Joint Traffic Management Center Parking Structure
Location: Honolulu, Hawaii
Submitted by: Baldridge & Associates Structural Engineering (BASE)
Owner: City & County of Honolulu, Department of Transportation Services
Architect(s): Anbe, Aruga & Ishizu, Architects, Inc.
Engineer(s): Baldridge & Associates Structural Engineering, Inc. (BASE)
Contractor: Hawaiian Dredging Construction Company, Inc.
PT Supplier: CMC Cable (Supplier)
Other Contributors: Associated Steel Workers (PT Installer)
Joint Traffic Management Center Parking Structure
Project Highlights:
• Exemplifies the cost-effectiveness of PT, with the cast-in-place
post-tensioned design being selected over a precast, prestressed
alternate.
• Using BIM, the design/construction team was able to reduce the
structure size and, as a result, seismic loading, yet maximize the
parking stall count.
• Use of cast-in-place post-tensioned concrete enabled the
designers to round off two corners to meet the aesthetic
requirements of the owner.
• Efficient design resulted in a savings of materials while increasing
the number of vehicles that could be accommodated, enabling
the structure to attain a LEED Gold rating.
Joint Traffic Management Center Parking Structure
Project Overview:
In March 2010, the city and county of Honolulu released a competitive
design-build request for proposal (RFP) to design and construct a multi-
storied, access-controlled parking structure sufficient to accommodate a
minimum of 380 cars in addition to providing parking space for 16 buses
and two travel lanes at grade. The RFP included structural documentation
for a 128 ft wide by 249 ft long trapezoidal-shaped parking structure but
allowed the contractors to submit an Alternate Technical concept.
The RFP included two structural scenarios. The first was a precast
prestressed structure using double tees, inverted L-beam girders, and
precast perimeter girders. The second was a cast-in-place system using
37 in. deep post-tensioned beams spaced at 18 ft on center.
Joint Traffic Management Center Parking Structure
Project Overview Continued:
The contractor, architect, and structural engineer worked together
collaboratively to develop an alternate post-tensioned concrete scheme
based on a revised column grid optimized for the site dimensions,
parking layout, and reuse of the forming system. The final grid system
was based on a 24 by 60 ft module that fit equally in to eight bays of the
ramping portion of the garage. The layout resulted in a more efficient but
slightly smaller 122 ft wide by 247 ft long trapezoidal typical floor that
reduced the mass of the building while saving material use for the
construction of the parking deck.
The revised column grid also reduced the maximum span of the typical
girders without losing any functionality in the garage. This shorter span
also allowed the structural depth of the system to be reduced. Through
coordination within the team using a project building information
modeling (BIM) model, they were able to reduce the floor-to-floor height
by 6 in. The final layout included a 6 in.
thick post-tensioned slab supported by 31 in. deep post-tensioned
girders.
Joint Traffic Management Center Parking Structure
Project Overview Continued:
The Joint Traffic Management Center Parking Structure was completed in
January 2012. Through the use of post-tensioning, along with the hard
work and innovation of the architect, the structural engineer, and the
contractor, the city and county of Honolulu now has a parking structure
that meets its functional requirements, is an attractive addition to the
Hawaii Capital Special District, and is LEED Gold certified.
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure

Más contenido relacionado

La actualidad más candente

Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationCrosstown TO
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open houseCrosstown TO
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Josia Tannos, EIT
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - CambridgeMarian Vargas Mendoza
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21CramondandBarntonCom
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open houseCrosstown TO
 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNew Jersey Future
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
North link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalNorth link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalseatransitblog
 
West district library presentation
West district library presentationWest district library presentation
West district library presentationottawapubliclibrary
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Planawweiss
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsCity of College Station
 

La actualidad más candente (19)

Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
2009 CNU New England Urbanism Awards
2009 CNU New England Urbanism Awards2009 CNU New England Urbanism Awards
2009 CNU New England Urbanism Awards
 
Presentation Master
Presentation MasterPresentation Master
Presentation Master
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizio
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
North link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalNorth link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 final
 
+
++
+
 
West district library presentation
West district library presentationWest district library presentation
West district library presentation
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
 

Destacado

San Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersSan Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersPostTensioningInstitute
 
Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
 Rehabilitation of a Parking Garage in Downtown Milwaukee, WI Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
Rehabilitation of a Parking Garage in Downtown Milwaukee, WIPostTensioningInstitute
 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywayPostTensioningInstitute
 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)PostTensioningInstitute
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structuresLuan Truong Van
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 

Destacado (19)

Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
 
San Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersSan Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission Headquarters
 
2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
 
Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
 Rehabilitation of a Parking Garage in Downtown Milwaukee, WI Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
 
Reinforcement of Driscoll Bridge
Reinforcement of Driscoll BridgeReinforcement of Driscoll Bridge
Reinforcement of Driscoll Bridge
 
The Trump International Hotel & Tower
The Trump International Hotel & TowerThe Trump International Hotel & Tower
The Trump International Hotel & Tower
 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: Skyway
 
