Testing
High Voltage
Breakers




A guide to understanding
what is involved with
keeping the lights on
                                                   www.megger.com/us




The word “Megger” is a registered trademark
Table of Contents




Introduction............................................................. 2       Coil Current Measurements ................................... 9
Why Test Breakers? ................................................. 3             Travel Motion ........................................................... 9
Bad things can happen ........................................... 4                Breaker Timing and SC Points ................................ 10
Maintenance Strategies.......................................... 5                 First Trip ................................................................. 11
What to test ............................................................ 6       Working between the Grounds ........................... 11
  Timing Measurements.............................................. 6              Vibration Testing .................................................... 12
  Coil Measurements .................................................. 7           Test Method........................................................... 12
  Travel Measurements ............................................... 7           Failure Mode Analysis .......................................... 14
  Minimum Trip Voltage .............................................. 7           After the Test: Data Interpretation ...................... 15
  Contact Resistance/Ductor ....................................... 7             Megger Test Instruments...................................... 16
What is Static Resistance? ...................................... 7               How to Mount a Motion Transducer ................... 17
What is Dynamic Resistance? ................................. 7                   DRM (Dynamic Resistance Measurements) ......... 19
  A Look Inside ........................................................... 7     References ............................................................. 19
  Timing .................................................................... 8




				                                                                                                            TeSTinG	HiGH	VolTaGe	BreakerS	                 1
InTroducTIon                                                          The most recent addition to the Megger product line is                  why TesT Breakers                                                     The task of the utility is to generate power, transmit it and
What’s in the name...?                                                an innovative range of instruments for testing data and                 Some of the most important of the many reasons for testing            distribute it with maximum availability. While doing this, it is
                                                                      telecommunication installations. Working with both copper               circuit breakers are:                                                 imperative that losses are kept to a minimum, and acceptable
For over 100 years, Megger has been a premier provider of
                                                                      and optical technologies, and collaborating closely with the                                                                                  levels of power quality and safety are maintained. All of this
test equipment and measuring instruments for electrical power                                                                                 n		 To	guard	against	damage	to	expensive	equipment
                                                                      major industry players, Megger has developed easy-to-use                                                                                      must be done in an environmentally friendly manner. Breakers
applications. The Megger trademark was first registered in                                                                                    n		 To	prevent	outages	that	lead	to	loss	of	income
                                                                      products to keep the costs of test and measurement down and                                                                                   play an important part in making this happen.
May 1903 and is closely guarded by the company. Although                                                                                      n		 To	ensure	reliability	of	the	electricity	supply
Megger is best known for its world-famous range of insulation         productivity up.
                                                                                                                                              n		 To	prevent	downtime	and	darkness                                  High voltage circuit breakers are extremely important for the
testers, the company provides a full service solution to meet         Megger also operates the renowned AVO Training Institute,                                                                                     function of modern electric power supply systems. The breaker
                                                                                                                                              n		 To	verify	breaker	performance
all electrical test and measurement needs. Megger products            which offers top rated training for electrical maintenance and                                                                                is the active link that ultimately has the role of quickly opening
provide testing solutions for the most critical maintenance           safety through the network of Megger offices. In addition,              Substation breaker testing is an important task for any utility.      the primary circuit when a fault occurs. Often, the breaker has
areas, including cable fault location, protective relay and circuit   the company manufactures STATES® terminal blocks and                    The breakers are there to facilitate the flow of current during       to perform its duty within a few milliseconds, after months,
breaker testing, and power quality testing. With such a diverse       test switches, which are specified by many major electric               normal operation and to interrupt current flow in the event of        perhaps years of idly standing by. Since RCM (reliability
product offering, Megger is the single source for electrical test     utilities. For over 65 years, test technicians and engineers            a fault. But any and all electrically operated devices are, sooner    centered maintenance) and condition based maintenance
and measuring instruments.                                            have depended on STATES products to provide easy access to              or later, likely to experience some kind of failure. That failure     have become the established strategies for most owners and
                                                                      wiring on panel boards and switchboards, to eliminate wiring            can be caused by many factors, including ageing and external          operators of electric power delivery systems, the need for
The Megger product offering spans 30 distinct product groups
                                                                      reconnection errors and to save operator time.                          faults. The utility operator has to be prepared and have a plan       reliable and accurate test instruments for field use is clear.
with over 1,000 specific products.
                                                                                                                                              in place to handle every situation.                                   Protection systems are put in place to detect all electrical
Circuit breaker test sets, watt-hour meter test equipment and         Megger manufactures and markets products on a global
                                                                      scale. Its principal manufacturing sites are in College Station         This document will help readers to understand what is involved        faults or other abnormal operating conditions and they are
protective relay test instruments, instruments used for testing
                                                                      and Dallas, Texas; Valley Forge, Pennsylvania, Dover, England           with keeping circuit breakers operating at peak performance.          coordinated to disconnect the smallest possible part of a
and maintaining transformers, batteries and underground
                                                                      and Täby, Sweden. Sales and technical support offices are               Breakers are mechanically challenging devices requiring               power system in the event of a fault. With good system
cables and other products designed for the power industry
                                                                      maintained at each manufacturing site as well as in Sydney,             periodic adjustments. The need for some of these adjustments          design, it should be possible to quickly restore normal
were formerly supplied under the Biddle, Multi-Amp, PAX
                                                                      Australia; Toronto, Canada; Paris, France; Oberursel, Germany;          can be determined visually and they can be given the attention        operation.
Diagnostics and Programma brands. Among other innovations,
Megger developed the first completely automatic, software             Mumbai, India, Johannesburg, South Africa; Oberkulm,                    needed without testing. However, in most cases, it will be            When a fault is detected by a protective relay and a trip
driven protective relay test system in 1984 and the first             Switzerland, Chonburi, Thailand and Bahrain, UAE. With                  necessary to carry out electrical testing to find out what is the     impulse is sent to the breaker operating mechanism, the
commercial cable fault locator in 1950.                               a global network of hundreds of sales representatives,                  cause of out-of-tolerance conditions.                                 breaker has to function as specified and interrupt the current
                                                                      product literature and user manuals in eight languages, and                                                                                   as soon as possible or severe damage may occur. The cost of
Manufacturing insulation testers from 1kV to 10kV is where                                                                                    This document primarily deals with electrical testing.
                                                                      multilingual product software, Megger is a local supplier for                                                                                 damage caused by a malfunctioning breaker can often reach
Megger started, and the Megger brand name is so well known            customers anywhere in the world.                                                                                                              millions of dollars.
today that maintenance professionals often incorrectly use it
as a verb when they refer to insulation testing on wiring. This       All Megger products meet the highest standards for quality,                                                                                   Proper functioning of a breaker is reliant on a number of
famous name dates back to 1889, when the first portable               reliability and safety. All of the company’s facilities are certified                                                                         individual components that have to be calibrated and tested at
insulation tester was introduced with the MEGGER brand.               as meeting the requirements of the ISO 9001 quality standard,                                                                                 regular intervals. The trigger for maintenance intervals differs
                                                                      and the Dover and Täby sites are also certified to ISO14001,                                                                                  greatly between utilities but the intervals are often based
Recently, Megger acquired PAX diagnostics, adding sweep               the international environmental standard. Megger is constantly                                                                                on time since last test, number of operations, or severity of
frequency diagnostic test equipment to its portfolio. Megger          striving to maximize quality, thereby ensuring that the                                                                                       fault current operations. Environmental considerations such
enjoys an outstanding reputation in the areas of ground               experience of its customers is always world class.                                                                                            as humidity and temperature, whether the breaker is located
testing, oil testing and as a supplier of electrical contractor
                                                                                                                                                                                                                    in a desert or coastal region, also play into the maintenance
maintenance tools such as multimeters, portable appliance             who should read ThIs documenT?
                                                                                                                                                                                                                    scheme.
testers and clamp-on meters.                                          This document is intended for engineers and technicians in the
                                                                      power, industrial and utility sectors who wish to learn how to          HV Breakers in a transmission scheme can be viewed as                 Mechanical wear and lubrication often affects the
                                                                      test substation circuit breakers.                                       forming a tree starting with the generating station, fanning          performance of breakers, so being able to trend mission
                                                                                                                                              out to the transmission grid, to the distribution grid, and finally   critical parameters and compare these with factory thresholds
                                                                                                                                              to the point of consumption.                                          helps to verify proper breaker functionality.




	 2	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                          				                                                                                           TeSTinG	HiGH	VolTaGe	BreakerS	        3
Bad ThIngs can happen – safeTy fIrsT!                               2) There was a ground fault a few years ago that caused the        According to a recent study, the following were the most         Whatever form of maintenance approach is selected, the most
There are many things to consider when testing a HV Breaker,        insulating oil inside a transformer to evaporate and finally it    commonly reported breaker problems:                              important goal is to achieve maximum reliability at the
but first and foremost, it is essential to think about safety.      caught fire. The upstream breaker should have cleared this                                                                          lowest possible life cycle cost. The bottom line is usually
                                                                                                                                           Does not close on command               34%
Always:                                                             fault, but it was too late.                                                                                                         $$$$ but do not forget personal safety!
                                                                                                                                           Does not open on command                14%
n		 Make	sure	the	breaker	is	isolated	and	grounded                  3) In Ohio, thieves removed the ground conductors in a                 Breakdowns (poles, ground)               8%                  Ideally a non-invasive method of testing should be used;
n		 Disconnect	the	breaker	control	circuit	from	test	               substation. This resulted in a fire that was put out before it         Operates without command                 7%                  with Megger equipment it is possible to compare measured
    equipment	before	performing	work	on	the	breaker                 caused major damage, but it could have easily led to a disaster        Others                                 30+%                  values of key parameters with the values that are given by
n		 observe	polarity                                                had it not been caught in time.                                                                    (Courtesy CIGRE)                 the circuit breaker manufacturer. A series of tests are carried
n		 Use	touch-proof	connectors                                                                                                         The same study listed the most common fault areas as:            out to provide a comparison with previous results or to create
n		 Connect	the	ground	to	the	test	equipment                                                                                                                                                            a “footprint” for future reference and comparison. Where
                                                                                                                                              Operating mechanism                      70%
n		 Comply	with	local	safety	regulations                                                                                                                                                                changes are discovered, further tests and analysis can be
                                                                                                                                              Interrupters                             14%
n		 exercise	care	before	operating	a	breaker                                                                                                                                                            carried out to trace the cause of deviations from the reference
                                                                                                                                              Insulation                                 6%
                                                                                                                                                                                                        and to determine corrective action.
                                                                                                                                              Frame/foundation                           5%
As with any electromechanical device, things can happen                                                                                                                                                 Corrective Maintenance
                                                                                                                                              All others                                 5%
that cause problems in the substation. The mantra of most
                                                                                                                                                                        (Courtesy CIGRE)                n	 when	something	has	already	happened
utilities is “Thou shall not fail to trip” when talking about the
                                                                                                                                       With some breakers, it is also useful to look at the frequency   Preventive Maintenance
breakers.
                                                                                                                                       of operation when determining the maintenance strategy.          n	 based	on	time	or	number	of	operations
But ensuring that the breaker will operate when needed                                                                                 For example:                                                     Periodic Maintenance
requires maintenance. Testing is essential.
                                                                                                                                           No of operations                      >10,000                n	carried out at regular intervals
It is not always an electrical failure that causes a breaker to                                                                            Time                                 >20 years               Condition-Based Maintenance
trip, as the following examples show.                                                                                                  Actual service, number of operations                             n	 a	maintenance	flag	is	set
1) Animals can get across the hot line of a breaker and cause                                                                                 Line CBs                            <50/yea               Predictive Maintenance
an unexpected trip, as can be seen in the photo below where         4) Even in a substation with batteries controlling the operation          Generator CBs                        <1/day               n	 service	only	when	needed
a snake got across a live conductor and ground.                     of the trip coils on breakers, there can be failures.                     Filter CBs                           >1/day               Reliability Centered Maintenance
                                                                                                                                                                                                        n	 predictive	maintenance	but	with	value/importance	
                                                                                                                                                                                                           priorities	taken	into	consideration
                                                                                                                                       maInTenance sTraTegIes
                                                                                                                                       Various utilities, people and organizations have different       No matter which strategy is chosen, it is important to strive
                                                                                                                                       viewpoints on and approaches to maintenance strategies.          to have the same conditions from test to test. High precision
                                                                                                                                       Testing and maintenance methodologies have changed over          signal acquisition is also necessary, together with high
                                                                                                                                       the years and in all likelihood will continue to evolve as new   measurement accuracy and a reliable means of storage
                                                                                                                                       technologies become available. This section is only intended     for data.
                                                                                                                                       to create awareness about some of the possible approaches.
                                                                                                                                                                                                        If the set up work required can be minimized and the
                                                                                                                                       There are no correct or incorrect strategies, but there is
                                                                                                                                                                                                        connection hook-up from the test instrument to the apparatus
                                                                                                                                       sometimes a better way of doing things.
                                                                                                                                                                                                        simplified, faster testing and evaluation of results can be
                                                                                                                                       Approaches to maintenance include but are not limited to         achieved.
                                                                                                                                       the following:
                                                                                                                                                                                                        Testing can be done at various stages in the life of a breaker
                                                                                                                                       n	 Corrective	maintenance                                        including:
                                                                                                                                       n	 Preventative	maintenance
                                                                                                                                                                                                        n	 Development
                                                                                                                                       n	 Periodic	time	interval	based	maintenance
                                                                                                                                                                                                        n	 Production	
                                                                                                                                       n	 Condition	based	maintenance
                                                                                                                                                                                                        n	 Commissioning
                                                                                                                                       n	 reliability	centered	maintenance	(The	primary	aim	
                                                                                                                                                                                                        n	 Maintenance/fault	tracing
                                                                                                                                          here	is	to	preserve	system	functions	by	determining	
                                                                                                                                                                                                        n	 after	service	(re-commissioning)
                                                                                                                                          the	criticality	of	individual	components,	etc.)




