Scrum & PMI How can that go well? 7.6.2011 - Saarbrücker Reihe
7.6.2011 - Saarbrücker Reihe Pierre Neis PMO Advisor / Scrum & Lean Coach
Project management 7.6.2011 - Saarbrücker Reihe
Project Management Issues 7.6.2011 - Saarbrücker Reihe
Project Management scope time resources 7.6.2011 - Saarbrücker Reihe
Agile Project Management scope time Quality resources 7.6.2011 - Saarbrücker Reihe
PMBOK 7.6.2011 - Saarbrücker Reihe
Product Life Cycle  Project Project Project Project Project Project Project Project 7.6.2011 - Saarbrücker Reihe
Product Life Cycle for Small Project 7.6.2011 - Saarbrücker Reihe
I P C E M&C Source Rita Mulcahy 7.6.2011 - Saarbrücker Reihe
Product Life Cycle for IT Projects I I I I I I I I P P P P P P P P C C C C C C C C E E E E E E E E M&C M&C M&C M&C M&C M&C M&C M&C 7.6.2011 - Saarbrücker Reihe
Value Steam I I I I I I I I P P P P P P P P C C C C C C C C Lead Time Lead Time Lead Time E E E E E E E E M&C M&C M&C M&C M&C M&C M&C M&C Lead Time Lead Time Lead Time Lead Time 7.6.2011 - Saarbrücker Reihe
How long doesittake? 7.6.2011 - Saarbrücker Reihe
And yourcustomer? 7.6.2011 - Saarbrücker Reihe
Winston W. Royce  (1929–1995) was an American computer scientist, director at Lockheed Software Technology Center in Austin, Texas, and one of the leaders in software development in the second half of the 20th century.[1] He was the first who described the Waterfall model for software development, although Royce did not use the term "waterfall" in that article, [2] nor advocated the waterfall model as a working methodology. 7.6.2011 - Saarbrücker Reihe
Winston Royce’s “Grandiose” Model 7.6.2011 - Saarbrücker Reihe “Single Pass” phased model to cope with US DoDregulatory requirements “I believe in this concept, but the implementation is risky and invites failure.” Winston W. Royce, “Managing the development of large software systems”, Aug 1970 Source: SilvanaWasitova
Winston Royce’s Recommendation 7.6.2011 - Saarbrücker Reihe Iterations between phases, hopefully confined to successive steps Source: SilvanaWasitova
Winston Royce’s “Problem” Model 7.6.2011 - Saarbrücker Reihe Problem:Testing phase, at the end of  Development cycle, is the first time the integrated components are “experienced”. Failure may require a major redesign, or modifying the requirements. Can expect up to 100% schedule and/or cost overrun.  Source: SilvanaWasitova
Scrum 7.6.2011 - Saarbrücker Reihe
7.6.2011 - Saarbrücker Reihe
Product Life Cycle  Project Project Project Project Project Project Project Project 7.6.2011 - Saarbrücker Reihe
Product Life Cycle for Small Project 7.6.2011 - Saarbrücker Reihe
I P C E M&C Scrum 7.6.2011 - Saarbrücker Reihe
Scrum Project Management Process 7.6.2011 - Saarbrücker Reihe
Project Charter 7.6.2011 - Saarbrücker Reihe
Roadmap 7.6.2011 - Saarbrücker Reihe
Product Backlog High priority Sprint Medium Priority Release Future Releases 7.6.2011 - Saarbrücker Reihe
Assumptions The customer do only have to define the vision The customer do not really know the whole scope – wetoo! To maximize value and reducerisk, iteration planning sounds the best solution to measureeffectiveness And give us freedom to on-going change 7.6.2011 - Saarbrücker Reihe
How? 7.6.2011 - Saarbrücker Reihe
Who are the stakeholders? 7.6.2011 - Saarbrücker Reihe
The power of Scrum comesfrom Time-boxing 4 hours 4 hours 4 hours 3hours Sprint Planning Sprint Review Retrospective Sprint Planning 15’ Daily Meetings SPRINT 30 days 7.6.2011 - Saarbrücker Reihe
PMBOK Strengths Process oriented Clearproject kickoff & administrative initiation Enumeration of stakeholders, formalizedcommunication plan More explicitly calls for cost management Outlinesrisk management approach: identification, qualitative and quantitative analysis, response planning 7.6.2011 - Saarbrücker Reihe Source: SilvanaWasitova
Scrum Strengths Empowered, self-organizing team Collaboration, cross-fertilization, shared responsibilities & commitments Allows for adjustments and learnings produce a better results Risk management  smaller units of work more accurate Frequent checks  fewer surprises & delays Welcomes voice of the customer 7.6.2011 - Saarbrücker Reihe Source: SilvanaWasitova
Scrum Values 7.6.2011 - Saarbrücker Reihe
Transparency 7.6.2011 - Saarbrücker Reihe
7.6.2011 - Saarbrücker Reihe Inspection
7.6.2011 - Saarbrücker Reihe adaptation
3 Examples 7.6.2011 - Saarbrücker Reihe
Fixed time & Fixed Scope 3 months to build a CMS for a Global E-Commerce 7.6.2011 - Saarbrücker Reihe
Scrum to increase Releases Global industrycompanyneeding to increase the releases of the R&D Departments 7.6.2011 - Saarbrücker Reihe
Scrum to increaseStakeholder participation 7.6.2011 - Saarbrücker Reihe Support of Government’s PMO
Resources 7.6.2011 - Saarbrücker Reihe http://www.slideshare.net/wasitova/pmbok-and-scrum-best-of-both-worlds
Companies using SCRUM 7.6.2011 - Saarbrücker Reihe
Thanks 7.6.2011 - Saarbrücker Reihe
pierreneis@gmail.com 7.6.2011 - Saarbrücker Reihe

