost of future interventions;
To reduce vehicle operating cost and travel time;
To improve riding comfort.
2. Budget Sub-Programme Description
Minor rehabilitation improving existing road by providing adequate drainage structures,
minimal changes in horizontal and vertical alignment. In some cases, existing roads may be
widened.
Minor rehabilitation involves the following operations:
Minor Upgrading
Construction of culverts and other drainage structures
3. Budget Sub-ProgrammeResults Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this sub-programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Minor Rehabilitation
Km of road
rehabilitated
- Trunk Roads
(13,344km)
36 44 625 625 625
42. Ministry of Roads and Highways Page 39
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
- Feeder Roads
(42,210km)
1,325 374 1,425 1,425 1,425
- Urban Roads
(12,400km)
55 13 200 200 200
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the programme.
Operations Projects (Investment)
Inventory, design, estimation and project packaging
Preparation of Tender and Contract Documents
Invitation for bids and Expression of Interests
Evaluation of bids
Award of contracts
Supervision/monitoring and evaluation of
projects/contracts
Preparation and certification of payment certificates
Preparation of monthly, quarterly and annual reports
Post audit/project completion reporting.
Conduction of road condition survey
43. Ministry of Roads and Highways Page 40
5. Budget Sub-Programme Summary : Expenditure by Economic
Classification and Projects
Sub-Programme SP 3.3: Minor Rehabilitation
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees - - -
22 Use of Goods and Services 1,722 778 786
25 Subsidies - - -
26 Grants - - -
27 Social Benefits - - -
28 Other Expenses 273 - -
Capital Expenditure
31 Non-Financial Assets 35,002,863 34,202,863 34,544,892
Total Expenditure 35,004,858 34,203,641 34,545,678
44. Ministry of Roads and Highways Page 41
BUDGET PROGRAMMESUMMARY
PROGRAMME 4: Road Safety and Environment
1. Budget ProgrammeObjectives
To reduce road crashes and fatalities
To reduce adverse effects resulting from road accidents
To reduce adverse social and environmental impacts resulting from road improvement
activities.
To minimise pavement damage resulting from excessive loading
2. Budget Programme Description
The Road Safety and Environment Programme is responsible for the following:
Timely identification of road hazards;
Speedy response to complaints from communities on road hazards;
Effective road safety audit involving the inspection and analysis of road hazards and
prescription of measures to abate hazard;
Enforcement of axle load limits;
Control of adverse social and environmental impacts.
Installation and Maintenance of Road Furniture (Road signs, crash barriers etc)
Roadline Marking
Provision of Speed Calming Measures
Road Safety audits, educational activities and treatment of accident black-spots are carried out
in conjunction with the National Road Safety Commission. This is to ensure that the roads
being designed or maintained are made safe and also to educate users on the correct use and
meaning of signs that are put in place to reduce accidents.
45. Ministry of Roads and Highways Page 42
3. Budget Programme Results Statement
The table indicates the main outputs, its indicators and projections by which the Ministry
measures the performance of this programme. The past data indicates actual performance
whilst the projections are the Ministry’s estimate of future performance.
Main Outputs Output Indicator
Past Years Projections
2012 2013
Budget
Year
2014
Indicative
Year
2015
Indicative
Year
2016
Installation and
maintenance of
traffic signals
Number of traffic
signals installed and
maintained
91 32 60 60 60
Treatment of road
hazard sites
Number of road
safety hazard sites
treated
- 21 21 21 21
Enforcement of
axle load limits
Percentage of
overloaded vehicles
identified by axle
load stations
- 15 15 15 15
4. Budget Sub-Programme Operations and Projects
The table lists the main Operations and Projects to be undertaken by the
programme.
Operations Projects (Investment)
Inventory, design, estimation and project packaging Overhauling of traffic signals
Preparation of Tender and Contract Documents Construction of speed calming measures
Invitation for bids and Expression of Interests Erection of guardrails
Evaluation of bids Procurement of Traffic Signs and other Road Safety
Management Infrastructure
Award of contracts
Supervision/monitoring and evaluation of
projects/contracts
Preparation and certification of payment certificates
Preparation of monthly, quarterly and annual reports
Post audit/project completion reporting.
46. Ministry of Roads and Highways Page 43
5. Budget Programme Summary : Expenditure by Economic Classification and
Projects
Programme 4: Road Safety and Environment
Expenditure by Economic
Classification
2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Current Expenditure
21 Compensation of Employees 17,000 17,170 17,170
22 Use of Goods and Services 97,947 88,504 89,389
25 Subsidies - - -
26 Grants - - -
27 Social Benefits 7,164 7,164 7,235
28 Other Expenses 40,176,909 40,174,182 40,575,924
Capital Expenditure
31 Non-Financial Assets 7,136,554 14,064,164 14,204,806
Total Expenditure 47,435,574 54,351,184 54,894,524
Expenditure by Projects 2012 2013 2014 2015 2016
Budget Budget Budget Indicative Indicative
GH₵ GH₵ GH₵
Road Safety and Environment 6,409,954 6,409,954 6,474,054
Undertake Road Safety and
Environmental activities 726,600 519,000 524,190
Total Expenditure 7,136,554 6,928,954 6,998,244
47. Ministry of Roads and Highways Page 44
PART C: FINANCIAL INFORMATION
Annex 1: Summary of Expenditure by Programme, Economic Classification and
Funding Source
Annex 2: Expenditure by Programme and Sub-Programme
Annex 3: Expenditure by Project and Programme
Annex 4: Expenditure by Funding and Programme
Annex 5: Expenditure by Programme/Sub-Programme and Economic
Classification