	 4	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                   				                                                                                      TeSTinG	HiGH	VolTaGe	BreakerS	      5
Most breaker failures are due to lack of maintenance.             whaT To TesT                                                         Coil Measurements                                                  whaT Is sTaTIc resIsTance
                                                                  Definitions                                                          Coil measurements can be recorded on both close and trip
The three important issues for breaker maintenance are:
                                                                  There are fundamental differences between timing, travel,            coils. If the breaker is gang operated then you will have
n	 lubrication
                                                                  motion, velocity, and acceleration. The differences need to be       one trip coil and one close coil operating all three phases. If
n	 Contact	adjustment
                                                                  explained before going any further.                                  the breaker is an IPO (Independent Pole Operation) breaker
n	 neglect	or	lack	of	maintenance
                                                                  Timing                                                               then you will have a separate close coil for each phase and a
Briefly, the most important thing for breaker maintenance is      Timing is most often measured in milliseconds (ms) but it is         separate open coil for each phase.
grease. ALL breakers use grease as lubricant, and grease tends    occasionally measured in cycles. Note the value of a cycle is        Travel Measurements
to dry out over time. Heat is produced on the breaker parts as    different depending on what region of the world you are in i.e.      Travel measurements include stroke, speed, damping, and
the breaker carries its normal load current and that heat dries   50Hz or 60Hz network.                                                penetration of the main contacts.
out the grease.
                                                                  Close Time                                                           Minimum Trip Voltage
Most breaker manufacturers allow the use of Mobil 28              The time it takes from the moment a circuit breaker receives a       Under normal conditions the breaker should be operated
lubricant, but you should check with the breaker manufacturer     close pulse until the main contact touches.                          at a standard control voltage but the breaker is designed          High contact resistance in circuit breakers is caused by high-
for their specifications. An important thing to keep in mind is                                                                        to operate at a minimum voltage level as well. This test will      current breaking operations. Modern networks are carrying
                                                                  Open Time
NEVER to use WD-40. It has a tendency to evaporate rather                                                                              allow the operator to verify that the breaker coil is operating    increasing loads requiring improved contact resistance.
                                                                  The time it takes from the moment a circuit breaker receives
quickly leaving moving surfaces without lubricant.                                                                                     correctly by injecting a variable coil voltage and observing
                                                                  an open pulse until the main contact separates. This is also                                                                            Potential problems that can be detected:
Further details of that type of maintenance will be left          referred to as Trip Time.                                            whether the breaker maintains proper trip characteristics
                                                                                                                                                                                                          n	 overheating	of	contact	surfaces
for another presentation. This document will continue by                                                                               within acceptable levels of control voltage.
                                                                  Close-Open Time                                                                                                                         n	 internal	breakage	(even	with	a	breaker	in	the	fully	
discussing non-invasive functional testing.                                                                                            Contact Resistance/Ductor                                             closed	position	the	resistance	is	infinite)
                                                                  The time it takes from the initial touch of the main contact
Maintenance and inspection procedures can include any or all      until the main contact separates. This is commonly referred to       Contact resistance tests provide information about how
of the following:                                                 as Trip-Free Time or Contact Dwell Time.                             healthy the contacts are and their ability to handle their rated   whaT Is dynamIc resIsTance?
                                                                                                                                       current. The maximum contact resistance should be verified         A look inside
Test Equipment                                                    Open-Close Time
                                                                                                                                       against manufacturers’ specifications.                             Here is a cut-away view of the inside of an Arcing Chamber of
n	 Micro-ohmmeters                                                The time it takes from contact separation until the contact
                                                                                                                                                                                                          an SF6 Breaker.
n	 Breaker	analyzers                                              touches again. This is often referred to as Reclose time.            Rated current should not be exceeded and testing at 10%
n	 Power	supplies                                                                                                                      of the rated current is recommended. The minimum DC
                                                                  Travel
n	 Vacuum	testers                                                                                                                      test current should be used according to manufactures
                                                                  The travel trace indicates the instantaneous position of the
n	 High	current	sources                                                                                                                specification; however, the IEC and ANSI recommended
                                                                  circuit breaker contacts during an operation. The travel trace
                                                                                                                                       levels are:
Software – including capability to do the following               is a bi-directional linear movement traveling back and forth
                                                                                                                                                    50 A        IEC 60694
                                                                  between the open and closed positions. Travel is measured in
n	 Set	user	defined	parameters                                                                                                                      100 A       ANSI
                                                                  either millimeters or inches.
n	 Create	databases
                                                                                                                                       Contact resistance tests are commonly referred to as a
n	 Generate	reports                                               Velocity
                                                                                                                                       Ductor, micro-ohmmeter, static resistance test or DLRO which
n	 analyze	data                                                   Measured in meters per second (m/s) or feet per second (ft/s)
                                                                                                                                       stands for Digital Low Resistance Ohm Meter. Static Contact        The white nozzle is the Arc Chute for the arcing contact.
                                                                  velocity is calculated from the slope of the travel trace. This is
n	 Create	graphical	presentations                                                                                                      resistance is measured by injecting a DC current through the       The right side of the picture is the stationary part of the
                                                                  the speed at which the main contacts travel.
                                                                                                                                       breaker or device under test and measuring the voltage drop.       contact and the left side with the white nozzle is the moving
                                                                  Acceleration                                                         A four wire measurement method is used. The breaker must           contact. The arcing contact is the metal rod (copper, tungsten,
                                                                  This is the rate of change of velocity of the contacts.              be in the closed position.                                         etc.) that is inserted into the nozzle and is designed to take
                                                                  Electrical testing can reveal much information about the health      Static resistance is measured to reduce switchgear breakdowns      the brunt of the arcing during close and open operations. The
                                                                  of the High Voltage Breaker.                                         caused by high contact resistances across bus bar joints,          ring around the arcing contact is the main contact (silver, silver
                                                                                                                                       breaker contact points and isolators.                              plated copper, etc.) and it functions to carry the load while the
                                                                  There are several electrical parameters that need to be tested                                                                          breaker is in the closed position.
                                                                  on these breakers including the following:                           If low resistance readings are obtained when testing the
                                                                                                                                       breaker contact resistance using a low current, then it is         The arcing contact is the first to make contact during a close
                                                                  Timing Measurements
                                                                                                                                       recommended to re-test the contacts at a higher current. Why       operation and the last to break contact during an open
                                                                  Timing of the contacts can include the main contacts,                                                                                   operation. The arcing contact wears by normal operation
                                                                                                                                       would we benefit using a higher current? A higher current will
                                                                  pre-insertion or post-insertion resistors, and auxiliary contacts.                                                                      as well as when breaking short-circuit currents. If the arcing
                                                                                                                                       have the ability to overcome connection issues and oxidation
                                                                  Timing of the contacts can be as simple as a single break per                                                                           contact is too short or otherwise in bad condition, then the
                                                                                                                                       on terminals, where a lower current may produce false (higher)
                                                                  phase or as complicated as 12-breaks per phase.                                                                                         breaker soon becomes unreliable. Main contact surfaces can
                                                                                                                                       readings under these conditions.