I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
 
Wacker Drive Viaduct Reconstruction
Wacker Drive Viaduct ReconstructionWacker Drive Viaduct Reconstruction
Wacker Drive Viaduct Reconstruction
 
Sky View Parc
Sky View ParcSky View Parc
Sky View Parc
 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 

Similar a Joint Traffic Management Center Parking Structure

Transportation Systems Design Project
Transportation Systems Design ProjectTransportation Systems Design Project
Transportation Systems Design ProjectMegan Hanrahan
 
Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyKevin Fust
 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions Teresa Elliott
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptxPrabhuGurusamy2
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Centeraiahouston
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...AamerShakoor
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfRavenousSolos
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxOffshore outsourcing India
 
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...itech2017
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM tekenstudio 3D
 
A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016Comit Projects Ltd
 

Similar a Joint Traffic Management Center Parking Structure (20)

Transportation Systems Design Project
Transportation Systems Design ProjectTransportation Systems Design Project
Transportation Systems Design Project
 
Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case Study
 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
 
Final_Capstone_2016
Final_Capstone_2016Final_Capstone_2016
Final_Capstone_2016
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptx
 
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
 
A-insinoorit
A-insinooritA-insinoorit
A-insinoorit
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
 
Sujal Mamadgi Work Samples
Sujal Mamadgi Work SamplesSujal Mamadgi Work Samples
Sujal Mamadgi Work Samples
 
A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016
 
Sujal Mamadgi Work Samples
Sujal Mamadgi Work SamplesSujal Mamadgi Work Samples
Sujal Mamadgi Work Samples
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
 
Sujal Mamadgi - Work Samples
Sujal Mamadgi - Work SamplesSujal Mamadgi - Work Samples
Sujal Mamadgi - Work Samples
 

Último

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 

Último (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 

Joint Traffic Management Center Parking Structure

  • 1. Joint Traffic Management Center Parking Structure
  • 2. Location: Honolulu, Hawaii Submitted by: Baldridge & Associates Structural Engineering (BASE) Owner: City & County of Honolulu, Department of Transportation Services Architect(s): Anbe, Aruga & Ishizu, Architects, Inc. Engineer(s): Baldridge & Associates Structural Engineering, Inc. (BASE) Contractor: Hawaiian Dredging Construction Company, Inc. PT Supplier: CMC Cable (Supplier) Other Contributors: Associated Steel Workers (PT Installer) Joint Traffic Management Center Parking Structure
  • 3. Project Highlights: • Exemplifies the cost-effectiveness of PT, with the cast-in-place post-tensioned design being selected over a precast, prestressed alternate. • Using BIM, the design/construction team was able to reduce the structure size and, as a result, seismic loading, yet maximize the parking stall count. • Use of cast-in-place post-tensioned concrete enabled the designers to round off two corners to meet the aesthetic requirements of the owner. • Efficient design resulted in a savings of materials while increasing the number of vehicles that could be accommodated, enabling the structure to attain a LEED Gold rating. Joint Traffic Management Center Parking Structure
  • 4. Project Overview: In March 2010, the city and county of Honolulu released a competitive design-build request for proposal (RFP) to design and construct a multi- storied, access-controlled parking structure sufficient to accommodate a minimum of 380 cars in addition to providing parking space for 16 buses and two travel lanes at grade. The RFP included structural documentation for a 128 ft wide by 249 ft long trapezoidal-shaped parking structure but allowed the contractors to submit an Alternate Technical concept. The RFP included two structural scenarios. The first was a precast prestressed structure using double tees, inverted L-beam girders, and precast perimeter girders. The second was a cast-in-place system using 37 in. deep post-tensioned beams spaced at 18 ft on center. Joint Traffic Management Center Parking Structure
  • 5. Project Overview Continued: The contractor, architect, and structural engineer worked together collaboratively to develop an alternate post-tensioned concrete scheme based on a revised column grid optimized for the site dimensions, parking layout, and reuse of the forming system. The final grid system was based on a 24 by 60 ft module that fit equally in to eight bays of the ramping portion of the garage. The layout resulted in a more efficient but slightly smaller 122 ft wide by 247 ft long trapezoidal typical floor that reduced the mass of the building while saving material use for the construction of the parking deck. The revised column grid also reduced the maximum span of the typical girders without losing any functionality in the garage. This shorter span also allowed the structural depth of the system to be reduced. Through coordination within the team using a project building information modeling (BIM) model, they were able to reduce the floor-to-floor height by 6 in. The final layout included a 6 in. thick post-tensioned slab supported by 31 in. deep post-tensioned girders. Joint Traffic Management Center Parking Structure
  • 6. Project Overview Continued: The Joint Traffic Management Center Parking Structure was completed in January 2012. Through the use of post-tensioning, along with the hard work and innovation of the architect, the structural engineer, and the contractor, the city and county of Honolulu now has a parking structure that meets its functional requirements, is an attractive addition to the Hawaii Capital Special District, and is LEED Gold certified. Joint Traffic Management Center Parking Structure