SlideShare una empresa de Scribd logo
1 de 37
Bicycle traffic in Helsinki
City of Helsinki
City Planning Department
pyöräliikenne.fi
14.4.2016
Pihla Melander
Outline for presentation
1. Bicycle traffic in Helsinki
2. Cycling in a key role in enabling growth
3. Developing the network
4. Winter maintenance pilot
5. What next?
Bicycle traffic in Helsinki
Strategy and key figures
From strategy to kerbstone
Why does the city want more cyclists?
Number of cyclists on the rise
The Goal 2020
– Increase the modal
share of bicycle
trips to 15 % by
2020
– Strategy
programme:
Promote walking,
cycling and public
transport
Bicycle traffic action plan
Source: Pyöräilyn edistämisohjelma
Most important actions for the City:
1.Straight and smooth routes, with good
arrangements for crossing, pedestrians and
cycling quality-separated
2.More and better bicycle parking spaces
3.High-quality maintenance all year round
4.Clear-term and high-quality worksite traffic
5.Marketing and communication
Cycling in a key role in
enabling growth
Enabling growth
By 2050:
• the City of Helsinki +250 000 people
• Greater Helsinki Region +600 000 people
The new Helsinki City Plan proposes:
Expansion of the inner city as a major part of
the growth
New City Plan
1. Creating a Public
Transport Network
City
2. Expansion of the
inner city
3. Infill development of
important nodes
4. Improving the green
network city
How can we achieve this?
Space
40 bicycles vs. 40 cars
Health and Environment
Time benefits
Helsinki’s Urban Mobility Strategy
1.Pedestrians
2.Bicycle traffic
3.Public transport
4.Goods transport
5.Cars
http://www.hel.fi/hel2/ksv/julkaisut/esitteet/esite_2016-1_en.pdf
Developing the network
Where do we need bicycle paths?
http://www.mobilitymodeling.com/try-it-out/
Baana-Bicycle highways
Part of Baana -highways already exist
More is detail planned every year
Bicycle Network for city center 2025
• One directional
bicycle paths at
city center
Part of the network is already built
Winter maintenance pilot on
cycle paths
2015-2016
Current quality standards
Bike paths:
– Plowed by 7 o’clock:
410 km
– Plowed by 10 o’clock:
1 200 km
– Plowed by 12 o’clock:
860 km
Plowing has to start,
when the layer of snow is
more than 5 cm.
Photo: Jari Aho
Why are we developing winter
maintenance now?
Increase the number of cyclists
Find out the winter maintenance quality
standards needed to increase the number of
winter cyclists
What are the costs of better winter
maintenance?
New route-specific winter maintenance
methods
Baana – Helsinginkatu (3,1 km)
– Brushing
– New de-icing solution Granlux
– Potassium formate-liquid Eco-Melter
Helsinginkatu – Oulunkylä (5,6 km)
– Brushing
– Salt Kuva: Reetta Keisanen / KSV
Preliminary results
Granlux and Eco-
Melter
• More eco-friendly
than salt
• Costs tenfold
compared to salt
• Make snow stick
to the bike
Anti-skid using salt
• Needs to be applied
often
• Costs bigger compared
to gravel
• Works well in near-
zero-temperatures
• Good maintenance
level at very low
temperatures
• Negative
environmental effects
Brushing snow
• Brushing
essential to
achieve better
quality
• Slower than
plowing snow
• Machines big
and have little
other use
Summary
Better winter maintenance quality is clearly more expensive than
current quality.
Brushing is in central role.
The pathway is to be built with high quality, drainage needs to be
well executed.
No considerable differences in the quality of the winter
maintenance between the two methods.
Pilot to be continued with salt due to cost-efficiency
What next?
New guidelines for bicycle traffic
and parking
www.pyöräliikenne.fi
https://issuu.com/helsinkisuunnittelee/
docs/pyorailykatsaus_2015_en_issu
Bicycle account 2015
Marketing strategy for bicycle traffic
City Bikes, opening party 2.5.2016
Bicycle traffic in Helsinki -exhibition
14.4. – 1.10 in Kamppi,
Helsinki.
Events & education
about the guidelines
More:
http://laituri.hel.fi/en
Thank you!
Pihla Melander
Traffic and Transportation Engineer
pihla.melander@hel.fi
City of Helsinki
City Planning Department

Más contenido relacionado

Similar a Bicycle traffic in Helsinki

SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for InvernessSCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for Invernesswmud
 
Ie app slides mestres #g
Ie app   slides mestres #gIe app   slides mestres #g
Ie app slides mestres #gyughoyoshida
 
01coolbike Asian Trends Report
01coolbike Asian Trends Report01coolbike Asian Trends Report
01coolbike Asian Trends Reportgoodtochina
 
BKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryBKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryKovács Virág
 
2011 coolqiasiadraft
2011 coolqiasiadraft2011 coolqiasiadraft
2011 coolqiasiadraftgoodtochina
 