	 6	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                   				                                                                                        TeSTinG	HiGH	VolTaGe	BreakerS	       7
be deteriorated by arcing resulting in increased resistance,       DRM can also be used as a timing measurement in certain            auxiliary contacts quickly change state as well. When the “a”         Time t2 to t3
excessive heating and in worst-case explosion.                     applications when it is not possible to disconnect both sides of   contacts switch from closed to open position, the coil is no          The rate of rise of current between t2 and t3 depends on the
                                                                   ground connections to the breaker.                                 longer being energized and it quickly discharges. There are no        electrical characteristics of the coil.
The main contact resistance is measured dynamically over an
                                                                   Potential problems to detect:                                      generalized time limits for the time relationships between main
open or close operation and the arcing contact length can                                                                                                                                                   Time t4
                                                                                                                                      and auxiliary contacts, but it is still important to understand
be reliably estimated. The only real alternative in finding the    n	 Measure	shortening	of	the	arcing	contacts
                                                                                                                                      and check their operation.                                            At time t4 the auxiliary contact breaks the DC supply to the
length of the arcing contact is dismantling the circuit breakers   n	 Determination	of	the	length	of	the	arcing	contact                                                                                     coil, which de-energizes down to zero.
arcing chamber.                                                                                                                       Potential problems that can be detected
                                                                   n	 increased	resistance	of	arcing	contact
                                                                                                                                      Closing times in spring-actuated breakers are directly related
Reliable interpretation requires high test current and a circuit   Timing                                                             to the potential energy in the spring mechanism. Increasing
breaker analyzer with good measurement resolution.
                                                                   Accuracy and Consistency Variations in times obtained do           or decreasing operating times tends to indicate changes in
Dynamic resistance measurement, commonly known as                  not always indicate problems on the breaker. It’s important to     the amount of energy used by the linkage driving the main
“DRM” is a test method used as a diagnostic and analysis           take into account variations in ambient temperature, previous      and auxiliary contacts. Increased friction will consume part of
tool. It is a comparative test and as such will not necessarily    method of testing and the type of equipment used.                  the spring’s energy. Time differences between phases with
yield results the first time it is performed. The measurement                                                                         separate operating mechanisms could indicate differences in
                                                                   Timing – within single phases Simultaneous measurements
is performed by injecting current through the breaker and                                                                             individual operating mechanism settings, imminent mechanism
                                                                   within a single phase are important in situations where a
simultaneously monitoring the voltage drop as well as current                                                                         failure, internal chamber faults developing on a particular
                                                                   number of contacts are connected in series. Here, the breaker
flow during the operation of the breaker. From these two                                                                              phase or be an indication of faulty actuating coils on a
                                                                   becomes a voltage divider when it opens a circuit. If the time
parameters a resistance value can be calculated. In the figure                                                                        particular mechanism. Time differences between phases with a           Figure 1.
                                                                   differences are too great, the voltage becomes too high across
below the resistance trace starts out as a straight line before                                                                       common operating mechanism could indicate internal faults on
                                                                   one contact, and the tolerance for most types of breakers is
the breaker starts to move, this is your DLRO value. As the                                                                           main and/or secondary contacts on a particular phase.                 The peak value of the first, lower current peak is related to the
                                                                   less than 2 ms.
breaker starts to move, the resistance increases slightly. When                                                                                                                                             fully saturated coil current (max current), and this relationship
the main contacts part, there is a spike in the resistance curve   Timing between phases The upper limits of timing between           coIl currenT measuremenTs                                             gives an indication of the spread to the lowest tripping
and now the arcing contact resistance can be measured.             phases is approximately 5-7 ms, provided that the breaker is       Please refer to Figure 1                                              voltage. If the coil were to reach its maximum current before
When the resistance goes to infinity or current flow stops the     not equipped with synchronized tripping. Always consult the                                                                              the armature and latch started to move, the breaker would
                                                                                                                                      General
breaker is open.                                                   manufactures specifications when setting limits.                                                                                         not be tripped. It is important to note, however, that the
                                                                                                                                      Coil current measurement is a good diagnostic measurement
                                                                   Timing main/auxiliary contacts                                                                                                           relationship between the two current peaks varies, particularly
                                                                                                                                      tool to detect potential electrical and/or mechanical problems
                                                                   Circuit breakers use auxiliary contacts to determine what                                                                                with temperature. This also applies to the lowest tripping
                                                                                                                                      in the actuating coils. Specific parts of the mechanism that
                                                                   state the breaker is in and to control current flow in the                                                                               voltage.
                                                                                                                                      will be checked are the trip coil, the close coil and the auxiliary
                                                                   control circuitry. Circuit breakers have two types of auxiliary    contacts.                                                             Travel Motion
                                                                   contacts, “a” contacts and “b” contacts. The “a” contacts,                                                                               A high-voltage breaker is designed to interrupt short-circuit
                                                                                                                                      Time t0
                                                                   which are found in the open control circuitry, follow the state                                                                          current in a controlled manner. This puts great demands
                                                                   of the breaker i.e. if the breaker is closed, the “a” contacts     Time t0 is the time when the operating voltage is applied to
                                                                                                                                                                                                            on the mechanical performance of all components in the
                                                                   are closed and if the breaker is open, the “a” contacts are        the coil. If the voltage is temporarily interrupted for some
                                                                                                                                                                                                            interrupter chamber as well as the operating mechanism.
                                                                   open. The “b” contacts, which are found in the close control       reason, for example a bouncing contact in the supply source,
                                                                                                                                                                                                            It has to operate at a specific speed in order to build up
                                                                   circuitry, have the opposite state of the breaker i.e. when the    the coil will be de-energized and the coil current will drop. As
                                                                                                                                                                                                            adequate pressure to allow for cooling stream of air, oil or gas
                                                                   breaker is closed, the “b” contacts are open and when the          a result the operating time of the breaker will be increased due
                                                                                                                                                                                                            (depending on the type of breaker) to extinguish the arc that
                                                                   breaker is open, the “b” contacts are closed. The auxiliary        to uncontrolled fluctuations in the test device.
                                                                                                                                                                                                            is generated after the contact separation until the next zero-
                                                                   contacts always lag the main contacts of the circuit breaker.      Time t1                                                               crossing. It is important to interrupt the current to prevent a
When a motion trace is overlaid onto the resistance trace,         As an example let’s discuss an open operation for the circuit      Time t1 is the time when the latch of the coil begins to move.        re-strike. This is accomplished by making sure that the contacts
the actual length of the arcing contact can be determined.         breaker. The breaker starts in the closed position therefore the   As a result the rate of rise of the current will change due to the    move apart far enough from each other before the moving
Monitoring the length of the arcing contact and the resistance     “a” contacts are closed and the “b” contacts are open. An          change of inductance in the circuit.                                  contact has entered the so-called damping zone.
of the arcing contact can give you insight into the health of      open pulse is sent through the control circuitry and is flowing
                                                                                                                                      Time t2                                                               The contact travel motion is captured by connecting a travel
the interrupter without opening up the breaker.                    through the “a” contacts. The coil is energized and it releases
                                                                   the trip latch that releases the spring energy in order to trip    Time t2 is the time when the latch has stopped moving or              transducer on the moving part of the operating mechanism.
                                                                   the breaker. Once the breaker changes to the open state, the       slightly later. If the drop off of the current has been sharp as a    The motion is presented as a curve where distance vs. time
                                                                                                                                      result of a fast moving latch, the dynamic delay of the current       allows for further analysis. Speed is calculated between two
                                                                                                                                      drop might cause a minor delay in time t2 in comparison with          points on this motion curve. The upper point is defined as a
                                                                                                                                      the stop time of the latch.                                           distance in length, degrees or percentage of movement from




	 8	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                  				                                                                                          TeSTinG	HiGH	VolTaGe	BreakerS	         9
a) the breaker’s closed position, or b) the contact-closure or    Breaker Timing and Speed Calculation Points                      First trip
contact-separation point. The time that elapses between these     I was helping a customer who was using a TM1600 Breaker          Testing the circuit breaker’s first open operation after it has
two points ranges from 10 to 20 ms, which corresponds to 1-2      Timer to time an old McGraw Edison OCB. He was getting           been sitting idle for some time, is a good way to evaluate
zero-crossovers.                                                  good contact timing information of 20 ms closing time for        status, especially of a line circuit breaker. The measurement
The distance the breaker has to travel in which the electric      phase A, but he was not getting any speed information.           and connections to the circuit breaker are carried out while
arc must be extinguished is usually called the arcing zone.                                                                        it is still is in service. All of the connections are made inside
                                                                  We did not know what the SC (speed calculation) points were
From the motion curve, a velocity or acceleration curve can be                                                                     the control cabinet. This of course makes it impossible to do
                                                                  for the breaker but he did tell me that he had a stroke of 355
calculated in order to reveal changes in the breaker mechanics                                                                     some of the recordings and means that there is a bigger risk of      Regulations and laws require all objects to be grounded
                                                                  mm. He had his “Cls Sp Calculation Blw Cls” point set to 1.97
that may affect the breakers operation.                                                                                            injury during testing. Extra caution must be taken since there       on both sides of a breaker before any maintenance work is
                                                                  inches. I told him to make that value 4 inches and it started
                                                                                                                                   is up to 480V in the control cabinet and the mechanism is fully      performed on the object. The average experience of personnel
Damping is an important parameter to monitor and test as the      working. The reason is that we moved the point down onto
                                                                                                                                   charged. The breaker can operate at any time if there is a fault     for substation testing has seen a decrease in recent years.
stored energy an operating mechanism use to open and close        the linear portion of the curve. The original value was too
                                                                                                                                   on the line.                                                         The education level and experience reduction of personnel
a circuit breaker is considerable. The powerful mechanical        close to the end of the travel, so the motion was over before
                                                                  the TM1600 could calculate the speed. By moving that point       The biggest benefit of using first trip testing is to test “real     lead to an inability to follow complex safety procedures and
stress can easily damage the breaker and/or reduce the
                                                                  down, it was able to calculate the speed correctly.              world” operating conditions. If the circuit breaker has not          requires extensive field training or can lead to uncertainty that
breakers’ useful life. The damping of opening operations is
                                                                                                                                   operated for year, first trip testing will show if the circuit       tests are being executed in a correct way. Electric arc flash
usually measured as a second speed, but it can also be based      Below is a typical printout from a TM1600 Breaker Analyzer.
                                                                                                                                   breaker is slower due to problems like corrosion in the              and electrocution accidents in substations are due to fault
on the time that elapses between two points just above the
                                                                                                                                   mechanism linkages. With traditional methods, the testing            currents, lightning on power lines connected to the substation
breaker’s open position.
                                                                                                                                   is carried out after the circuit breaker has been taken out of       and capacitive coupling within the substation. The outcome of
The Travel Trace                                                                                                                                                                                        accidents spans from short-term hospital visits to funerals. This
                                                                                                                                   service and has been operated once or even twice.
By analyzing the travel trace obtained from a linear or rotary                                                                                                                                          risk appears because a test on the circuit breaker is performed
transducer it is possible to obtain information about the                                                                          On a gang operated breaker once coil current is measured and         without safety grounding. The risk for an accident can be
contacts such as total travel, over travel, rebound, under                                                                         on an IPO breaker three coil currents are measured. Auxiliary        regarded as low, but the impact could be catastrophic and
travel, contact penetration, and contact position at the time                                                                      contacts can also be measured. If the CB has another breaker         usually covered by media. Arc flash accidents in high voltage
of making or breaking. See the following graph for a typical                                                                       connected in parallel then open times may also be measured           substations will cause significant injuries. The most important
“close” travel trace.                                                                                                              by monitoring the protection CT’s. A more advanced approach          test for circuit breaker diagnosis is the main contact timing and
                                                                                                                                   to first trip is to also measure vibration. This provides detailed   contact resistance. Main contact timing and contact resistance
                                                                                                                                   information of the status of the circuit breaker. These              requires an instrument connected to the circuit breaker on
                                                                                                                                   measurements during first trip are possible with TM1800 and          site. Knowledge of conventional instrumentation technology
                                                                                                                                   TM1600/MA.                                                           implies that safety grounding can be removed during the test
                                                                                                                                                                                                        and is therefore not in compliance with national law, trade
                                                                                                                                   workIng BeTween The grounds
                                                                                                                                                                                                        union demands, or substation safety procedures produced
                                                                                                                                   Dual Ground Testing Significance                                     by standardization bodies like IEEE and IEC. Safety bodies,
                                                                                                                                   With the ongoing deregulation of the electrical power                like HSE and OSHA and their counterparts in other countries
                                                                                                                                   industry, utilities and service companies are acting in a            have guidelines prescribing that circuit breakers need to be
                                                                                                                                   changing business environment. There is expectation of               grounded at both ends during any maintenance work. The
                                                                                                                                   increasing profitability with fewer and fewer key technical          current situation is mitigated by undertaking cumbersome
Speed
                                                                                                                                   resources. Further, companies are judged by the public on            and time-consuming safety procedures. This makes the test
Manufacturers often include speed calculation points in
                                                                                                                                   their social activities. The health and safety of personnel          work very inefficient from a personnel and asset management
their breaker specifications. These are predefined points of
                                                                                                                                   undertaking high voltage testing has become a topic where            point of view. Because the safety ground is removed, extensive
reference, which we can use with the breaker analyzer to
                                                                                                                                   trade unions and media are on their toes at a time when              safety exercises are added to the way of working. A special
determine a velocity in a certain region on the travel trace.
                                                                                                                                   the level of critical skills is decreasing. Stock price can be       work permit has to be acquired in the field and this is typically
These points will be used as the speed calculation points asked
                                                                                                                                   significantly impacted by poor health and safety performance –       granted by remote office personnel.
for in the CABA software. Speed is defined as the “average
                                                                                                                                   never mind corporate responsibility laws that could put senior
speed calculated between two defined points on the motion
                                                                                                                                   managers in court for negligence. Keeping HV test engineers
curve. A point might be defined as an absolute position, an
                                                                                                                                   safe has never been more important.
absolute time, a position at the instant for an event, a time
difference or position difference to the other point.”




