 Transformers and generators are voltage
sources. They are traditionally protected
by an Over current + Earth fault relay,
normally mounted in the breaker panel.
This is shown in fig. 1. It should be noted
that this protection alone is not adequate.
 When an earth fault occurs within the
zone defined as A in the fig-1, or within
the machine, the fault current will
circulate within the zone or within the
machine. The fault current will not flow
through the CTs connected to the O/C
+E/F relays near the breaker. This will
cause a no trip situation when there is a
fault in the zone A (Internal fault)
 Consequently, a separate scheme is
required to detect internal earth faults in
zone A. This scheme is called Restricted
Earth Fault (REF) scheme.
 It should be noted that the fault currents in
Zone A is limited by the impedance of the
equipments in the zone.
 for transformers and generators it is very low
so the fault currents can rise very fast and
damage the equipment. Consequently REF
protection is of utmost importance for
generators and transformers.
 The name Restricted is derived – since the
objective of the protection is to detect the earth
fault in the specific zone , restricted to the zone,
starting from the breaker to the machine
terminals.
 In case of a generator, the machine terminal is
the neutral point.
 In case of a transformer , the machine terminal
becomes the star point of either the primary or
secondary winding or both. In case of delta
winding, it is the winding itself.
 It is well established that the sum of currents at
the beginning of the zone A should be equal to
the sum of currents exiting the zone .
 Two sets of CT’s are Used to derive this sum of
currents at the inlet and exit. A fault in the
zone will result in a difference in current.
 An over current relay is used to measure the
difference in the sum of these currents.
 Typical REF scheme shown in Fig-2.
 The REF relay is connected between P & S. It
will pick up if there is enough voltage across P-
S to drive the pick up current through the
relay.
 There are two current sources in the CT
secondary circuit PQRSTU:
a) The current produces by CT X (loop RSPQ)
b) The current produced by CT Y (loop UPST)
 Under normal conditions, vectorial sum of the
currents of these two CT’s will be equal and
opposite in the branch P-S (i.e.) the resultant
current in the branch PS will be zero.
 In this situation, the currents of CT X and CT Y
will circulate in the loop PQRSTU. The voltage
across P-S will be zero.
 When there is an earth fault within the zone A, the
currents of X & Y CT’s will not be equal, a small
difference of current will flow in the branch P-S.
This current will result in a voltage across P-S
since the current flows through the relay
impedance.
 If this voltage is adequate to operate the relay, the
relay will pick up this detecting a fault within the
zone.
 For a fault outside the zone, the currents
through CT’s X & Y will be the same so the
resultant current through P-S will still be zero
and the relay will not pick up.
 In this case the fault has to be cleared by
another O/C + E/F relay connected near the
breaker.
 REF relay will detect a fault within a zone restricted
between two CT’s and it will not detect a fault out side
the zone defined by the CT’s. This is true, only for ideal
conditions, where the two CT’s are perfectly matched.
 Following miss matches will occur under practical
situations in the field:
i) The CT secondary impedances may not be equal.
ii) The lead wires connecting the CT secondary's to the
relay may not have equal resistances.
iii) The CT’s may have different ratio error and phase
angle error due to this, the secondary current’s will not
be equal even if the primary currents are same.
iv) The CT’s may have different ratio error and phase
angle error due to this, the secondary current’s will not
be equal even if the primary currents are same.
 The cumulative effect all the above, can make the relay
trip even when there is a full load current flowing in
the primaries, though the primary side currents are
same, the secondary side currents need not be the same
so a voltage sufficient to trip the REF relay may
develop across P-S and hence the relay will trip.
 To make the relay insensitive to this voltage produced
by CT mismatch, a resistor is added in series with the
relay.
 Once this resistor is added, the relay will need a
voltage which is higher than the voltage produced by
the CT mismatch.
 This resistor is called stabilizing resistor ,this is an
important component in REF scheme since this ensures
stability in the scheme by avoiding spurious tripping.
 It should be noted that actual input circuit to trip
mechanism (consisting of the Relay + stabilizing
resistor) has become a high impedance circuit.
 If the relay Has to trip, the CT secondary's
should produce sufficiently high enough Voltage
to activate the relay, after allowing for the drop
across the stabilizing Resistor.
 To ensure the CT’s produce enough voltage, an
additional specification the Knee point voltage is
included for the CT’s used for REF protection.
 Knee point voltage (KPV) is defined as the point
on the magnetizing curve (of the material used
for the CT core) where the core will need 50%
increase in the magnetizing force (ampere turns)
to cause a 10% increase in the flux Density.
(Voltage builds up across secondary).
 In effect, KPV defines the end of the linear portion
of the BH curve. Higher the KPV, larger is the
linear zone and better will be secondary output for
higher fault currents. Higher the KPV, better are
the chances of a high impedance relay trip.
Fig.3 shows a typical
scheme for REF
protection for
generators. The scheme
have the following ;
a) 3 nos. phase CTs
b) 1 no. neutral CT
c) 1 no. Relay
d) 1 no. Stabilizing
resistor
 Fig.4 shows a typical scheme for REF protection for
transformers. It should be noted that transformers will
need two REF schemes ,one on the primary side and
the other on the secondary side.
 For the transformer primary side , which is usually
delta connected, followings are in the REF scheme:
a) 3 nos. phase CTs
b) 1 no. Relay
d) 1 no. Stabilizing resistor
 For the transformer secondary side, which is usually
star connected, followings are in the REF scheme:
a) 3 nos. phase CTs
b) 1 no. neutral CT
c) 1 no. Relay
d) 1 no. Stabilizing resistor
Restricted Earth Fault(REF) Protection.pptx

