i) Which one of the following is not included in the 5 R in purchasing?
a) Quality b) Quantity
c) Price d) None of these
Answer: (d)
ii) Which of the following is not a function of purchasing management?
a) Selecting the source
b) Placement of purchase order
b) Physical controls of material
d) None of these
Answer: (d)
iii) The purchase order form is designed by
a) Materials Manager
b) Purchase Manager
b) Marketing Manager
d) None of them
Answer: (b)
v) The objective(s) of forward purchasing is / are
a) To guard against interruption in supply
b) To economize the use of storage space
c) To guard against the future rise in price
d) All of these
Answer: (a)
viii) JIT contributed to the
a) Reduced inventories and WIP
b) Reduced suppliers and vendors
c) Reduced information flows
d) Reduced manpower planning
Answer: (a)
xii) “Hedging” technique is used
a) When there is an organized commodity market
b) Where large quantities of a particular commodity are bought and sold
c) Both (a) and (b)
d) None of these
Answer: (c)
i) Purchase Budget has an impact on
a) Profitability of the company
b) Materials Budget of the company
c) Bill of materials
d) All of these
Answer: (d)
ii) Right quality means
a) over specifying the quality standards for purchasers
b) under specifying the quality for purchasing
c) buying standard items
d) Buying quality which suits the needs without incurring extra cost to the company
Answer: (d)
iii) Purchase order is a legal binding contract only if it is
a) accepted by the supplier
b) acknowledged by the supplier
b) posted by the buyer
d) none of these
Answer: (a)
iv) JIT is a concept which means
a) Japanese language
b) Making a plan from time to time
c) Getting the items just when they are needed for production
d) Raising purchase order just before delivery.
Answer: (c)
vi) The type of purchasing where the purchaser tries to protect himself by entering into two transactions
– a purchase and a sale contacts in two markets whose prices fluctuate is known as
a) Speculative Buying
b) Forward Buying
b) Hedging
d) Blanket order
Answer: (c)
xii) The parameters for vendor rating include
a) Price
b) Service
b) Delivery
d) All of these
Answer: (d)
xi) The type of purchasing where the purchaser tries to protect himself by entering into 2 transactions –
a purchase and a sale contacts in two markets whose prices fluctuate is known as
a) hedging b) speculative buying
c) forward buying d) blanket order
Answer: (d)
iv) The document prepared on receipt of materials in store is known as
a) MRN b) GRN
c) Challan d) Bill of materials.
Answer: (c)
i) The system of purchasing from one’s customer preferred to others is known as
a) Forward Buying b) Tender Buying
c) Reciprocal Buying d) Blanket Order
Answer: (c)
v) A stipulation in a contract of sale pertaining to goods which is essential to the main purpose of the
contract is called
a) Rejection
b) Warranty
c) Acceptance
d) Condition.
Answer: (d)
vi) When the contract of agency is in writing it is called
a) Law of agency
b) Qui facit peractum facit per se
c) Power of Attorney
d) none of these.
Answer: c
vii) An arrangement whereby the obligation to pay an exporter is undertaken by a bank is called
a) Bill of Landing
b) Letter of Credit
c) International Credit
d) Hundi.
Answer: b
viii) The type of buying most suitable for C strategy of items of inventory is
a) Forward Buying
b) Tender Buying
c) Blanket Order
d) Systems Contract.
Answer: c
PART 2
1. Resources such as labor materials and energy are known as ___ in the
transformation process
outputs
intangibles
factors of production
inputs
2. A series of quality assurance standards designed to ensure consistent product
quality under many conditions is known as
statistical process control.
total quality standards.
total quality management.
ISO 9000.
3. The raw materials, components, completed or partially completed products, and
pieces of equipment a firm uses are often referred to as
Inventory.
order quantities.
production.
outputs.
4. In a large company, the department charged with determining the actual
processes to be used in turning inputs to outputs is
marketing research.
engineering.
operations
product planning.
5. Which of the following brings all resources required to create a product to a
central location?
fixed-position layout
process layout
product layout
continuous layout
6. Getting products to customers, obtaining and managing raw materials, and
packaging finished products are all activities of
procurement.
logistics
production.
materials management.