	 10	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                              				                                                                                         TeSTinG	HiGH	VolTaGe	BreakerS	       11
DualGround Testing Has Arrived!                                  VIBraTIon TesTIng                                                   The following parameters can be measured with the                   MA61 where they are recorded during breaker operation.
Dual grounding involves grounding the breaker on both sides      Many different diagnostic methods have been used over the           in-service test:                                                    The directly recorded vibration signals can be analyzed in the
after it has been removed or taken out of service. When HV       years. The most common measurements on circuit breakers are         Trip and close coil currents                                        CABA Win program, together with time, motion and coil-
breakers in live substations are removed from the system, the    off-line measurements of contact resistance, contact timing,                                                                            current data. These data alone, however, do not suffice for
                                                                                                                                     The trip and close coil current measurements reveal a lot of
effects of the induction from adjacent live overhead lines can   travel motion, velocity and coil current.                                                                                               determining breaker-condition trends.
                                                                                                                                     interesting data such as maximum current, latch release time
create hazardous voltages in any un-grounded equipment                                                                               and current interruption time. The current waveform for the
                                                                 More sophisticated methods are acceleration, DRM (dynamic
and erroneous results in connected test equipment. Typical                                                                           individual breaker is unique and a good indicator of circuit
                                                                 resistance measurement) and vibration testing. The tests
substation procedure includes the breaker being grounded                                                                             breaker performance.
                                                                 are well known and widely used for periodic or preventive
on both sides initially and then one side is usually removed
                                                                 maintenance.                                                        Auxiliary (A/B) contact timing
or temporarily lifted while testing is taking place. The
DualGround technology allows the breaker under test to be        Another possibility is to introduce on-line condition monitoring    As in many condition-monitoring systems, the auxiliary
grounded while testing is being performed without any impact     of circuit breakers. An estimated 10% of breaker problems           contacts can be used as an indirect measurement of the main
to the test results being obtained.                              and failures are attributed to improper maintenance, and            contact. The switching times of the “a” and ”b” contacts are
                                                                 condition monitoring could possibly eliminate too-early or          correlated to the main contact timing and, depending on the
Benefits
                                                                 unnecessary off-line testing and overhauls and make just-in-        actual design of the breaker, the statistical deviation between
There are various benefits to using DualGround capable test                                                                          the two may be very small. Within the limitations of the
                                                                 time maintenance possible. The problem is that a complete
Instruments:                                                                                                                         breaker design, the a/b contact time provides an accurate and
                                                                 monitoring system that covers all breaker subsystems and
n	 Personnel	can	work	safely	between	safety	grounds              failure modes can easily escalate in complexity until its cost      repeatable reference for the main contact timing.                   Typical Accelerometer
n	 Test	results	are	not	affected                                 becomes as much as half the breaker cost.                           Load current/Main contact timing                                    A sophisticated procedure known as dynamic time warping
n	 no	need	for	a	standby	bucket	truck	and	crew                                                                                                                                                           (DTW) is used for further analysis. DTW compares vibration
                                                                 An alternative to installing a separate condition monitoring        Using the secondary current from the circuit breaker current
n	 no	waiting	time	between	tests                                                                                                                                                                         signals with reference signals obtained (preferably) from a
                                                                 system on each breaker is to use portable test sets but still       measurement transformer, it is possible to measure the load
n	 Hazardous	voltages	are	negated                                                                                                                                                                        previous test conducted on the very same breaker. However,
                                                                 perform in-service measurements on energized breakers. The          current using a Hall-effect clamp on current sensor. From
n	 number	of	work	permits	is	reduced                                                                                                                                                                     inter-phase comparisons and comparisons with the results
                                                                 complete test procedure will be less complex and the time           the waveform and depending on the actual test setup, both
                                                                                                                                                                                                         of tests conducted on other breakers of the same type can
n	 actual	testing	time	is	reduced                                saving may be substantial compared to traditional off-line          contact closing and opening may be detected as well as when
                                                                                                                                                                                                         be used in the initial phase of a series of tests. Comparison
                                                                 testing. To many utilities, this may become an attractive testing   arcing is extinguished.
                                                                                                                                                                                                         results are presented on a time-time diagram that shows
                                                                 alternative.                                                        DC voltage supply                                                   time deviations and also on a deviation diagram that reveals
                                                                 TesT meThod                                                         Proper breaker operation is only achieved if the supply voltage     differences in vibration amplitudes.
                                                                                                                                     to the operating coils is stable at the correct value. Monitoring
                                                                 Traditional circuit breaker testing is based on measuring
                                                                                                                                     the DC voltage when operating the breaker gives a quick test
                                                                 specific parameters like close/open time, contact speed,
                                                                                                                                     of the battery system, including wiring and junctions from the
                                                                 maximum coil current, and then comparing the test data with
                                                                                                                                     batteries to the circuit breaker.
                                                                 the specifications from the manufacturer (pass-fail testing).
                                                                 When using more advanced circuit breaker analyzers and/or           Vibration
                                                                 test methods, such as dynamic resistance and vibration testing,     Vibration testing of circuit breakers is an interesting tool for
                                                                 it is also possible or even necessary to look at the different      circuit breaker diagnostics. In particular, measurements inside
                                                                 waveforms as unique signatures or footprints for the individual     the operating mechanism have given the best input data for
                                                                 breaker. This approach may also be used when measuring a            the analysis. This means that in-service testing using vibration
                                                                 circuit breaker in-service, on line and under load.                 data for diagnostic comparisons can be a very useful tool.
                                                                 It is important to understand that the signature data are           When a breaker operates, the mechanical motion generates
   Figure 2. Connection diagram of TM1800 with both sides
   grounded.                                                     not precise single-numbered values for a pass-fail decision.        strong vibrations. These signals can be used for diagnostics
                                                                                                                                                                                                         All test data and analysis data can be reported along with
                                                                 Instead the signature should be used for comparisons with           and maintenance. Both TM1600/MA and the popular TM1800
                                                                                                                                                                                                         other data such as motion and speed. The overall results
                                                                 benchmarks, ideally taken from the very same breaker or at          can make vibration measurements.
                                                                                                                                                                                                         provide a more detailed picture of breaker condition than has
                                                                 least from the same circuit breaker type. Comparing signatures
                                                                                                                                     One or more accelerometers are attached to the breaker              previously been available. In this picture it is easily possible to
                                                                 by using overlays has proved to be a reliable method of
                                                                                                                                     poles and operating mechanism. Vibration signals from the           discern deviations that are beginning to appear and trace their
                                                                 detecting critical changes in breaker performance.
                                                                                                                                     accelerometers proceed via a signal-conditioning unit that          origins.
                                                                                                                                     incorporates an amplifier and filter to the TM1800 or TM1600/




	 12	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                				                                                                                         TeSTinG	HiGH	VolTaGe	BreakerS	        13
DTW vibration analysis is available in a separate program                                                                              afTer The TesT: daTa InTerpreTaTIon                                CABA Win’s intuitive split screen format means that users can
module that can be purchased as an optional add-on for                                                                                 With any complicated procedure like HV breaker testing, it’s       easily navigate to past test data or quickly create a new test to
CABA Win. This type of measurement requires a high sampling                                                                            important to have a good software package to store and             gather new test data.
rate and a broad dynamic range. Together with the specially                                                                            analyze the data. For this, Megger offers a product called
designed signal conditioning amplifier SCA606, the TM1600/                                                                             CABA Win (Computer Aided Breaker Analysis for Windows).
MA61 or TM1800 enables users to measure vibrations with
frequencies ranging up to 15 kHz.                                                                                                      After connecting the breaker analyzer to a personal computer
                                                                                                                                       (PC), CABA Win can be used to speed up testing and improve
                                                                                                                                       reliability. CABA Win can be used with TM1800, TM1600/
                                                                                                                                       MA61 and EGIL. Results are presented on the display both
faIlure mode analysIs
                                                                                                                                       graphically and in table form after each breaker operation
The following chart indicates some typical failure modes of HV                                                                         so that comparisons can be made with limit values and
Breakers and looks at the various mechanical areas that could                                                                          previous test results from any of the three analyzers. Simple
cause an out-of-tolerance condition.                                                                                                   procedures enable the creation of individual test plans tailored
                                                                                                                                       to individual breakers. Timesaving conversion tables simplify
                                                                                                        possible cause of
           close Time               open Time              damping Time       charging motor            failure condition              the task of connecting and linking transducers to the breaker.
                                                                                                Change	in	characteristic	of	the	
                                                                                                                                       Reports created in the user’s own format can be obtained
           Faster/	Slower               normal                   normal           normal        closing	system.	latching	system	is	    easily using standard field-linking functions in List & Label or
                                                                                                binding.
                                                                                                                                       Microsoft Word. The reports are easy distributed either in the     It is possible to quickly analyze the operation of a breaker and
                                                                                                Spring	charging	system	used	for	
                                                                                                closing	is	damaged.	The	springs	       form of a pdf document or in List & Label format which can be      see if it is opening or closing in the proper amount of time and
               Faster                   normal                   normal           normal        have	probably	been	excessively	        read by a freeware L&L viewer. A basic database is included in     in some cases it is possible to see pass or fail. Being able to see
                                                                                                charged,	and	the	breaker	has	been	
                                                                                                operated.                              the program to help users to organize their circuit breakers.      pass or fail criteria involves entering limits into the breaker test
                                                                                                                                                                                                          plan before starting to testing the breaker
                                                                                                Spring	charging	system	used	for	
                                                                                                closing	is	damaged.	The	springs	
              Slower                    normal                   normal           normal        have	probably	been	excessively	
                                                                                                charged,	and	the	breaker	has	been	
                                                                                                operated.

                                                                                                Change	in	characteristic	of	the	
              normal                    Slower                   normal           normal        closing	system.	latching	system	is	
                                                                                                binding.

                                                                                                reduced	force	exerted	by	opening	
               Faster                   Slower              normal	/	Slower   normal	/	Slower   springs.	one	of	the	opening	springs	
                                                                                                is	broken.