Más contenido relacionado

Similar a Scrum & PMbok @ pmi

Presentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar MudiakalPresentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar Mudiakal
PMI_IREP_TP
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?

Similar a Scrum & PMbok @ pmi (20)

Agile Project Management Process- Vasudev Prabhu
Agile Project Management Process- Vasudev PrabhuAgile Project Management Process- Vasudev Prabhu
Agile Project Management Process- Vasudev Prabhu
 
The Agile PMO
The Agile PMOThe Agile PMO
The Agile PMO
 
Meeting For Starting New Project Powerpoint Presentation Slides
Meeting For Starting New Project Powerpoint Presentation SlidesMeeting For Starting New Project Powerpoint Presentation Slides
Meeting For Starting New Project Powerpoint Presentation Slides
 
Presentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar MudiakalPresentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar Mudiakal
 
PMP Training
PMP TrainingPMP Training
PMP Training
 
Understand SAP ASAP 8.0
Understand SAP ASAP 8.0Understand SAP ASAP 8.0
Understand SAP ASAP 8.0
 
Agile Project Management training by manohar prasad
Agile Project Management training by manohar prasadAgile Project Management training by manohar prasad
Agile Project Management training by manohar prasad
 
Introducing SCRUM
Introducing SCRUM Introducing SCRUM
Introducing SCRUM
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
SAP agile proof of concept
SAP agile proof of conceptSAP agile proof of concept
SAP agile proof of concept
 
Agile Comes to You (Mironov, Bellevue)
Agile Comes to You (Mironov, Bellevue)Agile Comes to You (Mironov, Bellevue)
Agile Comes to You (Mironov, Bellevue)
 
Kickoff Meeting Powerpoint Presentation Slides
Kickoff Meeting Powerpoint Presentation SlidesKickoff Meeting Powerpoint Presentation Slides
Kickoff Meeting Powerpoint Presentation Slides
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
10 Key Words of Agile Scrum
10 Key  Words of Agile Scrum10 Key  Words of Agile Scrum
10 Key Words of Agile Scrum
 
Project_Management.pptx
Project_Management.pptxProject_Management.pptx
Project_Management.pptx
 
Project Launch Meeting Powerpoint Presentation Slides
Project Launch Meeting Powerpoint Presentation SlidesProject Launch Meeting Powerpoint Presentation Slides
Project Launch Meeting Powerpoint Presentation Slides
 
sandeep sisodia rspl cv
sandeep sisodia rspl cvsandeep sisodia rspl cv
sandeep sisodia rspl cv
 