7. The development and administration of the activities involved in transforming
resources into goods and services is known as
operations management
manufacturing.
the transformation process.
production.
8. Which of the following is NOT a difference between manufacturers and service
providers?
nature and consumption of output
uniformity of inputs
uniformity of outputs
nature and consumption of input
9. The process through which inputs are converted into outputs is referred to as
the transformation process.
manufacturing.
materials management.
physical distribution.
10. The degree to which a good or service meets the demands and requirements of
customers is called
quality.
customer satisfaction.
effectiveness
productivity.
11. ____ involves building an item in self-contained units that can be combined or
interchanged to create different products.
Customization
Standardization
Process control
Modular design
12. Making identical, interchangeable components or complete products is
referred to as
customization.
standardization.
engineering.
mechanization.
13. Unique products are generally produced through
customization
standardization.
mechanization.
personalization.
14. Procurement is another name for?
consumption
disposition
budgeting
purchasing
15. Which of the following is the sequence of operations through which a product
must pass?
scheduling
critical path
transformation process
routing
16. A planning system that schedules the precise quantity of materials needed to
make a product is called
flexible scheduling
cycle time management.
material requirements planning
economic order quantities.
17. The activities and processes used in making both tangible and intangible
products is known as
manufacturing.
production.
operations.
the transformation process.
18. Customers' perceptions are important in determining
economic order quantities.
production schedules.
product specifications.
quality.
19. The raw materials, components, completed or partially completed products,
and pieces of equipment a firm uses are often referred to as
inventory.
order quantities.
production.
outputs.
20. Getting products to customers, obtaining and managing raw materials, and
packaging finished products are all activities of
procurement.
logistics.
production.
materials management.
PART 3
Materials Management Multiple Choice Questions with their answers. Answers are indicated in Italic
form.
1. Business cycle, price trends, National Economy are …………….
a. Micro Factors
b. Macro Factors
c. Controllable Factors
2. ……………………….also called part lists or building lists is the document generated at the
design stage.
a. MRP (Material Requirement Planning)
b. BOM (Bill of Materials)
c. MPS (Master Production Schedule)
3. ………………………………is the scientific technique for planning the ordering and usage of
materials at various levels of production and for monitoring the stocks during these
transaction.
a. MPS
b. MRP
c. BOM
4. …………………………is the time that elapses between issuing replenishment order and
receiving the material in stores.
a. Replenishment time
b. Lead time
c. Idle time
5. …………………is the task of buying goods of right quality, in the right quantities, at the
right time and at the right price.
a. Supplying
b. Purchasing
c. Scrutinizing
6. Which is not a part of 5R’s of buying?
a. Right Quality
b. Right Quantity
c. Right Source
d. Right Price
e. None of the above
7. Purchasing responsibilities can be divided into Buying, Clerical and ………..division.
a. Packing
b. Traffic
c. Record
d. Follow up
8. The first activity of Purchasing cycle is
a. Communicating requirement to the purchase
b. Source Selection and development
c. Recognizing the need for procurement
d. Inspection of goods
9. Buying according to the requirements is called …………
a. Seasonal Buying
b. Hand to mouth buying
c. Scheduled Buying
d. Tender Buying
e. Speculative Buying
10. Procuring an item in staggering deliveries according to the delivery schedule finished to
the supplier by the buyer.
a. Seasonal Buying
b. Hand to mouth buying
c. Scheduled Buying
d. Tender Buying
e. Speculative Buying
11. Buying of the annual requirements of an item during its season.
a. Seasonal Buying
b. Hand to mouth buying
c. Scheduled Buying
d. Tender Buying
e. Speculative Buying
12. Raw Materials and WIP can be classified under-
a. Indirect Material
b. Direct Material
c. Finished Material
d. Standard Parts
13. …………..are the basic materials which have not undergone any conversion since their
receipt from suppliers.
a. WIP
b. Raw Material
c. Finished Parts
d. Work Made Parts