                                                                                                increased	friction	throughout		
                                                                                                the	entire	breaker	caused	by		
              Slower                    Slower              normal	/	Slower   normal	/	Slower   (for	example)	corrosion	in	the	
                                                                                                linkage	system.

                                                                                                Malfunctioning	puffer	system	or	
              normal                    Faster                   normal           normal        extremely	low	SF6	-	pressure.

                                                                                                Damaged	opening	damper.	not	
              normal                    normal                   Faster           Faster        enough	oil	in	the	dashpot.

                                                                                                Damaged	opening	damper.	
              normal                    normal                   Slower           Slower        increased	friction	in	the	dashpot.




	 14	   TeSTinG	HiGH	VolTaGe	BreakerS                                                                                                  				                                                                                        TeSTinG	HiGH	VolTaGe	BreakerS	         15
Testing high voltage breakers guide
Testing high voltage breakers guide
Testing high voltage breakers guide

Más contenido relacionado

La actualidad más candente

Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
Relay coordination
Relay coordinationRelay coordination
Relay coordinationD Målîk
 
Power quality improvement techniques
Power quality improvement techniquesPower quality improvement techniques
Power quality improvement techniquessahid raja khan
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...Jobin Abraham
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
protection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationprotection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationabu jubayer
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Digital testing of high voltage circuit breaker seminar ppt
Digital testing of high voltage circuit breaker seminar pptDigital testing of high voltage circuit breaker seminar ppt
Digital testing of high voltage circuit breaker seminar pptMd Sadab Hussain Khan
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformerPreet_patel
 
Power System Protection
Power System ProtectionPower System Protection
Power System ProtectionRahul Mehra
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in preciseMuthar Hussain
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part ISlides Hub
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basicsRajan Singh Tanwar
 

La actualidad más candente (20)

Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Power quality improvement techniques
Power quality improvement techniquesPower quality improvement techniques
Power quality improvement techniques
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
protection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationprotection scheme of a grid substation prsentation
protection scheme of a grid substation prsentation
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Digital testing of high voltage circuit breaker seminar ppt
Digital testing of high voltage circuit breaker seminar pptDigital testing of high voltage circuit breaker seminar ppt
Digital testing of high voltage circuit breaker seminar ppt
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Surge supressor
Surge supressorSurge supressor
Surge supressor
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in precise
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basics
 
distance relay
distance relaydistance relay
distance relay
 

Destacado

Impact of eams on ppm optimization
Impact of eams on ppm optimizationImpact of eams on ppm optimization
Impact of eams on ppm optimizationfxudegbu
 
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur indiamartsupplier
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaningMohamed Elshora
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagoutCreative Safety Supply
 
Water treatment process by RO UF
Water treatment process by RO UFWater treatment process by RO UF
Water treatment process by RO UFceutics1315
 
Ro system animation
Ro system animationRo system animation
Ro system animationIndiana Agak
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
De-mineralization of Water
De-mineralization of WaterDe-mineralization of Water
De-mineralization of WaterDilip Kumar
 
Reverse Osmosis System Basics
Reverse Osmosis System BasicsReverse Osmosis System Basics
Reverse Osmosis System BasicsWaterFilters.NET
 
Reverse osmosis (ro) plant an overview-saeed
Reverse osmosis (ro) plant  an overview-saeedReverse osmosis (ro) plant  an overview-saeed
Reverse osmosis (ro) plant an overview-saeedAHMED NADIM JILANI
 
Water test methods
Water test methodsWater test methods
Water test methodsSoumen Basu
 
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.SHASHANK SHEKHAR
 
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansLiving Online
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Panduit Safety
 
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...Tushar Sonawane
 
progress in civil engg by aatif sadiq
progress in  civil engg by aatif sadiqprogress in  civil engg by aatif sadiq
progress in civil engg by aatif sadiqaatif malik
 

Destacado (20)

Impact of eams on ppm optimization
Impact of eams on ppm optimizationImpact of eams on ppm optimization
Impact of eams on ppm optimization
 
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
Water Purifiers and RO Plant By Valency Enterprises Pvt. Ltd, Nagpur
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaning
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Water treatment process by RO UF
Water treatment process by RO UFWater treatment process by RO UF
Water treatment process by RO UF
 
Ro system animation
Ro system animationRo system animation
Ro system animation
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
BASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERINGBASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERING
 
De-mineralization of Water
De-mineralization of WaterDe-mineralization of Water
De-mineralization of Water
 
Reverse Osmosis System Basics
Reverse Osmosis System BasicsReverse Osmosis System Basics
Reverse Osmosis System Basics
 
Reverse osmosis (ro) plant an overview-saeed
Reverse osmosis (ro) plant  an overview-saeedReverse osmosis (ro) plant  an overview-saeed
Reverse osmosis (ro) plant an overview-saeed
 
Water test methods
Water test methodsWater test methods
Water test methods
 
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
DIESEL LOCOMOTIVE WORKS, VARANASI, FOR CIVIL ENGG.
 
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and TechniciansPractical Arc Flash Protection for Electrical Safety Engineers and Technicians
Practical Arc Flash Protection for Electrical Safety Engineers and Technicians
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
 
progress in civil engg by aatif sadiq
progress in  civil engg by aatif sadiqprogress in  civil engg by aatif sadiq
progress in civil engg by aatif sadiq
 
Ayaz ahmed
Ayaz ahmedAyaz ahmed
Ayaz ahmed
 

Similar a Testing high voltage breakers guide

Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Thorne & Derrick International
 
Cable Harness Tester from Digilogic Systems
Cable Harness Tester from Digilogic SystemsCable Harness Tester from Digilogic Systems
Cable Harness Tester from Digilogic SystemsDigilogic Systems
 
wire harness testers.ppt
wire harness testers.pptwire harness testers.ppt
wire harness testers.pptDhyana16
 
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...PT. Siwali Swantika
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and TestingGPTraining
 
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...Thorne & Derrick International
 
Electrical FM Compiled.pdf
Electrical  FM Compiled.pdfElectrical  FM Compiled.pdf
Electrical FM Compiled.pdfSyed Atif Naseem
 
Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Michael Toecker
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversionrob_1v
 
OMNI CONTROLS INC - Test and Measurement Equipment Online Store
OMNI CONTROLS INC - Test and Measurement Equipment Online StoreOMNI CONTROLS INC - Test and Measurement Equipment Online Store
OMNI CONTROLS INC - Test and Measurement Equipment Online Storeomnicontrolsinc
 
Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOChris Forrest
 
Windfarm services and grid compliance
Windfarm services and grid complianceWindfarm services and grid compliance
Windfarm services and grid compliancePremium Power
 
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...Miracle Electronic Devices Private Limited
 

Similar a Testing high voltage breakers guide (20)

High voltagebooklet ug_en_v01
High voltagebooklet ug_en_v01High voltagebooklet ug_en_v01
High voltagebooklet ug_en_v01
 
Nafta power catalog_sc_en_v01
Nafta power catalog_sc_en_v01Nafta power catalog_sc_en_v01
Nafta power catalog_sc_en_v01
 
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
Megger Power And Industrial Test Equipment - Cable Fault Locators, High Volta...
 
Cable Harness Tester from Digilogic Systems
Cable Harness Tester from Digilogic SystemsCable Harness Tester from Digilogic Systems
Cable Harness Tester from Digilogic Systems
 
wire harness testers.ppt
wire harness testers.pptwire harness testers.ppt
wire harness testers.ppt
 
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
 
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...
Megger Electrical Testing Instruments - Cable Fault Locators, High Voltage De...
 
Electrical FM Compiled.pdf
Electrical  FM Compiled.pdfElectrical  FM Compiled.pdf
Electrical FM Compiled.pdf
 
Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversion
 
Lightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding SolutionLightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding Solution
 
Appliance Test and Tag Part 1
Appliance Test and Tag Part 1Appliance Test and Tag Part 1
Appliance Test and Tag Part 1
 
OMNI CONTROLS INC - Test and Measurement Equipment Online Store
OMNI CONTROLS INC - Test and Measurement Equipment Online StoreOMNI CONTROLS INC - Test and Measurement Equipment Online Store
OMNI CONTROLS INC - Test and Measurement Equipment Online Store
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Megger lrcd200
Megger lrcd200Megger lrcd200
Megger lrcd200
 
Forum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPOForum_Enviro_Brch_VPO
Forum_Enviro_Brch_VPO
 
Windfarm services and grid compliance
Windfarm services and grid complianceWindfarm services and grid compliance
Windfarm services and grid compliance
 
SebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault LocatorsSebKMT Cable Sheath testers & Fault Locators
SebKMT Cable Sheath testers & Fault Locators
 
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...
Wire Assemblies In Electronics Manufacturing — Ensuring Efficient Assembly An...
 

Más de Powerpoint Engineering Ltd (9)

Insulation Testing
Insulation TestingInsulation Testing
Insulation Testing
 
Cable Fault Location
Cable Fault LocationCable Fault Location
Cable Fault Location
 
Portable Appliance Testing
Portable Appliance TestingPortable Appliance Testing
Portable Appliance Testing
 
Transformer Resistance Testing
Transformer Resistance TestingTransformer Resistance Testing
Transformer Resistance Testing
 
Earth Resistance Testing
Earth Resistance TestingEarth Resistance Testing
Earth Resistance Testing
 
Battery Testing Guide
Battery Testing GuideBattery Testing Guide
Battery Testing Guide
 
Powerpoint Engineering Ltd - Company Presentation 2010
Powerpoint Engineering Ltd - Company Presentation 2010Powerpoint Engineering Ltd - Company Presentation 2010
Powerpoint Engineering Ltd - Company Presentation 2010
 
Low Resistance Testing
Low Resistance TestingLow Resistance Testing
Low Resistance Testing
 
