SEMINAR ON SUMMER TRAINING
NTPC .LTD SHAKTINAGAR
RAM NARAYAN SHAH
B.TECH (Mech.Engg.)
FINAL YEAR
Roll No.1005340058
 “A world class integrated power major, powering India's growth with increasing
global presence.”
 NTPC was set up in 1975 with 100% ownership by the Government of india.
 NTPC has installed capacity of 29,394 MW.
 It has 15 coal based power station (23,395MW) &7 gas based power
station(3,955MW).
 4 power stations in joint venture (1794MW)
 In 1997, Government of India granted NTPC status of “Navratna” company.
 NTPC has embarked on plans to become a 75,000 MW company by 2017.
 Installed capacity 2000 MW.
 Location Sonebhadra Uttar Pradesh.
 Coal Source:-Jayant Mine.
 Water Source :- Rihand Reservoir.
 Beneficiary States:- UP, Uttranchal, Rajasthan,
Punjab, Haryana, Delhi, Himanchal Pradesh,
Chandigarh.
 Unit Size:- STAGE 1: 5*200 MW & STAGE2:
2*500MW.
A simplified diagram of a thermal power plant
 Steam generating equipment
 Condenser
 Prime mover
 Electrical equipments
 Boiler
 Superheater
 Economiser
 Air preheater
 A boiler is a closed vessel in which water is
converted into steam by utilising the heat of
coal combustion.
 Steam boiler are broadly classified into
following two type: (a)-water tube boiler
&(b)- fire tube boiler.
 In water tube boiler water flows through the
tube and the hot combustion gases flows
over these tubes. Water tube boilers are used
for high pressure boiler.
 A device which removes last traces of moisture.
 It helps in reduction in requirement of steam
quantity.
 steam being dry reduces the mechanical resistance of
turbine.
 No corrosion at the turbine blades.
 They are such devices which recover the heat
from the flue gases on their way to chimney
and raise the temperature of feed water.
 Air Pre-heaters recover the heat from the flue
gases leaving the economiser and heat the
incoming air required for combustion.
 Which condenses the steam at the exhaust
of turbine.
 It creates a very low pressure at the exhaust
of turbine, this helps in converting heat
energy of steam into mechanical energy
in the prime mover.
 The condensed steam can be used as feed
water to the boiler.
 A steam turbine is a mechanical device that
extracts thermal energy from pressurized steam,
and converts it into mechanical energy.
 About 86% of all electric generation in the world
is by use of steam turbines.
 It has almost completely replaced the
reciprocating piston steam engine.
 Turbo generator :
 An turbo generator is coupled to a steam turbine and converts mechanical
energy of the turbine into electrical energy.
 It may be hydrogen or air cooled. Rating of turbo generator is normally
200MW & 500MW.
 Transformers:
 (a) main step-transformers, which steps-up generated voltagetransmission
of power.
 (b) station transformers, general purpose.
 (c) auxiliary transformers, which supply to individual unit-auxiliaries.
 Switchgear:
 which locates fault on the system and isolate faulty part fromhealthy
section.It contains circuit breakers, relays, switches and other controldevices.
 Source of coal=Jayant mines(madhya
pradesh).
 Location of source=Near singrauli(madhya
pradesh).
 Distance of source from plant =5km.
 Type of coal-D grade.
 Coal requirement: 25,000 MT/day
 Generally thermal power stations use coal
mills or called coal firing system.
 Coal is reduced to fineness (-20mm).
 This fine powdered coal is called pulverized
coal and is carried forward to the burner by
air through pipes.
 A natural result from the burning of fossil fuels,
particularly coal, is the emission of fly ash.
 Ash is mineral matter present in the fuel. For a pulverized
coal unit, 60-80% of ash leaves with the flue gas.
 Electrostatic precipitator has series of collecting & emitting
electrodes in a chamber.
 At the inlet of the chamber there are distributer screen.
 Hooper and flushing system form a base of chamber.
 Efficiency of ESP is approx. 99.8%
ANY QUESTION
?

Más contenido relacionado

La actualidad más candente

NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
Rajan Kumar Choudhary
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
Subarna Poddar
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
Vikas Gupta
 

La actualidad más candente (20)

Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
Ntpc
NtpcNtpc
Ntpc
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 

Destacado

NQF 5 Statement of Achievements.
NQF 5 Statement of Achievements.NQF 5 Statement of Achievements.
NQF 5 Statement of Achievements.
Iain Fleming Paton
 
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 YearResume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
Raunak Agrawal
 
«не зраджуйте пам’яті війни!»
«не зраджуйте пам’яті війни!»«не зраджуйте пам’яті війни!»
«не зраджуйте пам’яті війни!»
jekah
 

Destacado (16)

Saravanan C
Saravanan CSaravanan C
Saravanan C
 
NQF 5 Statement of Achievements.
NQF 5 Statement of Achievements.NQF 5 Statement of Achievements.
NQF 5 Statement of Achievements.
 
Self-service nets higher pay rates in utility collections
Self-service nets higher pay rates in utility collectionsSelf-service nets higher pay rates in utility collections
Self-service nets higher pay rates in utility collections
 
Sobre La Retrocompatibilidad Y La S. Mano.
Sobre La Retrocompatibilidad Y La S. Mano.
Sobre La Retrocompatibilidad Y La S. Mano.
Sobre La Retrocompatibilidad Y La S. Mano.
 