Project Mgmt Fundamentals
Project Mgmt FundamentalsProject Mgmt Fundamentals
Project Mgmt Fundamentals
 
Project Launch Meeting PowerPoint Presentation Slides
Project Launch Meeting PowerPoint Presentation SlidesProject Launch Meeting PowerPoint Presentation Slides
Project Launch Meeting PowerPoint Presentation Slides
 
AgilePM® - Agile Project Management - Foundation
AgilePM® - Agile Project Management - FoundationAgilePM® - Agile Project Management - Foundation
AgilePM® - Agile Project Management - Foundation
 

Más de Pierre E. NEIS

Más de Pierre E. NEIS (20)

Organised for devops
Organised for devopsOrganised for devops
Organised for devops
 
The twelve step to transform your company, Agile Spain 2022
The twelve step to transform your company, Agile Spain 2022The twelve step to transform your company, Agile Spain 2022
The twelve step to transform your company, Agile Spain 2022
 
Twelve steps to transform your company
Twelve steps to transform your companyTwelve steps to transform your company
Twelve steps to transform your company
 
Les 12 étapes de la transformation agile
Les 12 étapes de la transformation agileLes 12 étapes de la transformation agile
Les 12 étapes de la transformation agile
 
From whale to swarm
From whale to swarmFrom whale to swarm
From whale to swarm
 
Swarming... how to launch every activities in the new normal
Swarming... how to launch every activities in the new normalSwarming... how to launch every activities in the new normal
Swarming... how to launch every activities in the new normal
 
Vucagile... my kind of Agile in the New Normal
Vucagile... my kind of Agile in the New NormalVucagile... my kind of Agile in the New Normal
Vucagile... my kind of Agile in the New Normal
 
Decision making in the new normal
Decision making in the new normalDecision making in the new normal
Decision making in the new normal
 
Agile SAP ACTIVATE
Agile SAP ACTIVATEAgile SAP ACTIVATE
Agile SAP ACTIVATE
 
Requisite agility
Requisite agilityRequisite agility
Requisite agility
 
What is agile?
What is agile?What is agile?
What is agile?
 
What is agile coaching?
What is agile coaching?What is agile coaching?
What is agile coaching?
 
What's agile? (Scaling agile and dev ops Scotland)
What's agile? (Scaling agile and dev ops Scotland)What's agile? (Scaling agile and dev ops Scotland)
What's agile? (Scaling agile and dev ops Scotland)
 
Introduction to agile organisations (ao) NYC, Requisite Agility Unsymposium
Introduction to agile organisations (ao) NYC, Requisite Agility UnsymposiumIntroduction to agile organisations (ao) NYC, Requisite Agility Unsymposium
Introduction to agile organisations (ao) NYC, Requisite Agility Unsymposium
 
At strasbourg AO le futur des organisations agiles
At strasbourg AO le futur des organisations agilesAt strasbourg AO le futur des organisations agiles
At strasbourg AO le futur des organisations agiles
 
What kind of agile is your agile?
What kind of agile is your agile?What kind of agile is your agile?
What kind of agile is your agile?
 
AO, the future of agile organisations the sap case #3
AO, the future of agile organisations   the sap case #3AO, the future of agile organisations   the sap case #3
AO, the future of agile organisations the sap case #3
 
AO, the sap case
AO, the sap caseAO, the sap case
AO, the sap case
 
Digitale Transformationen und Service Design
Digitale Transformationen und Service DesignDigitale Transformationen und Service Design
Digitale Transformationen und Service Design
 
An introduction to agile organisation
An introduction to agile organisation An introduction to agile organisation
An introduction to agile organisation
 

Último

NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 

Último (20)

Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA Firms
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 