Diff ICM
Diff ICMDiff ICM
Diff ICM
 

Último

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 

Último (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 

Testing high voltage breakers guide

  • 1. US $9.95 GBP £6.55 Testing High Voltage Breakers A guide to understanding what is involved with keeping the lights on www.megger.com/us The word “Megger” is a registered trademark
  • 2. Table of Contents Introduction............................................................. 2 Coil Current Measurements ................................... 9 Why Test Breakers? ................................................. 3 Travel Motion ........................................................... 9 Bad things can happen ........................................... 4 Breaker Timing and SC Points ................................ 10 Maintenance Strategies.......................................... 5 First Trip ................................................................. 11 What to test ............................................................ 6 Working between the Grounds ........................... 11 Timing Measurements.............................................. 6 Vibration Testing .................................................... 12 Coil Measurements .................................................. 7 Test Method........................................................... 12 Travel Measurements ............................................... 7 Failure Mode Analysis .......................................... 14 Minimum Trip Voltage .............................................. 7 After the Test: Data Interpretation ...................... 15 Contact Resistance/Ductor ....................................... 7 Megger Test Instruments...................................... 16 What is Static Resistance? ...................................... 7 How to Mount a Motion Transducer ................... 17 What is Dynamic Resistance? ................................. 7 DRM (Dynamic Resistance Measurements) ......... 19 A Look Inside ........................................................... 7 References ............................................................. 19 Timing .................................................................... 8 TeSTinG HiGH VolTaGe BreakerS 1
  • 3. InTroducTIon The most recent addition to the Megger product line is why TesT Breakers The task of the utility is to generate power, transmit it and What’s in the name...? an innovative range of instruments for testing data and Some of the most important of the many reasons for testing distribute it with maximum availability. While doing this, it is telecommunication installations. Working with both copper circuit breakers are: imperative that losses are kept to a minimum, and acceptable For over 100 years, Megger has been a premier provider of and optical technologies, and collaborating closely with the levels of power quality and safety are maintained. All of this test equipment and measuring instruments for electrical power n To guard against damage to expensive equipment major industry players, Megger has developed easy-to-use must be done in an environmentally friendly manner. Breakers applications. The Megger trademark was first registered in n To prevent outages that lead to loss of income products to keep the costs of test and measurement down and play an important part in making this happen. May 1903 and is closely guarded by the company. Although n To ensure reliability of the electricity supply Megger is best known for its world-famous range of insulation productivity up. n To prevent downtime and darkness High voltage circuit breakers are extremely important for the testers, the company provides a full service solution to meet Megger also operates the renowned AVO Training Institute, function of modern electric power supply systems. The breaker n To verify breaker performance all electrical test and measurement needs. Megger products which offers top rated training for electrical maintenance and is the active link that ultimately has the role of quickly opening provide testing solutions for the most critical maintenance safety through the network of Megger offices. In addition, Substation breaker testing is an important task for any utility. the primary circuit when a fault occurs. Often, the breaker has areas, including cable fault location, protective relay and circuit the company manufactures STATES® terminal blocks and The breakers are there to facilitate the flow of current during to perform its duty within a few milliseconds, after months, breaker testing, and power quality testing. With such a diverse test switches, which are specified by many major electric normal operation and to interrupt current flow in the event of perhaps years of idly standing by. Since RCM (reliability product offering, Megger is the single source for electrical test utilities. For over 65 years, test technicians and engineers a fault. But any and all electrically operated devices are, sooner centered maintenance) and condition based maintenance and measuring instruments. have depended on STATES products to provide easy access to or later, likely to experience some kind of failure. That failure have become the established strategies for most owners and wiring on panel boards and switchboards, to eliminate wiring can be caused by many factors, including ageing and external operators of electric power delivery systems, the need for The Megger product offering spans 30 distinct product groups reconnection errors and to save operator time. faults. The utility operator has to be prepared and have a plan reliable and accurate test instruments for field use is clear. with over 1,000 specific products. in place to handle every situation. Protection systems are put in place to detect all electrical Circuit breaker test sets, watt-hour meter test equipment and Megger manufactures and markets products on a global scale. Its principal manufacturing sites are in College Station This document will help readers to understand what is involved faults or other abnormal operating conditions and they are protective relay test instruments, instruments used for testing and Dallas, Texas; Valley Forge, Pennsylvania, Dover, England with keeping circuit breakers operating at peak performance. coordinated to disconnect the smallest possible part of a and maintaining transformers, batteries and underground and Täby, Sweden. Sales and technical support offices are Breakers are mechanically challenging devices requiring power system in the event of a fault. With good system cables and other products designed for the power industry maintained at each manufacturing site as well as in Sydney, periodic adjustments. The need for some of these adjustments design, it should be possible to quickly restore normal were formerly supplied under the Biddle, Multi-Amp, PAX Australia; Toronto, Canada; Paris, France; Oberursel, Germany; can be determined visually and they can be given the attention operation. Diagnostics and Programma brands. Among other innovations, Megger developed the first completely automatic, software Mumbai, India, Johannesburg, South Africa; Oberkulm, needed without testing. However, in most cases, it will be When a fault is detected by a protective relay and a trip driven protective relay test system in 1984 and the first Switzerland, Chonburi, Thailand and Bahrain, UAE. With necessary to carry out electrical testing to find out what is the impulse is sent to the breaker operating mechanism, the commercial cable fault locator in 1950. a global network of hundreds of sales representatives, cause of out-of-tolerance conditions. breaker has to function as specified and interrupt the current product literature and user manuals in eight languages, and as soon as possible or severe damage may occur. The cost of Manufacturing insulation testers from 1kV to 10kV is where This document primarily deals with electrical testing. multilingual product software, Megger is a local supplier for damage caused by a malfunctioning breaker can often reach Megger started, and the Megger brand name is so well known customers anywhere in the world. millions of dollars. today that maintenance professionals often incorrectly use it as a verb when they refer to insulation testing on wiring. This All Megger products meet the highest standards for quality, Proper functioning of a breaker is reliant on a number of famous name dates back to 1889, when the first portable reliability and safety. All of the company’s facilities are certified individual components that have to be calibrated and tested at insulation tester was introduced with the MEGGER brand. as meeting the requirements of the ISO 9001 quality standard, regular intervals. The trigger for maintenance intervals differs and the Dover and Täby sites are also certified to ISO14001, greatly between utilities but the intervals are often based Recently, Megger acquired PAX diagnostics, adding sweep the international environmental standard. Megger is constantly on time since last test, number of operations, or severity of frequency diagnostic test equipment to its portfolio. Megger striving to maximize quality, thereby ensuring that the fault current operations. Environmental considerations such enjoys an outstanding reputation in the areas of ground experience of its customers is always world class. as humidity and temperature, whether the breaker is located testing, oil testing and as a supplier of electrical contractor in a desert or coastal region, also play into the maintenance maintenance tools such as multimeters, portable appliance who should read ThIs documenT? scheme. testers and clamp-on meters. This document is intended for engineers and technicians in the power, industrial and utility sectors who wish to learn how to HV Breakers in a transmission scheme can be viewed as Mechanical wear and lubrication often affects the test substation circuit breakers. forming a tree starting with the generating station, fanning performance of breakers, so being able to trend mission out to the transmission grid, to the distribution grid, and finally critical parameters and compare these with factory thresholds to the point of consumption. helps to verify proper breaker functionality. 2 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 3
  • 4. Bad ThIngs can happen – safeTy fIrsT! 2) There was a ground fault a few years ago that caused the According to a recent study, the following were the most Whatever form of maintenance approach is selected, the most There are many things to consider when testing a HV Breaker, insulating oil inside a transformer to evaporate and finally it commonly reported breaker problems: important goal is to achieve maximum reliability at the but first and foremost, it is essential to think about safety. caught fire. The upstream breaker should have cleared this lowest possible life cycle cost. The bottom line is usually Does not close on command 34% Always: fault, but it was too late. $$$$ but do not forget personal safety! Does not open on command 14% n Make sure the breaker is isolated and grounded 3) In Ohio, thieves removed the ground conductors in a Breakdowns (poles, ground) 8% Ideally a non-invasive method of testing should be used; n Disconnect the breaker control circuit from test substation. This resulted in a fire that was put out before it Operates without command 7% with Megger equipment it is possible to compare measured equipment before performing work on the breaker caused major damage, but it could have easily led to a disaster Others 30+% values of key parameters with the values that are given by n observe polarity had it not been caught in time. (Courtesy CIGRE) the circuit breaker manufacturer. A series of tests are carried n Use touch-proof connectors The same study listed the most common fault areas as: out to provide a comparison with previous results or to create n Connect the ground to the test equipment a “footprint” for future reference and comparison. Where Operating mechanism 70% n Comply with local safety regulations changes are discovered, further tests and analysis can be Interrupters 14% n exercise care before operating a breaker carried out to trace the cause of deviations from the reference Insulation 6% and to determine corrective action. Frame/foundation 5% As with any electromechanical device, things can happen Corrective Maintenance All others 5% that cause problems in the substation. The mantra of most (Courtesy CIGRE) n when something has already happened utilities is “Thou shall not fail to trip” when talking about the With some breakers, it is also useful to look at the frequency Preventive Maintenance breakers. of operation when determining the maintenance strategy. n based on time or number of operations But ensuring that the breaker will operate when needed For example: Periodic Maintenance requires maintenance. Testing is essential. No of operations >10,000 n carried out at regular intervals It is not always an electrical failure that causes a breaker to Time >20 years Condition-Based Maintenance trip, as the following examples show. Actual service, number of operations n a maintenance flag is set 1) Animals can get across the hot line of a breaker and cause Line CBs <50/yea Predictive Maintenance an unexpected trip, as can be seen in the photo below where 4) Even in a substation with batteries controlling the operation Generator CBs <1/day n service only when needed a snake got across a live conductor and ground. of the trip coils on breakers, there can be failures. Filter CBs >1/day Reliability Centered Maintenance n predictive maintenance but with value/importance priorities taken into consideration maInTenance sTraTegIes Various utilities, people and organizations have different No matter which strategy is chosen, it is important to strive viewpoints on and approaches to maintenance strategies. to have the same conditions from test to test. High precision Testing and maintenance methodologies have changed over signal acquisition is also necessary, together with high the years and in all likelihood will continue to evolve as new measurement accuracy and a reliable means of storage technologies become available. This section is only intended for data. to create awareness about some of the possible approaches. If the set up work required can be minimized and the There are no correct or incorrect strategies, but there is connection hook-up from the test instrument to the apparatus sometimes a better way of doing things. simplified, faster testing and evaluation of results can be Approaches to maintenance include but are not limited to achieved. the following: Testing can be done at various stages in the life of a breaker n Corrective maintenance including: n Preventative maintenance n Development n Periodic time interval based maintenance n Production n Condition based maintenance n Commissioning n reliability centered maintenance (The primary aim n Maintenance/fault tracing here is to preserve system functions by determining n after service (re-commissioning) the criticality of individual components, etc.) 4 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 5