Más contenido relacionado

La actualidad más candente

Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Over current protection
Over current protectionOver current protection
Over current protectionSHUBHAM KUMAR
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYRaviraj solanki
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6Nageswar Rao
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)kaushal boghani
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601SARAVANAN A
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)Rohini Haridas
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.pptSalim Palayi
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Ppt of current transformer
Ppt of current transformerPpt of current transformer
Ppt of current transformerROOPAL PANCHOLI
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CTParth Patel
 

La actualidad más candente (20)

Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Over current protection
Over current protectionOver current protection
Over current protection
 
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
BUS BAR  PROTECTION PPT BY:-R.K.PANDITBUS BAR  PROTECTION PPT BY:-R.K.PANDIT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
 
DISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAYDISTANCE PROTECTION RELAY
DISTANCE PROTECTION RELAY
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
Overcurrent protection
Overcurrent protectionOvercurrent protection
Overcurrent protection
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Relays
RelaysRelays
Relays
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Ppt of current transformer
Ppt of current transformerPpt of current transformer
Ppt of current transformer
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
Transformers Protection
Transformers ProtectionTransformers Protection
Transformers Protection
 

Similar a Restricted Earth Fault(REF) Protection.pptx

C0212014018
C0212014018C0212014018
C0212014018theijes
 
pptonprotectionofpowertransformers-161020085118 (1).pdf
pptonprotectionofpowertransformers-161020085118 (1).pdfpptonprotectionofpowertransformers-161020085118 (1).pdf
pptonprotectionofpowertransformers-161020085118 (1).pdfSunny268892
 
Symmetrical components in transient regime
Symmetrical components in transient regimeSymmetrical components in transient regime
Symmetrical components in transient regimegaonioni
 
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Power System Operation
 
CURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxCURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxManishPandya29
 
3 _CRT Display Design_A_
3   _CRT Display Design_A_3   _CRT Display Design_A_
3 _CRT Display Design_A_James Webb
 
Electronics and Communication Engineering
Electronics and Communication EngineeringElectronics and Communication Engineering
Electronics and Communication EngineeringEkeeda
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]Md Irshad Ahmad
 
06 current -__voltage_transformers
06 current -__voltage_transformers06 current -__voltage_transformers
06 current -__voltage_transformersKrishna Das
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals termsRajneesh Budania
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals termsRajneesh Budania
 