Scrum & PMbok @ pmi

  • 1. Scrum & PMI How can that go well? 7.6.2011 - Saarbrücker Reihe
  • 2. 7.6.2011 - Saarbrücker Reihe Pierre Neis PMO Advisor / Scrum & Lean Coach
  • 3. Project management 7.6.2011 - Saarbrücker Reihe
  • 4. Project Management Issues 7.6.2011 - Saarbrücker Reihe
  • 5. Project Management scope time resources 7.6.2011 - Saarbrücker Reihe
  • 6. Agile Project Management scope time Quality resources 7.6.2011 - Saarbrücker Reihe
  • 7. PMBOK 7.6.2011 - Saarbrücker Reihe
  • 8. Product Life Cycle Project Project Project Project Project Project Project Project 7.6.2011 - Saarbrücker Reihe
  • 9. Product Life Cycle for Small Project 7.6.2011 - Saarbrücker Reihe
  • 10. I P C E M&C Source Rita Mulcahy 7.6.2011 - Saarbrücker Reihe
  • 11. Product Life Cycle for IT Projects I I I I I I I I P P P P P P P P C C C C C C C C E E E E E E E E M&C M&C M&C M&C M&C M&C M&C M&C 7.6.2011 - Saarbrücker Reihe
  • 12. Value Steam I I I I I I I I P P P P P P P P C C C C C C C C Lead Time Lead Time Lead Time E E E E E E E E M&C M&C M&C M&C M&C M&C M&C M&C Lead Time Lead Time Lead Time Lead Time 7.6.2011 - Saarbrücker Reihe
  • 13. How long doesittake? 7.6.2011 - Saarbrücker Reihe
  • 14. And yourcustomer? 7.6.2011 - Saarbrücker Reihe
  • 15. Winston W. Royce  (1929–1995) was an American computer scientist, director at Lockheed Software Technology Center in Austin, Texas, and one of the leaders in software development in the second half of the 20th century.[1] He was the first who described the Waterfall model for software development, although Royce did not use the term "waterfall" in that article, [2] nor advocated the waterfall model as a working methodology. 7.6.2011 - Saarbrücker Reihe
  • 16. Winston Royce’s “Grandiose” Model 7.6.2011 - Saarbrücker Reihe “Single Pass” phased model to cope with US DoDregulatory requirements “I believe in this concept, but the implementation is risky and invites failure.” Winston W. Royce, “Managing the development of large software systems”, Aug 1970 Source: SilvanaWasitova
  • 17. Winston Royce’s Recommendation 7.6.2011 - Saarbrücker Reihe Iterations between phases, hopefully confined to successive steps Source: SilvanaWasitova
  • 18. Winston Royce’s “Problem” Model 7.6.2011 - Saarbrücker Reihe Problem:Testing phase, at the end of Development cycle, is the first time the integrated components are “experienced”. Failure may require a major redesign, or modifying the requirements. Can expect up to 100% schedule and/or cost overrun. Source: SilvanaWasitova
  • 19. Scrum 7.6.2011 - Saarbrücker Reihe
  • 21. Product Life Cycle Project Project Project Project Project Project Project Project 7.6.2011 - Saarbrücker Reihe
  • 22. Product Life Cycle for Small Project 7.6.2011 - Saarbrücker Reihe
  • 23. I P C E M&C Scrum 7.6.2011 - Saarbrücker Reihe
  • 24. Scrum Project Management Process 7.6.2011 - Saarbrücker Reihe
  • 25. Project Charter 7.6.2011 - Saarbrücker Reihe
  • 26. Roadmap 7.6.2011 - Saarbrücker Reihe
  • 27. Product Backlog High priority Sprint Medium Priority Release Future Releases 7.6.2011 - Saarbrücker Reihe
  • 28. Assumptions The customer do only have to define the vision The customer do not really know the whole scope – wetoo! To maximize value and reducerisk, iteration planning sounds the best solution to measureeffectiveness And give us freedom to on-going change 7.6.2011 - Saarbrücker Reihe
  • 29. How? 7.6.2011 - Saarbrücker Reihe
  • 30. Who are the stakeholders? 7.6.2011 - Saarbrücker Reihe
  • 31. The power of Scrum comesfrom Time-boxing 4 hours 4 hours 4 hours 3hours Sprint Planning Sprint Review Retrospective Sprint Planning 15’ Daily Meetings SPRINT 30 days 7.6.2011 - Saarbrücker Reihe
  • 32. PMBOK Strengths Process oriented Clearproject kickoff & administrative initiation Enumeration of stakeholders, formalizedcommunication plan More explicitly calls for cost management Outlinesrisk management approach: identification, qualitative and quantitative analysis, response planning 7.6.2011 - Saarbrücker Reihe Source: SilvanaWasitova
  • 33. Scrum Strengths Empowered, self-organizing team Collaboration, cross-fertilization, shared responsibilities & commitments Allows for adjustments and learnings produce a better results Risk management smaller units of work more accurate Frequent checks  fewer surprises & delays Welcomes voice of the customer 7.6.2011 - Saarbrücker Reihe Source: SilvanaWasitova
  • 34. Scrum Values 7.6.2011 - Saarbrücker Reihe
  • 35. Transparency 7.6.2011 - Saarbrücker Reihe
  • 36. 7.6.2011 - Saarbrücker Reihe Inspection
  • 37. 7.6.2011 - Saarbrücker Reihe adaptation
  • 38. 3 Examples 7.6.2011 - Saarbrücker Reihe
  • 39. Fixed time & Fixed Scope 3 months to build a CMS for a Global E-Commerce 7.6.2011 - Saarbrücker Reihe
  • 40. Scrum to increase Releases Global industrycompanyneeding to increase the releases of the R&D Departments 7.6.2011 - Saarbrücker Reihe
  • 41. Scrum to increaseStakeholder participation 7.6.2011 - Saarbrücker Reihe Support of Government’s PMO
  • 42. Resources 7.6.2011 - Saarbrücker Reihe http://www.slideshare.net/wasitova/pmbok-and-scrum-best-of-both-worlds
  • 43. Companies using SCRUM 7.6.2011 - Saarbrücker Reihe
  • 44. Thanks 7.6.2011 - Saarbrücker Reihe
  • 45. pierreneis@gmail.com 7.6.2011 - Saarbrücker Reihe