Más contenido relacionado

La actualidad más candente (6)

Material mangmt
Material mangmtMaterial mangmt
Material mangmt
 
Six Sigma Green Belt - The correlation coefficient for the length and weight ...
Six Sigma Green Belt - The correlation coefficient for the length and weight ...Six Sigma Green Belt - The correlation coefficient for the length and weight ...
Six Sigma Green Belt - The correlation coefficient for the length and weight ...
 
Materil costing
Materil costingMateril costing
Materil costing
 
ISO: 9001: 2008 - The analysis of data shall provide information relating to ...
ISO: 9001: 2008 - The analysis of data shall provide information relating to ...ISO: 9001: 2008 - The analysis of data shall provide information relating to ...
ISO: 9001: 2008 - The analysis of data shall provide information relating to ...
 
Old as 2
Old as 2Old as 2
Old as 2
 
Materials management ppt
Materials management pptMaterials management ppt
Materials management ppt
 

Similar a 101754299 mcq-p-amp-mm

1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
ahsansaeed78
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
nbvhgfuyt876
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
mn8676766
 
Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%
choices11
 
Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%
versyty
 
Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
choices11
 
Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
versyty
 

Similar a 101754299 mcq-p-amp-mm (20)

1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
 
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Bro store (English) .pdf
Bro store (English) .pdfBro store (English) .pdf
Bro store (English) .pdf
 
Supply chain slides
Supply chain slidesSupply chain slides
Supply chain slides
 
Ops 571 final exam guide new
Ops 571 final exam guide newOps 571 final exam guide new
Ops 571 final exam guide new
 
Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%
 
Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%Qnt 561 final exam 30#questions with answers correct 100%
Qnt 561 final exam 30#questions with answers correct 100%
 
Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
 
Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 
OPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 versionOPS 571 Final Exam 2015 version
OPS 571 Final Exam 2015 version
 

Más de RakeshNimhan (20)

Ch15 eval strategy perform
Ch15 eval strategy performCh15 eval strategy perform
Ch15 eval strategy perform
 
Ch14 personal selling
Ch14 personal sellingCh14 personal selling
Ch14 personal selling
 
Ch13 adv and sales prom
Ch13 adv and sales promCh13 adv and sales prom
Ch13 adv and sales prom
 
Ch12 pricing strategy
Ch12 pricing strategyCh12 pricing strategy
Ch12 pricing strategy
 
Ch11 sc mgmt
Ch11 sc mgmtCh11 sc mgmt
Ch11 sc mgmt
 
Ch10 bus mktg channels
Ch10 bus mktg channelsCh10 bus mktg channels
Ch10 bus mktg channels
 
Ch09 services for bus mkts
Ch09 services for bus mktsCh09 services for bus mkts
Ch09 services for bus mkts
 
Ch08 innov and new prod dev
Ch08 innov and new prod devCh08 innov and new prod dev
Ch08 innov and new prod dev
 
Ch07 mng prod for bus mkts
Ch07 mng prod for bus mktsCh07 mng prod for bus mkts
Ch07 mng prod for bus mkts
 
Ch06 bus mkt strat glbl mkts
Ch06 bus mkt strat glbl mktsCh06 bus mkt strat glbl mkts
Ch06 bus mkt strat glbl mkts
 
Ch05 bus mktg planning
Ch05 bus mktg planningCh05 bus mktg planning
Ch05 bus mktg planning
 
Ch4 segmenting b2 b mkts
Ch4 segmenting b2 b mktsCh4 segmenting b2 b mkts
Ch4 segmenting b2 b mkts
 
Ch03 cust relationship mgmt
Ch03 cust relationship mgmtCh03 cust relationship mgmt
Ch03 cust relationship mgmt
 
Ch02 organ buying behavior
Ch02 organ buying behaviorCh02 organ buying behavior
Ch02 organ buying behavior
 
Ch01 bus mktg perspective
Ch01 bus mktg perspectiveCh01 bus mktg perspective
Ch01 bus mktg perspective
 
Scm t8
Scm t8Scm t8
Scm t8
 
Scm t7 cold_chain_logistics
Scm t7 cold_chain_logisticsScm t7 cold_chain_logistics
Scm t7 cold_chain_logistics
 
Scm t6 transportation_freight_mgmt
Scm t6 transportation_freight_mgmtScm t6 transportation_freight_mgmt
Scm t6 transportation_freight_mgmt
 
Scm t5 best_practices
Scm t5 best_practicesScm t5 best_practices
Scm t5 best_practices
 
Scm t3 e-procurement
Scm t3 e-procurementScm t3 e-procurement
Scm t3 e-procurement
 

Último

4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
Cara Menggugurkan Kandungan 087776558899
 

Último (20)

Tata Punch brochure with complete detail of all the variants
Tata Punch brochure with complete detail of all the variantsTata Punch brochure with complete detail of all the variants
Tata Punch brochure with complete detail of all the variants
 
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptxDigital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
 
Best 5 Graphics Designing Course In Chandigarh
Best 5 Graphics Designing Course In ChandigarhBest 5 Graphics Designing Course In Chandigarh
Best 5 Graphics Designing Course In Chandigarh
 
The+State+of+Careers+In+Retention+Marketing-2.pdf
The+State+of+Careers+In+Retention+Marketing-2.pdfThe+State+of+Careers+In+Retention+Marketing-2.pdf
The+State+of+Careers+In+Retention+Marketing-2.pdf
 
Social Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh BendaySocial Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh Benday
 
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
 
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdfTAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
 
The 9th May Incident in Pakistan A Turning Point in History.pptx
The 9th May Incident in Pakistan A Turning Point in History.pptxThe 9th May Incident in Pakistan A Turning Point in History.pptx
The 9th May Incident in Pakistan A Turning Point in History.pptx
 
How consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their livesHow consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their lives
 
Cartona.pptx. Marketing how to present your project very well , discussed a...
Cartona.pptx.   Marketing how to present your project very well , discussed a...Cartona.pptx.   Marketing how to present your project very well , discussed a...
Cartona.pptx. Marketing how to present your project very well , discussed a...
 