Electrical and Electronics Engineering
Electrical and Electronics EngineeringElectrical and Electronics Engineering
Electrical and Electronics EngineeringEkeeda
 

Similar a Restricted Earth Fault(REF) Protection.pptx (20)

C0212014018
C0212014018C0212014018
C0212014018
 
pptonprotectionofpowertransformers-161020085118 (1).pdf
pptonprotectionofpowertransformers-161020085118 (1).pdfpptonprotectionofpowertransformers-161020085118 (1).pdf
pptonprotectionofpowertransformers-161020085118 (1).pdf
 
Symmetrical components in transient regime
Symmetrical components in transient regimeSymmetrical components in transient regime
Symmetrical components in transient regime
 
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
 
IEEE 2004
IEEE 2004IEEE 2004
IEEE 2004
 
Lesson4
Lesson4Lesson4
Lesson4
 
Averaging - 1.docx
Averaging - 1.docxAveraging - 1.docx
Averaging - 1.docx
 
Voltage Ripple Reduction in Voltage Loop of Voltage Source Converter
Voltage Ripple Reduction in Voltage Loop of Voltage Source ConverterVoltage Ripple Reduction in Voltage Loop of Voltage Source Converter
Voltage Ripple Reduction in Voltage Loop of Voltage Source Converter
 
CURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxCURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptx
 
W044151159
W044151159W044151159
W044151159
 
3 _CRT Display Design_A_
3   _CRT Display Design_A_3   _CRT Display Design_A_
3 _CRT Display Design_A_
 
Electronics and Communication Engineering
Electronics and Communication EngineeringElectronics and Communication Engineering
Electronics and Communication Engineering
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
 
06 current -__voltage_transformers
06 current -__voltage_transformers06 current -__voltage_transformers
06 current -__voltage_transformers
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
 
Lecture (11.11.22).pptx
Lecture (11.11.22).pptxLecture (11.11.22).pptx
Lecture (11.11.22).pptx
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
 
TRANSIENT IN POWER SYSTEM
TRANSIENT IN POWER SYSTEMTRANSIENT IN POWER SYSTEM
TRANSIENT IN POWER SYSTEM
 
Electrical and Electronics Engineering
Electrical and Electronics EngineeringElectrical and Electronics Engineering
Electrical and Electronics Engineering
 