Notas del editor

  1. Source: SilvanaWasitovaWinston W. Royce,Managing the development of large software systemsProc. IEEE WESCON, Aug 1970Royce developed the phased delivery model to cope with regulatory requirements set out in the US DoD STD-2167 document, which was so byzantine and bureaucratic that the waterfall was the only way to cope with it;
  2. Source: SilvanaWasitovaWinston W. Royce,Managing the development of large software systemsProc. IEEE WESCON, Aug 1970Royce’s Son:http://usability.typepad.com/confusability/2006/02/index.html
  3. Source: SilvanaWasitovahttp://www.techdarkside.com/is-there-really-any-rigor-in-waterfallIt is sad that software development philosophies and practices developed in a world of government regulation, punch cards, and very expensive computer time still have such a strong a hold on today’s commercial software development.Ben Simohttp://QuestioningSoftware.com
  4. Source: SilvanaWasitovaDiscipline:Structured approach,Plan aheadmodel itself progresses linearly through discrete, easily understandable and explainable phases and thus is easy to understand; it also provides easily markable milestones in the development process.Steve McConnell, in Code Complete, (a book that criticizes widespread use of the waterfall model) refers to design as a "wicked problem"—a problem whose requirements and limitations cannot be entirely known before completion. The implication of this is that it is impossible to perfect one phase of software development, thus it is impossible if using the waterfall model to move on to the next phase.David Parnas, in A Rational Design Process: How and Why to Fake It, writes:[5]“Many of the [system's] details only become known to us as we progress in the [system's] implementation. Some of the things that we learn invalidate our design and we must backtrack.”The idea behind the waterfall model may be "measure twice; cut once," and those opposed to the waterfall model argue that this idea tends to fall apart when the problem constantly changes due to requirement modifications and new realizations about the problem itself. A potential solution is for an experienced developer to spend time up front on refactoring to consolidate the software, and to prepare it for a possible update, no matter if such is planned already. Another approach is to use a design targeting modularity with interfaces, to increase the flexibility of the software with respect to the design.[edit] Modified modelsIn response to the perceived problems with the pure waterfall model, many modified waterfall models have been introduced. These models may address some or all of the criticisms of the pure waterfall model.[citation needed] Many different models are covered by Steve McConnell in the "lifecycle planning" chapter of his book Rapid Development: Taming Wild Software Schedules.
  5. Source: SilvanaWasitovaDiscipline: rhythm, daily scrum, work agreements, consistentAgile approach is Great Risk Management:Risk of not pleasing the customerRisk of poor estimation and planningRisk of festering issues and delaysRisk of over-commitmentRisk of not being able to ship