  • 5. Most breaker failures are due to lack of maintenance. whaT To TesT Coil Measurements whaT Is sTaTIc resIsTance Definitions Coil measurements can be recorded on both close and trip The three important issues for breaker maintenance are: There are fundamental differences between timing, travel, coils. If the breaker is gang operated then you will have n lubrication motion, velocity, and acceleration. The differences need to be one trip coil and one close coil operating all three phases. If n Contact adjustment explained before going any further. the breaker is an IPO (Independent Pole Operation) breaker n neglect or lack of maintenance Timing then you will have a separate close coil for each phase and a Briefly, the most important thing for breaker maintenance is Timing is most often measured in milliseconds (ms) but it is separate open coil for each phase. grease. ALL breakers use grease as lubricant, and grease tends occasionally measured in cycles. Note the value of a cycle is Travel Measurements to dry out over time. Heat is produced on the breaker parts as different depending on what region of the world you are in i.e. Travel measurements include stroke, speed, damping, and the breaker carries its normal load current and that heat dries 50Hz or 60Hz network. penetration of the main contacts. out the grease. Close Time Minimum Trip Voltage Most breaker manufacturers allow the use of Mobil 28 The time it takes from the moment a circuit breaker receives a Under normal conditions the breaker should be operated lubricant, but you should check with the breaker manufacturer close pulse until the main contact touches. at a standard control voltage but the breaker is designed High contact resistance in circuit breakers is caused by high- for their specifications. An important thing to keep in mind is to operate at a minimum voltage level as well. This test will current breaking operations. Modern networks are carrying Open Time NEVER to use WD-40. It has a tendency to evaporate rather allow the operator to verify that the breaker coil is operating increasing loads requiring improved contact resistance. The time it takes from the moment a circuit breaker receives quickly leaving moving surfaces without lubricant. correctly by injecting a variable coil voltage and observing an open pulse until the main contact separates. This is also Potential problems that can be detected: Further details of that type of maintenance will be left referred to as Trip Time. whether the breaker maintains proper trip characteristics n overheating of contact surfaces for another presentation. This document will continue by within acceptable levels of control voltage. Close-Open Time n internal breakage (even with a breaker in the fully discussing non-invasive functional testing. Contact Resistance/Ductor closed position the resistance is infinite) The time it takes from the initial touch of the main contact Maintenance and inspection procedures can include any or all until the main contact separates. This is commonly referred to Contact resistance tests provide information about how of the following: as Trip-Free Time or Contact Dwell Time. healthy the contacts are and their ability to handle their rated whaT Is dynamIc resIsTance? current. The maximum contact resistance should be verified A look inside Test Equipment Open-Close Time against manufacturers’ specifications. Here is a cut-away view of the inside of an Arcing Chamber of n Micro-ohmmeters The time it takes from contact separation until the contact an SF6 Breaker. n Breaker analyzers touches again. This is often referred to as Reclose time. Rated current should not be exceeded and testing at 10% n Power supplies of the rated current is recommended. The minimum DC Travel n Vacuum testers test current should be used according to manufactures The travel trace indicates the instantaneous position of the n High current sources specification; however, the IEC and ANSI recommended circuit breaker contacts during an operation. The travel trace levels are: Software – including capability to do the following is a bi-directional linear movement traveling back and forth 50 A IEC 60694 between the open and closed positions. Travel is measured in n Set user defined parameters 100 A ANSI either millimeters or inches. n Create databases Contact resistance tests are commonly referred to as a n Generate reports Velocity Ductor, micro-ohmmeter, static resistance test or DLRO which n analyze data Measured in meters per second (m/s) or feet per second (ft/s) stands for Digital Low Resistance Ohm Meter. Static Contact The white nozzle is the Arc Chute for the arcing contact. velocity is calculated from the slope of the travel trace. This is n Create graphical presentations resistance is measured by injecting a DC current through the The right side of the picture is the stationary part of the the speed at which the main contacts travel. breaker or device under test and measuring the voltage drop. contact and the left side with the white nozzle is the moving Acceleration A four wire measurement method is used. The breaker must contact. The arcing contact is the metal rod (copper, tungsten, This is the rate of change of velocity of the contacts. be in the closed position. etc.) that is inserted into the nozzle and is designed to take Electrical testing can reveal much information about the health Static resistance is measured to reduce switchgear breakdowns the brunt of the arcing during close and open operations. The of the High Voltage Breaker. caused by high contact resistances across bus bar joints, ring around the arcing contact is the main contact (silver, silver breaker contact points and isolators. plated copper, etc.) and it functions to carry the load while the There are several electrical parameters that need to be tested breaker is in the closed position. on these breakers including the following: If low resistance readings are obtained when testing the breaker contact resistance using a low current, then it is The arcing contact is the first to make contact during a close Timing Measurements recommended to re-test the contacts at a higher current. Why operation and the last to break contact during an open Timing of the contacts can include the main contacts, operation. The arcing contact wears by normal operation would we benefit using a higher current? A higher current will pre-insertion or post-insertion resistors, and auxiliary contacts. as well as when breaking short-circuit currents. If the arcing have the ability to overcome connection issues and oxidation Timing of the contacts can be as simple as a single break per contact is too short or otherwise in bad condition, then the on terminals, where a lower current may produce false (higher) phase or as complicated as 12-breaks per phase. breaker soon becomes unreliable. Main contact surfaces can readings under these conditions. 6 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 7
  • 6. be deteriorated by arcing resulting in increased resistance, DRM can also be used as a timing measurement in certain auxiliary contacts quickly change state as well. When the “a” Time t2 to t3 excessive heating and in worst-case explosion. applications when it is not possible to disconnect both sides of contacts switch from closed to open position, the coil is no The rate of rise of current between t2 and t3 depends on the ground connections to the breaker. longer being energized and it quickly discharges. There are no electrical characteristics of the coil. The main contact resistance is measured dynamically over an Potential problems to detect: generalized time limits for the time relationships between main open or close operation and the arcing contact length can Time t4 and auxiliary contacts, but it is still important to understand be reliably estimated. The only real alternative in finding the n Measure shortening of the arcing contacts and check their operation. At time t4 the auxiliary contact breaks the DC supply to the length of the arcing contact is dismantling the circuit breakers n Determination of the length of the arcing contact coil, which de-energizes down to zero. arcing chamber. Potential problems that can be detected n increased resistance of arcing contact Closing times in spring-actuated breakers are directly related Reliable interpretation requires high test current and a circuit Timing to the potential energy in the spring mechanism. Increasing breaker analyzer with good measurement resolution. Accuracy and Consistency Variations in times obtained do or decreasing operating times tends to indicate changes in Dynamic resistance measurement, commonly known as not always indicate problems on the breaker. It’s important to the amount of energy used by the linkage driving the main “DRM” is a test method used as a diagnostic and analysis take into account variations in ambient temperature, previous and auxiliary contacts. Increased friction will consume part of tool. It is a comparative test and as such will not necessarily method of testing and the type of equipment used. the spring’s energy. Time differences between phases with yield results the first time it is performed. The measurement separate operating mechanisms could indicate differences in Timing – within single phases Simultaneous measurements is performed by injecting current through the breaker and individual operating mechanism settings, imminent mechanism within a single phase are important in situations where a simultaneously monitoring the voltage drop as well as current failure, internal chamber faults developing on a particular number of contacts are connected in series. Here, the breaker flow during the operation of the breaker. From these two phase or be an indication of faulty actuating coils on a becomes a voltage divider when it opens a circuit. If the time parameters a resistance value can be calculated. In the figure particular mechanism. Time differences between phases with a Figure 1. differences are too great, the voltage becomes too high across below the resistance trace starts out as a straight line before common operating mechanism could indicate internal faults on one contact, and the tolerance for most types of breakers is the breaker starts to move, this is your DLRO value. As the main and/or secondary contacts on a particular phase. The peak value of the first, lower current peak is related to the less than 2 ms. breaker starts to move, the resistance increases slightly. When fully saturated coil current (max current), and this relationship the main contacts part, there is a spike in the resistance curve Timing between phases The upper limits of timing between coIl currenT measuremenTs gives an indication of the spread to the lowest tripping and now the arcing contact resistance can be measured. phases is approximately 5-7 ms, provided that the breaker is Please refer to Figure 1 voltage. If the coil were to reach its maximum current before When the resistance goes to infinity or current flow stops the not equipped with synchronized tripping. Always consult the the armature and latch started to move, the breaker would General breaker is open. manufactures specifications when setting limits. not be tripped. It is important to note, however, that the Coil current measurement is a good diagnostic measurement Timing main/auxiliary contacts relationship between the two current peaks varies, particularly tool to detect potential electrical and/or mechanical problems Circuit breakers use auxiliary contacts to determine what with temperature. This also applies to the lowest tripping in the actuating coils. Specific parts of the mechanism that state the breaker is in and to control current flow in the voltage. will be checked are the trip coil, the close coil and the auxiliary control circuitry. Circuit breakers have two types of auxiliary contacts. Travel Motion contacts, “a” contacts and “b” contacts. The “a” contacts, A high-voltage breaker is designed to interrupt short-circuit Time t0 which are found in the open control circuitry, follow the state current in a controlled manner. This puts great demands of the breaker i.e. if the breaker is closed, the “a” contacts Time t0 is the time when the operating voltage is applied to on the mechanical performance of all components in the are closed and if the breaker is open, the “a” contacts are the coil. If the voltage is temporarily interrupted for some interrupter chamber as well as the operating mechanism. open. The “b” contacts, which are found in the close control reason, for example a bouncing contact in the supply source, It has to operate at a specific speed in order to build up circuitry, have the opposite state of the breaker i.e. when the the coil will be de-energized and the coil current will drop. As adequate pressure to allow for cooling stream of air, oil or gas breaker is closed, the “b” contacts are open and when the a result the operating time of the breaker will be increased due (depending on the type of breaker) to extinguish the arc that breaker is open, the “b” contacts are closed. The auxiliary to uncontrolled fluctuations in the test device. is generated after the contact separation until the next zero- contacts always lag the main contacts of the circuit breaker. Time t1 crossing. It is important to interrupt the current to prevent a When a motion trace is overlaid onto the resistance trace, As an example let’s discuss an open operation for the circuit Time t1 is the time when the latch of the coil begins to move. re-strike. This is accomplished by making sure that the contacts the actual length of the arcing contact can be determined. breaker. The breaker starts in the closed position therefore the As a result the rate of rise of the current will change due to the move apart far enough from each other before the moving Monitoring the length of the arcing contact and the resistance “a” contacts are closed and the “b” contacts are open. An change of inductance in the circuit. contact has entered the so-called damping zone. of the arcing contact can give you insight into the health of open pulse is sent through the control circuitry and is flowing Time t2 The contact travel motion is captured by connecting a travel the interrupter without opening up the breaker. through the “a” contacts. The coil is energized and it releases the trip latch that releases the spring energy in order to trip Time t2 is the time when the latch has stopped moving or transducer on the moving part of the operating mechanism. the breaker. Once the breaker changes to the open state, the slightly later. If the drop off of the current has been sharp as a The motion is presented as a curve where distance vs. time result of a fast moving latch, the dynamic delay of the current allows for further analysis. Speed is calculated between two drop might cause a minor delay in time t2 in comparison with points on this motion curve. The upper point is defined as a the stop time of the latch. distance in length, degrees or percentage of movement from 8 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 9