приказ № 234 от 14 марта 2014г. (1)
приказ № 234 от 14 марта 2014г. (1)приказ № 234 от 14 марта 2014г. (1)
приказ № 234 от 14 марта 2014г. (1)
 
My haiku
My haikuMy haiku
My haiku
 
145 Son
145 Son145 Son
145 Son
 
degree
degreedegree
degree
 
Rcs non si compra con la carta
Rcs non si compra con la cartaRcs non si compra con la carta
Rcs non si compra con la carta
 
MDW Over The Years
MDW Over The YearsMDW Over The Years
MDW Over The Years
 
Reduccion de horario
Reduccion de horarioReduccion de horario
Reduccion de horario
 
ציור חברתי
ציור חברתי  ציור חברתי
ציור חברתי
 
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 YearResume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
Resume RAUNAK AGRAWAL_ Quality Assurance_ 1.2 Year
 
האמן ובובת המודל
האמן ובובת המודל האמן ובובת המודל
האמן ובובת המודל
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
«не зраджуйте пам’яті війни!»
«не зраджуйте пам’яті війни!»«не зраджуйте пам’яті війни!»
«не зраджуйте пам’яті війни!»
 

Similar a thermal power plant NTPC singrauli

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
kini_niki
 
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
GEETESH SHARMA
 

Similar a thermal power plant NTPC singrauli (20)

Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
NTPC BY PANKAJ
NTPC BY PANKAJNTPC BY PANKAJ
NTPC BY PANKAJ
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
RASHID ANWAR RAAZ ppt
RASHID ANWAR RAAZ pptRASHID ANWAR RAAZ ppt
RASHID ANWAR RAAZ ppt
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Thermal Power Plant PPT
Thermal Power Plant PPTThermal Power Plant PPT
Thermal Power Plant PPT
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Complete report
Complete reportComplete report
Complete report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
HARDUAGANJ THERMAL POWER STATION TRAINING REPORT BY GEETESH 8800980200
 

Último

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

thermal power plant NTPC singrauli

  • 1. SEMINAR ON SUMMER TRAINING NTPC .LTD SHAKTINAGAR RAM NARAYAN SHAH B.TECH (Mech.Engg.) FINAL YEAR Roll No.1005340058
  • 2.
  • 3.  “A world class integrated power major, powering India's growth with increasing global presence.”  NTPC was set up in 1975 with 100% ownership by the Government of india.  NTPC has installed capacity of 29,394 MW.  It has 15 coal based power station (23,395MW) &7 gas based power station(3,955MW).  4 power stations in joint venture (1794MW)  In 1997, Government of India granted NTPC status of “Navratna” company.  NTPC has embarked on plans to become a 75,000 MW company by 2017.
  • 4.  Installed capacity 2000 MW.  Location Sonebhadra Uttar Pradesh.  Coal Source:-Jayant Mine.  Water Source :- Rihand Reservoir.  Beneficiary States:- UP, Uttranchal, Rajasthan, Punjab, Haryana, Delhi, Himanchal Pradesh, Chandigarh.  Unit Size:- STAGE 1: 5*200 MW & STAGE2: 2*500MW.
  • 5.
  • 6. A simplified diagram of a thermal power plant
  • 7.  Steam generating equipment  Condenser  Prime mover  Electrical equipments
  • 8.  Boiler  Superheater  Economiser  Air preheater
  • 9.  A boiler is a closed vessel in which water is converted into steam by utilising the heat of coal combustion.  Steam boiler are broadly classified into following two type: (a)-water tube boiler &(b)- fire tube boiler.  In water tube boiler water flows through the tube and the hot combustion gases flows over these tubes. Water tube boilers are used for high pressure boiler.
  • 10.
  • 11.
  • 12.  A device which removes last traces of moisture.  It helps in reduction in requirement of steam quantity.  steam being dry reduces the mechanical resistance of turbine.  No corrosion at the turbine blades.
  • 13.  They are such devices which recover the heat from the flue gases on their way to chimney and raise the temperature of feed water.  Air Pre-heaters recover the heat from the flue gases leaving the economiser and heat the incoming air required for combustion.
  • 14.
  • 15.
  • 16.  Which condenses the steam at the exhaust of turbine.  It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover.  The condensed steam can be used as feed water to the boiler.
  • 17.
  • 18.  A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into mechanical energy.  About 86% of all electric generation in the world is by use of steam turbines.  It has almost completely replaced the reciprocating piston steam engine.
  • 19.  Turbo generator :  An turbo generator is coupled to a steam turbine and converts mechanical energy of the turbine into electrical energy.  It may be hydrogen or air cooled. Rating of turbo generator is normally 200MW & 500MW.  Transformers:  (a) main step-transformers, which steps-up generated voltagetransmission of power.  (b) station transformers, general purpose.  (c) auxiliary transformers, which supply to individual unit-auxiliaries.  Switchgear:  which locates fault on the system and isolate faulty part fromhealthy section.It contains circuit breakers, relays, switches and other controldevices.
  • 20.  Source of coal=Jayant mines(madhya pradesh).  Location of source=Near singrauli(madhya pradesh).  Distance of source from plant =5km.  Type of coal-D grade.  Coal requirement: 25,000 MT/day
  • 21.  Generally thermal power stations use coal mills or called coal firing system.  Coal is reduced to fineness (-20mm).  This fine powdered coal is called pulverized coal and is carried forward to the burner by air through pipes.
  • 22.  A natural result from the burning of fossil fuels, particularly coal, is the emission of fly ash.  Ash is mineral matter present in the fuel. For a pulverized coal unit, 60-80% of ash leaves with the flue gas.  Electrostatic precipitator has series of collecting & emitting electrodes in a chamber.  At the inlet of the chamber there are distributer screen.  Hooper and flushing system form a base of chamber.  Efficiency of ESP is approx. 99.8%
  • 23.