HOW TO HANDLE SALES OBJECTIONS | SELLING AND NEGOTIATION
HOW TO HANDLE SALES OBJECTIONS | SELLING AND NEGOTIATIONHOW TO HANDLE SALES OBJECTIONS | SELLING AND NEGOTIATION
HOW TO HANDLE SALES OBJECTIONS | SELLING AND NEGOTIATION
 
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift AdvertisingElevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
 
SP Search Term Data Optimization Template.pdf
SP Search Term Data Optimization Template.pdfSP Search Term Data Optimization Template.pdf
SP Search Term Data Optimization Template.pdf
 
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night ServiceVIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
 
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
 
Social Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh BendaySocial Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh Benday
 
Enhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San FranciscoEnhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San Francisco
 
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdfMicro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
Micro-Choices, Max Impact Personalizing Your Journey, One Moment at a Time.pdf
 
Discover Ardency Elite: Elevate Your Lifestyle
Discover Ardency Elite: Elevate Your LifestyleDiscover Ardency Elite: Elevate Your Lifestyle
Discover Ardency Elite: Elevate Your Lifestyle
 
Press Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdfPress Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdf
 

101754299 mcq-p-amp-mm

  • 1. i) Which one of the following is not included in the 5 R in purchasing? a) Quality b) Quantity c) Price d) None of these Answer: (d) ii) Which of the following is not a function of purchasing management? a) Selecting the source b) Placement of purchase order b) Physical controls of material d) None of these Answer: (d) iii) The purchase order form is designed by a) Materials Manager b) Purchase Manager b) Marketing Manager d) None of them Answer: (b) v) The objective(s) of forward purchasing is / are a) To guard against interruption in supply b) To economize the use of storage space c) To guard against the future rise in price d) All of these Answer: (a) viii) JIT contributed to the a) Reduced inventories and WIP b) Reduced suppliers and vendors
  • 2. c) Reduced information flows d) Reduced manpower planning Answer: (a) xii) “Hedging” technique is used a) When there is an organized commodity market b) Where large quantities of a particular commodity are bought and sold c) Both (a) and (b) d) None of these Answer: (c) i) Purchase Budget has an impact on a) Profitability of the company b) Materials Budget of the company c) Bill of materials d) All of these Answer: (d) ii) Right quality means a) over specifying the quality standards for purchasers b) under specifying the quality for purchasing c) buying standard items d) Buying quality which suits the needs without incurring extra cost to the company Answer: (d) iii) Purchase order is a legal binding contract only if it is a) accepted by the supplier b) acknowledged by the supplier b) posted by the buyer
  • 3. d) none of these Answer: (a) iv) JIT is a concept which means a) Japanese language b) Making a plan from time to time c) Getting the items just when they are needed for production d) Raising purchase order just before delivery. Answer: (c) vi) The type of purchasing where the purchaser tries to protect himself by entering into two transactions – a purchase and a sale contacts in two markets whose prices fluctuate is known as a) Speculative Buying b) Forward Buying b) Hedging d) Blanket order Answer: (c) xii) The parameters for vendor rating include a) Price b) Service b) Delivery d) All of these Answer: (d) xi) The type of purchasing where the purchaser tries to protect himself by entering into 2 transactions – a purchase and a sale contacts in two markets whose prices fluctuate is known as a) hedging b) speculative buying c) forward buying d) blanket order Answer: (d)
  • 4. iv) The document prepared on receipt of materials in store is known as a) MRN b) GRN c) Challan d) Bill of materials. Answer: (c) i) The system of purchasing from one’s customer preferred to others is known as a) Forward Buying b) Tender Buying c) Reciprocal Buying d) Blanket Order Answer: (c) v) A stipulation in a contract of sale pertaining to goods which is essential to the main purpose of the contract is called a) Rejection b) Warranty c) Acceptance d) Condition. Answer: (d) vi) When the contract of agency is in writing it is called a) Law of agency b) Qui facit peractum facit per se c) Power of Attorney d) none of these. Answer: c vii) An arrangement whereby the obligation to pay an exporter is undertaken by a bank is called a) Bill of Landing b) Letter of Credit c) International Credit d) Hundi.
  • 5. Answer: b viii) The type of buying most suitable for C strategy of items of inventory is a) Forward Buying b) Tender Buying c) Blanket Order d) Systems Contract. Answer: c PART 2 1. Resources such as labor materials and energy are known as ___ in the transformation process outputs intangibles factors of production inputs 2. A series of quality assurance standards designed to ensure consistent product quality under many conditions is known as statistical process control. total quality standards. total quality management. ISO 9000. 3. The raw materials, components, completed or partially completed products, and pieces of equipment a firm uses are often referred to as Inventory. order quantities. production.