The process of evaluating English cycle cities
The process of evaluating English cycle citiesThe process of evaluating English cycle cities
The process of evaluating English cycle citiesCyclingEmbassy
 
Lucy Saunders Active Travel August 2011
Lucy Saunders Active Travel August 2011Lucy Saunders Active Travel August 2011
Lucy Saunders Active Travel August 2011LucySaunders
 
RV 2014: Can We Get There from Here? First and Last Miles by Whitney Pitkanen
RV 2014: Can We Get There from Here? First and Last Miles by Whitney PitkanenRV 2014: Can We Get There from Here? First and Last Miles by Whitney Pitkanen
RV 2014: Can We Get There from Here? First and Last Miles by Whitney PitkanenRail~Volution
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesign South East
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for CyclistsCycling Scotland
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventDesign South East
 
Eu practice Copenhagen
Eu practice CopenhagenEu practice Copenhagen
Eu practice CopenhagenAsmida Nasir
 
Gyda Grendstad - Cabe UDSS Keynote
Gyda Grendstad - Cabe UDSS KeynoteGyda Grendstad - Cabe UDSS Keynote
Gyda Grendstad - Cabe UDSS KeynoteDesign South East
 
2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for CyclistsCycling Scotland
 
Campaign priorities AGM 2016 (v4)
Campaign priorities AGM 2016 (v4)Campaign priorities AGM 2016 (v4)
Campaign priorities AGM 2016 (v4)newcycling
 
Delivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkDelivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkKevin Baker
 

Similar a Bicycle traffic in Helsinki (20)

SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for InvernessSCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
 
Ie app slides mestres #g
Ie app   slides mestres #gIe app   slides mestres #g
Ie app slides mestres #g
 
01coolbike Asian Trends Report
01coolbike Asian Trends Report01coolbike Asian Trends Report
01coolbike Asian Trends Report
 
BKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryBKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 February
 
2011 coolqiasiadraft
2011 coolqiasiadraft2011 coolqiasiadraft
2011 coolqiasiadraft
 
The process of evaluating English cycle cities
The process of evaluating English cycle citiesThe process of evaluating English cycle cities
The process of evaluating English cycle cities
 
Winter maintanance: Cyclists point of view
Winter maintanance: Cyclists point of viewWinter maintanance: Cyclists point of view
Winter maintanance: Cyclists point of view
 
Lucy Saunders Active Travel August 2011
Lucy Saunders Active Travel August 2011Lucy Saunders Active Travel August 2011
Lucy Saunders Active Travel August 2011
 
RV 2014: Can We Get There from Here? First and Last Miles by Whitney Pitkanen
RV 2014: Can We Get There from Here? First and Last Miles by Whitney PitkanenRV 2014: Can We Get There from Here? First and Last Miles by Whitney Pitkanen
RV 2014: Can We Get There from Here? First and Last Miles by Whitney Pitkanen
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian Lord
 
Matti Koistinen: Winter maintanance - Cyclists' point of view - Riga
Matti Koistinen: Winter maintanance - Cyclists' point of view - RigaMatti Koistinen: Winter maintanance - Cyclists' point of view - Riga
Matti Koistinen: Winter maintanance - Cyclists' point of view - Riga
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Eu practice Copenhagen
Eu practice CopenhagenEu practice Copenhagen
Eu practice Copenhagen
 
VACC Program Roadshow
VACC Program RoadshowVACC Program Roadshow
VACC Program Roadshow
 
Gyda Grendstad - Cabe UDSS Keynote
Gyda Grendstad - Cabe UDSS KeynoteGyda Grendstad - Cabe UDSS Keynote
Gyda Grendstad - Cabe UDSS Keynote
 
Fulltext01
Fulltext01Fulltext01
Fulltext01
 
2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists
 
Campaign priorities AGM 2016 (v4)
Campaign priorities AGM 2016 (v4)Campaign priorities AGM 2016 (v4)
Campaign priorities AGM 2016 (v4)
 
Delivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkDelivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle Network
 

Más de Pyöräliikenne Helsingissä

Más de Pyöräliikenne Helsingissä (7)

Pyöräliikennemessut 10.5.2016.
Pyöräliikennemessut 10.5.2016.Pyöräliikennemessut 10.5.2016.
Pyöräliikennemessut 10.5.2016.
 
Pyöräliikenteen uusi suunnitteluohje - koulutukset
Pyöräliikenteen uusi suunnitteluohje - koulutuksetPyöräliikenteen uusi suunnitteluohje - koulutukset
Pyöräliikenteen uusi suunnitteluohje - koulutukset
 
Winter maintenance pilot on cycle paths 2015-2016
Winter maintenance pilot on cycle paths 2015-2016Winter maintenance pilot on cycle paths 2015-2016
Winter maintenance pilot on cycle paths 2015-2016
 
Pyöräteiden talvihoidon kokeilu 2015 - 2016
Pyöräteiden talvihoidon kokeilu 2015 - 2016Pyöräteiden talvihoidon kokeilu 2015 - 2016
Pyöräteiden talvihoidon kokeilu 2015 - 2016
 