  • 7. a) the breaker’s closed position, or b) the contact-closure or Breaker Timing and Speed Calculation Points First trip contact-separation point. The time that elapses between these I was helping a customer who was using a TM1600 Breaker Testing the circuit breaker’s first open operation after it has two points ranges from 10 to 20 ms, which corresponds to 1-2 Timer to time an old McGraw Edison OCB. He was getting been sitting idle for some time, is a good way to evaluate zero-crossovers. good contact timing information of 20 ms closing time for status, especially of a line circuit breaker. The measurement The distance the breaker has to travel in which the electric phase A, but he was not getting any speed information. and connections to the circuit breaker are carried out while arc must be extinguished is usually called the arcing zone. it is still is in service. All of the connections are made inside We did not know what the SC (speed calculation) points were From the motion curve, a velocity or acceleration curve can be the control cabinet. This of course makes it impossible to do for the breaker but he did tell me that he had a stroke of 355 calculated in order to reveal changes in the breaker mechanics some of the recordings and means that there is a bigger risk of Regulations and laws require all objects to be grounded mm. He had his “Cls Sp Calculation Blw Cls” point set to 1.97 that may affect the breakers operation. injury during testing. Extra caution must be taken since there on both sides of a breaker before any maintenance work is inches. I told him to make that value 4 inches and it started is up to 480V in the control cabinet and the mechanism is fully performed on the object. The average experience of personnel Damping is an important parameter to monitor and test as the working. The reason is that we moved the point down onto charged. The breaker can operate at any time if there is a fault for substation testing has seen a decrease in recent years. stored energy an operating mechanism use to open and close the linear portion of the curve. The original value was too on the line. The education level and experience reduction of personnel a circuit breaker is considerable. The powerful mechanical close to the end of the travel, so the motion was over before the TM1600 could calculate the speed. By moving that point The biggest benefit of using first trip testing is to test “real lead to an inability to follow complex safety procedures and stress can easily damage the breaker and/or reduce the down, it was able to calculate the speed correctly. world” operating conditions. If the circuit breaker has not requires extensive field training or can lead to uncertainty that breakers’ useful life. The damping of opening operations is operated for year, first trip testing will show if the circuit tests are being executed in a correct way. Electric arc flash usually measured as a second speed, but it can also be based Below is a typical printout from a TM1600 Breaker Analyzer. breaker is slower due to problems like corrosion in the and electrocution accidents in substations are due to fault on the time that elapses between two points just above the mechanism linkages. With traditional methods, the testing currents, lightning on power lines connected to the substation breaker’s open position. is carried out after the circuit breaker has been taken out of and capacitive coupling within the substation. The outcome of The Travel Trace accidents spans from short-term hospital visits to funerals. This service and has been operated once or even twice. By analyzing the travel trace obtained from a linear or rotary risk appears because a test on the circuit breaker is performed transducer it is possible to obtain information about the On a gang operated breaker once coil current is measured and without safety grounding. The risk for an accident can be contacts such as total travel, over travel, rebound, under on an IPO breaker three coil currents are measured. Auxiliary regarded as low, but the impact could be catastrophic and travel, contact penetration, and contact position at the time contacts can also be measured. If the CB has another breaker usually covered by media. Arc flash accidents in high voltage of making or breaking. See the following graph for a typical connected in parallel then open times may also be measured substations will cause significant injuries. The most important “close” travel trace. by monitoring the protection CT’s. A more advanced approach test for circuit breaker diagnosis is the main contact timing and to first trip is to also measure vibration. This provides detailed contact resistance. Main contact timing and contact resistance information of the status of the circuit breaker. These requires an instrument connected to the circuit breaker on measurements during first trip are possible with TM1800 and site. Knowledge of conventional instrumentation technology TM1600/MA. implies that safety grounding can be removed during the test and is therefore not in compliance with national law, trade workIng BeTween The grounds union demands, or substation safety procedures produced Dual Ground Testing Significance by standardization bodies like IEEE and IEC. Safety bodies, With the ongoing deregulation of the electrical power like HSE and OSHA and their counterparts in other countries industry, utilities and service companies are acting in a have guidelines prescribing that circuit breakers need to be changing business environment. There is expectation of grounded at both ends during any maintenance work. The increasing profitability with fewer and fewer key technical current situation is mitigated by undertaking cumbersome Speed resources. Further, companies are judged by the public on and time-consuming safety procedures. This makes the test Manufacturers often include speed calculation points in their social activities. The health and safety of personnel work very inefficient from a personnel and asset management their breaker specifications. These are predefined points of undertaking high voltage testing has become a topic where point of view. Because the safety ground is removed, extensive reference, which we can use with the breaker analyzer to trade unions and media are on their toes at a time when safety exercises are added to the way of working. A special determine a velocity in a certain region on the travel trace. the level of critical skills is decreasing. Stock price can be work permit has to be acquired in the field and this is typically These points will be used as the speed calculation points asked significantly impacted by poor health and safety performance – granted by remote office personnel. for in the CABA software. Speed is defined as the “average never mind corporate responsibility laws that could put senior speed calculated between two defined points on the motion managers in court for negligence. Keeping HV test engineers curve. A point might be defined as an absolute position, an safe has never been more important. absolute time, a position at the instant for an event, a time difference or position difference to the other point.” 10 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 11
  • 8. DualGround Testing Has Arrived! VIBraTIon TesTIng The following parameters can be measured with the MA61 where they are recorded during breaker operation. Dual grounding involves grounding the breaker on both sides Many different diagnostic methods have been used over the in-service test: The directly recorded vibration signals can be analyzed in the after it has been removed or taken out of service. When HV years. The most common measurements on circuit breakers are Trip and close coil currents CABA Win program, together with time, motion and coil- breakers in live substations are removed from the system, the off-line measurements of contact resistance, contact timing, current data. These data alone, however, do not suffice for The trip and close coil current measurements reveal a lot of effects of the induction from adjacent live overhead lines can travel motion, velocity and coil current. determining breaker-condition trends. interesting data such as maximum current, latch release time create hazardous voltages in any un-grounded equipment and current interruption time. The current waveform for the More sophisticated methods are acceleration, DRM (dynamic and erroneous results in connected test equipment. Typical individual breaker is unique and a good indicator of circuit resistance measurement) and vibration testing. The tests substation procedure includes the breaker being grounded breaker performance. are well known and widely used for periodic or preventive on both sides initially and then one side is usually removed maintenance. Auxiliary (A/B) contact timing or temporarily lifted while testing is taking place. The DualGround technology allows the breaker under test to be Another possibility is to introduce on-line condition monitoring As in many condition-monitoring systems, the auxiliary grounded while testing is being performed without any impact of circuit breakers. An estimated 10% of breaker problems contacts can be used as an indirect measurement of the main to the test results being obtained. and failures are attributed to improper maintenance, and contact. The switching times of the “a” and ”b” contacts are condition monitoring could possibly eliminate too-early or correlated to the main contact timing and, depending on the Benefits unnecessary off-line testing and overhauls and make just-in- actual design of the breaker, the statistical deviation between There are various benefits to using DualGround capable test the two may be very small. Within the limitations of the time maintenance possible. The problem is that a complete Instruments: breaker design, the a/b contact time provides an accurate and monitoring system that covers all breaker subsystems and n Personnel can work safely between safety grounds failure modes can easily escalate in complexity until its cost repeatable reference for the main contact timing. Typical Accelerometer n Test results are not affected becomes as much as half the breaker cost. Load current/Main contact timing A sophisticated procedure known as dynamic time warping n no need for a standby bucket truck and crew (DTW) is used for further analysis. DTW compares vibration An alternative to installing a separate condition monitoring Using the secondary current from the circuit breaker current n no waiting time between tests signals with reference signals obtained (preferably) from a system on each breaker is to use portable test sets but still measurement transformer, it is possible to measure the load n Hazardous voltages are negated previous test conducted on the very same breaker. However, perform in-service measurements on energized breakers. The current using a Hall-effect clamp on current sensor. From n number of work permits is reduced inter-phase comparisons and comparisons with the results complete test procedure will be less complex and the time the waveform and depending on the actual test setup, both of tests conducted on other breakers of the same type can n actual testing time is reduced saving may be substantial compared to traditional off-line contact closing and opening may be detected as well as when be used in the initial phase of a series of tests. Comparison testing. To many utilities, this may become an attractive testing arcing is extinguished. results are presented on a time-time diagram that shows alternative. DC voltage supply time deviations and also on a deviation diagram that reveals TesT meThod Proper breaker operation is only achieved if the supply voltage differences in vibration amplitudes. to the operating coils is stable at the correct value. Monitoring Traditional circuit breaker testing is based on measuring the DC voltage when operating the breaker gives a quick test specific parameters like close/open time, contact speed, of the battery system, including wiring and junctions from the maximum coil current, and then comparing the test data with batteries to the circuit breaker. the specifications from the manufacturer (pass-fail testing). When using more advanced circuit breaker analyzers and/or Vibration test methods, such as dynamic resistance and vibration testing, Vibration testing of circuit breakers is an interesting tool for it is also possible or even necessary to look at the different circuit breaker diagnostics. In particular, measurements inside waveforms as unique signatures or footprints for the individual the operating mechanism have given the best input data for breaker. This approach may also be used when measuring a the analysis. This means that in-service testing using vibration circuit breaker in-service, on line and under load. data for diagnostic comparisons can be a very useful tool. It is important to understand that the signature data are When a breaker operates, the mechanical motion generates Figure 2. Connection diagram of TM1800 with both sides grounded. not precise single-numbered values for a pass-fail decision. strong vibrations. These signals can be used for diagnostics All test data and analysis data can be reported along with Instead the signature should be used for comparisons with and maintenance. Both TM1600/MA and the popular TM1800 other data such as motion and speed. The overall results benchmarks, ideally taken from the very same breaker or at can make vibration measurements. provide a more detailed picture of breaker condition than has least from the same circuit breaker type. Comparing signatures One or more accelerometers are attached to the breaker previously been available. In this picture it is easily possible to by using overlays has proved to be a reliable method of poles and operating mechanism. Vibration signals from the discern deviations that are beginning to appear and trace their detecting critical changes in breaker performance. accelerometers proceed via a signal-conditioning unit that origins. incorporates an amplifier and filter to the TM1800 or TM1600/ 12 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 13
  • 9. DTW vibration analysis is available in a separate program afTer The TesT: daTa InTerpreTaTIon CABA Win’s intuitive split screen format means that users can module that can be purchased as an optional add-on for With any complicated procedure like HV breaker testing, it’s easily navigate to past test data or quickly create a new test to CABA Win. This type of measurement requires a high sampling important to have a good software package to store and gather new test data. rate and a broad dynamic range. Together with the specially analyze the data. For this, Megger offers a product called designed signal conditioning amplifier SCA606, the TM1600/ CABA Win (Computer Aided Breaker Analysis for Windows). MA61 or TM1800 enables users to measure vibrations with frequencies ranging up to 15 kHz. After connecting the breaker analyzer to a personal computer (PC), CABA Win can be used to speed up testing and improve reliability. CABA Win can be used with TM1800, TM1600/ MA61 and EGIL. Results are presented on the display both faIlure mode analysIs graphically and in table form after each breaker operation The following chart indicates some typical failure modes of HV so that comparisons can be made with limit values and Breakers and looks at the various mechanical areas that could previous test results from any of the three analyzers. Simple cause an out-of-tolerance condition. procedures enable the creation of individual test plans tailored to individual breakers. Timesaving conversion tables simplify possible cause of close Time open Time damping Time charging motor failure condition the task of connecting and linking transducers to the breaker. Change in characteristic of the Reports created in the user’s own format can be obtained Faster/ Slower normal normal normal closing system. latching system is easily using standard field-linking functions in List & Label or binding. Microsoft Word. The reports are easy distributed either in the It is possible to quickly analyze the operation of a breaker and Spring charging system used for closing is damaged. The springs form of a pdf document or in List & Label format which can be see if it is opening or closing in the proper amount of time and Faster normal normal normal have probably been excessively read by a freeware L&L viewer. A basic database is included in in some cases it is possible to see pass or fail. Being able to see charged, and the breaker has been operated. the program to help users to organize their circuit breakers. pass or fail criteria involves entering limits into the breaker test plan before starting to testing the breaker Spring charging system used for closing is damaged. The springs Slower normal normal normal have probably been excessively charged, and the breaker has been operated. Change in characteristic of the normal Slower normal normal closing system. latching system is binding. reduced force exerted by opening Faster Slower normal / Slower normal / Slower springs. one of the opening springs is broken. increased friction throughout the entire breaker caused by Slower Slower normal / Slower normal / Slower (for example) corrosion in the linkage system. Malfunctioning puffer system or normal Faster normal normal extremely low SF6 - pressure. Damaged opening damper. not normal normal Faster Faster enough oil in the dashpot. Damaged opening damper. normal normal Slower Slower increased friction in the dashpot. 14 TeSTinG HiGH VolTaGe BreakerS TeSTinG HiGH VolTaGe BreakerS 15