  • 6. outputs. 4. In a large company, the department charged with determining the actual processes to be used in turning inputs to outputs is marketing research. engineering. operations product planning. 5. Which of the following brings all resources required to create a product to a central location? fixed-position layout process layout product layout continuous layout 6. Getting products to customers, obtaining and managing raw materials, and packaging finished products are all activities of procurement. logistics production. materials management. 7. The development and administration of the activities involved in transforming resources into goods and services is known as operations management manufacturing. the transformation process. production. 8. Which of the following is NOT a difference between manufacturers and service providers?
  • 7. nature and consumption of output uniformity of inputs uniformity of outputs nature and consumption of input 9. The process through which inputs are converted into outputs is referred to as the transformation process. manufacturing. materials management. physical distribution. 10. The degree to which a good or service meets the demands and requirements of customers is called quality. customer satisfaction. effectiveness productivity. 11. ____ involves building an item in self-contained units that can be combined or interchanged to create different products. Customization Standardization Process control Modular design 12. Making identical, interchangeable components or complete products is referred to as customization. standardization. engineering.
  • 8. mechanization. 13. Unique products are generally produced through customization standardization. mechanization. personalization. 14. Procurement is another name for? consumption disposition budgeting purchasing 15. Which of the following is the sequence of operations through which a product must pass? scheduling critical path transformation process routing 16. A planning system that schedules the precise quantity of materials needed to make a product is called flexible scheduling cycle time management. material requirements planning economic order quantities. 17. The activities and processes used in making both tangible and intangible products is known as manufacturing.
  • 9. production. operations. the transformation process. 18. Customers' perceptions are important in determining economic order quantities. production schedules. product specifications. quality. 19. The raw materials, components, completed or partially completed products, and pieces of equipment a firm uses are often referred to as inventory. order quantities. production. outputs. 20. Getting products to customers, obtaining and managing raw materials, and packaging finished products are all activities of procurement. logistics. production. materials management. PART 3 Materials Management Multiple Choice Questions with their answers. Answers are indicated in Italic form. 1. Business cycle, price trends, National Economy are …………….
  • 10. a. Micro Factors b. Macro Factors c. Controllable Factors 2. ……………………….also called part lists or building lists is the document generated at the design stage. a. MRP (Material Requirement Planning) b. BOM (Bill of Materials) c. MPS (Master Production Schedule) 3. ………………………………is the scientific technique for planning the ordering and usage of materials at various levels of production and for monitoring the stocks during these transaction. a. MPS b. MRP c. BOM 4. …………………………is the time that elapses between issuing replenishment order and receiving the material in stores. a. Replenishment time b. Lead time c. Idle time 5. …………………is the task of buying goods of right quality, in the right quantities, at the right time and at the right price.
  • 11. a. Supplying b. Purchasing c. Scrutinizing 6. Which is not a part of 5R’s of buying? a. Right Quality b. Right Quantity c. Right Source d. Right Price e. None of the above 7. Purchasing responsibilities can be divided into Buying, Clerical and ………..division. a. Packing b. Traffic c. Record d. Follow up 8. The first activity of Purchasing cycle is a. Communicating requirement to the purchase b. Source Selection and development c. Recognizing the need for procurement d. Inspection of goods
  • 12. 9. Buying according to the requirements is called ………… a. Seasonal Buying b. Hand to mouth buying c. Scheduled Buying d. Tender Buying e. Speculative Buying 10. Procuring an item in staggering deliveries according to the delivery schedule finished to the supplier by the buyer. a. Seasonal Buying b. Hand to mouth buying c. Scheduled Buying d. Tender Buying e. Speculative Buying 11. Buying of the annual requirements of an item during its season. a. Seasonal Buying b. Hand to mouth buying c. Scheduled Buying d. Tender Buying e. Speculative Buying 12. Raw Materials and WIP can be classified under-
  • 13. a. Indirect Material b. Direct Material c. Finished Material d. Standard Parts 13. …………..are the basic materials which have not undergone any conversion since their receipt from suppliers. a. WIP b. Raw Material c. Finished Parts d. Work Made Parts