Pyöräliikenne ja katutyöt_2016
Pyöräliikenne ja katutyöt_2016Pyöräliikenne ja katutyöt_2016
Pyöräliikenne ja katutyöt_2016
 
Katsaus Helsingin pyöräliikenteeseen 14.4.2016
Katsaus Helsingin pyöräliikenteeseen 14.4.2016Katsaus Helsingin pyöräliikenteeseen 14.4.2016
Katsaus Helsingin pyöräliikenteeseen 14.4.2016
 
Pyöräliikenteen viestinnän pikavinkit
Pyöräliikenteen viestinnän pikavinkitPyöräliikenteen viestinnän pikavinkit
Pyöräliikenteen viestinnän pikavinkit
 

Último

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 

Último (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

Bicycle traffic in Helsinki

  • 1. Bicycle traffic in Helsinki City of Helsinki City Planning Department pyöräliikenne.fi 14.4.2016 Pihla Melander
  • 2. Outline for presentation 1. Bicycle traffic in Helsinki 2. Cycling in a key role in enabling growth 3. Developing the network 4. Winter maintenance pilot 5. What next?
  • 3. Bicycle traffic in Helsinki Strategy and key figures
  • 4. From strategy to kerbstone
  • 5. Why does the city want more cyclists?
  • 6. Number of cyclists on the rise
  • 7. The Goal 2020 – Increase the modal share of bicycle trips to 15 % by 2020 – Strategy programme: Promote walking, cycling and public transport
  • 8. Bicycle traffic action plan Source: Pyöräilyn edistämisohjelma
  • 9. Most important actions for the City: 1.Straight and smooth routes, with good arrangements for crossing, pedestrians and cycling quality-separated 2.More and better bicycle parking spaces 3.High-quality maintenance all year round 4.Clear-term and high-quality worksite traffic 5.Marketing and communication
  • 10. Cycling in a key role in enabling growth
  • 11. Enabling growth By 2050: • the City of Helsinki +250 000 people • Greater Helsinki Region +600 000 people The new Helsinki City Plan proposes: Expansion of the inner city as a major part of the growth
  • 12. New City Plan 1. Creating a Public Transport Network City 2. Expansion of the inner city 3. Infill development of important nodes 4. Improving the green network city
  • 13. How can we achieve this?
  • 17. Helsinki’s Urban Mobility Strategy 1.Pedestrians 2.Bicycle traffic 3.Public transport 4.Goods transport 5.Cars http://www.hel.fi/hel2/ksv/julkaisut/esitteet/esite_2016-1_en.pdf
  • 19. Where do we need bicycle paths? http://www.mobilitymodeling.com/try-it-out/
  • 21. Part of Baana -highways already exist
  • 22. More is detail planned every year
  • 23. Bicycle Network for city center 2025 • One directional bicycle paths at city center
  • 24. Part of the network is already built
  • 25. Winter maintenance pilot on cycle paths 2015-2016
  • 26. Current quality standards Bike paths: – Plowed by 7 o’clock: 410 km – Plowed by 10 o’clock: 1 200 km – Plowed by 12 o’clock: 860 km Plowing has to start, when the layer of snow is more than 5 cm. Photo: Jari Aho
  • 27. Why are we developing winter maintenance now? Increase the number of cyclists Find out the winter maintenance quality standards needed to increase the number of winter cyclists What are the costs of better winter maintenance?
  • 28. New route-specific winter maintenance methods Baana – Helsinginkatu (3,1 km) – Brushing – New de-icing solution Granlux – Potassium formate-liquid Eco-Melter Helsinginkatu – Oulunkylä (5,6 km) – Brushing – Salt Kuva: Reetta Keisanen / KSV
  • 29. Preliminary results Granlux and Eco- Melter • More eco-friendly than salt • Costs tenfold compared to salt • Make snow stick to the bike Anti-skid using salt • Needs to be applied often • Costs bigger compared to gravel • Works well in near- zero-temperatures • Good maintenance level at very low temperatures • Negative environmental effects Brushing snow • Brushing essential to achieve better quality • Slower than plowing snow • Machines big and have little other use
  • 30. Summary Better winter maintenance quality is clearly more expensive than current quality. Brushing is in central role. The pathway is to be built with high quality, drainage needs to be well executed. No considerable differences in the quality of the winter maintenance between the two methods. Pilot to be continued with salt due to cost-efficiency
  • 32. New guidelines for bicycle traffic and parking www.pyöräliikenne.fi
  • 34. Marketing strategy for bicycle traffic
  • 35. City Bikes, opening party 2.5.2016
  • 36. Bicycle traffic in Helsinki -exhibition 14.4. – 1.10 in Kamppi, Helsinki. Events & education about the guidelines More: http://laituri.hel.fi/en
  • 37. Thank you! Pihla Melander Traffic and Transportation Engineer pihla.melander@hel.fi City of Helsinki City Planning Department

Notas del editor

  1. Ilmestyy jokatoinen vuosi