Último

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 

Último (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

Restricted Earth Fault(REF) Protection.pptx

  • 2.  Transformers and generators are voltage sources. They are traditionally protected by an Over current + Earth fault relay, normally mounted in the breaker panel. This is shown in fig. 1. It should be noted that this protection alone is not adequate.  When an earth fault occurs within the zone defined as A in the fig-1, or within the machine, the fault current will circulate within the zone or within the machine. The fault current will not flow through the CTs connected to the O/C +E/F relays near the breaker. This will cause a no trip situation when there is a fault in the zone A (Internal fault)  Consequently, a separate scheme is required to detect internal earth faults in zone A. This scheme is called Restricted Earth Fault (REF) scheme.
  • 3.  It should be noted that the fault currents in Zone A is limited by the impedance of the equipments in the zone.  for transformers and generators it is very low so the fault currents can rise very fast and damage the equipment. Consequently REF protection is of utmost importance for generators and transformers.
  • 4.  The name Restricted is derived – since the objective of the protection is to detect the earth fault in the specific zone , restricted to the zone, starting from the breaker to the machine terminals.  In case of a generator, the machine terminal is the neutral point.  In case of a transformer , the machine terminal becomes the star point of either the primary or secondary winding or both. In case of delta winding, it is the winding itself.
  • 5.  It is well established that the sum of currents at the beginning of the zone A should be equal to the sum of currents exiting the zone .  Two sets of CT’s are Used to derive this sum of currents at the inlet and exit. A fault in the zone will result in a difference in current.  An over current relay is used to measure the difference in the sum of these currents.
  • 6.
  • 7.  Typical REF scheme shown in Fig-2.  The REF relay is connected between P & S. It will pick up if there is enough voltage across P- S to drive the pick up current through the relay.  There are two current sources in the CT secondary circuit PQRSTU: a) The current produces by CT X (loop RSPQ) b) The current produced by CT Y (loop UPST)
  • 8.  Under normal conditions, vectorial sum of the currents of these two CT’s will be equal and opposite in the branch P-S (i.e.) the resultant current in the branch PS will be zero.  In this situation, the currents of CT X and CT Y will circulate in the loop PQRSTU. The voltage across P-S will be zero.  When there is an earth fault within the zone A, the currents of X & Y CT’s will not be equal, a small difference of current will flow in the branch P-S. This current will result in a voltage across P-S since the current flows through the relay impedance.  If this voltage is adequate to operate the relay, the relay will pick up this detecting a fault within the zone.
  • 9.  For a fault outside the zone, the currents through CT’s X & Y will be the same so the resultant current through P-S will still be zero and the relay will not pick up.  In this case the fault has to be cleared by another O/C + E/F relay connected near the breaker.
  • 10.  REF relay will detect a fault within a zone restricted between two CT’s and it will not detect a fault out side the zone defined by the CT’s. This is true, only for ideal conditions, where the two CT’s are perfectly matched.  Following miss matches will occur under practical situations in the field: i) The CT secondary impedances may not be equal. ii) The lead wires connecting the CT secondary's to the relay may not have equal resistances. iii) The CT’s may have different ratio error and phase angle error due to this, the secondary current’s will not be equal even if the primary currents are same. iv) The CT’s may have different ratio error and phase angle error due to this, the secondary current’s will not be equal even if the primary currents are same.
  • 11.  The cumulative effect all the above, can make the relay trip even when there is a full load current flowing in the primaries, though the primary side currents are same, the secondary side currents need not be the same so a voltage sufficient to trip the REF relay may develop across P-S and hence the relay will trip.  To make the relay insensitive to this voltage produced by CT mismatch, a resistor is added in series with the relay.  Once this resistor is added, the relay will need a voltage which is higher than the voltage produced by the CT mismatch.  This resistor is called stabilizing resistor ,this is an important component in REF scheme since this ensures stability in the scheme by avoiding spurious tripping.
  • 12.  It should be noted that actual input circuit to trip mechanism (consisting of the Relay + stabilizing resistor) has become a high impedance circuit.  If the relay Has to trip, the CT secondary's should produce sufficiently high enough Voltage to activate the relay, after allowing for the drop across the stabilizing Resistor.  To ensure the CT’s produce enough voltage, an additional specification the Knee point voltage is included for the CT’s used for REF protection.
  • 13.  Knee point voltage (KPV) is defined as the point on the magnetizing curve (of the material used for the CT core) where the core will need 50% increase in the magnetizing force (ampere turns) to cause a 10% increase in the flux Density. (Voltage builds up across secondary).  In effect, KPV defines the end of the linear portion of the BH curve. Higher the KPV, larger is the linear zone and better will be secondary output for higher fault currents. Higher the KPV, better are the chances of a high impedance relay trip.
  • 14. Fig.3 shows a typical scheme for REF protection for generators. The scheme have the following ; a) 3 nos. phase CTs b) 1 no. neutral CT c) 1 no. Relay d) 1 no. Stabilizing resistor
  • 15.
  • 16.  Fig.4 shows a typical scheme for REF protection for transformers. It should be noted that transformers will need two REF schemes ,one on the primary side and the other on the secondary side.  For the transformer primary side , which is usually delta connected, followings are in the REF scheme: a) 3 nos. phase CTs b) 1 no. Relay d) 1 no. Stabilizing resistor  For the transformer secondary side, which is usually star connected, followings are in the REF scheme: a) 3 nos. phase CTs b) 1 no. neutral CT c) 1 no. Relay d) 1 no. Stabilizing resistor